Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.22K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
This media is not supported in your browser
VIEW IN TELEGRAM
👉Burj Khalifa

💫The Sky-High Engineering Wonder

🚧Check out this video to marvel at Burj Khalifa, the tallest building on Earth, soaring 829.8 meters! It’s a masterpiece of concrete, steel, and bold vision!

🏷How It Stands Tall:
Built with over 330,000 cubic meters of concrete and 55,000 tonnes of steel, its unique Y-shaped design fights wind and heat. A deep foundation anchors it against Dubai’s sandy soil!

🏷Engineering Genius:
The structure uses a clever cooling system to handle desert temperatures, while its elevators zip at 10 meters per second—amazing for 163 floors!

⭐️Burj Khalifa’s foundation piles reach 50 meters deep, deeper than most buildings are tall.

@etconp
❤9👍2👌1
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
❤1
👉How many times can we use Plywood formwork:

💫The number of times you can reuse wooden plywood formwork for slab depends mainly on:

🏷I. Quality of plywood:

1.Ordinary commercial plywood 2–3 times (because it absorbs water, swells, and weakens quickly).

2.Shuttering plywood (film-faced, waterproof, WBP grade) → 6–10 times with good care.

3.High-quality phenolic film-faced plywood→ 15–25 times or more.

🏷II. Handling & storage:

If edges are damaged during striking → reuse reduces.

If stored in dry, shaded place after use → reuse increases.

Applying form oil / release agent before concreting prevents sticking and extends life.

🏷III. Workmanship:

Careful nailing and removal reduces breakage.

Cutting into smaller pieces for adjustments reduces future usability.

🚧In practice, on site conditions (normal quality + average care), you can expect:

⏺Ordinary plywood: 3–4 repetitions.

⏺Film-faced shuttering plywood: 8–12 repetitions.

⏺Premium imported shuttering plywood: up to 20+ repetitions.

@etconp
👍10❤6
👉QUALITY OF PROJECT MANAGER?

💫A good construction manager is the person who makes sure a building project is completed safely, on time, within budget, and to the required quality standards — while keeping workers, clients, and suppliers all on the same page.

🚧What makes a good one:

1. Strong Planning Skills

Break down the project into clear phases (design, site prep, foundation, structure, finishing).

Create realistic schedules and budgets.
Anticipate problems before they happen.

2. Technical Knowledge

Understand construction methods, materials, and equipment.

Read and interpret drawings, specs, and contracts.

Know local building codes and safety regulations.

3. Leadership & People Skills

Motivate workers and keep morale high.

Resolve conflicts quickly.
Communicate clearly with clients, engineers, architects, and suppliers.

4. Problem-Solving Ability

Find quick solutions to delays, shortages, or design changes.
Make decisions under pressure.

5. Safety-First Mindset
Ensure workers follow safety rules.
Conduct regular site inspections.
Respond immediately to hazards.

6. Quality Control
Check that work meets specifications at every stage.
Prevent costly rework by catching mistakes early.

7. Financial Discipline
Monitor costs daily.
Approve only necessary purchases.
Prevent waste of materials and resources.

⚡️Here is Golden rule!

⭐️A good construction manager doesn’t just “build a building” -they manage the process so the building is built right, safely, and profitably.

@etconp
❤26👍5🥰2
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

♧ ሁሉን በአንድ ቦታ ለሁሉም ቅርብ

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

♧ ይደውሉልን ያማክሩን

0904040477
0994941708
❤7
👉EFFECT OF TEMPRETURE IN CONCRETE CASTING:

💫Temperature has a big influence on concrete casting because it directly affects hydration rate, setting time, workability, and long-term strength.

⭐️A breakdown for both hot and cold conditions are listed below.

🏷1. In Hot Weather (High Temperature)

▶️Effects:Rapid water evaporation → reduces workability and slump.

▶️Faster hydration → shortens setting time, making placing & finishing harder.

▶️Higher risk of plastic shrinkage cracks due to quick surface drying.

▶️Increased risk of cold joints if delays happen during pouring.

▶️Possible reduction in long-term strength if water evaporates before proper hydration.

⚡️Precautions:

⏺Use cool mixing water or chilled aggregates.

⏺Cast during cooler times of the day (early morning/evening).

⏺Cover concrete immediately after finishing to reduce evaporation.

⏺Use retarding admixtures to slow setting.

⏺Keep formwork and reinforcement cool before casting.

🏷2. In Cold Weather (Low Temperature)

▶️Effects:Slower hydration → delays setting and strength gain.

▶️Risk of freezing water inside fresh concrete → disrupts hydration and weakens structure.

▶️Extended curing time required before formwork removal.

▶️Potential scaling or surface damage if concrete freezes before gaining ~3.5 MPa strength.

⚡️Precautions:

⏺Use warm mixing water or heated aggregates.

⏺Use accelerating admixtures to speed up setting.

⏺Cover concrete with thermal blankets or use heated enclosures.

⏺Avoid casting if ambient temperature is below 5 °C without protection.

📜General Rule: Concrete performs best when the fresh concrete temperature is kept between 10 °C and 30 °C during casting and early curing.

@etconp
❤9👍3👏1
👉Resident engineer

⏺Is a construction professional who serves as the client's or design engineer's representative on-site, overseeing the project's daily operations and ensuring adherence to plans, specifications, and timelines. 

⏺They act as the primary point of contact between the site and the client or consulting firm, coordinating with contractors, architects, and other stakeholders. 

🏷Key Responsibilities:

⭐️Project Oversight:
Resident engineers supervise construction activities, ensuring work aligns with engineering designs and specifications. 

⭐️Contractor Management:
They issue instructions to the contractor, monitor progress, and address any deviations from the project plan. 

⭐️Quality Control:
They inspect work at various stages, ensuring it meets quality standards and specifications. 

⭐️Communication and Reporting:
They maintain regular communication with the client, design team, and other stakeholders, providing updates and reporting on project status. 

⭐️Documentation:
Resident engineers are responsible for maintaining proper records, including site instructions, inspection reports, and project documentation. 

⭐️Conflict Resolution:
They help resolve conflicts between the contractor and other parties, facilitating smooth project execution. 

⭐️Safety Compliance:
They ensure that the contractor adheres to all safety regulations and procedures. 

💫Basic Skills and Qualifications needed:

⏺Technical Expertise:
A strong understanding of engineering principles, construction methods, and relevant regulations is essential. 

⏺Communication Skills:
Excellent communication and interpersonal skills are needed to effectively interact with various stakeholders. 

⏺Problem-Solving Abilities:
Resident engineers must be able to identify and resolve issues that arise during construction. 

⏺Leadership and Management:
They need to be able to lead and manage the construction team effectively. 

@etconp
❤16👏4
👉የአዲስ አበባ ከተማ አስተዳደር ግንባታ ፈቃድና ቁጥጥር ባለስልጣን በአቃቂ ቃሊቲ ክፍለ ከተማ ወረዳ 8፣ ለ30 አባወራዎች የሚሆን ባለ G+4 ወለል ህንጻ ግንባታ ማስጀመሪያ መርሃ ግብር አካሂዷል።

የአዲስ አበባ ከተማ አስተዳደር እያካሄዳቸው ያሉ ሰው ተኮር የልማት ስራዎች አካል የሆነው ይህ መርሃ ግብር፣ የአቅመ ደካሞች የመኖሪያ ቤቶች ግንባታ አንዱ ነው።

ፕሮጀክቱ የአዲስ አበባ ከተማ አስተዳደር ግንባታ ፈቃድና ቁጥጥር ባለስልጣን ከሪልስቴት አልሚዎች ማህበር እና ከኮንስትራክሽን ስራ ተቋራጮች ማህበር ጋር በትብብር የሚያካሄደው ሲሆን፣ በ90 ቀናት አጠናቆ ለነዋሪዎቹ እንደሚተላለፍ የባለስልጣኑ ዋና ዳይሬክተር ኢንጂነር ሕይወት ሳሙኤል ተናግረዋል።

የኮንስትራክሽን ስራ ተቋራጮች ማህበር ፕሬዝዳንት ኢንጂነር የሱፍ መሃመድ እና
የሪልስቴት አልሚዎች ማህበር ምክትል ፕሬዝዳንት ኢንጂነር ጀበል ጀማል፣ከየዘርፋቸው ተልዕኮ ጎን ለጎን ማህበራዊ ኃላፊነታቸውን ለመወጣት እየሰሩ መሆኑን ጠቅሰው፣ የከተማ አስተዳደሩን ሰው ተኮር ፕሮጀክቶች ለማሳካት የራሳቸውን ድርሻ እንደሚወጡና ፕሮጀክቱን በ90 ቀናት አጠናቀው እንደሚያስረክቡ ተናግረዋል።

ምንጭ:-አሚኔ

@etconp
❤15👍4
👉62.6 ቢሊየን ብር ውል የተገባለት የሚኤሶ - ድሬዳዋ ፍጥነት መንገድ ግንባታ ፕሮጀክት የጨረታ ሂደቱ ምን ይመስላል?

💫ከዓለም ባንክ ድህረገጽ ላይ ይፋ ከሆነው የአሸናፊ ድርጅት ማሳወቂያ ላይ መረዳት እንደሚቻለው ፕሮጀክቱ በሁለት ሎት ተከፍሎ የተከናወነ ነው።

⏺ሎት 1 ላይ 5 ተጫራቾች የተሳተፉ ሲሆን 4 የቻይና እና አንድ የህንድ ድርጅቶች ናቸው።

🏗አሸናፊው ድርጅት ለዚህ ሎት 31.14  ቢሊየን ብር (172.9 ሚሊየን በዶላር እና 9.3 ቢሊየን በብር) ያቀረበ ሲሆን በሌሎች ተጫራቾች ከቀረቡት  ዋጋዎች መካከል ከፍተኛው 39.1 ቢሊየን  ብር መሆኑን ያሳያል።

🚧ሎት 2 ላይ 4 የቻይና ድርጅት የተሳተፉ ሲሆን አሸናፊው ድርጅት ለዚህ ሎት 31.4 ቢሊየን ብር (174.3 ሚሊየን በዶላር እና 9.4 ቢሊየን በብር) አቅርቧል።

⏺ለዚህ ሎት በሌሎች ተጫራቾች ከቀረበው ዋጋ  ከፍተኛው 38.5 ቢሊየን  ብር መሆኑን ያሳያል።

⏺የፕሮጀክቱ የውል ጊዜ አራት ዓመት ሆኖ ዲዛይንና ግንባታው (Design-Build) በስራ ተቋራጩ የሚከናወን  መሆኑም ተጠቅሷል።

⏺ኮንትራቱ የtolling መሰረተ ልማቶች እና Intelligent Transportation System (ITS) አካቷል።

@etconp
👍14❤10
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
❤5
👉A stair (or staircase) is a series of steps that allows people to move between different levels of a building or structure.

▶️Each stair is made up of steps consisting of a tread (the horizontal part you step on) and a riser (the vertical part between treads).

⏺Stairs are essential in architecture for vertical movement when elevators or ramps aren’t suitable.

🔹 Types of Stairs (Based on Design & Shape):

📌1. Straight Stair

▶️Runs in a straight line without turning.

⏺Simple, common, and easy to build.

📌2. Quarter-Turn (L-shaped) Stair

▶️Has a 90° turn at a landing, changing direction.

⏺Saves space and looks more elegant.

📌3. Half-Turn (U-shaped) Stair

▶️Includes two flights with a 180° turn at a landing.
⏺Compact and often used in multi-storey buildings.

📌4. Spiral Stair

⏺Circular design winding around a central pole.
▶️Space-saving, but narrow and not ideal for heavy use.

📌5. Helical (Curved) Stair

⏺Smooth, curved design (not around a central pole).
▶️Stylish and often seen in luxury buildings.

📌6. Bifurcated Stair

▶️Starts with a wide flight at the bottom, then splits into two narrower flights going in opposite directions.
▶️Common in grand buildings and palaces.

📌7. Circular Stair

⏺Similar to spiral, but with larger radius and no central post.
Easier to use than spiral stairs.

📌8. Dog-Legged Stair

⏺A type of half-turn stair without any gap between flights.
⏺Saves floor space, used in residential/commercial buildings.

📌9. Winder Stair

▶️Turns using triangular steps instead of a landing.
▶️Space-saving but less safe than landings.

📌10. Open-Well Stair

▶️Two flights (like dog-legged) but with a gap/well in between.
Provides light and ventilation through the well.

✅ In summary:

⏺Straight & dog-legged → simple & common.
⏺L-shaped & U-shaped → compact, better aesthetics.
⏺Spiral & helical → decorative, space-saving.
⏺Bifurcated → grand style.

@etconp
👍11❤10
👉The design principles of Reinforced Concrete (RC) Slab

💫are based on structural behavior, safety, economy, and serviceability.

▶️A slab is a structural element that mainly resists bending and shear loads and distributes them to the beams, columns, or walls.

📜Here are the key design principles:

🚧1. Structural Behavior Understanding

⏺Slabs are mainly subjected to flexure (bending) and shear.
Loads act perpendicular to the surface of the slab.

❇️Slabs can be:

⏺One-way slab (load transfer in one direction, Lx/Ly ≥ 2).

⏺Two-way slab (load transfer in both directions, Lx/Ly < 2).

▶️Bending moments are resisted by reinforcement placed perpendicular to the span direction.

🚧2. Load Consideration

⏺Dead loads: self-weight of slab, finishes, partitions.
Live loads: occupancy loads (per EBCS).

⏺Environmental loads: wind, earthquake (if applicable).

🚧3. Thickness and Depth Requirements

⏺Slab thickness must prevent excessive deflection and satisfy span/depth ratio.

⏺Minimum thickness (as per IS 456):
Simply supported → L/20
Continuous → L/26
Cantilever → L/7

🚧4. Flexural Strength (Bending Design)

⏺Reinforcement is designed so that tensile stresses are carried by steel.

⏺Concrete resists compression.

⏺Reinforcement must be placed properly in tension zones.
⏺Use limit state method (preferred) ensuring safety against collapse.

🚧5. Shear Strength

⏺Slabs are thin, so generally shear is not critical.
However, punching shear must be checked around columns in flat slabs.
⏺Provide additional reinforcement if shear exceeds permissible limits.

🚧6. Reinforcement Detailing

⏺Main reinforcement: placed in shorter span direction (one-way slab).
⏺Distribution reinforcement: placed perpendicular to main bars to resist shrinkage, temperature stresses, and distribute loads.
⏺Minimum reinforcement:
For HYSD bars → 0.12% of gross cross-sectional area
For mild steel → 0.15% of gross cross-sectional area
⏺Proper spacing, anchorage, cover (usually 20 mm for slabs).

🚧7. Deflection and Crack Control

⏺Satisfy span/depth ratio limits.
⏺Provide shrinkage & temperature reinforcement.
⏺Ensure crack width < permissible limit (usually ≤ 0.3 mm).
⏺Control deflection under service loads.

🚧8. Serviceability and Durability

⏺Adequate cover to reinforcement to protect against corrosion.
⏺Proper concrete grade (minimum C-25 in RCC).
Satisfy fire resistance requirements.

🚧9. Economy and Practicality

⏺Optimize slab thickness and reinforcement to reduce cost.
Standardize bar lengths and spacing for easy construction.
⏺Ensure constructability and avoid congestion of reinforcement.

✅ In short:

🏷The design principles of RC slabs are:

⏺Correct identification of slab type (one-way or two-way).
⏺Proper load assessment.
Adequate thickness for strength & deflection control.
⏺Correct flexural and shear design.
⏺Proper detailing of reinforcement.
⏺Crack, deflection, and durability checks.

@etconp
❤13
👉እየተጠናቀቀ ነው‼️

🚧በአማራ ክልል ከአዲስ አበባ-ደብረማርቆስ-ባህርዳር በሚወስደዉ መንገድ በጊደብ ወንዝ ላይ የተሰራዉ ድልድይ ከአስር ቀን በፊት በጎርፍ መወሰዱ ይታወቃል።

⏺አሁን ላይ ድልድዩ እየተሰራ ሲሆን ዛሬ 16/12/2017 ዓም ድልድዩ በዚህ ደረጃ ላይ ይገኛል።

💫ይህ ማለት በመጪዎቹ ቀናት ውስጥ ለአገልግሎት ክፍት ሊሆን እንደሚችል ይጠበቃል።

🚧በድልድዩ መፍረስ ምክንያት በርካታ መኪኖች ቆመዉ ይገኛሉ።

@etconp
❤4👍3
👉 በ2017 በጀት ዓመት በመዲናዋ 19 ሺህ ፕሮጀክቶች ተጠናቀው ለአገልግሎት ክፍት ሆነዋል።

▪️ የአዲስ አበባ ከተማ አሥተዳደር ከንቲባ አዳነች አቤቤ በመዲናዋ ተገንብተው የተጠናቀቁ የገበያ ማዕከላትን እና የመኪና ማቆሚያ ፕሮጀክቶችን መርቀዋል።

▪️በ2017 በጀት ዓመት በመዲናዋ 19 ሺህ ፕሮጀክቶች ተጠናቀው ለአገልግሎት ክፍት መሆናቸውን ከንቲባዋ አንስተዋል።

▪️በመዲናዋ የገበያ ማዕከላትን እና የመኪና ማቆሚያ ቦታዎችን በማስፋት የኅብረተሰቡን ሁለንተናዊ ተጠቃሚነት ለማረጋገጥ በመንግሥት በኩል ትኩረት ተሰጥቶ እየተሠራ ነው ብለዋል።

▪️ከሜክሲኮ እስከ ለገሃር 13 የሚሆኑ የመኪና ፓርኪንጎች ተገንብተው ለአገልግሎት ክፍት ሆነዋል ነው ያሉት። በአንድ ጊዜ ብቻ ከ2 ሺህ በላይ ተሽከርካሪዎችን የመያዝ አቅም እንዳላቸውም ገልጸዋል።

⏺በተጨማሪም አስር ተርሚናሎች ለአገልግሎት ክፍት መሆናቸውን ጠቁመዋል። ይህም በአንድ ጊዜ ብቻ  ከ1 ሺህ 600 በላይ ተሽከርካሪዎችን እንደሚይዝ ተናግረዋል።

▪️ከአሁን በፊት በከተማዋ በቂ የተሽከርካሪ ማቆሚያ ቦታዎች ባለመኖራቸው ከፍተኛ የሆነ የትራፊክ መጨናነቅ ችግር እንደነበር ያስታወሱት ከንቲባዋ አሁን ላይ የተገነቡት የመኪና ማቆሚያ ፕሮጀክቶች የትራፊክ ፍሰቱን በማሳለጥ  ከፍተኛ ሚና አላቸው ብለዋል።

▪️በመዲናዋ ተገንብተው ለአገልግሎት ክፍት ከሆኑት የገበያ ማዕከላት መካከል የስኬት እና የአፍሪካ ኅብረት የገበያ ማዕከላት ተጠቃሽ ናቸው። እነዚህ የገበያ ማዕከላት የከተማውን ኢኮኖሚ በማነቃቃት እና የተለያዩ ምርቶችን በበቂ ሁኔታ በማቅረብ እንድሁም የሥራ ዕድልን በመፍጠር ረገድ ሚናቸው የጎላ መሆኑን ነው ከንቲባ አዳነች አቤቤ የገለጹት።

▪️የአካባቢውን ማኅበረሰብ አቅም ባገናዘበ ሁኔታ ምርትን ከማቅረብ በተጨማሪ ምቹ የግብይት ምኅዳር እንዲኖር ከፍተኛ ጠቀሜታ እንዳላቸውም ተናግረዋል።

▪️ለአገልግሎት ክፍት የሆኑት ፕሮጀክቶች የካፍቴሪያ፣ የመዝናኛ፣ የሱቅ አገልግሎት፣ የመፀዳጃ ቤቶች፣ ዘመኑን የዋጁ የደኅንነት ካሜራዎች እና ሌሎች ቴክኖሎጅዎችን ያሟሉ ናቸው።

💫በመዲናዋ የተከናወኑ የልማት ፕሮጀክቶች የኢትዮጵያን መልክ የሚያሳዩ እና ዓለማቀፍ ተወዳዳሪነትን የሚያረጋግጡ ስለመሆናቸውም ተጠቁሟል።

@etconp
❤10👍3😭1
የሚሸጥ scaffolding
በብዛት ስላለን ይደውሉና ያናግሩን ።

☎️ +251922452989
❤1
👉በሪል እስቴት ልማት የተመዘገቡ 6 ሺሕ የሚሆኑ አልሚዎች ቢኖሩም በሥራ ላይ የሚገኙት ግን ከ400 እንደማይበልጡ ተነገረ

ከፌዴራልና ከክልል በአጠቃላይ በሀገር አቀፍ ደረጃ በሪል እስቴት ልማት ዘርፍ ለመሳተፍ ፈቃድ የወሰዱና የተመዘገቡ 6 ሺሕ የሚሆኑ አልሚዎች ያሉ ቢሆኑም፤ በሥራ ላይ የሚገኙት ግን ከ400 እንደማይበልጡ የኢትዮጵያ ሪል እስቴት አልሚዎች ማህበር ለአሐዱ አስታውቋል።

የሪል እስቴት ዘርፉ ከአልሚዎች፣ ከገዢዎችና ከፋይናንስ ተቋማት ጨምሮ፤ በርካታ ችግሮች እና ተነሳሽነት ያልነበረበት እንደነበር የገለጹት፤ የማህበሩ ም/ፕሬዝዳንት ኢንጂነር ጀበል ጀማል ናቸው።

ያለውን ችግር ለማስተካከልና በዘርፉ መተጋገዝ ካለና በጋራ መስራት ከተቻለ፤ የተሻለ ለውጥ ሊመጣ እንደሚችል በማመን የሪል እስቴት አልሚዎች ማሕበር መመስረት መቻሉንም አንስተዋል።

ማሕበሩ ከመንግሥትና ከሚመለከታቸው ባለድርሻ አካላት ጋር በመሆን በ29 አባላት መመስረት እንደቻለ አስታውሰው፤ አሁን ላይ ከ100 በላይ አባልትን በውስጡ መያዙን ገልጸዋል።

አሁን ላይ እንደሀገር ከተመዘገቡት 6 ሺሕ የሚሆኑ አልሚዎች መካከል ከ400 የማይበልጡት ብቻ በሥራ ላይ እንደሚገኙ ያነሱት ም/ፕሬዝዳንቱ፤ "እነዚህ 400ዎቹ ግን ምቹ መደላደል ተፈጥሮላቸው በጥሩ ተነሳሽነት የሚሰሩ ከሆነ ለሀገሪቱ ከበቂ በላይ ሥራን መስራት ይችላሉ" ብለዋል።

ማሕበሩ ከተመሰረተ ገና 5 ወሩ እንደሆነ ገልጸው፤ ሚያዚያ 15 2017 ዓ.ም ተመስርቶ ሰኔ 7 ጠቅላላ ጉባኤ ማካሄዱን አስታውሰዋል። ነገር ግን በዚህ አጭር ጊዜ ውስጥ ከከተማ አስተዳደሩ ጋር በመሆን ለማህበረሰቡ ዘርፈ ብዙ ሥራዎችን ማከናወንኑን ተናግረዋል።

ዘርፉ ላይ የተሰማሩ ባለሙያዎችም ከሥራ ብቃታቸው ባሻገር በሥነ-ምግባር የታነጹ እንዲሆኑ ለማድረግ እየተሰራበት እንደሚገኝም አስታውቀዋል።

ማህበሩ ከመደበኛ ሥራው ጎን ለጎን ለሕብረተሰቡ የሚጠቅሙ የማህበራዊ አገልግሎት ላይ ንቁ ተሳትፎ እንደሚያደርግ ም/ፕሬዝዳንቱ ተናግረዋል።

አክለውም የሪል እስቴት ዘርፉን ለማሳደግና ያሉትን ክፍተቶች ለመሙላት በጋራ መስራት እንዲቻል ጥሪ አስተላልፈዋል።

Via አሐዱ ሬዲዮ

@etconp
❤15
ADVERTISMENT

ታምራት ፕሌት እና ጄ ቦልት አቅራቢ

✅የምንሰጣቸው አገልግሎቶች

🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)

🔅 የተለያዩ  [modefic] ስራዎችን እንሰራለን።

♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።

☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1

አድራሻ፦  ቁ 1.መርካቶ
                ቁ.2 አየር ጤና  ኪዳነ ምህረት

ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
🙏2❤1
👉The role of a Quantity Surveyor (QS) on a building construction site is multifaceted and critical to the project's financial and contractual success.

⏺While often perceived as an office-based role, a significant portion of their duties requires a physical presence on-site to be effective.

🏷Here is a detailed breakdown of the duties and responsibilities of a Quantity Surveyor on a building construction site, categorized for clarity.

⭐️Core Philosophy: The Financial and Contractual Guardian

⏺The overarching duty of a QS is to manage all costs and contractual matters relating to a construction project.

⏺They ensure the project is completed within budget, while ensuring the client and contractor get value for money and that all parties are treated fairly according to the contract.

🚧I. Pre-Construction & Planning Phase (On-Site Involvement Begins)

⏺Even before ground is broken, the QS's work is tied to the site conditions.
*   Site Visits for Tender Preparation: Conducting pre-tender site visits to understand existing conditions, access issues, logistical challenges, and any potential risks that could affect cost (e.g., poor ground conditions, tight site boundaries, presence of asbestos).
*   Informing Cost Plans: Using site intelligence to create accurate cost estimates and bills of quantities.

🚧II. Construction Phase (Primary On-Site Responsibilities)
This is where the site-based QS is most active.

📜A. Cost Control and Financial Management

❇️1.  Valuation of Work in Progress (Interim Applications):
    *   Site Measurement: Physically measuring and verifying the amount of work completed on-site each month (e.g., cubic meters of concrete poured, tons of reinforcement fixed, square meters of brickwork laid).
    *   Progress Assessment: Evaluating the percentage completion of complex elements like MEP (Mechanical, Electrical, and Plumbing) services.
    *   Preparing Payment Certificates: Using these measurements to prepare detailed valuations (Interim Payment Applications) to submit to the client or consultant for payment.

❇️2.  Cost Reporting:
    *   Tracking Actual vs. Budgeted Cost: Monitoring all site expenditures against the original budget and forecasted final cost.
    *   Preparing Cost Reports: Creating regular reports for project managers and clients, highlighting any cost overruns, savings, and forecasting the final account value.

❇️3.  Subcontractor Management:
    *   Appointing Subcontractors: Managing the tender process for packages of work, comparing quotes, and preparing subcontract documents.
    *   Valuing Subcontractor Work: Measuring their work, agreeing on valuations, and authorizing payments (often after deducting retention money).
    *   Managing Final Accounts: Agreeing on the final sum due to each subcontractor upon completion of their work.

📜B. Contract Administration

❇️4.  Change Management (Variations):
    *   Identifying Variations: Recognizing any changes instructed by the client or deviations from the original design/drawings.
    *   Pricing Variations: Quantifying the change and negotiating a fair price for the additional/omitted work, including its impact on program time.
    *   Documenting Variations: Ensuring all variations are formally instructed in writing to justify future claims for payment.

❇️5.  Claims Management:
    *   Evaluating Entitlement: Assessing if the contractor is entitled to additional time or money due to client-caused delays, unforeseen site conditions (e.g., discovering unexpected rock), or other disruptive events as per the contract.
    *   Preparing Claims: Compiling all necessary evidence (diaries, photos, emails, programs) to build a robust claim for either an extension of time (EoT) or financial compensation.

@etconp
❤15🙏2