The minimum gross pressure intensity at the
base of the foundation at which the soil fails in
shear is called as :
Anonymous Quiz
42%
(a) Ultimate bearing capacity
11%
(b) Net safe bearing capacity
35%
(c) Allowable bearing capacity
12%
(d) Safe bearing capacity
❀7
For upstream face of an earth dam, the most
adverse condition for stability of slope, is:
Anonymous Quiz
28%
(a) sudden draw down.
36%
(b) steady seepage condition.
11%
(c) during construction.
25%
(d) during overflowing.
πŸ”₯3πŸŽ‰2
❀4
What type of beam will produce maximum
strain energy, if the uniformly distributed load
on its full length?
Anonymous Quiz
45%
(a) Fixed beam
15%
(b) Propped cantilever
21%
(c) Simply supported
19%
(d) Cantilever
❀6πŸ‘1
πŸ‘3❀2πŸ₯°2πŸ‘1
The project is falling behind schedule, and the team lead reports that they do not have enough skilled resources to complete a key task on time.

What should the project manager do FIRST?
Anonymous Quiz
11%
A. Cut a non-essential feature from the project scope.
16%
B. Ask the team to work overtime to meet the deadline.
61%
C. Meet with the team lead to assess the resource needs and current workload.
11%
D. Immediately request more resources from the project sponsor.
❀4πŸ‘1
A supplier delivers substandard sand. Your site team wants to use it to maintain schedule, arguing the defect is minor. The schedule is already delayed by 3 weeks, and replacing the supplier may cause further delays.
What You should do?
Anonymous Quiz
15%
A. Accept the material to avoid additional delay
68%
B. Conduct a technical impact assessment on structural quality
6%
C. Escalate to sponsor for decision
11%
D. Reject material and order from a new supplier
πŸ‘8❀1
A key piece of construction equipment breaks down, and repairs will take two weeks. The site supervisor requests immediate rental of a replacement at a much higher cost. What should the project manager do FIRST?
Anonymous Quiz
10%
A. Approve the rental to avoid work stoppage
81%
B. Perform a cost-benefit analysis of renting vs. waiting
5%
C. Escalate the issue to senior management
5%
D. Update the procurement management plan
❀5πŸ‘1
During construction of a high-rise building, a government agency issues a new regulation that directly impacts your ongoing works and will require design modifications. What should the project manager do FIRST?
Anonymous Quiz
14%
A. Stop the project until the regulation is fully clarified
69%
B. Assess the impact of the regulation on scope, cost, and schedule
12%
C. Raise a formal change request immediately
6%
D. Escalate the issue to the project sponsor
πŸ‘5πŸ₯°2❀1
You discover that a critical material was delivered late because the procurement team miscommunicated the required delivery date to the supplier. What should the project manager do FIRST?
Anonymous Quiz
8%
A. Escalate the issue to senior management
14%
B. Update the lessons learned register and risk register
72%
C. Analyze how the delay impacts the project’s critical path
6%
D. Replace the supplier for better performance
A vendor delivers sand to site, but quality tests reveal it doesn’t meet the the required grade specified in the contract. The site team is pressuring to use it to avoid delay. What should the project manager do FIRST?
Anonymous Quiz
12%
A. Approve usage of the cement if supplier provides a discount
53%
B. Review quality specifications and contract terms
9%
C. Escalate the issue to the sponsor for decision
27%
D. Order a new batch immediately to avoid risks
❀2