Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
πŸ”¨ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

πŸ“¨ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Burj khalifa
-Height-828 m
-Material-steel,concrete
-floors:-163
-service..office,,hotel residential
- location-Dubai,UAE
-Rank-1st

@etconp
πŸ‘6
Shanghi Tower
Height-632m
material-composite
floors-128
service-hotel,office
location-shanghi,china
Rank-2nd

@etconp
πŸ₯°4❀3πŸ”₯1
macca royal clock Tower
Height-601m
material-composite
floors-120
service-hotel,other
location-saudi arabia
Rank-3rd

@etconp
❀5
Ping An finance center
Height-599.1m
material-composite
floors-123
service-office
location-shenzhen,china
Rank-4th

@etconp
❀6πŸ₯°1
Lotte world Tower
Height-554.5m
material-composite
floors-123
service-office
location-seoul,south korea
Rank-5th

@etconp
❀4
One world trade center
Height-541.3m
material-composite
floors-94
service-office
location-newyork,USA
Rank-6th

@etconp
❀4πŸ‘3
Guangzhou CTF finance center
Height-530m
material-composite
floors-97
service-hotel,serviced appartment,office
location-china
Rank-7th

@etconp
πŸ‘3
Tianjin CTF finance center
Height-530m
material-composite
floors-111
service-hotel, appartment,office
location-tianjin,china
Rank-7th

@etconp
πŸ₯°3
CITIC Tower
Height-527.7m
material-composite
floors-109
service-office
location-Beijing,china
Rank-9th

@etconp
πŸ‘3
Taipei 101
Height-508m
material-composite
floors-101
service-office
location-Taipei,Taiwan
Rank-10th

@etconp
❀6
πŸ‘‰Leveling Method, commonly used in civil engineering and surveying.

πŸš§β€‹Mastering Slope Calculation

πŸ’«β€‹The image demonstrates the relationship between vertical height difference (\Delta H) and horizontal distance (L) to determine the percentage of a slope.

​Key Components Explained:
​Elevation A: The starting ground point (32.000 m).
​Backsight (BS): The rod reading at the known point (2.105 m).

​Instrument Height (I.H.): Calculated as {Elevation A} + {Backsight} = 34.105{ m}.

​Foresight (FS): The rod reading at the new point (0.607 m).

​Elevation B: Calculated as {I.H.} - {Foresight} = 33.498 { m}.

​Height Difference (Delta H): The rise between points A and B (1.498 m).

​The Formula:
​To find the slope (S), we use the ratio of the height difference over the horizontal distance, multiplied by 100:

With a distance of 98.90 m and a height change of 1.498 m, the resulting slope is 1.514%.

​#CivilEngineering #Surveying #ConstructionLife #SiteEngineering #LandSurveying #EngineeringStudent

@etconp
❀15
The ratio of maximum shear stress to average shear stress of circular beam is _______.
Anonymous Quiz
33%
2/3
16%
1
22%
4/3
28%
ΒΎ
❀9πŸ‘2
The structure which supports externally applied load by developing tension in it is called
Anonymous Quiz
16%
Plate
52%
Cable
10%
Shell
22%
Arch
πŸ‘8
The process of making the back ground rough before plastering is
Anonymous Quiz
19%
Dubbing
28%
Hacking
34%
Blisting
20%
Peeling
πŸ‘6
The property of a liquid which offers resistance to the movement of one layer of liquid over another adjacent layer of liquid is called _______.
Anonymous Quiz
12%
Compressibility
19%
Capillary
19%
Surface tension
51%
Viscosity
πŸ‘5❀1πŸ₯°1
The specific gravity of water is taken as ______.
Anonymous Quiz
60%
1
20%
0.1
18%
100
2%
2
❀9
_______ is the part of building constructed above the plinth level(grade beam).
Anonymous Quiz
81%
Superstructure
11%
Substructure
3%
Foundation
5%
Plinth
❀8πŸ”₯4
πŸ‘‰ α‰ αŠ α‹²αˆ΅ αŠ α‰ α‰£ αˆ•αŠ•αƒ αŠ αˆ΅αŒˆαŠ•α‰’α‹Žα‰½ α‹¨αˆ αˆ«α‰°αŠžα‰½αŠ• α‹°αŠ…αŠ•αŠα‰΅ α‹¨αˆšα‰†αŒ£αŒ αˆ­ α‰£αˆˆαˆ™α‹« αŠ₯αŠ•α‹²αˆ˜α‹΅α‰‘ αˆŠα‹°αˆ¨αŒ αŠα‹

πŸš§α‰ αŠ α‹²αˆ΅ αŠ α‰ α‰£ αŠ¨α‰°αˆ› αˆ•αŠ•αƒ α‹¨αˆšα‹«αˆ΅αŒˆαŠα‰‘ α‹¨αˆ αˆ«α‰°αŠžα‰½αŠ• α‹°αŠ…αŠ•αŠα‰΅αŠ• α‹¨αˆšα‰†αŒ£αŒ αˆ­ α‰£αˆˆαˆ™α‹« αŠ₯αŠ•α‹²αˆ˜α‹΅α‰‘ αŠ₯αŠ•α‹°αˆšαŒˆα‹°α‹±α£ α‹¨αŠ¨α‰°αˆ›α‹‹ α‹¨αŒαŠ•α‰£α‰³ αˆα‰ƒα‹΅αŠ“ ቁαŒ₯αŒ₯ር α‰£αˆˆαˆ₯αˆαŒ£αŠ• αŠ αˆ΅α‰³α‹ˆα‰€α‘α‘

πŸ“α‹¨αŠ α‹²αˆ΅ αŠ α‰ α‰£ αŠ¨α‰°αˆ› αŠ αˆ΅α‰°α‹³α‹°αˆ­ α‹¨αŒαŠ•α‰£α‰³ αˆα‰ƒα‹΅αŠ“ ቁαŒ₯αŒ₯ር α‰£αˆˆαˆ₯αˆαŒ£αŠ• αˆαŠ­α‰΅αˆ α‹‹αŠ“ α‹³α‹­αˆ¬αŠ­α‰°αˆ­ αŠ α‰ α‰  αŠ₯αˆΈα‰± (αŠ’αŠ•αŒ‚αŠαˆ­) ለαˆͺα–αˆ­α‰°αˆ­ αŠ₯αŠ•α‹°αŒˆαˆˆαŒΉα‰΅α£ α‰ αˆ₯ራ αˆ‹α‹­ α‹¨αˆšα‹«αŒ‹αŒ₯ም αˆžα‰΅αŠ• αˆˆαˆ˜αŠ¨αˆ‹αŠ¨αˆαŠ“ α‹¨αŒαŠ•α‰£α‰³ α‹°αŠ…αŠ•αŠα‰΅ αˆ˜αˆ αˆ¨α‰³α‹Š αŠ αˆ΅αˆαˆ‹αŒŠαŠα‰΅αŠ• αˆˆαˆ›αˆ¨αŒ‹αŒˆαŒ₯ α‹¨αˆ•αŠ•αƒ αŠ αˆ΅αŒˆαŠ•α‰’α‹Žα‰½ α‰ α‹˜αˆ­α‰ α‹¨αˆ αˆˆαŒ αŠ α‹¨α‹°αŠ…αŠ•αŠα‰΅ α‰£αˆˆαˆ™α‹« αŠ₯αŠ•α‹²α‰€αŒ₯ሩ α‹­αŒˆα‹°α‹³αˆ‰α‘α‘

πŸ’«α‹­αˆ…αŠ• αˆˆαˆ›α‹΅αˆ¨αŒ α‹¨αˆšα‹«αˆ΅α‰½αˆ αˆ˜αˆ˜αˆ­α‹« αŠ₯αŠ•α‹°αˆšα‹ˆαŒ£ αŒˆαˆαŒΈα‹α£ αŠ₯α‹«αŠ•α‹³αŠ•α‹± α‹¨αŒαŠ•α‰£α‰³ ቦታ α‰ αˆ•αŒ α‰°α‹°αŒαŽ α‹¨α‹°αŠ…αŠ•αŠα‰΅ α‰£αˆˆαˆ™α‹« α‹­αŠ–αˆ¨α‹‹αˆ α‰₯αˆˆα‹‹αˆα‘α‘

πŸ”— α‰°αŒ¨αˆ›αˆͺ α‹«αŠ•α‰₯ቑ: https://ethiopianreporter.com/153509/

@etconp
❀5πŸ‘3
πŸ‘‰ INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

πŸ”Ή Address 1: Signal road, around
Dinberwa Hospital

πŸ”Ή Addres 2: Wellosefer, Infront of
Dani Plaza
❀6
πŸ‘‰Road Lane Marking in driving :

πŸš§β€‹1. Solid White Line

πŸ’«β€‹Meaning: This marks the edge of a lane or a separation between lanes moving in the same direction where lane changing is hazardous.

βš‘οΈβ€‹Rule: No lane changing allowed. You must stay in your current lane until the line changes to a broken pattern.

πŸš§β€‹2. Broken White Line

πŸ’«β€‹Meaning: These are standard dividers for multi-lane roads.

βš‘οΈβ€‹Rule: Lane change permitted. You may cross these lines to change lanes or overtake, provided you have signaled and it is safe to do so.

πŸš§β€‹3. Double Solid Yellow Line

πŸ’«β€‹Meaning: These are typically found on two-way roads to separate opposing traffic.

βš‘οΈβ€‹Rule: No overtaking from either side. It is strictly prohibited to cross these lines to pass another vehicle. They act as a "virtual wall" for safety. 

πŸš§β€‹4. Broken Yellow Line

πŸ’«β€‹Meaning: Used on two-way roads where visibility is clear enough for safe maneuvering.

βš‘οΈβ€‹Rule: Passing allowed with caution. You may cross into the opposing lane to overtake a slower vehicle, but only when the road ahead is clear of oncoming traffic. 

πŸš§β€‹5. Zebra Crossing

πŸ’«β€‹Meaning: A series of broad white stripes painted across the road.

βš‘οΈβ€‹Rule: This is a pedestrian crossing zone. In many jurisdictions, motorists are legally required to yield or stop for pedestrians who have stepped onto the crossing. 

πŸš§β€‹6. Stop Line

πŸ’«β€‹Meaning: A thick white transverse bar located at intersections or before traffic signals.

βš‘οΈβ€‹Rule: Vehicles must stop completely behind this line. It ensures that cars do not nose into the intersection, keeping the path clear for cross-traffic and pedestrians.

@etconp
πŸ‘7❀6