Which admixture is used to improve workability?
Anonymous Quiz
50%
Plasticizers
10%
Aggregates
32%
Accelerators
7%
Reducers
π₯°5β€4
The accumulation of water on the outer surface of concrete is called:
Anonymous Quiz
28%
Curing
60%
Bleeding
9%
Absorption
3%
Hardening
π3
In the slope deflection equations, the
deformations are considered to be caused by
deformations are considered to be caused by
Anonymous Quiz
15%
a) Shear force
36%
(b) Bending moment
18%
(c) Axial force
32%
(d) Bending moment and shear force both
π4β€2
A fixed beam settles at one end by Ξ΄, if EI is the
flexural rigidity of the beam, the fixed end
moments at the ends be
flexural rigidity of the beam, the fixed end
moments at the ends be
Anonymous Quiz
25%
(a) EI Ξ΄/L2
31%
(b) 2EI Ξ΄/L2
28%
(c) 4EI Ξ΄/L2
16%
(d) 6EI Ξ΄/L2
π4β€2
The elastic curve of a beam means
Anonymous Quiz
25%
(a) BMD
8%
(b) SFD
28%
(c) Deflection curve
40%
(d) Stress-strain curve
π11β€1
The deflection of beams may be decreased by
Anonymous Quiz
70%
(a) Increasing the depth of beam
13%
(b) Increase the span
10%
(c) Decreasing the depth of beam
7%
(d) Increasing the width of beam
β€6π3
Conjugate beam of an indeterminate structure
will be
will be
Anonymous Quiz
25%
(a) Unstable
43%
(b) Indeterminate
26%
(c) Stable
5%
(d) Can't say
π6β€5π1
βThe deflection of a point in the real beam is
numerically equal to the bending moment at
the corresponding point in the conjugate beamβ. This theorem is used for analysis of beams in which of the following methods?
numerically equal to the bending moment at
the corresponding point in the conjugate beamβ. This theorem is used for analysis of beams in which of the following methods?
Anonymous Quiz
13%
(a) Castigliano's method
32%
(b) Moment area method
51%
(c) Conjugate beam method
4%
(d) None of the above
π6β€2
The principle of virtual work is applied to elastic
system by considering virtual work done by
system by considering virtual work done by
Anonymous Quiz
19%
(a) Internal forces only
19%
(b) External forces only
58%
(c) Internal as well as external forces
4%
(d) None of the above
π1
Which of the following statements is not
applicable to Unit Load Method?
applicable to Unit Load Method?
Anonymous Quiz
24%
(a) External and internal forces are in equilibrium
23%
(c) The material is strained well within elastic limit
31%
(d) The structure is redundant
21%
(b) The structure is determinate
β€5
In reinforced concrete construction, the
structures in which marked changes in plane
dimension take place abruptly shall be provided with :
structures in which marked changes in plane
dimension take place abruptly shall be provided with :
Anonymous Quiz
15%
(a) contraction joints
16%
(b) vertical cut
35%
(c) construction joints
34%
(d) expansion joints
β€6
In reinforced cement concrete construction; lap
splices are not recommended to be used for
rebars when the bar diameter is more than :
splices are not recommended to be used for
rebars when the bar diameter is more than :
Anonymous Quiz
43%
(a) 32 mm
13%
(b) 30 mm
29%
(c) 36 mm
15%
(d) 25 m
β€6π2
Effective moment of inertia for short term
deflection of a reinforced concrete section does
not depend onβ
deflection of a reinforced concrete section does
not depend onβ
Anonymous Quiz
20%
(a) the maximum moment under the service load
21%
(c) breadth of the compression face
35%
(d) ultimate shrinkage strain of concrete.
24%
(b) depth of the neutral axis
π5β€1
At the time of bending of a beam, a layer is
neither elongated nor contracted is.
neither elongated nor contracted is.
Anonymous Quiz
16%
(a) Axis of symmetry
62%
(b) Neutral axis
13%
(c) Axis of moment
9%
(d) Axis of load
π4β€2
Quality of reinforcing steel is evaluated by :
Anonymous Quiz
9%
(a) Compressive strength
60%
(b) Tensile strength, ductility
28%
(c) Yield strength, ductility
4%
(d) None of the above
β€3
The additional cover thickness to be provided
in reinforced concrete member that are total
immersed in sea water is :
in reinforced concrete member that are total
immersed in sea water is :
Anonymous Quiz
28%
(a) 25 mm
12%
(b) 30 mm
10%
(c) 35 mm
50%
(d) 40 mm
β€3π3
π INTERCON Construction Chemicals
β Concrete Admixtures
β Bonding Agents
β Waterproofings
β Wall Putty, Prime Coat
β Concrete Repair Mortar
β Floor hardener, Epoxy
β Grout, Self-level mortar
β Quartz paint, Contextra
β Tile Adhesive & Tile Joint Fillers
β Geotextiles and other construction chemicals and materials
βοΈ Tel: 0961955555
πΉ Address 1: Signal road, around
Dinberwa Hospital
πΉ Addres 2: Wellosefer, Infront of
Dani Plaza
β Concrete Admixtures
β Bonding Agents
β Waterproofings
β Wall Putty, Prime Coat
β Concrete Repair Mortar
β Floor hardener, Epoxy
β Grout, Self-level mortar
β Quartz paint, Contextra
β Tile Adhesive & Tile Joint Fillers
β Geotextiles and other construction chemicals and materials
βοΈ Tel: 0961955555
πΉ Address 1: Signal road, around
Dinberwa Hospital
πΉ Addres 2: Wellosefer, Infront of
Dani Plaza
ADVERTISMENT
α³αα«α΅ ααα΅ α₯α α α¦αα΅ α α α«α’
β α¨ααα°α£αΈα α αααααΆα½
π ααα΅ any Size & thickness
π α α¦αα΅ (α₯αα΅ ααα£α΅α αα α)
π α¨α°αα«α© [modefic] α΅α«αα½α α₯αα°α«ααα’
β¦οΈ αααααα α₯α¨α³ α₯α¨α΅ α₯αααααα’
βοΈα΅αα 0904040477 ααα 0911016833 α°ααα α«ααα
π±α΄ααα«α αα α¦https://t.me/heavenic1
α α΅α«α»α¦ α 1.ααα«αΆ
α.2 α α¨α α€α αͺα³α αα α¨α΅
α₯α«α΅α α³αααα΅ ααα«α½α ααα’
α³αα«α΅ ααα΅ α₯α α α¦αα΅ α α α«α’
α³αα«α΅ ααα΅ α₯α α α¦αα΅ α α α«α’
β α¨ααα°α£αΈα α αααααΆα½
π ααα΅ any Size & thickness
π α α¦αα΅ (α₯αα΅ ααα£α΅α αα α)
π α¨α°αα«α© [modefic] α΅α«αα½α α₯αα°α«ααα’
β¦οΈ αααααα α₯α¨α³ α₯α¨α΅ α₯αααααα’
βοΈα΅αα 0904040477 ααα 0911016833 α°ααα α«ααα
π±α΄ααα«α αα α¦https://t.me/heavenic1
α α΅α«α»α¦ α 1.ααα«αΆ
α.2 α α¨α α€α αͺα³α αα α¨α΅
α₯α«α΅α α³αααα΅ ααα«α½α ααα’
α³αα«α΅ ααα΅ α₯α α α¦αα΅ α α α«α’
β€1π1
πHOLLOW CONCRETE BLOCK (HCB) β CLASS B LABORATORY TESTS
π«Class B Hollow Concrete Blocks are used for non-load bearing walls or medium-strength construction.
π§To certify quality, the following laboratory tests are performed.
β 1. Compressive Strength Test
βΊStandard: ASTM C140
Purpose: To measure block strength.
βοΈTypical Requirement for Class B HCB:
Minimum compressive strength: 3.5 MPa to 5.0 MPa (varies with project spec)
Test 3 blocks (average value)
β 2. Dimension & Shape Tolerance
Standard: ASTM C140 / ES Standard
Purpose: Check if the block meets size and shape requirements.
Requirements (typical):
Length, width, height within Β±3 mm tolerance
Faces should be flat and perpendicular
No large cracks or visible defects
β 3. Density Test (Dry Density)
Purpose: Confirm block classification (lightweight, medium, or normal).
Typical values:
1400 β 1700 kg/mΒ³ for Class B HCB
β 4. Water Absorption
Standard: ASTM C140
Requirement:
Water absorption β€ 12β15%
High absorption indicates weak block quality.
β 5. Block Weight Measurement
Purpose: Ensure consistency and structural performance.
Values depend on block size (e.g., 150 mm, 200 mm thickness).
β Optional Tests (if required)
Ultrasound pulse velocity test β for uniformity
Efflorescence test β check salt content
Moisture content
π Summary Table for Easy Use
Test Purpose Typical Requirement (Class B)
Compressive Strength Strength β₯ 3.5 β 5.0 MPa
Dimensions Size accuracy Β± 3 mm tolerance
Density Quality classification 1400β1700 kg/mΒ³
Water Absorption Durability β€ 12β15%
Weight Consistency As per design block type
@etconp
π«Class B Hollow Concrete Blocks are used for non-load bearing walls or medium-strength construction.
π§To certify quality, the following laboratory tests are performed.
β 1. Compressive Strength Test
βΊStandard: ASTM C140
Purpose: To measure block strength.
βοΈTypical Requirement for Class B HCB:
Minimum compressive strength: 3.5 MPa to 5.0 MPa (varies with project spec)
Test 3 blocks (average value)
β 2. Dimension & Shape Tolerance
Standard: ASTM C140 / ES Standard
Purpose: Check if the block meets size and shape requirements.
Requirements (typical):
Length, width, height within Β±3 mm tolerance
Faces should be flat and perpendicular
No large cracks or visible defects
β 3. Density Test (Dry Density)
Purpose: Confirm block classification (lightweight, medium, or normal).
Typical values:
1400 β 1700 kg/mΒ³ for Class B HCB
β 4. Water Absorption
Standard: ASTM C140
Requirement:
Water absorption β€ 12β15%
High absorption indicates weak block quality.
β 5. Block Weight Measurement
Purpose: Ensure consistency and structural performance.
Values depend on block size (e.g., 150 mm, 200 mm thickness).
β Optional Tests (if required)
Ultrasound pulse velocity test β for uniformity
Efflorescence test β check salt content
Moisture content
π Summary Table for Easy Use
Test Purpose Typical Requirement (Class B)
Compressive Strength Strength β₯ 3.5 β 5.0 MPa
Dimensions Size accuracy Β± 3 mm tolerance
Density Quality classification 1400β1700 kg/mΒ³
Water Absorption Durability β€ 12β15%
Weight Consistency As per design block type
@etconp
β€15
πTHE CHEMISTRY OF A CONCRETE MIX
π«When you combine Cement + Water + Aggregates + (Admixtures) a set of chemical reactions begin automatically.
π§The most important chemical process is hydration β the reaction between cement and water.
π·1. Chemistry of Cement
Cement is mainly made of four compounds:
*Tricalcium Silicate , CβS for Early strength + heat
*Dicalcium Silicate, CβS for Later strength
*Tricalcium Aluminate, CβA to Controls setting (fast reaction)
*Tetracalcium Aluminoferrite, CβAF for Minor strength
Gypsum (CaSOβΒ·2HβO) is added to control setting time.
π·2. When water is added β Hydration begins
Water reacts with cement compounds to form new materials that make the concrete hard and strong.
𧬠A. Main Reaction: Formation of CβSβH Gel
CβS + Water β CβSβH (Calcium Silicate Hydrate) + Ca(OH)β
CβSβH gel is the glue that binds everything
Gives strength + durability
Forms 50β60% of the final hardened concrete
CβS reacts slower:
CβS + Water β CβSβH + Less Ca(OH)β
This provides long-term strength.
𧬠B. Formation of Ettringite (Setting Control)
CβA reacts extremely fast, so gypsum controls the reaction:
CβA + Gypsum + Water β Ettringite
Ettringite crystals cause initial setting (stiffening).
If gypsum is finished, ettringite converts to monosulfate:
Ettringite β Monosulfate
𧬠C. Reaction of CβAF
Produces ferrite hydrates that help setting but add little strength.
π·3. Chemistry of Aggregates
Aggregates do not react much chemically.
Their main role is:
*Fill space
*Provide bulk
*Reduce cement content
*Improve strength by interlocking
But their surface bonds chemically with the CβSβH gel.
π·4. WaterβCement Ratio (w/c) Chemistry
Lower water = denser hydration products.
Low w/c β more CβSβH, higher strength
High w/c β more pores, weaker concrete
π·5. Chemistry of Admixtures
Admixtures modify hydration:
*Plasticizers / Superplasticizers
Disperse cement particles
Reduce water demand
Delay or accelerate hydration based on type
*Retarders
Slow down CβA + CβS reaction
*Accelerators
Speed up early hydration
π·6. Chemistry Timeline of Concrete Hydration
*0β2 Hours: Initial setting
-CβA + Gypsum β Ettringite
-Early CβS reaction begins
*2β10 Hours: Final setting
-Needle-like crystals lock particles
-Concrete becomes solid
*1β7 Days: Early Strength
-Rapid CβSβH growth from CβS
*7β28 Days: Major Strength Gain
-Slow hydration of CβS
-Pore structure becomes tighter
*MonthsβYears: Long-term Hydration
-Continuous formation of CβSβH gel
-Increase in durability
π In simple words:
βΊConcrete gets hard because cement reacts with water and forms glue (CβSβH gel) and crystals that bind sand and stone together.
@etconp
π«When you combine Cement + Water + Aggregates + (Admixtures) a set of chemical reactions begin automatically.
π§The most important chemical process is hydration β the reaction between cement and water.
π·1. Chemistry of Cement
Cement is mainly made of four compounds:
*Tricalcium Silicate , CβS for Early strength + heat
*Dicalcium Silicate, CβS for Later strength
*Tricalcium Aluminate, CβA to Controls setting (fast reaction)
*Tetracalcium Aluminoferrite, CβAF for Minor strength
Gypsum (CaSOβΒ·2HβO) is added to control setting time.
π·2. When water is added β Hydration begins
Water reacts with cement compounds to form new materials that make the concrete hard and strong.
𧬠A. Main Reaction: Formation of CβSβH Gel
CβS + Water β CβSβH (Calcium Silicate Hydrate) + Ca(OH)β
CβSβH gel is the glue that binds everything
Gives strength + durability
Forms 50β60% of the final hardened concrete
CβS reacts slower:
CβS + Water β CβSβH + Less Ca(OH)β
This provides long-term strength.
𧬠B. Formation of Ettringite (Setting Control)
CβA reacts extremely fast, so gypsum controls the reaction:
CβA + Gypsum + Water β Ettringite
Ettringite crystals cause initial setting (stiffening).
If gypsum is finished, ettringite converts to monosulfate:
Ettringite β Monosulfate
𧬠C. Reaction of CβAF
Produces ferrite hydrates that help setting but add little strength.
π·3. Chemistry of Aggregates
Aggregates do not react much chemically.
Their main role is:
*Fill space
*Provide bulk
*Reduce cement content
*Improve strength by interlocking
But their surface bonds chemically with the CβSβH gel.
π·4. WaterβCement Ratio (w/c) Chemistry
Lower water = denser hydration products.
Low w/c β more CβSβH, higher strength
High w/c β more pores, weaker concrete
π·5. Chemistry of Admixtures
Admixtures modify hydration:
*Plasticizers / Superplasticizers
Disperse cement particles
Reduce water demand
Delay or accelerate hydration based on type
*Retarders
Slow down CβA + CβS reaction
*Accelerators
Speed up early hydration
π·6. Chemistry Timeline of Concrete Hydration
*0β2 Hours: Initial setting
-CβA + Gypsum β Ettringite
-Early CβS reaction begins
*2β10 Hours: Final setting
-Needle-like crystals lock particles
-Concrete becomes solid
*1β7 Days: Early Strength
-Rapid CβSβH growth from CβS
*7β28 Days: Major Strength Gain
-Slow hydration of CβS
-Pore structure becomes tighter
*MonthsβYears: Long-term Hydration
-Continuous formation of CβSβH gel
-Increase in durability
π In simple words:
βΊConcrete gets hard because cement reacts with water and forms glue (CβSβH gel) and crystals that bind sand and stone together.
@etconp
β€8π2
πClaim on Additional floor Construction/Addition Works/:
π«A contractor can generally claim for an additional floor construction requested by the client, but it depends on the contract agreement and the change management procedures in place.
π·How it usually works?
π§1. Check the Original Contract
If the signed contract was for G+8, and now the client wants to extend to G+10, this is outside the original scope.
The contractor is not obligated to do it without a variation order (VO) or new contract agreement.
π§2. Variation / Change Order
Most contracts (FIDIC, PPA Ethiopia 2011, etc.) have clauses for variations.
The client (or Engineer/Consultant) issues a variation instruction in writing.
The contractor then submits a claim for:
Additional costs (materials, labor, equipment, subcontractors).
Time extension (because adding two floors increases duration).
π§3. Contractorβs Right to Claim
The contractor can claim if:
The client formally instructs the change.
The change affects cost and time.
Contractor must submit the claim within the time frame stated in the contract (often 28 days in FIDIC).
π§4. Evaluation and Approval
The Engineer/Consultant or Client evaluates the claim.
Once approved, the contract price and completion date are adjusted.
π§5. Risks if No Formal Agreement
If the contractor builds extra floors without written approval, payment disputes may arise.
The client may later refuse to pay, claiming it was not properly instructed.
πIn summary:
βΊThe contractor has the right to claim for additional floor construction requested by the client, but it must go through the formal variation/change order process, with clear documentation of cost and time impact.
@etconp
π«A contractor can generally claim for an additional floor construction requested by the client, but it depends on the contract agreement and the change management procedures in place.
π·How it usually works?
π§1. Check the Original Contract
If the signed contract was for G+8, and now the client wants to extend to G+10, this is outside the original scope.
The contractor is not obligated to do it without a variation order (VO) or new contract agreement.
π§2. Variation / Change Order
Most contracts (FIDIC, PPA Ethiopia 2011, etc.) have clauses for variations.
The client (or Engineer/Consultant) issues a variation instruction in writing.
The contractor then submits a claim for:
Additional costs (materials, labor, equipment, subcontractors).
Time extension (because adding two floors increases duration).
π§3. Contractorβs Right to Claim
The contractor can claim if:
The client formally instructs the change.
The change affects cost and time.
Contractor must submit the claim within the time frame stated in the contract (often 28 days in FIDIC).
π§4. Evaluation and Approval
The Engineer/Consultant or Client evaluates the claim.
Once approved, the contract price and completion date are adjusted.
π§5. Risks if No Formal Agreement
If the contractor builds extra floors without written approval, payment disputes may arise.
The client may later refuse to pay, claiming it was not properly instructed.
πIn summary:
βΊThe contractor has the right to claim for additional floor construction requested by the client, but it must go through the formal variation/change order process, with clear documentation of cost and time impact.
@etconp