๐Foundation Settlement refers to the downward movement of a buildingโs foundation due to changes in the underlying soil or loading conditions.
โบIt typically occurs when the soil beneath the foundation can no longer support the structureโs weight
๐งWhile some degree of settlement is normal , excessive or uneven settlement can compromise the integrity of the entire structure.
๐ซEngineers classify settlement into two main types: uniform settlement and differential settlement.
@etconp
โบIt typically occurs when the soil beneath the foundation can no longer support the structureโs weight
๐งWhile some degree of settlement is normal , excessive or uneven settlement can compromise the integrity of the entire structure.
๐ซEngineers classify settlement into two main types: uniform settlement and differential settlement.
@etconp
๐7โค3
๐Basic Roles & Responsibilities of a Site Engineer
๐ท1. Supervision of Site Work
โบMonitor all construction activities on the site.
โบEnsure workers follow drawings, specifications, and instructions.
โบMake sure work is done safely and correctly.
๐ท2. Interpretation of Drawings
โบRead and understand structural, architectural, and MEP drawings.
โบGive instructions to workers based on the drawings.
โบReport any discrepancies to the project manager or consultant.
๐ท3. Quality Control
โบCheck the quality of materials before use (cement, sand, aggregates, steel, etc.).
โบEnsure workmanship meets standards and project specifications.
โบConduct inspections at different stages: foundation, reinforcement, formwork, concreting, finishing, etc.
๐ท4. Setting Out & Measurements
โบMark levels, alignments, and layout points on site.
โบMeasure and calculate quantities for materials and progress reports.
โบEnsure the structure is built in the correct location and dimensions.
๐ท5. Coordination
โบCoordinate with subcontractors, laborers, supervisors, and suppliers.
โบEnsure timely delivery of materials to avoid delays.
โบCommunicate with consultants and project managers about site issues.
๐ท6. Site Safety
โบEnsure workers use PPE (helmets, gloves, boots).
โบIdentify and eliminate hazards on site.
โบEnforce safety guidelines during excavation, scaffolding, formwork, and electrical work.
๐ท7. Documentation & Reporting
โบMaintain daily site records (Daily Progress Report).
โบRecord manpower, materials used, equipment, and weather conditions.
โบPrepare reports for inspections and approvals.
๐ท8. Material Management
โบEstimate required materials.
โบRequest materials on time and manage storage properly.
โบPrevent wastage and theft.
๐ท9. Concreting & Reinforcement Checks
โบCheck formwork dimensions, alignment, and supports.
โบVerify reinforcement spacing, diameter, cover, and tying.
โบMonitor mixing, placing, compaction, curing of concrete.
๐ท10. Problem Solving
โบAddress issues that arise on site (design conflicts, material shortages, labor problems).
โบMake quick decisions to keep work progressing.
๐ท11. Ensuring Progress as per Schedule
โบPlan daily/weekly activities.
โบFollow the project schedule and push the work to meet deadlines.
@etconp
๐ท1. Supervision of Site Work
โบMonitor all construction activities on the site.
โบEnsure workers follow drawings, specifications, and instructions.
โบMake sure work is done safely and correctly.
๐ท2. Interpretation of Drawings
โบRead and understand structural, architectural, and MEP drawings.
โบGive instructions to workers based on the drawings.
โบReport any discrepancies to the project manager or consultant.
๐ท3. Quality Control
โบCheck the quality of materials before use (cement, sand, aggregates, steel, etc.).
โบEnsure workmanship meets standards and project specifications.
โบConduct inspections at different stages: foundation, reinforcement, formwork, concreting, finishing, etc.
๐ท4. Setting Out & Measurements
โบMark levels, alignments, and layout points on site.
โบMeasure and calculate quantities for materials and progress reports.
โบEnsure the structure is built in the correct location and dimensions.
๐ท5. Coordination
โบCoordinate with subcontractors, laborers, supervisors, and suppliers.
โบEnsure timely delivery of materials to avoid delays.
โบCommunicate with consultants and project managers about site issues.
๐ท6. Site Safety
โบEnsure workers use PPE (helmets, gloves, boots).
โบIdentify and eliminate hazards on site.
โบEnforce safety guidelines during excavation, scaffolding, formwork, and electrical work.
๐ท7. Documentation & Reporting
โบMaintain daily site records (Daily Progress Report).
โบRecord manpower, materials used, equipment, and weather conditions.
โบPrepare reports for inspections and approvals.
๐ท8. Material Management
โบEstimate required materials.
โบRequest materials on time and manage storage properly.
โบPrevent wastage and theft.
๐ท9. Concreting & Reinforcement Checks
โบCheck formwork dimensions, alignment, and supports.
โบVerify reinforcement spacing, diameter, cover, and tying.
โบMonitor mixing, placing, compaction, curing of concrete.
๐ท10. Problem Solving
โบAddress issues that arise on site (design conflicts, material shortages, labor problems).
โบMake quick decisions to keep work progressing.
๐ท11. Ensuring Progress as per Schedule
โบPlan daily/weekly activities.
โบFollow the project schedule and push the work to meet deadlines.
@etconp
โค15๐12๐ฅ1๐1
ADVERTISMENT
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โค2
๐Certification of Inspection certificate:
๐ทAn inspection certificate cannot be certified before the work starts.
๐Why?
โ 1. Inspection certificates confirm completed or inspected work
๐งAn inspection certificate is issued after the inspector verifies that:
*Materials are correct
*Work is completed according to the drawing/spec
*Quality meets standards
*Safety and workmanship are acceptable
๐งIf the work has not started, there is nothing to inspect.
โ 2. Issuing before work begins is considered invalid
Certifying before work is done can:
*Create legal and contractual problems
*Hide quality issues
*Cause rejection by consultants/clients
*Be treated as falsification
โ 3. What can be issued before work starts?
๐งBefore work begins, only these can be issued:
*Inspection Request (IR) โ mentioning โwork ready to startโ
*Method Statement
*Material Approval (MAR/MIR)
*Work Permit / Permit to Start Work
โญ Recommendation
โบIf your team or contractor is asking for inspection certificate early, tell them:
๐ซInspection certificate can only be signed after actual inspection.
โก๏ธPlease complete the work or prepare the section for inspection first.โ
@etconp
๐ทAn inspection certificate cannot be certified before the work starts.
๐Why?
โ 1. Inspection certificates confirm completed or inspected work
๐งAn inspection certificate is issued after the inspector verifies that:
*Materials are correct
*Work is completed according to the drawing/spec
*Quality meets standards
*Safety and workmanship are acceptable
๐งIf the work has not started, there is nothing to inspect.
โ 2. Issuing before work begins is considered invalid
Certifying before work is done can:
*Create legal and contractual problems
*Hide quality issues
*Cause rejection by consultants/clients
*Be treated as falsification
โ 3. What can be issued before work starts?
๐งBefore work begins, only these can be issued:
*Inspection Request (IR) โ mentioning โwork ready to startโ
*Method Statement
*Material Approval (MAR/MIR)
*Work Permit / Permit to Start Work
โญ Recommendation
โบIf your team or contractor is asking for inspection certificate early, tell them:
๐ซInspection certificate can only be signed after actual inspection.
โก๏ธPlease complete the work or prepare the section for inspection first.โ
@etconp
โค7๐2
๐Do you Know About Curtain wall
๐ซCurtain walls are non-structural cladding systems for building exteriors โ they resist weather and wind loads but do not carry floor or roof loads.
โบThey are usually made of aluminum frames with glass, metal panels, or thin stone infill.
๐งHere are the common types of curtain wall systems:
๐งฑ 1. Stick System Curtain Wall
โบAssembled piece by piece on site โ vertical mullions (sticks) and horizontal rails (Transoms) are installed, then glass panels are fitted.
โญ๏ธAdvantages:
โ Flexible for on-site adjustments.
โ Suitable for low- to mid-rise buildings.
๐ทDisadvantages:
โ Slower installation.
โ More affected by site weather conditions
๐๏ธ 2. Unitized (Modular) Curtain Wall
โบLarge prefabricated units (panels with glass already installed) are manufactured in a factory and delivered to site for quick installation. Or prepared in site work shop.
๐ทAdvantages are
โ Faster installation.
โ Better quality control (factory-made).
โ Ideal for high-rise buildings.
๐ทDisadvantages:
โ Higher transportation and handling costs.
โ Requires cranes or hoists.
โบCurtain wall designed by curtain wall engineers
โบLoad transfer mechanism curtain wall to frames by connections.
@etconp
๐ซCurtain walls are non-structural cladding systems for building exteriors โ they resist weather and wind loads but do not carry floor or roof loads.
โบThey are usually made of aluminum frames with glass, metal panels, or thin stone infill.
๐งHere are the common types of curtain wall systems:
๐งฑ 1. Stick System Curtain Wall
โบAssembled piece by piece on site โ vertical mullions (sticks) and horizontal rails (Transoms) are installed, then glass panels are fitted.
โญ๏ธAdvantages:
โ Flexible for on-site adjustments.
โ Suitable for low- to mid-rise buildings.
๐ทDisadvantages:
โ Slower installation.
โ More affected by site weather conditions
๐๏ธ 2. Unitized (Modular) Curtain Wall
โบLarge prefabricated units (panels with glass already installed) are manufactured in a factory and delivered to site for quick installation. Or prepared in site work shop.
๐ทAdvantages are
โ Faster installation.
โ Better quality control (factory-made).
โ Ideal for high-rise buildings.
๐ทDisadvantages:
โ Higher transportation and handling costs.
โ Requires cranes or hoists.
โบCurtain wall designed by curtain wall engineers
โบLoad transfer mechanism curtain wall to frames by connections.
@etconp
โค9
๐แแฃแจแ แจแแแฃแณ แแ ''แจแแ แแณแต แแแซ''/Liquidated damage/
๐ซแ แฎแแตแตแซแญแฝแ แแ แแญ แจแแ แจแแแฃแณ แตแซ แฐแฅแ แจแฐแแแ แแ แ แฒแแญแ แฅแ แแญแแญ แตแแตแแฌแฝแ แแฐแจแต แ แแ แ แฐแแแ แ แจแแ แแฐแฅ แฐแญแถ แแ แแแ แจแฐแแซแฉ แแแแแต แแแกแก
๐งแฐแแซแฉ แจแแแ แจแแแฃแณ แตแซ แ แแ แ แฐแแแ แ แจแแ แแฐแฅ แ แแ แฑ แฐแญแถ แซแแ แแแ แฅแแฐแแ แจแแ แแ แแแแซ แแ/completion date/ แ แแ แแแฃแณแ แฅแตแจแแ แแแ แ แต แแ แตแจแต แแฅแซแแณแแฑ แแ แฐแแซแฉ แจแแแฃแณ แแแแจแต แแญแแซแต แแ แฐแชแ แจแแ แแณแต แแแซ/Liquidated damage/ แจแแญแแ แแแแแต แญแแญแ แณแแกแก
๐ฐแ แแ แ แฐแแแ แ แจแแ แแฐแฅ แฒแฃแ แแ แแแต แแ?
โบแ แแณแแต แ แฐแชแแฝ/client/ แ แแแแค แฅแฅแจแต แ แแ แแญ แจแฐแแแ แ แฐแแซแฉแ แ แฐแชแ แแแแฃแณแ แแ แแแแซ แจแฐแตแแแ แตแ แจแแ แฅแแต/แจแแ แฅแญแแแ/ แแแ แญ แจแแแแจแ แแ แ แแซ แแ แจแฐแแจแแ แต แแ แแแฎ แฅแแฐแแ แญแจแฑแณแแกแกแญแ แ แจแณแต แตแ แฐแต แแแกแก
๐ฒแ แฎแแตแตแซแญแฝแ แแ แตแ แแ แ แแฃแ แญ แ แฐแแญ
-แจแแแฃแณ แแ แจแฐแฐแจแแ แต แแ/contract signing date/ แฃ
-แแขแแญแแฝแ แแฌแต/mobilization period/แฃ
-แจแณแญแต แแจแจแขแซ แแ/site handover/แฃ
-แจแตแซ แแแแชแซ แแ/commencement date/ แฅแ
-แจแตแซ แแ แแแแซ แแ/completion date/ แจแแแตแ แแจแณแต แจแแแฃแณ แจแแ แจแแณแต แแแซ/Liquidated damage/ แจแแแแ แ แ แแฃแก แแแแ แญแ แ แแแกแก
๐งแ แแฐแจแฑ แ แแ แจแฐแแแ แ แจแตแซ แแจแแแ แจแแ แแฐแฅ แแแ แญ แจแแแแจแ แฐแแซแฉ แจแแแฃแณแแ แณแญแต แจแ แฐแชแ แจแฐแจแจแ แ แแ แแแกแก
โบแญแแแ แจแณแญแต แญแญแญแฅ แ แแ แจแตแซ แแแแชแซ แแ /commencement date/ แ แแแแฒแฑ แจแแแฐแ แฅแ แแฐแแซแฉ แจแแแแฝแแต แญแแแแกแก
โบแฅแแแฒแ แ แแแแฒแฑ แจแแแฐแแ แจแตแซ แแแแชแซ แแ แแแฎ แ แแ แแญ แจแฐแแแ แ แแ แญแแ แญแ แจแตแซ แแ แแแแซ แแ/completion date/ แแผ แฅแแฐแแ แแแแ แซแตแฝแแ แแแต แแแกแก
โ๏ธแฅแแ แแญ แแณแแ แจแแแฃแ แแแญ แ แฎแแตแตแซแญแฝแ แแ แแญ แจแฐแแฐแแแ แจแตแซ แญแแ แจแแ แจแแ แแแแซ แแ แ แตแแตแ แแแ แแแ แแ แแฐแจแ แจแแฝแแ แต แฅแตแแ แ แแกแก
โบ/Partial completion/ แแแต แแแกแกแจแแ แ แแฃแ แฉ แจแแญ แฅแแฐแฐแฅแซแซแ แจแแฐแ แญแแแแกแก
๐งแตแแแแ แจแแแฃแณ แแแแจแต แ แฃแต แจแแแ แแณแญ แจแแแฃแ แฐแแซแฉ แจแแแ แจแแแฃแณ แตแซ แ แแ แตแซ แจแแ แแแแซ แแ /completion date/ แณแซแ แแ แ แจแแจ แฅแแฐแแ แแแกแก
โบแจแแแแฅ แ แฃแฑ แจแแฃแแ แ แฐแแซแฉ แแญ แแแกแกแฐแแซแฉ แแแฃแณแแ แแแแจแ แต แแฅแซแแณแแฑ แแ แ แแ แจแฐแแแ แแ แจแแ แชแณแซ แแแซแจแแจแแ แญแแแแกแกแ แแแซแฝแ แแญ แฅแจแฐแแก แแตแซแต แแฐแแซแฉ แแฅแตแ แญแแญ แแแกแกแญแ แแแต แ แฐแชแ แจแแ แแ แแแแซ แแ แตแแแ แแ แ แแญแฃแแ แแแต แ แญแฝแแแกแกแ แแ แแญ แจแฐแแแ แ แจแแแแจแต แ แฃแต แฃแชแซ แแ แ แจแแ แ แแ แแ แ แฐแชแ แแ แแแจแฅ แญแฝแแแกแกแแ แจแฐแแจแ แ แแ แจแแแแจแต แ แฃแต แจแแฃแ แแแญแ แจแแแกแก
๐แแแ แฐแแซแฉ แแฐ แแแแจแต แ แฃแต แฅแแฒแแฃ แจแแฐแจแ แ แตแแตแ แ แ แแฃแก แแจแแแฅ แซแแ แต แแแญ แแแแฒแฑ แแฐแแซแฉ แจแแ แแซแแแซ/Extension of Time / แแ แทแ แแญแต แ แแแแฐแ แจแแแ แแฅแฅ แแแกแกแแญแแซแฑแ แแฐแแซแฉ แจแแ แแซแแแซ แฐแแ แถแแต แจแแ แจแแแฃแณ แแ แแแแซ แแแแ แ แฅแฎ แตแแแซแแแ แแ แตแแแแจแญ แแแกแก
โบแจแแแซแฝแแ แจแ แ แแฅแแ แ แแ แจแแต แแ แญแแ? แจแแแแ แแแแแต แ แแตแแฅแแญ แ แ แ แแแฝ 1887 แฅแตแจ 1895 แตแจแต แจแฐแฐแแแแตแ แแณแฐแต แญแ แญแแแกแก
๐ซแ แแตแแฅแแญ แ แ แ แแแฝ 1889 แแญ แฐแแแฎแฝ แ แแแธแ แแแแฃแต แ แแฐแแ แแแ แฅแแฐแแ แแดแณแแ แซแแแธแ แฅแแฐแแ แแญแ แ แแตแ แจแแธแ แฅแแฐแแ แแญแ แ แแแญแถ แจแแธแ แฅแแฐแแ แจแแจแแแแ แจแแแฎ แแ แ แ แตแแตแแ แ แแแธแ แแแแฐแ แฅแแฐแแฝแ แ แแแ แต แแแฉ แฐแฐแแแแแกแกแฅแแ แแญ แจแแ แแดแณแ แ แแแญแถ แแแธแ แตแแแซแตแจแตแแ แ แฃแต แจแแแแแต แ แฐแแญ แจแแแฃแณ แแ แจแแณแต แแแซ/liquidated damage/ แจแแแแจแต แญแแแแกแก
โบแจแแแแจแต แ แฃแต แตแแแแต แฃแ แแ แ แฐแชแ แจแแ แตแซ แฅแแฒแแธแแ แจแ แฃแต แแแแกแแ แแแแ แ แแฅแต แฅแแฐแแแจแ แจแ/แ /แ 1890(2) แญแฐแแแแแกแกแฅแแฐแแแ แ แฐแชแ แชแณแซ แฃแญแฐแญแตแ แต แฅแแณ แจแแแแจแต แ แฃแต แแแแก แแจแแแ แฅแแฐแแแฃ แจแ/แ /แ 1892(1) แญแฐแแแแแกแกแฅแแแฒแ แฐแแซแฉ แแแฃแณแแ แ แแ แฑ แซแแ แแแแ แ แฐแชแแ แแ แฅแ แแแแณแต แ แตแฆ แแแ แ แแ แธแแฐแแแต แแญแ แ แจแฃแต แฅแแต แแแ แจแฐแจแแแ แฅแแฐแแ แ แฐแชแ แ แแ แจแฐแแแ แ แจแ แฃแต แแแแฅ แ แแญ แ แฐแจแฐแ แต แตแญแญแแ แแณแต แแ แ แแญ แจแฐแแซแฉ แแญ แชแณแซ แแแ แจแ แฅแแฐแแฝแ แจแ/แ /แ 1892(2) แญแฐแแแแแกแก
โ๏ธแแแ แจแแแแจแต แ แฃแต แแ แ แ แณแแฝ แแแแต แจแแฝแแ แต แฅแตแ แตแแแแฉ แจแ/แ /แ 1893 แญแฐแแแแแกแกแญแแแ แฐแแซแฉ แแดแณแแ แ แจแแ แจแแธแ แแ แฒแแ แแแกแกแญแ แแแต แฐแแซแฉ แฃแจแแแแ แตแซ แแ แ แฃแต แจแแฃแแ แต แ แญแแแ แแแต แแแกแก
โบแ แแ แจแแต แ แฒแชแ แแแฃแณ แตแซแแฝ แแ แจแแ แแฐแณแฐแชแซ แ แแแฝ 47(1) แแญ แฐแแซแฉ แตแซแแ แ แแ แจแแ แแแแซ แแ แซแแ แแแ แแแแจแ แต แแฅแซแแณแแฑ แแ แจแแแ แแ 1/1000 แฅแแฐแแจแแ แฅแ แญแแแ แ แ แแแญ แแ แ แจแแ แแ แจ(10-20%)แแฅแแฅ แฅแแฐแแญแฝแ แญแฐแแแแแกแกแแแ แแ แ แจแแ แแฐแจแแแแ แตแซ แแแแฒแฑ แแจแแแซ แฐแญแฐแแฌแต แ แฐแ แแ แจแ แฃแฑ แแ แ แจแแฐแแ แฃแแฐแจแแแแ แตแซ แแ แ แแ แแญ แ แแแตแจแต แญแแแ แแแต แแแกแก
โถ๏ธแ แแจแจแปแ แจแแแแจแต แ แฃแต แ แ แแแญ แจแแญ แฅแแณแจแแ แฅแแฐแ แฃแต แจแแแ แญแ แ แ แ แ แฃแฑ แฅแแ แ แจแแฐแ แ แฒแแ แ แฎแแ แแ แจแ แ แตแญแ แต แแ แ แฃแต แ แญแฐแแแกแก
โบแ แฎแแ แแ แจแแ แจแแณแต แแแซ แ แ แฐแชแ แแญ แจแฐแจแฐแ แแณแต แแญ แฅแฉแ แแ แแแแแ แจแแแญแ แต แฒแแ แจแ แฃแต แ แญแแต แฐแแณแณแญ แฃแ แช แซแแ แฐแแปแแแต แ แญแแจแแแกแก
@etconp
๐ซแ แฎแแตแตแซแญแฝแ แแ แแญ แจแแ แจแแแฃแณ แตแซ แฐแฅแ แจแฐแแแ แแ แ แฒแแญแ แฅแ แแญแแญ แตแแตแแฌแฝแ แแฐแจแต แ แแ แ แฐแแแ แ แจแแ แแฐแฅ แฐแญแถ แแ แแแ แจแฐแแซแฉ แแแแแต แแแกแก
๐งแฐแแซแฉ แจแแแ แจแแแฃแณ แตแซ แ แแ แ แฐแแแ แ แจแแ แแฐแฅ แ แแ แฑ แฐแญแถ แซแแ แแแ แฅแแฐแแ แจแแ แแ แแแแซ แแ/completion date/ แ แแ แแแฃแณแ แฅแตแจแแ แแแ แ แต แแ แตแจแต แแฅแซแแณแแฑ แแ แฐแแซแฉ แจแแแฃแณ แแแแจแต แแญแแซแต แแ แฐแชแ แจแแ แแณแต แแแซ/Liquidated damage/ แจแแญแแ แแแแแต แญแแญแ แณแแกแก
๐ฐแ แแ แ แฐแแแ แ แจแแ แแฐแฅ แฒแฃแ แแ แแแต แแ?
โบแ แแณแแต แ แฐแชแแฝ/client/ แ แแแแค แฅแฅแจแต แ แแ แแญ แจแฐแแแ แ แฐแแซแฉแ แ แฐแชแ แแแแฃแณแ แแ แแแแซ แจแฐแตแแแ แตแ แจแแ แฅแแต/แจแแ แฅแญแแแ/ แแแ แญ แจแแแแจแ แแ แ แแซ แแ แจแฐแแจแแ แต แแ แแแฎ แฅแแฐแแ แญแจแฑแณแแกแกแญแ แ แจแณแต แตแ แฐแต แแแกแก
๐ฒแ แฎแแตแตแซแญแฝแ แแ แตแ แแ แ แแฃแ แญ แ แฐแแญ
-แจแแแฃแณ แแ แจแฐแฐแจแแ แต แแ/contract signing date/ แฃ
-แแขแแญแแฝแ แแฌแต/mobilization period/แฃ
-แจแณแญแต แแจแจแขแซ แแ/site handover/แฃ
-แจแตแซ แแแแชแซ แแ/commencement date/ แฅแ
-แจแตแซ แแ แแแแซ แแ/completion date/ แจแแแตแ แแจแณแต แจแแแฃแณ แจแแ แจแแณแต แแแซ/Liquidated damage/ แจแแแแ แ แ แแฃแก แแแแ แญแ แ แแแกแก
๐งแ แแฐแจแฑ แ แแ แจแฐแแแ แ แจแตแซ แแจแแแ แจแแ แแฐแฅ แแแ แญ แจแแแแจแ แฐแแซแฉ แจแแแฃแณแแ แณแญแต แจแ แฐแชแ แจแฐแจแจแ แ แแ แแแกแก
โบแญแแแ แจแณแญแต แญแญแญแฅ แ แแ แจแตแซ แแแแชแซ แแ /commencement date/ แ แแแแฒแฑ แจแแแฐแ แฅแ แแฐแแซแฉ แจแแแแฝแแต แญแแแแกแก
โบแฅแแแฒแ แ แแแแฒแฑ แจแแแฐแแ แจแตแซ แแแแชแซ แแ แแแฎ แ แแ แแญ แจแฐแแแ แ แแ แญแแ แญแ แจแตแซ แแ แแแแซ แแ/completion date/ แแผ แฅแแฐแแ แแแแ แซแตแฝแแ แแแต แแแกแก
โ๏ธแฅแแ แแญ แแณแแ แจแแแฃแ แแแญ แ แฎแแตแตแซแญแฝแ แแ แแญ แจแฐแแฐแแแ แจแตแซ แญแแ แจแแ แจแแ แแแแซ แแ แ แตแแตแ แแแ แแแ แแ แแฐแจแ แจแแฝแแ แต แฅแตแแ แ แแกแก
โบ/Partial completion/ แแแต แแแกแกแจแแ แ แแฃแ แฉ แจแแญ แฅแแฐแฐแฅแซแซแ แจแแฐแ แญแแแแกแก
๐งแตแแแแ แจแแแฃแณ แแแแจแต แ แฃแต แจแแแ แแณแญ แจแแแฃแ แฐแแซแฉ แจแแแ แจแแแฃแณ แตแซ แ แแ แตแซ แจแแ แแแแซ แแ /completion date/ แณแซแ แแ แ แจแแจ แฅแแฐแแ แแแกแก
โบแจแแแแฅ แ แฃแฑ แจแแฃแแ แ แฐแแซแฉ แแญ แแแกแกแฐแแซแฉ แแแฃแณแแ แแแแจแ แต แแฅแซแแณแแฑ แแ แ แแ แจแฐแแแ แแ แจแแ แชแณแซ แแแซแจแแจแแ แญแแแแกแกแ แแแซแฝแ แแญ แฅแจแฐแแก แแตแซแต แแฐแแซแฉ แแฅแตแ แญแแญ แแแกแกแญแ แแแต แ แฐแชแ แจแแ แแ แแแแซ แแ แตแแแ แแ แ แแญแฃแแ แแแต แ แญแฝแแแกแกแ แแ แแญ แจแฐแแแ แ แจแแแแจแต แ แฃแต แฃแชแซ แแ แ แจแแ แ แแ แแ แ แฐแชแ แแ แแแจแฅ แญแฝแแแกแกแแ แจแฐแแจแ แ แแ แจแแแแจแต แ แฃแต แจแแฃแ แแแญแ แจแแแกแก
๐แแแ แฐแแซแฉ แแฐ แแแแจแต แ แฃแต แฅแแฒแแฃ แจแแฐแจแ แ แตแแตแ แ แ แแฃแก แแจแแแฅ แซแแ แต แแแญ แแแแฒแฑ แแฐแแซแฉ แจแแ แแซแแแซ/Extension of Time / แแ แทแ แแญแต แ แแแแฐแ แจแแแ แแฅแฅ แแแกแกแแญแแซแฑแ แแฐแแซแฉ แจแแ แแซแแแซ แฐแแ แถแแต แจแแ แจแแแฃแณ แแ แแแแซ แแแแ แ แฅแฎ แตแแแซแแแ แแ แตแแแแจแญ แแแกแก
โบแจแแแซแฝแแ แจแ แ แแฅแแ แ แแ แจแแต แแ แญแแ? แจแแแแ แแแแแต แ แแตแแฅแแญ แ แ แ แแแฝ 1887 แฅแตแจ 1895 แตแจแต แจแฐแฐแแแแตแ แแณแฐแต แญแ แญแแแกแก
๐ซแ แแตแแฅแแญ แ แ แ แแแฝ 1889 แแญ แฐแแแฎแฝ แ แแแธแ แแแแฃแต แ แแฐแแ แแแ แฅแแฐแแ แแดแณแแ แซแแแธแ แฅแแฐแแ แแญแ แ แแตแ แจแแธแ แฅแแฐแแ แแญแ แ แแแญแถ แจแแธแ แฅแแฐแแ แจแแจแแแแ แจแแแฎ แแ แ แ แตแแตแแ แ แแแธแ แแแแฐแ แฅแแฐแแฝแ แ แแแ แต แแแฉ แฐแฐแแแแแกแกแฅแแ แแญ แจแแ แแดแณแ แ แแแญแถ แแแธแ แตแแแซแตแจแตแแ แ แฃแต แจแแแแแต แ แฐแแญ แจแแแฃแณ แแ แจแแณแต แแแซ/liquidated damage/ แจแแแแจแต แญแแแแกแก
โบแจแแแแจแต แ แฃแต แตแแแแต แฃแ แแ แ แฐแชแ แจแแ แตแซ แฅแแฒแแธแแ แจแ แฃแต แแแแกแแ แแแแ แ แแฅแต แฅแแฐแแแจแ แจแ/แ /แ 1890(2) แญแฐแแแแแกแกแฅแแฐแแแ แ แฐแชแ แชแณแซ แฃแญแฐแญแตแ แต แฅแแณ แจแแแแจแต แ แฃแต แแแแก แแจแแแ แฅแแฐแแแฃ แจแ/แ /แ 1892(1) แญแฐแแแแแกแกแฅแแแฒแ แฐแแซแฉ แแแฃแณแแ แ แแ แฑ แซแแ แแแแ แ แฐแชแแ แแ แฅแ แแแแณแต แ แตแฆ แแแ แ แแ แธแแฐแแแต แแญแ แ แจแฃแต แฅแแต แแแ แจแฐแจแแแ แฅแแฐแแ แ แฐแชแ แ แแ แจแฐแแแ แ แจแ แฃแต แแแแฅ แ แแญ แ แฐแจแฐแ แต แตแญแญแแ แแณแต แแ แ แแญ แจแฐแแซแฉ แแญ แชแณแซ แแแ แจแ แฅแแฐแแฝแ แจแ/แ /แ 1892(2) แญแฐแแแแแกแก
โ๏ธแแแ แจแแแแจแต แ แฃแต แแ แ แ แณแแฝ แแแแต แจแแฝแแ แต แฅแตแ แตแแแแฉ แจแ/แ /แ 1893 แญแฐแแแแแกแกแญแแแ แฐแแซแฉ แแดแณแแ แ แจแแ แจแแธแ แแ แฒแแ แแแกแกแญแ แแแต แฐแแซแฉ แฃแจแแแแ แตแซ แแ แ แฃแต แจแแฃแแ แต แ แญแแแ แแแต แแแกแก
โบแ แแ แจแแต แ แฒแชแ แแแฃแณ แตแซแแฝ แแ แจแแ แแฐแณแฐแชแซ แ แแแฝ 47(1) แแญ แฐแแซแฉ แตแซแแ แ แแ แจแแ แแแแซ แแ แซแแ แแแ แแแแจแ แต แแฅแซแแณแแฑ แแ แจแแแ แแ 1/1000 แฅแแฐแแจแแ แฅแ แญแแแ แ แ แแแญ แแ แ แจแแ แแ แจ(10-20%)แแฅแแฅ แฅแแฐแแญแฝแ แญแฐแแแแแกแกแแแ แแ แ แจแแ แแฐแจแแแแ แตแซ แแแแฒแฑ แแจแแแซ แฐแญแฐแแฌแต แ แฐแ แแ แจแ แฃแฑ แแ แ แจแแฐแแ แฃแแฐแจแแแแ แตแซ แแ แ แแ แแญ แ แแแตแจแต แญแแแ แแแต แแแกแก
โถ๏ธแ แแจแจแปแ แจแแแแจแต แ แฃแต แ แ แแแญ แจแแญ แฅแแณแจแแ แฅแแฐแ แฃแต แจแแแ แญแ แ แ แ แ แฃแฑ แฅแแ แ แจแแฐแ แ แฒแแ แ แฎแแ แแ แจแ แ แตแญแ แต แแ แ แฃแต แ แญแฐแแแกแก
โบแ แฎแแ แแ แจแแ แจแแณแต แแแซ แ แ แฐแชแ แแญ แจแฐแจแฐแ แแณแต แแญ แฅแฉแ แแ แแแแแ แจแแแญแ แต แฒแแ แจแ แฃแต แ แญแแต แฐแแณแณแญ แฃแ แช แซแแ แฐแแปแแแต แ แญแแจแแแกแก
@etconp
โค12๐6๐ฅ2
๐Here Is Our YouTube Channel
๐ซPlease Subscribe & Help Us๐
https://youtube.com/@ethiopianconstruction?si=YPBAC3MRTl5Uu6BK
๐ซPlease Subscribe & Help Us๐
https://youtube.com/@ethiopianconstruction?si=YPBAC3MRTl5Uu6BK
โค3๐3๐2
๐Concrete admixtures
๐ซConcrete admixtures are additives, either chemical or mineral, added to concrete during mixing to modify its properties, improving workability, durability, strength, and other characteristics.
๐ทHere's a more detailed explanation of concrete admixtures:
โ๏ธWhat are Concrete Admixtures?
โบAdmixtures are substances other than water, aggregates, cement, and fibers used to modify the properties of concrete, both in its fresh (unhardened) and hardened (set) states.
โบThey can be either chemical or mineral.
โบThey are added to the concrete mix before or during mixing.
๐Types of Concrete Admixtures:
Chemical Admixtures:
๐ฒWater-reducing admixtures:
โบReduce the amount of water needed for a given concrete mix, improving workability and strength.
๐ฒSuperplasticizers:
โบEnhance workability and flowability of concrete, allowing for high-strength concrete without sacrificing workability.
๐ฒAccelerators:
โบSpeed up the setting and hardening of concrete, leading to faster strength gain.
๐ฒRetarders:
โบSlow down the setting time of concrete, allowing for easier handling and placement, especially in hot weather.
๐ฒAir-entraining agents:
โบIntroduce small, controlled air bubbles into the concrete mix, improving its resistance to freeze-thaw damage.
๐ฒCorrosion inhibitors:
โบProtect reinforcing steel from corrosion, extending the lifespan of concrete structures.
๐ฒShrinkage reducing admixtures:
โบMinimize drying shrinkage cracking in concrete.
๐ฒMineral Admixtures:
Silica fume:
โบA fine, pozzolanic material that improves durability, strength, and reduces permeability.
๐ฒFly ash:
โบA byproduct of coal combustion that can act as a pozzolan, improving concrete properties.
๐ฒGround granulated blast-furnace slag:
โบA pozzolanic material that can improve concrete durability and strength.
โญ๏ธBenefits of Using Admixtures:
๐ฐImproved Workability:
โบAdmixtures can make concrete easier to place, finish, and pump.
๐ฐEnhanced Durability:
โบAdmixtures can improve concrete's resistance to freeze-thaw damage, chemical attack, and abrasion.
๐ฐIncreased Strength:
โบAdmixtures can help achieve higher concrete strengths, both early and at later ages.
๐ฐReduced Water Content:
โบWater-reducing admixtures allow for a reduction in the water-cement ratio, leading to stronger and more durable concrete.
๐ฐCost-effectiveness:
โบAdmixtures can help optimize concrete mixes, potentially reducing overall project costs.
@etconp
๐ซConcrete admixtures are additives, either chemical or mineral, added to concrete during mixing to modify its properties, improving workability, durability, strength, and other characteristics.
๐ทHere's a more detailed explanation of concrete admixtures:
โ๏ธWhat are Concrete Admixtures?
โบAdmixtures are substances other than water, aggregates, cement, and fibers used to modify the properties of concrete, both in its fresh (unhardened) and hardened (set) states.
โบThey can be either chemical or mineral.
โบThey are added to the concrete mix before or during mixing.
๐Types of Concrete Admixtures:
Chemical Admixtures:
๐ฒWater-reducing admixtures:
โบReduce the amount of water needed for a given concrete mix, improving workability and strength.
๐ฒSuperplasticizers:
โบEnhance workability and flowability of concrete, allowing for high-strength concrete without sacrificing workability.
๐ฒAccelerators:
โบSpeed up the setting and hardening of concrete, leading to faster strength gain.
๐ฒRetarders:
โบSlow down the setting time of concrete, allowing for easier handling and placement, especially in hot weather.
๐ฒAir-entraining agents:
โบIntroduce small, controlled air bubbles into the concrete mix, improving its resistance to freeze-thaw damage.
๐ฒCorrosion inhibitors:
โบProtect reinforcing steel from corrosion, extending the lifespan of concrete structures.
๐ฒShrinkage reducing admixtures:
โบMinimize drying shrinkage cracking in concrete.
๐ฒMineral Admixtures:
Silica fume:
โบA fine, pozzolanic material that improves durability, strength, and reduces permeability.
๐ฒFly ash:
โบA byproduct of coal combustion that can act as a pozzolan, improving concrete properties.
๐ฒGround granulated blast-furnace slag:
โบA pozzolanic material that can improve concrete durability and strength.
โญ๏ธBenefits of Using Admixtures:
๐ฐImproved Workability:
โบAdmixtures can make concrete easier to place, finish, and pump.
๐ฐEnhanced Durability:
โบAdmixtures can improve concrete's resistance to freeze-thaw damage, chemical attack, and abrasion.
๐ฐIncreased Strength:
โบAdmixtures can help achieve higher concrete strengths, both early and at later ages.
๐ฐReduced Water Content:
โบWater-reducing admixtures allow for a reduction in the water-cement ratio, leading to stronger and more durable concrete.
๐ฐCost-effectiveness:
โบAdmixtures can help optimize concrete mixes, potentially reducing overall project costs.
@etconp
โค8๐4
๐Avoid construction disputes
โบPrevent conflicts before they start! Clear contracts, proper planning, and transparent communication are the keys to a smooth construction project.
โญ๏ธHow to Avoid
Construction Disputes.
๐Clear Contract
๐Write down scope, timelines, and payments.
๐Document Everything
๐Keep records of drawings, approvals, and materials.
๐Good Communication
๐Talk regularly and share updates in writing.
๐Plan Properly
๐Schedule work realistically and identify risks.
๐Manage Changes
๐Record all changes with approvals and costs.
๐Check Quality
๐Inspect work regularly and fix problems early.
๐Timely Payments
๐Follow agreed payment schedule.
๐Follow Laws & Codes
๐Ensure work meets legal requirements.
๐Resolve lssues Early
๐Address small problems before they grow.
@etconp
โบPrevent conflicts before they start! Clear contracts, proper planning, and transparent communication are the keys to a smooth construction project.
โญ๏ธHow to Avoid
Construction Disputes.
๐Clear Contract
๐Write down scope, timelines, and payments.
๐Document Everything
๐Keep records of drawings, approvals, and materials.
๐Good Communication
๐Talk regularly and share updates in writing.
๐Plan Properly
๐Schedule work realistically and identify risks.
๐Manage Changes
๐Record all changes with approvals and costs.
๐Check Quality
๐Inspect work regularly and fix problems early.
๐Timely Payments
๐Follow agreed payment schedule.
๐Follow Laws & Codes
๐Ensure work meets legal requirements.
๐Resolve lssues Early
๐Address small problems before they grow.
@etconp
โค17
๐แแขแฐแฎแตแซ แ แญแญแดแญแถแฝ แแ
แ แญ แจแตแซ แ แตแแปแ แฆแณแแฝ แฅแซแตแแแ แแ แแแฝแ แญแ แแแข
๐แแญแแฉแ แจแณแฝ แ แฐแซแซแแ แจแแ แ แฉ แฆแแดแแ แแแแซ แญแแแจแฑแข
๐งAEA Members, it's an Election Year! ๐ณ
โบNominations are now open for the upcoming Executive Committee positions as part of the 25th Convention & Annual General Assembly.
โ๏ธ Self-nomination encouraged
โ๏ธ Submit one nomination at a time
โ๏ธ Nominate multiple people by reopening the link
โ๏ธ Add contact details of nominees for follow-up
โ๏ธHave someone in mind who would make a great EC member? Or ready to take the lead yourself?
๐ Submit your nomination here:๐ https://forms.gle/AQXKSfGgAqvnqceC6
โญ๏ธLetโs shape the future of our association together.
#AEA #ElectionYear #ArchitectsEthiopia #AGA25
@etconp
๐แแญแแฉแ แจแณแฝ แ แฐแซแซแแ แจแแ แ แฉ แฆแแดแแ แแแแซ แญแแแจแฑแข
๐งAEA Members, it's an Election Year! ๐ณ
โบNominations are now open for the upcoming Executive Committee positions as part of the 25th Convention & Annual General Assembly.
โ๏ธ Self-nomination encouraged
โ๏ธ Submit one nomination at a time
โ๏ธ Nominate multiple people by reopening the link
โ๏ธ Add contact details of nominees for follow-up
โ๏ธHave someone in mind who would make a great EC member? Or ready to take the lead yourself?
๐ Submit your nomination here:๐ https://forms.gle/AQXKSfGgAqvnqceC6
โญ๏ธLetโs shape the future of our association together.
#AEA #ElectionYear #ArchitectsEthiopia #AGA25
@etconp
Google Docs
Nomination Form | NEW Executive Committee (EC) Elections | 25th AGA & Convention
As part of the 25th Annual General Assembly and Convention of the Association of Ethiopian Architects (AEA), we invite all members to submit nominations for the new Executive Committee.
This nomination form accepts one nomination at a time, but members mayโฆ
This nomination form accepts one nomination at a time, but members mayโฆ
โค6
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค3
๐FORMWORK DISMANTLING:
๐ซFormwork dismantling, also known as stripping or striking, involves carefully removing the temporary molds used to shape concrete after it has hardened, ensuring the concrete structure is not damaged and that the formwork is handled safely.
๐ทHere's a more detailed breakdown of the process:
๐ง1. Timing is Crucial:
Wait for Concrete to Cure:
Formwork should only be removed after the concrete has gained sufficient strength to support itself.
๐Factors Affecting Curing Time:
The exact time depends on the concrete mix, ambient temperature, humidity, and the structure's load-bearing requirements.
Don't Rush:
Removing formwork prematurely can lead to structural failure or damage.
๐ง2. Safe Dismantling Practices:
Systematic Approach:
Develop a systematic method for releasing and lowering components in a controlled manner.
Start from the Top:
Remove the highest forms first, working downwards.
Use Appropriate Tools:
Use pry bars, hammers, or lifting equipment, as appropriate, to avoid damaging the concrete surface.
Avoid Damage:
Be careful not to damage the concrete, especially edges and corners.
Maintain Structural Balance:
Remove formwork on alternating sides to help maintain structural balance.
Safety First:
Use temporary platforms to minimize the risk of falls when stripping and ensure adequate lighting.
Protect Workers:
Protect workers from falling objects by setting up exclusion zones and installing warning signs.
Curing After Removal:
After removing the formwork, cover all exposed surfaces with polythene or wet hessian or แแแซ to prevent moisture loss for about 5 days, so that the concrete is fully cured.
๐ง3. Specific Considerations:
Vertical Formwork:
Often removed by using pry bars, hammers, or lifting equipment, as appropriate.
Horizontal Formwork:
May require props to be left under the slab until it gains sufficient strength.
Bridge Formwork:
Follow specific procedures for dismantling steel formwork of bridges, including removing supports and arches in a controlled manner.
Aluminum Formwork:
Follow specific procedures for construction and dismantling of aluminum alloy formwork, including removing diagonal supports and wall bolts.
๐ง4. Post-Dismantling:
Recycle or Dispose Responsibly:
If formwork is still in good condition, it may be reused for other parts of your project or stored for future projects.
Clean and Store:
Clean up the removed formwork and accessories in time, and transport them to the same position on the upper floor and lay them flat.
Maintenance:
Ensure the formwork is carefully handled at all times to maintain its value and operational readiness.
Waste Removal:
Damaged material Boards shall be removed as per Ethiopian waste management procedures.
@etconp
๐ซFormwork dismantling, also known as stripping or striking, involves carefully removing the temporary molds used to shape concrete after it has hardened, ensuring the concrete structure is not damaged and that the formwork is handled safely.
๐ทHere's a more detailed breakdown of the process:
๐ง1. Timing is Crucial:
Wait for Concrete to Cure:
Formwork should only be removed after the concrete has gained sufficient strength to support itself.
๐Factors Affecting Curing Time:
The exact time depends on the concrete mix, ambient temperature, humidity, and the structure's load-bearing requirements.
Don't Rush:
Removing formwork prematurely can lead to structural failure or damage.
๐ง2. Safe Dismantling Practices:
Systematic Approach:
Develop a systematic method for releasing and lowering components in a controlled manner.
Start from the Top:
Remove the highest forms first, working downwards.
Use Appropriate Tools:
Use pry bars, hammers, or lifting equipment, as appropriate, to avoid damaging the concrete surface.
Avoid Damage:
Be careful not to damage the concrete, especially edges and corners.
Maintain Structural Balance:
Remove formwork on alternating sides to help maintain structural balance.
Safety First:
Use temporary platforms to minimize the risk of falls when stripping and ensure adequate lighting.
Protect Workers:
Protect workers from falling objects by setting up exclusion zones and installing warning signs.
Curing After Removal:
After removing the formwork, cover all exposed surfaces with polythene or wet hessian or แแแซ to prevent moisture loss for about 5 days, so that the concrete is fully cured.
๐ง3. Specific Considerations:
Vertical Formwork:
Often removed by using pry bars, hammers, or lifting equipment, as appropriate.
Horizontal Formwork:
May require props to be left under the slab until it gains sufficient strength.
Bridge Formwork:
Follow specific procedures for dismantling steel formwork of bridges, including removing supports and arches in a controlled manner.
Aluminum Formwork:
Follow specific procedures for construction and dismantling of aluminum alloy formwork, including removing diagonal supports and wall bolts.
๐ง4. Post-Dismantling:
Recycle or Dispose Responsibly:
If formwork is still in good condition, it may be reused for other parts of your project or stored for future projects.
Clean and Store:
Clean up the removed formwork and accessories in time, and transport them to the same position on the upper floor and lay them flat.
Maintenance:
Ensure the formwork is carefully handled at all times to maintain its value and operational readiness.
Waste Removal:
Damaged material Boards shall be removed as per Ethiopian waste management procedures.
@etconp
โค5๐2
๐Factors influencing the strength of concrete
๐ซThe strength of concrete is mainly affected by the quality of raw materials, cement content, water-to-cement ratio, concrete pressure during pouring, concrete life, and treatment conditions.
โญ๏ธMajor factors affecting the strength of concreteแฆ
1. Quality of Raw Materials
Cement: It must meet standard specifications and be stored in dry conditions. Any pollution or loss of quality diminishes strength.
Gravel (gravel and sand): Its shape, size, purity, clay and salts (chlorides, sulfates) are very important.
Water: Preferably drinkable, as contaminated water affects chemical reaction.
2. Water to Cement Ratio
As the percentage of water to cement increases, the gaps in the interior structure of concrete increase, thus the strength decreases.
The ideal ratio strikes a balance between maneuverability and pressure force.
If the percentage is too low, the concrete becomes hard of the blood, which also leads to weak strength
3. The Contents of Cement
Increasing cement content (with consistency of water) reduces the content of water to cement, thus increases strength.
But too much cement can lead to shrinking and cracking problems.
4. Compaction of Concrete
Good blood removes air gaps and increases the density of concrete, improving its resistance.
Weakness of pressure leads to internal gaps that diminish strength.
5. The Age Of Concrete
Concrete gains most of its strength within 28 days of pouring.
Strength continues to increase with age if handled correctly
6. The Conditions of Curing
Curing Compounds are essential to retain moisture.
Untreated direct sun exposed concrete is much weaker than treated concrete.
๐Practical notes
โบUntreated concrete under direct sun may be as strong as one quarter of the strength of water-treated concrete at 20ยฐC.
โ๏ธTherefore, processing and durability are the two most neglected workers on site, though they determine the quality of final concrete more than anything else.
@etconp
๐ซThe strength of concrete is mainly affected by the quality of raw materials, cement content, water-to-cement ratio, concrete pressure during pouring, concrete life, and treatment conditions.
Any failure in these factors will result in weak mechanical resistance of concrete.
โญ๏ธMajor factors affecting the strength of concreteแฆ
1. Quality of Raw Materials
Cement: It must meet standard specifications and be stored in dry conditions. Any pollution or loss of quality diminishes strength.
Gravel (gravel and sand): Its shape, size, purity, clay and salts (chlorides, sulfates) are very important.
Water: Preferably drinkable, as contaminated water affects chemical reaction.
2. Water to Cement Ratio
As the percentage of water to cement increases, the gaps in the interior structure of concrete increase, thus the strength decreases.
The ideal ratio strikes a balance between maneuverability and pressure force.
If the percentage is too low, the concrete becomes hard of the blood, which also leads to weak strength
3. The Contents of Cement
Increasing cement content (with consistency of water) reduces the content of water to cement, thus increases strength.
But too much cement can lead to shrinking and cracking problems.
4. Compaction of Concrete
Good blood removes air gaps and increases the density of concrete, improving its resistance.
Weakness of pressure leads to internal gaps that diminish strength.
5. The Age Of Concrete
Concrete gains most of its strength within 28 days of pouring.
Strength continues to increase with age if handled correctly
6. The Conditions of Curing
Curing Compounds are essential to retain moisture.
Untreated direct sun exposed concrete is much weaker than treated concrete.
๐Practical notes
โบUntreated concrete under direct sun may be as strong as one quarter of the strength of water-treated concrete at 20ยฐC.
โ๏ธTherefore, processing and durability are the two most neglected workers on site, though they determine the quality of final concrete more than anything else.
@etconp
โค15๐2๐1
๐Main abbreviation in Construction engineering
1. BBS= Bar Bending Schedule
2. F.O.S= Factor of Safety
3. RCC = Reinforced Cement Concrete
4. PCC = plain cement concrete
5. NDT = Non destructive test
6. DL = Dead load
7. LL = live load
8. UDL = uniformly distributed load
9. FEM = finite element method
10. CAD = computer aided design
๐ Question ๐ฌ
1๏ธโฃ. Whatโs EBCS
2๏ธโฃ. whatโs BIM stands for
3๏ธโฃ. whatโs FCR
4๏ธโฃ. Whatโs W/C ratio
5๏ธโฃ. Whatโs FM ?
6๏ธโฃ. Whatโs TMT ?
7๏ธโฃ. Whatโs Fck
8๏ธโฃ. Whatโs HYSD
@etconp
1. BBS= Bar Bending Schedule
2. F.O.S= Factor of Safety
3. RCC = Reinforced Cement Concrete
4. PCC = plain cement concrete
5. NDT = Non destructive test
6. DL = Dead load
7. LL = live load
8. UDL = uniformly distributed load
9. FEM = finite element method
10. CAD = computer aided design
๐ Question ๐ฌ
1๏ธโฃ. Whatโs EBCS
2๏ธโฃ. whatโs BIM stands for
3๏ธโฃ. whatโs FCR
4๏ธโฃ. Whatโs W/C ratio
5๏ธโฃ. Whatโs FM ?
6๏ธโฃ. Whatโs TMT ?
7๏ธโฃ. Whatโs Fck
8๏ธโฃ. Whatโs HYSD
@etconp
โค14๐ฑ2
Permanent dimension changes due to loading is termed as:
Anonymous Quiz
6%
Extent
25%
Strain
21%
Creep
49%
Deformation
โค7
Which admixture is used to improve workability?
Anonymous Quiz
50%
Plasticizers
10%
Aggregates
32%
Accelerators
7%
Reducers
๐ฅฐ5โค4
The accumulation of water on the outer surface of concrete is called:
Anonymous Quiz
28%
Curing
60%
Bleeding
9%
Absorption
3%
Hardening
๐3
In the slope deflection equations, the
deformations are considered to be caused by
deformations are considered to be caused by
Anonymous Quiz
15%
a) Shear force
36%
(b) Bending moment
18%
(c) Axial force
32%
(d) Bending moment and shear force both
๐4โค2
A fixed beam settles at one end by ฮด, if EI is the
flexural rigidity of the beam, the fixed end
moments at the ends be
flexural rigidity of the beam, the fixed end
moments at the ends be
Anonymous Quiz
25%
(a) EI ฮด/L2
31%
(b) 2EI ฮด/L2
28%
(c) 4EI ฮด/L2
16%
(d) 6EI ฮด/L2
๐4โค2
The elastic curve of a beam means
Anonymous Quiz
25%
(a) BMD
8%
(b) SFD
28%
(c) Deflection curve
40%
(d) Stress-strain curve
๐11โค1
The deflection of beams may be decreased by
Anonymous Quiz
70%
(a) Increasing the depth of beam
13%
(b) Increase the span
10%
(c) Decreasing the depth of beam
7%
(d) Increasing the width of beam
โค6๐3