1)In route survey, the most suitable method of
contouring is-
contouring is-
Anonymous Quiz
19%
(a) by squares
38%
(b) by radial lines
16%
(c) by c/s
27%
(d) by tachometry
â¤8
2)Minimum diameter of the lateral ties should
not be less than
not be less than
Anonymous Quiz
27%
(a) 10 mm
51%
(b) 6 mm
13%
(c) 5 mm
9%
(d) 4 mm
đ3đ3â¤1
1) Bearing capacity increase with the
Anonymous Quiz
24%
a) increase in eccentricity of load
11%
(b) increase in inclination of load
50%
(c) increase in depth of water table below footing twice the width of footing
16%
(d) decrease in unit weight of soil
đ4â¤2
Which of the following is not a type of admixture?
Anonymous Quiz
20%
Plasticizers
10%
Air-entraining admixtures
7%
Set-acclerating/ Set-retarding
62%
Water-increasing
đ3â¤2đ2đ1
Workability of concrete depends on:
Anonymous Quiz
42%
Water to cement ratio
8%
Amount of water
48%
Both
2%
None of the abobe
đ6đĽ2
Which of the following statements is false?
Anonymous Quiz
25%
C20/25 is a measurement of class strength, pertaining to 25 MPa of compressive strength.
25%
S1 is a consistency class of concrete at the fresh state, and has lower workability than S3.
27%
A superplasticizer can be added to a concrete mix, which raises the water requirement by 20%.
24%
In the Compressive Strength vs. W/C ratio graph, a lower W/C corresponds to a higher Rc [MPa].
â¤9
Which characteristic does not necessarily describe a deformation in the elastic region?
Anonymous Quiz
13%
reversible
35%
molecular bonds have no slip
19%
temporary
33%
Stress/ Strain slope is constant
â¤5đ3
đŠâđŤ In concrete, air entrapped during mixing and handling:
Anonymous Quiz
11%
determines the abrasion resistance
22%
increases the resistance to freeze and thaw
16%
has no effect on compressive strength being under the influence of Wan der Waals forces
51%
should be removed by means of compacting system
â¤4đ2
đŠâđŤ Air-entraining agents are usually used in concrete to:
Anonymous Quiz
25%
reduce the porosity of the cement paste
14%
increase the setting time
16%
avoid the compaction at the construction site
45%
entrain a controlled quantity of air in the form of microscopic bubbles in the cement paste
đ8
đŠâđŤ The concrete tensile strength is measured:
Anonymous Quiz
38%
usually with the splitting or flexural test
16%
with the hardness test
26%
often with the direct tensile test
20%
it is never measured
đ3đ2
đŠâđŤ The grade of concrete strength indicates:
Anonymous Quiz
12%
the characteristic tensile strength after 28 days of curing
33%
the mean compressive strength after 28 days of curing
6%
the rate of development of compressive strength
49%
the characteristic compressive strength after 28 days of curing
â¤6
đŠâđŤ The workability of concrete is a measurement of:
Anonymous Quiz
11%
the resistance to degradation
52%
the flow behaviour
19%
the resistance to plastic shrinkage
18%
the degree of interconnection of capillary pores
â¤5đ3
Ethio Construction Engineering
đWhat Do You Think The Cause Of The Failure @etconp
đThe failure of the concrete staircase is primarily caused by
improper or insufficient steel reinforcement and poor structural design and execution at the connection point with the upper floor slab.
đ§Details of the Failure
đŤLack of Proper Anchorag:
âşThe image and associated information indicate a critical mistake where the main reinforcement bars of the staircase were not properly anchored into the landing beam or slab above with adequate development length or proper bends (hooks). Instead, they appear to have been cut short or installed incorrectly.
đŤMissing or Incorrect Negative Reinforcement:
âşThe diagrams in the image highlight the need for "top" or negative reinforcement bars extending from the top of the stair into the upper slab to handle the tension forces that occur at this connection point when the stair is loaded.
This was likely omitted or installed incorrectly in the failed structure.
đŤStructural Weakness:
âşA staircase is a major structural element that carries significant loads.
âşWithout correct and continuous reinforcement into the supporting structure, the connection point becomes a weak link, leading to a bond failure and collapse as seen in the image.
đŤSubstandard Workmanship:
âşThis type of failure often results from trying to cut costs, using unqualified labor, or failing to follow approved engineering drawings and building codes.
@etconp
improper or insufficient steel reinforcement and poor structural design and execution at the connection point with the upper floor slab.
đ§Details of the Failure
đŤLack of Proper Anchorag:
âşThe image and associated information indicate a critical mistake where the main reinforcement bars of the staircase were not properly anchored into the landing beam or slab above with adequate development length or proper bends (hooks). Instead, they appear to have been cut short or installed incorrectly.
đŤMissing or Incorrect Negative Reinforcement:
âşThe diagrams in the image highlight the need for "top" or negative reinforcement bars extending from the top of the stair into the upper slab to handle the tension forces that occur at this connection point when the stair is loaded.
This was likely omitted or installed incorrectly in the failed structure.
đŤStructural Weakness:
âşA staircase is a major structural element that carries significant loads.
âşWithout correct and continuous reinforcement into the supporting structure, the connection point becomes a weak link, leading to a bond failure and collapse as seen in the image.
đŤSubstandard Workmanship:
âşThis type of failure often results from trying to cut costs, using unqualified labor, or failing to follow approved engineering drawings and building codes.
@etconp
â¤8đ3đ1
đ INTERCON Construction Chemicals
â Concrete Admixtures
â Bonding Agents
â Waterproofings
â Wall Putty, Prime Coat
â Concrete Repair Mortar
â Floor hardener, Epoxy
â Grout, Self-level mortar
â Quartz paint, Contextra
â Tile Adhesive & Tile Joint Fillers
â Geotextiles and other construction chemicals and materials
âď¸ Tel: 0961955555
đš Address 1: Signal road, around
Dinberwa Hospital
đš Addres 2: Wellosefer, Infront of
Dani Plaza
â Concrete Admixtures
â Bonding Agents
â Waterproofings
â Wall Putty, Prime Coat
â Concrete Repair Mortar
â Floor hardener, Epoxy
â Grout, Self-level mortar
â Quartz paint, Contextra
â Tile Adhesive & Tile Joint Fillers
â Geotextiles and other construction chemicals and materials
âď¸ Tel: 0961955555
đš Address 1: Signal road, around
Dinberwa Hospital
đš Addres 2: Wellosefer, Infront of
Dani Plaza
â¤1
đThe main components of a staircase include the treads (the horizontal steps), risers (the vertical boards between steps), stringers (the side supports), handrails and balusters (the safety railing and vertical posts), and landings (the flat platforms for rest or direction changes).
đ˛The main parts can be grouped into the steps, the structural supports, and the safety features.
đ§Step components
âşTread: The flat, horizontal part of the step where you place your foot.
âşRiser: The vertical section between two treads that sets the height of the step.
âşNosing: The front edge of the tread that extends slightly over the riser.
âşCurtail Step: An ornamental step at the very bottom of a staircase, often with a rounded end.
đ§Structural components
âşStringer: The inclined board or panel that runs along the side or center of the stairs, supporting the treads and risers.
âşNewel Post: A larger, sturdy post located at the beginning, end, or bends of a staircase that supports the handrail.
âşLanding: A wide, flat platform at the top or bottom of a flight of stairs or between flights, used for rest or to change direction.
âď¸Safety and finishing components
âşHandrail: A long bar, typically attached to a wall or supported by newel posts and balusters, that provides support for users.
âşBaluster: The vertical posts or spindles that are placed between the handrail and the tread or base rail to prevent falls and fill the gap in the balustrade.
âşBalustrade: The entire system of handrail, balusters, and base rail that runs along the open side of the stairs.
âşNewel Cap: The ornamental top piece of a newel post.
@etconp
đ˛The main parts can be grouped into the steps, the structural supports, and the safety features.
đ§Step components
âşTread: The flat, horizontal part of the step where you place your foot.
âşRiser: The vertical section between two treads that sets the height of the step.
âşNosing: The front edge of the tread that extends slightly over the riser.
âşCurtail Step: An ornamental step at the very bottom of a staircase, often with a rounded end.
đ§Structural components
âşStringer: The inclined board or panel that runs along the side or center of the stairs, supporting the treads and risers.
âşNewel Post: A larger, sturdy post located at the beginning, end, or bends of a staircase that supports the handrail.
âşLanding: A wide, flat platform at the top or bottom of a flight of stairs or between flights, used for rest or to change direction.
âď¸Safety and finishing components
âşHandrail: A long bar, typically attached to a wall or supported by newel posts and balusters, that provides support for users.
âşBaluster: The vertical posts or spindles that are placed between the handrail and the tread or base rail to prevent falls and fill the gap in the balustrade.
âşBalustrade: The entire system of handrail, balusters, and base rail that runs along the open side of the stairs.
âşNewel Cap: The ornamental top piece of a newel post.
@etconp
â¤5đ2
đDifferent Types of Stresses in Materials
đŤ1. Tensile Stress
âşStress that tends to stretch a material, caused by axial pulling force.
đŤ2. Compressive Stress
âşStress that compresses or shortens a material, caused by axial pushing force.
đŤ3. Shear Stress
âşStress that acts parallel to the surface, causing layers to slide against each other.
đŤ4. Bending Stress
âşStress developed when a beam is subjected to bending moment, causing tension
on one side and compression on the other.
đŤ5. Torsional Stress
âşStress induced when a material is twisted by torque, producing shear stress along
its cross-section.
đŤ6. Thermal Stress
âşStress developed due to expansion or contraction from temperature changes when
deformation is restrained.
đŤ7. Bearing Stress
âşContact stress between two bodies, e.g., bolt pressing against a hole surface.
@etconp
đŤ1. Tensile Stress
âşStress that tends to stretch a material, caused by axial pulling force.
đŤ2. Compressive Stress
âşStress that compresses or shortens a material, caused by axial pushing force.
đŤ3. Shear Stress
âşStress that acts parallel to the surface, causing layers to slide against each other.
đŤ4. Bending Stress
âşStress developed when a beam is subjected to bending moment, causing tension
on one side and compression on the other.
đŤ5. Torsional Stress
âşStress induced when a material is twisted by torque, producing shear stress along
its cross-section.
đŤ6. Thermal Stress
âşStress developed due to expansion or contraction from temperature changes when
deformation is restrained.
đŤ7. Bearing Stress
âşContact stress between two bodies, e.g., bolt pressing against a hole surface.
@etconp
â¤10
đWhat is a Column? (General Explanation)
đA column is a vertical member and one of the most important structural elements in a building.
Its functions are:
đTo carry loads coming from the slab, beam, and upper floors
đTo transfer those loads down to the footing
đTo contribute to the stability and strength of the structure
đ§Materials Used to Make Columns
1ď¸âŁ Reinforced Concrete Column (RCC)
Made from concrete + rebar (steel bars)
This is the most commonly used type in buildings.
2ď¸âŁ Steel Column
Made from steel sections.
Used in high-rise buildings and industrial structures.
3ď¸âŁ Timber/Wood Column
Made from wood and seen in traditional houses.
đ Main Functions of a Column
đLoad carrying: It carries the loads from the structure above.
đTransfer of load: It transfers the load directly to the foundation.
đStability: It prevents the building from collapsing or bending.
đSupports beams & slabs: Beams rest on top of the column.
đ§Š Parts of a Column
1. Longitudinal bars â The long steel bars inside the column.
2. Stirrups/Ties â The circular/closed bars that hold the longitudinal bars in place.
3. Concrete cover â The protective concrete surrounding the steel.
4. Footing connection â The point where the column is connected to the foundation.
đď¸ Where Are Columns Used?
đMulti-storey buildings
đCommercial buildings
đBridges (piers)
đWarehouses
đChurchs, Mosques, schools, offices, etc.
đ Simple Example
đIf the beam is like the arms, and the slab is the top surface,
the column is the legs of the building.
đIf the legs become weak, the whole structure can collapse.
@etconp
đA column is a vertical member and one of the most important structural elements in a building.
Its functions are:
đTo carry loads coming from the slab, beam, and upper floors
đTo transfer those loads down to the footing
đTo contribute to the stability and strength of the structure
đ§Materials Used to Make Columns
1ď¸âŁ Reinforced Concrete Column (RCC)
Made from concrete + rebar (steel bars)
This is the most commonly used type in buildings.
2ď¸âŁ Steel Column
Made from steel sections.
Used in high-rise buildings and industrial structures.
3ď¸âŁ Timber/Wood Column
Made from wood and seen in traditional houses.
đ Main Functions of a Column
đLoad carrying: It carries the loads from the structure above.
đTransfer of load: It transfers the load directly to the foundation.
đStability: It prevents the building from collapsing or bending.
đSupports beams & slabs: Beams rest on top of the column.
đ§Š Parts of a Column
1. Longitudinal bars â The long steel bars inside the column.
2. Stirrups/Ties â The circular/closed bars that hold the longitudinal bars in place.
3. Concrete cover â The protective concrete surrounding the steel.
4. Footing connection â The point where the column is connected to the foundation.
đď¸ Where Are Columns Used?
đMulti-storey buildings
đCommercial buildings
đBridges (piers)
đWarehouses
đChurchs, Mosques, schools, offices, etc.
đ Simple Example
đIf the beam is like the arms, and the slab is the top surface,
the column is the legs of the building.
đIf the legs become weak, the whole structure can collapse.
@etconp
â¤10đ7đ1
#ááľáłáááŤ
Vivo interior design
á ááááľ ááťá¨á á ááá°áá˝áŁ áááá ááŠáĽá á ááŤá°á á¤áľ ááá ááááá áĽááá˛áŤááľ á á°ááŁáŁá áá á áĽááá áĽá áĽáŤáąá á á á á ááááá¨áľ áłá˘ á áľáááᤠá¤áľáá á áľáá á áĽááľá¨ááŁááá˘
áŞáŽáá˝ áá á¨á¤áľ ááľáĽ á˛ááá áĽá áááŁáł áá°áŤáľ á¨ááá áá°áááá
Vivo design
0921332907
0923607995
Vivo interior design
á ááááľ ááťá¨á á ááá°áá˝áŁ áááá ááŠáĽá á ááŤá°á á¤áľ ááá ááááá áĽááá˛áŤááľ á á°ááŁáŁá áá á áĽááá áĽá áĽáŤáąá á á á á ááááá¨áľ áłá˘ á áľáááᤠá¤áľáá á áľáá á áĽááľá¨ááŁááá˘
áŞáŽáá˝ áá á¨á¤áľ ááľáĽ á˛ááá áĽá áááŁáł áá°áŤáľ á¨ááá áá°áááá
Vivo design
0921332907
0923607995
â¤5
đWHAT IS BIM
đŤBIM, or Building Information Modeling, is a collaborative process for creating and managing digital models of construction projects.
âşIts purpose in the construction industry is to improve efficiency, streamline communication, and enhance decision-making by providing a single, data-rich source of information for all stakeholders throughout a project's entire lifecycle, from planning to maintenance.
âşThis approach enables better cost estimation, reduces clashes through virtual analysis, improves scheduling, and supports more sustainable building designs.
đ§What BIM is A collaborative process: BIM brings together architects, engineers, contractors, and other professionals to work together using shared digital information.
đ§A 3D model: It involves creating detailed three-dimensional models, but goes beyond simple 3D visuals by incorporating vast amounts of project information like materials, scheduling, and costs.
đ§A central database: A BIM project integrates multi-dimensional data into a single, coherent system, allowing for a more dynamic and synchronized approach to project management compared to older, disconnected methods.
âşIts purpose in the construction industry
đ§Improved collaboration and communication: By providing a single, shared platform, BIM ensures all parties are working with the most up-to-date information, which helps avoid mistakes and keeps projects moving smoothly.
đ§Enhanced decision-making: BIM allows for better-informed decisions through data-rich models that can be used to virtually test aspects like structural integrity or energy efficiency before any physical construction begins.
đ§Increased efficiency: It improves efficiency across multiple areas, including design, scheduling, cost management, and construction logistics.
đ§Reduced risk and cost: Potential conflicts between different systems, such as mechanical and electrical, can be identified and resolved digitally through clash detection before they become costly problems on-site.
đ§Long-term asset management: The comprehensive digital model created during construction can be used long after the building is complete for easier renovation, maintenance, and facility management.
@etconp
đŤBIM, or Building Information Modeling, is a collaborative process for creating and managing digital models of construction projects.
âşIts purpose in the construction industry is to improve efficiency, streamline communication, and enhance decision-making by providing a single, data-rich source of information for all stakeholders throughout a project's entire lifecycle, from planning to maintenance.
âşThis approach enables better cost estimation, reduces clashes through virtual analysis, improves scheduling, and supports more sustainable building designs.
đ§What BIM is A collaborative process: BIM brings together architects, engineers, contractors, and other professionals to work together using shared digital information.
đ§A 3D model: It involves creating detailed three-dimensional models, but goes beyond simple 3D visuals by incorporating vast amounts of project information like materials, scheduling, and costs.
đ§A central database: A BIM project integrates multi-dimensional data into a single, coherent system, allowing for a more dynamic and synchronized approach to project management compared to older, disconnected methods.
âşIts purpose in the construction industry
đ§Improved collaboration and communication: By providing a single, shared platform, BIM ensures all parties are working with the most up-to-date information, which helps avoid mistakes and keeps projects moving smoothly.
đ§Enhanced decision-making: BIM allows for better-informed decisions through data-rich models that can be used to virtually test aspects like structural integrity or energy efficiency before any physical construction begins.
đ§Increased efficiency: It improves efficiency across multiple areas, including design, scheduling, cost management, and construction logistics.
đ§Reduced risk and cost: Potential conflicts between different systems, such as mechanical and electrical, can be identified and resolved digitally through clash detection before they become costly problems on-site.
đ§Long-term asset management: The comprehensive digital model created during construction can be used long after the building is complete for easier renovation, maintenance, and facility management.
@etconp
đ7â¤4