Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.21K links
πŸ”¨ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

πŸ“¨ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Conjugate beam of an indeterminate structure
will be
Anonymous Quiz
25%
(a) Unstable
43%
(b) Indeterminate
26%
(c) Stable
5%
(d) Can't say
πŸ‘Œ6❀5πŸ•Š1
β€œThe deflection of a point in the real beam is
numerically equal to the bending moment at
the corresponding point in the conjugate beam”. This theorem is used for analysis of beams in which of the following methods?
Anonymous Quiz
13%
(a) Castigliano's method
32%
(b) Moment area method
51%
(c) Conjugate beam method
4%
(d) None of the above
πŸ‘6❀2
The principle of virtual work is applied to elastic
system by considering virtual work done by
Anonymous Quiz
19%
(a) Internal forces only
19%
(b) External forces only
58%
(c) Internal as well as external forces
4%
(d) None of the above
πŸ‘1
In reinforced concrete construction, the
structures in which marked changes in plane
dimension take place abruptly shall be provided with :
Anonymous Quiz
15%
(a) contraction joints
16%
(b) vertical cut
35%
(c) construction joints
34%
(d) expansion joints
❀6
In reinforced cement concrete construction; lap
splices are not recommended to be used for
rebars when the bar diameter is more than :
Anonymous Quiz
43%
(a) 32 mm
13%
(b) 30 mm
29%
(c) 36 mm
15%
(d) 25 m
❀6πŸ‘2
Effective moment of inertia for short term
deflection of a reinforced concrete section does
not depend on–
Anonymous Quiz
20%
(a) the maximum moment under the service load
21%
(c) breadth of the compression face
35%
(d) ultimate shrinkage strain of concrete.
24%
(b) depth of the neutral axis
πŸ™5❀1
At the time of bending of a beam, a layer is
neither elongated nor contracted is.
Anonymous Quiz
16%
(a) Axis of symmetry
62%
(b) Neutral axis
13%
(c) Axis of moment
9%
(d) Axis of load
πŸ™4❀2
The additional cover thickness to be provided
in reinforced concrete member that are total
immersed in sea water is :
Anonymous Quiz
28%
(a) 25 mm
12%
(b) 30 mm
10%
(c) 35 mm
50%
(d) 40 mm
❀3πŸŽ‰3
πŸ‘‰ INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

πŸ”Ή Address 1: Signal road, around
      Dinberwa Hospital

πŸ”Ή Addres 2: Wellosefer, Infront of
     Dani Plaza
ADVERTISMENT

α‰³αˆαˆ«α‰΅ α•αˆŒα‰΅ αŠ₯αŠ“ αŒ„ α‰¦αˆα‰΅ αŠ α‰…αˆ«α‰’

βœ…α‹¨αˆαŠ•αˆ°αŒ£α‰Έα‹ αŠ αŒˆαˆαŒαˆŽα‰Άα‰½

πŸ”… α•αˆŒα‰΅ any Size & thickness
πŸ”… αŒ„ α‰¦αˆα‰΅ (αŒ₯ርሡ αˆ›α‹‰αŒ£α‰΅αŠ“ αˆ›αŒ α)

πŸ”… α‹¨α‰°αˆˆα‹«α‹©  [modefic] αˆ΅αˆ«α‹Žα‰½αŠ• αŠ₯αŠ•αˆ°αˆ«αˆˆαŠ•α’

♦️ αˆ›αŠ•αŠ›α‹‰αŠ•αˆ α‰₯αˆ¨α‰³ α‰₯αˆ¨α‰΅ αŠ₯αŠ•αŒˆα‹›αˆˆαŠ•α’

☎️ሡልክ 0904040477 α‹ˆα‹­αˆ 0911016833 α‹°α‹αˆˆα‹ α‹«αŒαŠ™αŠ•
πŸ“±α‰΄αˆŒαŒαˆ«αˆ αˆ‹α‹­ ፦https://t.me/heavenic1

αŠ α‹΅αˆ«αˆ»α¦  ቁ 1.αˆ˜αˆ­αŠ«α‰Ά
                ቁ.2 αŠ α‹¨αˆ­ αŒ€αŠ“  αŠͺα‹³αŠ αˆαˆ…αˆ¨α‰΅

αŒ₯αˆ«α‰΅αŠ“ α‰³αˆ›αŠαŠα‰΅ αˆ˜αˆˆα‹«α‰½αŠ• αŠα‹α’
α‰³αˆαˆ«α‰΅ α•αˆŒα‰΅ αŠ₯αŠ“ αŒ„ α‰¦αˆα‰΅ αŠ α‰…αˆ«α‰’
❀1πŸ‘Œ1
πŸ‘‰HOLLOW CONCRETE BLOCK (HCB) – CLASS B LABORATORY TESTS

πŸ’«Class B Hollow Concrete Blocks are used for non-load bearing walls or medium-strength construction.

🚧To certify quality, the following laboratory tests are performed.

βœ… 1. Compressive Strength Test

⏺Standard: ASTM C140
Purpose: To measure block strength.

❇️Typical Requirement for Class B HCB:

Minimum compressive strength: 3.5 MPa to 5.0 MPa (varies with project spec)

Test 3 blocks (average value)

βœ… 2. Dimension & Shape Tolerance

Standard: ASTM C140 / ES Standard
Purpose: Check if the block meets size and shape requirements.

Requirements (typical):

Length, width, height within Β±3 mm tolerance

Faces should be flat and perpendicular

No large cracks or visible defects

βœ… 3. Density Test (Dry Density)

Purpose: Confirm block classification (lightweight, medium, or normal).

Typical values:

1400 – 1700 kg/mΒ³ for Class B HCB

βœ… 4. Water Absorption

Standard: ASTM C140
Requirement:

Water absorption ≀ 12–15%

High absorption indicates weak block quality.

βœ… 5. Block Weight Measurement

Purpose: Ensure consistency and structural performance.

Values depend on block size (e.g., 150 mm, 200 mm thickness).

βœ…Optional Tests (if required)

Ultrasound pulse velocity test – for uniformity

Efflorescence test – check salt content

Moisture content

πŸ“Œ Summary Table for Easy Use

Test Purpose Typical Requirement (Class B)

Compressive Strength Strength β‰₯ 3.5 – 5.0 MPa
Dimensions Size accuracy Β± 3 mm tolerance
Density Quality classification 1400–1700 kg/mΒ³
Water Absorption Durability ≀ 12–15%
Weight Consistency As per design block type

@etconp
❀15
πŸ‘‰THE CHEMISTRY OF A CONCRETE MIX

πŸ’«When you combine Cement + Water + Aggregates + (Admixtures) a set of chemical reactions begin automatically.

🚧The most important chemical process is hydration β€” the reaction between cement and water.

🏷1. Chemistry of Cement

Cement is mainly made of four compounds:

*Tricalcium Silicate , C₃S for Early strength + heat
*Dicalcium Silicate, Cβ‚‚S for Later strength
*Tricalcium Aluminate, C₃A to Controls setting (fast reaction)
*Tetracalcium Aluminoferrite,  Cβ‚„AF for Minor strength

Gypsum (CaSOβ‚„Β·2Hβ‚‚O) is added to control setting time.

🏷2. When water is added β†’ Hydration begins

Water reacts with cement compounds to form new materials that make the concrete hard and strong.

🧬 A. Main Reaction: Formation of C–S–H Gel

C₃S + Water β†’ C–S–H (Calcium Silicate Hydrate) + Ca(OH)β‚‚

C–S–H gel is the glue that binds everything

Gives strength + durability

Forms 50–60% of the final hardened concrete

Cβ‚‚S reacts slower:

Cβ‚‚S + Water β†’ C–S–H + Less Ca(OH)β‚‚

This provides long-term strength.

🧬 B. Formation of Ettringite (Setting Control)

C₃A reacts extremely fast, so gypsum controls the reaction:

C₃A + Gypsum + Water β†’ Ettringite

Ettringite crystals cause initial setting (stiffening).

If gypsum is finished, ettringite converts to monosulfate:

Ettringite β†’ Monosulfate

🧬 C. Reaction of Cβ‚„AF

Produces ferrite hydrates that help setting but add little strength.

🏷3. Chemistry of Aggregates

Aggregates do not react much chemically.
Their main role is:

*Fill space
*Provide bulk
*Reduce cement content
*Improve strength by interlocking

But their surface bonds chemically with the C–S–H gel.

🏷4. Water–Cement Ratio (w/c) Chemistry

Lower water = denser hydration products.

Low w/c β†’ more C–S–H, higher strength

High w/c β†’ more pores, weaker concrete


🏷5. Chemistry of Admixtures
Admixtures modify hydration:

*Plasticizers / Superplasticizers

Disperse cement particles

Reduce water demand

Delay or accelerate hydration based on type

*Retarders
Slow down C₃A + C₃S reaction

*Accelerators
Speed up early hydration

🏷6. Chemistry Timeline of Concrete Hydration

*0–2 Hours: Initial setting

-C₃A + Gypsum β†’ Ettringite
-Early C₃S reaction begins

*2–10 Hours: Final setting

-Needle-like crystals lock particles
-Concrete becomes solid

*1–7 Days: Early Strength

-Rapid C–S–H growth from C₃S

*7–28 Days: Major Strength Gain

-Slow hydration of Cβ‚‚S
-Pore structure becomes tighter

*Months–Years: Long-term Hydration

-Continuous formation of C–S–H gel
-Increase in durability

πŸ“Œ In simple words:

⏺Concrete gets hard because cement reacts with water and forms glue (C–S–H gel) and crystals that bind sand and stone together.

@etconp
❀8πŸ‘2
πŸ‘‰Claim on Additional floor Construction/Addition Works/:

πŸ’«A contractor can generally claim for an additional floor construction requested by the client, but it depends on the contract agreement and the change management procedures in place.

🏷How it usually works?

🚧1. Check the Original Contract

If the signed contract was for G+8, and now the client wants to extend to G+10, this is outside the original scope.

The contractor is not obligated to do it without a variation order (VO) or new contract agreement.

🚧2. Variation / Change Order

Most contracts (FIDIC, PPA Ethiopia 2011, etc.) have clauses for variations.

The client (or Engineer/Consultant) issues a variation instruction in writing.

The contractor then submits a claim for:

Additional costs (materials, labor, equipment, subcontractors).

Time extension (because adding two floors increases duration).

🚧3. Contractor’s Right to Claim

The contractor can claim if:

The client formally instructs the change.

The change affects cost and time.

Contractor must submit the claim within the time frame stated in the contract (often 28 days in FIDIC).

🚧4. Evaluation and Approval

The Engineer/Consultant or Client evaluates the claim.

Once approved, the contract price and completion date are adjusted.

🚧5. Risks if No Formal Agreement

If the contractor builds extra floors without written approval, payment disputes may arise.

The client may later refuse to pay, claiming it was not properly instructed.

πŸ“œIn summary:

⏺The contractor has the right to claim for additional floor construction requested by the client, but it must go through the formal variation/change order process, with clear documentation of cost and time impact.

@etconp
❀8πŸ‘3πŸ‘2πŸ•Š1
#ADVERTISEMENT

πŸ‘‰αˆˆαŒαŠ•α‰£α‰³α‹Ž ውበቡ αŠ₯αŠ›αŠ• ሡለ αˆαŠ“αˆ΅αˆαˆαŒα‹Ž αŠ¨αŒαŠ•α‰£α‰³ α‰ αŠ‹αˆ‹ α‹ˆα‹° αŠ₯αŠ› α‹­α‹°α‹αˆ‰α’

πŸ’«AR Building Finishing & Water Proofing Works αˆˆαˆ…αŠ•αƒα‹Žα‰½ ውበቡ ፈጣαˆͺα‹Žα‰½ αŠαŠ•

πŸš§α‰ αˆα‹© αŒ₯αˆ«α‰΅ α‹¨αŠαŠ’αˆ½αŠ•αŒ αˆ΅αˆ«α‹αŠ• αŠ αŒ αŠ“α‰€αŠ• α‰€α‰΅α‹Ž ውበቡ αŠ αŒŽαŠ“α…αˆαŠ• αŠ₯αŠ“αˆ΅αˆ¨αŠ­α‰₯α‹Žα‰³αˆˆαŠ•α’

πŸŒŸαŠ¨αˆ˜αŠ–αˆͺα‹« ቀቡ αŠ₯ሡከ α‰΅αˆαˆα‰… αˆ…αŠ•αƒα‹Žα‰½ αŠ αˆ»αˆ«α‰½αŠ•αŠ• αŠ αˆ³αˆ­αˆαŠ“αˆα’
▢️Contextra
▢️Fine quartez
▢️ Water Proofing Chemicals
▢️ Membranes α‰ αŒ₯αˆ«α‰΅ αŠ₯αŠ•αˆ°αˆ«αˆˆαŠ•α’

πŸŽ²α‰ α‰°αŒ¨αˆ›αˆͺ የ Sales αˆ΅αˆ«α‹Žα‰½ αŠ₯αŠ•αˆ°αˆ«αˆˆαŠ•

πŸ“αŠ α‹΅αˆ«αˆ»:β€”αŠ‘αˆ«αŠ€αˆ αˆ€α‹­αˆ‹αˆˆαˆ αˆ…αŠ•αƒ
            ሡልክ  0977 67 67 90
                      0912 23 04 71

πŸ’«AR Building Finishing & Water Proofing Works

πŸ“Œα‰΄αˆŒαŒαˆ«αˆπŸ‘‡

https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
❀2
πŸ‘‰Reuse of Formwork

πŸ“ŒReuse of Formwork Material β€” Save Cost, Save Time, Build Smart!

πŸ“ŒProper cleaning, maintenance, and timely repairs allow shuttering materials to be reused multiple times, reducing project cost and ensuring consistent concrete quality.

πŸ“ŒReuse of Formwork Materials

πŸ“š1. Materials that can be reused

πŸ”—Timber β†’ 5-7 times
πŸ”—Plywood β†’ 10-20 times
πŸ”—Steelβ†’ 100-200 times
πŸ”—Aluminium β†’ 150-300 times
πŸ”—Plasticβ†’ 50-100 times

πŸ“š2. How to increase reuse

πŸ”—Apply shuttering oil.
πŸ”—Clean after every use.
πŸ”— Store in a dry place.
πŸ”— Handle carefully (no damage).
πŸ”—Repair small defects.

πŸ“š3. Benefits

πŸ”— Saves cost.
πŸ”— Reduces material waste.
πŸ”— Faster work.

πŸ’«Efficient reuse = Efficient construction.

@etconp
πŸ‘5❀3
πŸ‘‰performance-related pay (PRP) in the construction industry, with a focus on Ethiopia and East Africa, and how it connects to global practice.

🚧1. What Performance-Related Pay Means

Performance-related pay (PRP) links an employee’s earnings to measurable results β€” not just to time worked.
In construction, that means workers, supervisors, or contractors can earn extra pay for doing one or more of the following:

β€’ Finishing work faster than planned (without lowering quality)
β€’ Keeping costs within or below budget
β€’ Maintaining a strong safety record
β€’ Delivering high-quality workmanship
β€’ Meeting specific productivity targets

It’s a way to motivate performance, reward efficiency, and align the worker’s interest with the project’s success.

🚧2. How PRP Works in Global Construction Practice

Around the world, PRP takes several main forms:

a. Bonus and Incentive Schemes
β€’ End-of-project bonuses: Paid when a project is completed early or meets key milestones.
β€’ Safety or quality bonuses: Reward workers or teams for achieving zero accidents or quality rework.
β€’ Performance appraisals: Supervisors and professionals are evaluated yearly, and bonuses are tied to ratings.

b. Piecework (Output-Based Pay)

Common in trades like bricklaying, plastering, roofing, or steel fixing.
Workers are paid per unit of work done β€” for example, per cubic meter of concrete placed or per square meter of wall finished.

c. Gainsharing and Profit Sharing

Some companies share part of the profit or cost savings with staff when a project performs better than expected.
This is common in big firms in the UK, USA, Australia, and Japan.

d. Performance-Based Contracts

Contractors themselves are paid based on performance β€” not just completion.
Examples:
β€’ β€œTarget cost” contracts in the UK: If a contractor delivers below the agreed cost, savings are shared with the client.
β€’ β€œDesign-build” or β€œturnkey” models link final payment to quality and functional performance.

🚧3. Performance-Related Pay in Ethiopia and East Africa

a. Current reality

In Ethiopia, Kenya, Tanzania, and Uganda, construction pay is still mostly time-based (daily, weekly, or monthly wages).
However, some elements of PRP exist β€” especially in large projects or companies with foreign partnerships.

Examples:
β€’ Site bonuses: When a project finishes early or meets milestones (especially in road and building works funded by international donors).
β€’ Piece-rate work: Common among casual laborers (e.g., masons or painters paid per square meter or cubic meter).
β€’ Engineer or supervisor incentives: Small allowances for meeting project schedules or maintaining safety standards.

b. Government and institutional influence
β€’ In public projects, pay structures follow government salary scales, so PRP is limited.
β€’ In private and international projects, PRP is more flexible β€” often written into contracts or negotiated individually.
β€’ Chinese and Turkish contractors working in Ethiopia often apply output-based systems or completion bonuses for key staff.

c. Cultural and structural challenges

1. Limited performance data: Hard to measure productivity accurately due to weak documentation and record systems.
2. Low awareness: Many workers are unfamiliar with PRP principles or fear unfair evaluation.
3. Payment delays: Incentives lose meaning if base pay isn’t regular.
4. Collective work patterns: Construction tasks rely on teams, so individual assessment can be tricky.
5. Labor law limits: Some national labor laws don’t clearly define or protect PRP systems.

🚧4. Opportunities and Future Direction

Performance-related pay is slowly gaining attention in East Africa, especially as:
β€’ Construction becomes more industrialized (mechanized, data-based).
β€’ Private developers and international donors push for efficiency and accountability.
β€’ Governments seek to reduce project delays and cost overruns.

@etconp
❀15πŸ‘1
πŸ‘‰What is the shear strength?

πŸ’«The shear strength of any material can be defined as the capacity of that material to resist those forces which cause the internal layers of the material structure to slide against each other in the direction of the force.

⏺The shear strength of the material can be computed in the either vertical or horizontal direction, by applying a force in the desired direction.

@etconp
❀7πŸ‘6