๐Ÿ‘‰Contour lines are one of the most fundamental tools in topographic mapping and civil engineering because they transform the threeโ€‘dimensional shape of the land into a twoโ€‘dimensional representation that can be analyzed, designed upon, and interpreted.

They are essentially imaginary lines connecting points of equal elevation, which means every point along a contour line sits at the same height above a reference level, usually mean sea level.

๐Ÿ”‘ Key Details

- Nonโ€‘crossing lines: Contour lines never intersect because a single point cannot have two different elevations.
- Closed loops: Hills and depressions are represented by loops; the difference lies in whether the elevation increases or decreases toward the center.
- Slope steepness: The spacing between lines indicates gradient โ€” closer lines mean steeper terrain, wider spacing means gentler slopes.
- Index contours: Bold lines drawn at regular intervals help quickly identify elevation levels.
- Valleys vs ridges: A โ€œVโ€ shape pointing upstream indicates a valley, while pointing downstream indicates a ridge.

๐Ÿ“ Applications

- Road design: Engineers use contour maps to plan routes that minimize steep gradients.
- Earthwork calculation: Essential for estimating cut and fill volumes in construction.
- Drainage & watersheds: Contours help identify water flow paths and catchment areas.
- Urban planning: Guides zoning, land use, and infrastructure placement.
- Civil works: Used in designing dams, canals, and other structural projects.

๐Ÿ› ๏ธ Tools for Contour Mapping

- Total Station
- GPS Receiver
- Automatic Level
- Drone Photogrammetry
- Topographic Software

๐ŸŒ Field Tips

- Always verify contour interval consistency.
- Use control points for accuracy.
- Match the map scale to project requirements.
- Field validation prevents costly design errors.

Contour lines are more than just symbols on a map โ€” they are the language of the land, allowing engineers, geographers, and planners to visualize terrain, anticipate challenges, and design solutions that respect natural topography.

#Topography
#CivilEngineering #ContourLines
#Mapping
#Surveying

@etconp
โค11๐Ÿ‘1๐Ÿ™1
แ‹จแˆฅแˆซ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แˆแˆแ‹ต


แˆฅแˆซแ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แ‰ แŠ แŠ•แ‹ต แ‹จแˆ˜แŠ•แŒแˆฅแ‰ต แŒจแˆจแ‰ณ แˆ‹แ‹ญ แˆˆแˆ˜แ‹ˆแ‹ณแ‹ฐแˆญ แŠฅแŠ•แ‹ฐแ‹จแ‹ฐแˆจแŒƒแ‰ธแ‹ แˆ›แ‰…แˆจแ‰ฅ แ‹ซแˆˆแ‰ฃแ‰ธแ‹ แ‹แ‰…แ‰ฐแŠ› แ‹จแˆฅแˆซ แˆแˆแ‹ต แ‹˜แˆ˜แŠ• แ‰ แˆ…แŒ แ‹จแ‰ฐแ‰€แˆ˜แŒ  แˆฒแˆ†แŠ•แค แˆˆแ‹ฐแˆจแŒƒ แŠ แŠ•แ‹ต แŠฅแŠ“ แˆแˆˆแ‰ต (Level 1 and 2) แ‹จแŠ แˆแˆตแ‰ต แ‹“แˆ˜แ‰ต แˆแˆแ‹ตแฃ แˆˆแ‹ฐแˆจแŒƒ 3 (Level 3) แ‹จแˆฆแˆตแ‰ต แ‹“แˆ˜แ‰ต แˆแˆแ‹ตแฃ แˆˆแ‹ฐแˆจแŒƒ 4 แŠฅแŠ“ 5 (Level 4 and 5) แ‹จแˆแˆˆแ‰ต แ‹“แˆ˜แ‰ต แˆแˆแ‹ต แˆŠแŠ–แˆซแ‰ธแ‹ แ‹ญแŒˆแ‰ฃแˆแกแก

แАแŒˆแˆญ แŒแŠ• แ‹จแ‹ˆแŒฃแ‹ แŒจแˆจแ‰ณ แ‹จแˆšแŒ แ‹ญแ‰€แ‹ แˆ˜แˆตแˆแˆญแ‰ต (Evaluation criteria) แ‹ญแˆ…แŠ•แŠ• แ‰ณแˆณแ‰ข แ‹ซแˆ‹แ‹ฐแˆจแŒˆ แ‰ขแˆ†แŠ• แ‰…แˆฌแ‰ณ แŠจแ‰€แˆจแ‰ แ‰ แ‰ต ยซแŠ แŒแ‰ฃแ‰ฅ แ‹ซแˆแˆ†แА แŒจแˆจแ‰ณยป แ‰ แˆšแˆ แˆŠแˆฐแˆจแ‹ แ‹ญแ‰ฝแˆ‹แˆแข

@etconp
โค14๐Ÿ‘2๐Ÿ˜ฑ2๐Ÿ”ฅ1
๐Ÿ‘‰แ‹จแŒจแˆจแ‰ณ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ (bid security/bond) แŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ• แŠ แ‹ˆแˆณแˆฐแŠ•

๐ŸšงแŠ แ‹ฒแˆฑ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ข แˆ˜แˆ˜แˆชแ‹ซ แ‹จแŒจแˆจแ‰ณ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แŠ แ‹ˆแˆณแˆฐแŠ•แŠ• แ‰ แ‰ฐแˆ˜แˆˆแŠจแ‰ฐ ยซแ‹จแˆ˜แŠ•แŒแˆตแ‰ต แˆ˜/แ‰คแ‰ฑ แ‹จแŒ แ‰…แˆ‹แˆ‹ แŒแ‹ฅแ‹แŠ• แŒแˆแ‰ณแ‹Š แ‹‹แŒ‹ แˆ˜แˆฐแˆจแ‰ต แ‰ แˆ›แ‹ตแˆจแŒ แŠจ 0.5% แ‹ซแˆ‹แАแˆฐ แŠฅแŠ“ แŠจ 2% แ‹ซแˆˆแˆแ‰ แˆˆแŒ  แ‹จแŒจแˆจแ‰ณ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ• แ‹ˆแˆตแŠ– แ‰ แŒจแˆจแ‰ณแ‹ แŒฅแˆชแ‹ แŠฅแŠ“ แ‰ แŒจแˆจแ‰ณ แˆฐแАแ‹ฑ แ‹แˆตแŒฅ แˆ˜แŒแˆˆแ… แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแกแก

แ‰ แ‹šแˆ… แˆ˜แˆ แˆจแ‰ต แ‹จแˆšแ‹ˆแˆฐแАแ‹ แ‹จแŒจแˆจแ‰ณ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ แˆ˜แŒ แŠ• แŠจแ‰ฅแˆญ 2,000,000 (แˆแˆˆแ‰ต แˆšแˆŠแ‹ฎแŠ• แ‰ฅแˆญ) แ‹จแ‰ แˆˆแŒ  แˆ˜แˆ†แŠ• แ‹จแˆˆแ‰ แ‰ตแˆ
ยป แ‹จแˆšแˆ แ‹ตแŠ•แŒ‹แŒŒ แŠ แˆตแ‰€แˆแŒงแˆแข

แ‰ แˆ˜แˆ†แŠ‘แˆ แ‰ แŠ แŠ•แ‹ต แ‹จแŒจแˆจแ‰ณ แˆ˜แŒฅแˆชแ‹ซ (Tender notice) แ‹ˆแ‹ญแˆ แ‰ แŒจแˆจแ‰ณ แˆฐแАแ‹ต แ‹แˆตแŒฅ แ‹จแ‰ฐแ‰€แˆ˜แŒ แ‹ แ‹จแŒจแˆจแ‰ณ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ แŠจ 0.5% แ‹ซแАแˆฐ แ‹ˆแ‹ญแˆ แŠจ2% แ‹จแ‰ แˆˆแŒ  แŠจแˆ†แАแฃ แ‰ แ‹จแ‰ตแŠ›แ‹แˆ แˆ˜แˆแŠฉ แ‹ฐแŒแˆž แŠจ 2,000,000 แ‰ฅแˆญ แŠจแ‰ แˆˆแŒ  แŒจแˆจแ‰ณแ‹แŠ• แˆŠแ‹ซแˆฐแˆญแ‹ แ‹ญแ‰ฝแˆ‹แˆแข

@etconp
โค7๐Ÿ‘7
๐Ÿ‘‰Different Between Sluice Gate Vs Spillway

๐ŸทSluice Gate: A sluice gate is a movable gate used to control the flow of water in canals, dams, and drainage systems.

โบIt can be opened or closed manually or mechanically.

๐ŸทSpillway: A spillway is a fixed structure in a dam that safely releases excess water when the water level becomes too high.

๐ŸšงMain Difference:

โบSluice Gate controls and regulates water flow.

โบSpillway safely disposes of overflow water to protect the dam from damage.

@etconl
โค5๐Ÿ™5๐Ÿ‘4๐Ÿฅฐ2
๐Ÿ‘‰Here is a comprehensive infographic detailing 8 essential laboratory tests for soil in civil and geotechnical engineering.

๐ŸšงWe break down the Purpose, step-by-step Procedure, fundamental Formulas (like Moisture Content % and Hydraulic Conductivity k), and standard Standards (ASTM and AASHTO). We also include critical visual aids like Particle Size Distribution (GSD) curves, the Soil Plasticity Chart, and Compaction/Proctor Density curves for deep classification and engineering application.

This guide is a vital reference for students and site professionals evaluating soil suitability for everything from foundations to pavements and retaining walls.

โ€‹#CivilEngineering #GeotechnicalEngineering #SoilMechanics #SoilTesting #GeotechEngineering #ConstructionSite #MaterialsTesting #LaboratoryTests #SoilClassification #StandardProctor
#CBRTest #ASTM #AASHTO #EngineeringChecklist

@etconp
โค8
#ADVERTISEMENT

๐Ÿ‘‹แŠฅแŠ•แŠณแŠ• แ‹ฐแˆต แŠ แˆ‹แ‰น !๐Ÿ‘‹

Purchasers แŠฅแŠ“ contractors แ‰ แแŒฅแАแ‰ต แŠฅแŠ“ แ‰ แ‰€แˆ‹แˆ‰ suppliers แŠฅแŠ•แ‹ฒแ‹ซแŒˆแŠ™ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ construction material sourcing bot แŠ แ‹˜แŒ‹แŒ…แ‰ฐแŠ“แˆแข

Bot user name: ๐Ÿ‘‡
๐Ÿ‘‰ @hbhbuyerbot ๐Ÿ‘ˆ
๐Ÿ‘†

แ‰ แ‹šแˆ… bot แŠ แˆ›แŠซแŠแАแ‰ตแฆ

โ€ข Quotations แ‰ แแŒฅแАแ‰ต แˆ˜แŒ แ‹จแ‰…
โ€ข แ‹จsuppliers แ‹‹แŒ‹ แˆ›แ‹ˆแ‹ณแ‹ฐแˆญ
โ€ข แ‹ซแˆ‰ materials แ‰ แ‰€แˆ‹แˆ‰ แˆ›แŒแŠ˜แ‰ต
โ€ข แ‰ฅแ‹™ suppliers แ‰ แˆตแˆแŠญ แŠจแˆ˜แ‹ฐแ‹ˆแˆ แŒŠแ‹œ แˆ˜แ‰†แŒ แ‰ฅ

แ‹จแˆšแŒˆแŠ™ materials แŠจแˆšแŠจแ‰ฐแˆ‰แ‰ต แˆ˜แŠซแŠจแˆแฆ

* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more

Step 1 : แ‹ญแˆ˜แ‹แŒˆแ‰ก
Step 2 : โ€œNew purchase orderโ€แ‹จแˆšแˆˆแ‹แŠ• แ‰ แˆ˜แŒซแŠ• แ‹ˆแ‹ฐแˆšแˆ˜แˆˆแŠจแ‰ฐแ‹ แŠ แ‰…แˆซแ‰ข PO แ‰ แˆ˜แˆ‹แŠญ แŒแ‰ฅแ‹ญแ‰ถแŠ• แ‹ซแ‰€แˆ‹แŒฅแ‹

Bot user name: ๐Ÿ‘‡
๐Ÿ‘‰ @hbhbuyerbot ๐Ÿ‘ˆ
โค7
๐Ÿ‘‰Detailed Explanation: Simply Supported Beam โ€“ Maximum Deflection

๐ŸšงA simply supported beam subjected to a uniformly distributed load (UDL) bends downward, with the greatest deflection occurring at the mid-span.

๐Ÿ’ซThe derivation process involves several logical steps, but here Iโ€™ll explain it clearly without formulas or tables.

๐Ÿ”น Step-by-Step Process

1. Beam and Loading

- A beam of span \(L\) carries a uniform load across its entire length.
- The goal is to determine how much it bends at the center.

2. Support Reactions
- Since the load is uniform and the beam is symmetric, both supports carry equal reactions.

3. Bending Moment at Section
- At any point along the beam, the bending moment is calculated using equilibrium principles.
- This moment varies along the span, being maximum at the center.

4. Elastic Curve Equation
- The bending moment is related to the curvature of the beam.
- By integrating step by step, the deflection equation is obtained.

5. Boundary Conditions
- At both supports, the deflection is zero.
- These conditions help determine the constants in the deflection equation.

6. Deflection Equation
- After applying conditions, the general deflection curve of the beam is established.

7. Location of Maximum Deflection
- The slope of the deflection curve is set to zero to find where the maximum occurs.
- This point is at the mid-span of the beam.

8. Maximum Deflection
- Substituting the mid-span location into the deflection equation gives the maximum downward deflection.
- The result shows that the deflection depends on the load intensity, span length, material stiffness, and beam geometry.

๐Ÿ”น Engineering Insight
This derivation is essential in structural analysis.

It ensures beams are designed not only for strength but also for serviceability, meaning they donโ€™t bend excessively under load.

๏ธ#CivilEngineering #BeamDeflection #StructuralAnalysis #UDL #MechanicsOfMaterials #EngineeringDesign

@etconp
โค9
๐Ÿ‘‰แ‹จแŠณแ‰ณแˆฉ แŠ แˆ-แŠปแ‹ซแ‰ต แ‰คแ‰ฐแˆฐแ‰ฅ แ‰ 12.5 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‰ แˆšแŒˆแАแ‰ฃแ‹ แ‹จแ‰ขแˆพแแ‰ฑ แ‹“แˆˆแˆ แŠ แ‰€แ แŠ แ‹แˆฎแ•แˆ‹แŠ• แˆ›แˆจแŠแ‹ซ แ•แˆฎแŒ€แŠญแ‰ต แˆ‹แ‹ญ แˆˆแˆ˜แˆณแ‰ฐแ แˆ›แ‰€แ‹ฑ แ‰ฐแŒˆแˆˆแ€!

แ‰ แˆถแˆญแ‹ซแŠ“ แŠณแ‰ณแˆญ แ‹แˆตแŒฅ แ‰ แŒฃแˆ แ‰ตแˆแ‰…แŠ“ แˆฐแŠ แ‹จแŠ•แŒแ‹ต แ‰ฐแ‰‹แˆ แ‹ซแˆˆแ‹ แ‹จแŠ แˆ-แŠธแ‹ซแ‰ต แ‰คแ‰ฐแˆฐแ‰ฅ แ‰ แŠ แแˆชแŠซ แˆ˜แˆฐแˆจแ‰ฐ-แˆแˆ›แ‰ต แˆ‹แ‹ญ แŠขแŠ•แ‰จแˆตแ‰ต แˆˆแˆ›แ‹ตแˆจแŒ แŠฅแ‹ซแ‰€แ‹ฐ แˆฒแˆ†แŠ•แฃ แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‰ 12.5 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‰ แˆšแŒˆแАแ‰ฃแ‹ แ‹จแ‰ขแˆพแแ‰ฑ แ‹“แˆˆแˆ แŠ แ‰€แ แŠ แ‹จแˆญ แˆ›แˆจแŠแ‹ซ แ•แˆฎแŒ€แŠญแ‰ต แˆ‹แ‹ญ แ‹ตแˆญแˆป แˆˆแˆ˜แ‹แˆฐแ‹ต แˆ›แˆˆแˆ™แŠ• แ‰ฅแˆ‰แˆแ‰ แˆญแŒ แ‹˜แŒแ‰งแˆแข

แ‹จแ‰คแ‰ฐแˆฐแ‰ก แŠ•แ‰ฅแˆจแ‰ต แ‹จแˆ†แАแ‹ แ‹ฉแˆฒแˆฒ แˆ†แˆแ‹ฒแŠ•แŒ แ‹จแ‰ฐแˆฐแŠ˜แ‹ แŠฉแ‰ฃแŠ•แ‹ซ แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠจแˆšแŒˆแАแ‰ฃแ‹ แˆœแŒ‹ แŠ แ‹จแˆญ แˆ›แˆจแŠแ‹ซ แ‰ แ‰ฐแŒจแˆ›แˆช แ‰ แ‹ฒแˆžแŠญแˆซแ‰ฒแŠญ แˆชแแ‰ฅแˆŠแŠญ แŠฎแŠ•แŒŽ แ‹จ400 แŠชแˆŽ แˆœแ‰ตแˆญ แŠ แ‹แˆซ แŒŽแ‹ณแŠ“ แŒแŠ•แ‰ฃแ‰ณแŠ• แŒจแˆแˆฎ แ‰ แŠ แแˆชแŠซ แ‰ตแˆ‹แˆแ‰… แ‹จแ‰ตแˆซแŠ•แˆตแ–แˆญแ‰ต แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แˆ‹แ‹ญ แˆˆแˆ˜แˆณแ‰ฐแ แŠ แˆแˆŸแˆแข

แ‹ญแˆ… แ‰ณแ‹‹แ‰‚ แ‹จแ‰ฃแˆˆแˆ€แ‰ฅแ‰ถแ‰ฝ แ‰คแ‰ฐแˆฐแ‰ฅ แ‰ แŠ…แ‹ณแˆญ 2025 แ‹“.แˆ. แ‰ แ‰ฐแŠซแˆ„แ‹ฐแ‹ แ‹จแ‹ฉแŠ“แ‹ญแ‰ตแ‹ต แˆตแ‰ดแ‰ตแˆต แ•แˆฌแ‹šแ‹ณแŠ•แ‰ต แ‹ถแŠ“แˆแ‹ต แ‰ตแˆซแˆแ• แ‹จแ‰ แ‹“แˆˆ-แˆฒแˆ˜แ‰ต แˆฅแА-แˆฅแˆญแ‹“แ‰ต แˆ‹แ‹ญ แŠจแ‰ฐแŒˆแŠ™ แŒฅแ‰‚แ‰ต แ‰ฐแ‹ฐแˆ›แŒญ แ‹จแ‹“แˆˆแˆ แ‰ณแ‹‹แ‰‚ แˆฐแ‹Žแ‰ฝ แˆ˜แŠซแŠจแˆ แŠ แŠ•แ‹ฑ แАแ‰ แˆญแข

แŠจแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แ‰ แˆตแ‰ฐแ‹ฐแ‰กแ‰ฅ แˆแˆตแˆซแ‰… 40 แŠชแˆŽ แˆœแ‰ตแˆญ แˆญแ‰€แ‰ต แˆ‹แ‹ญ แ‹จแˆšแŒˆแАแ‰ฃแ‹แŠ“ แ‰ แ‹›แˆƒ แˆƒแ‹ฒแ‹ต แŠ แˆญแŠญแ‰ดแŠญแ‰ถแ‰ฝ แ‹ฒแ‹›แ‹ญแŠ• แ‹จแ‰ฐแ‹ฐแˆจแŒˆแ‹ แ‹ญแˆ… แŠ แ‹ฒแˆต แŠ แ‹จแˆญ แˆ›แˆจแŠแ‹ซแฃ แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠ แ‹จแˆญ แˆ˜แŠ•แŒˆแ‹ตแŠ• แ‹จแ‹ˆแ‹ฐแŠแ‰ต แ‹จแŠ แ‰ชแ‹ฌแˆฝแŠ• แˆ›แ‹•แŠจแˆแАแ‰ต แˆˆแˆ›แŒ แŠ“แŠจแˆญ แ‹ซแˆˆแˆ˜แŠ“ แ‰ แŠ แแˆชแŠซ แ‰ตแˆแ‰ แŠฅแŠ•แ‹ฐแˆšแˆ†แŠ• แ‹ญแŒ แ‰ แ‰ƒแˆแข

แ‰ แ‹˜แŠ•แ‹ตแˆฎแ‹ แ‹จแŒฅแˆญ แ‹ˆแˆญ แˆ‹แ‹ญ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซ แˆแ‹•แˆซแ แŒแŠ•แ‰ฃแ‰ณแ‹ แ‹จแ‰ฐแŒ€แˆ˜แˆจแ‹แŠ“ 35 แˆตแŠฉแ‹Œแˆญ แŠชแˆŽ แˆœแ‰ตแˆญ แˆ˜แˆฌแ‰ต แˆ‹แ‹ญ แ‹จแˆšแ‹ซแˆญแˆแ‹ แ‹ญแˆ… แŠ แ‹แˆฎแ•แˆ‹แŠ• แˆ›แˆจแŠแ‹ซแฃ แ‰ แˆ˜แŒ€แˆ˜แˆชแ‹ซแ‹ แˆแ‹•แˆซแ 60 แˆšแˆŠแ‹ฎแŠ• แ‰ฐแˆณแ‹แˆชแ‹Žแ‰ฝแŠ• แ‹จแˆ›แˆตแ‰ฐแŠ“แŒˆแ‹ต แŠ แ‰…แˆ แ‹ญแŠ–แˆจแ‹‹แˆแข

แ‹จแŠ แ‹จแˆญ แˆ˜แŠ•แŒˆแ‹ฑ แ‹‹แŠ“ แˆตแˆซ แŠ แˆตแˆแƒแˆš แŠ แ‰ถ แˆ˜แˆตแแŠ• แŒฃแˆฐแ‹ แŠฅแŠ•แ‹ฐแŒˆแˆˆแŒนแ‰ตแฃ แŠ แŒ แ‰ƒแˆ‹แ‹ญ แ•แˆฎแŒ€แŠญแ‰ฑ แ‰ฐแŒ แŠ“แ‰† แˆฒแ‹ซแˆแ‰… แ‰ แŠ แˆ˜แ‰ต แŠฅแˆตแŠจ 100 แˆšแˆŠแ‹ฎแŠ• แ‰ฐแˆณแ‹แˆชแ‹Žแ‰ฝแŠ• แˆ›แˆตแ‰ฐแŠ“แŒˆแ‹ต แ‹จแˆšแ‰ฝแˆ แ‹จแŠ แˆ…แŒ‰แˆชแ‰ฑ แ‹‹แАแŠ› แ‹จแ‰ตแˆซแŠ•แ‹šแ‰ต แˆ˜แ‰ฐแˆ‹แˆˆแŠแ‹ซ แ‹ญแˆ†แŠ“แˆแข

@etconp
โค10
๐Ÿ‘‰แ‹จแ‹˜แˆ‹แ‰‚ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ฅ (Sustainable Public Procurement) แ‹“แˆ‹แˆ›แ‹Žแ‰ฝ แˆแŠ•แ‹ตแŠ• แŠ“แ‰ธแ‹?

โ–ถ๏ธ แ‹จแ‹˜แˆ‹แ‰‚ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ฅ (Sustainable Public Procurement) แ‹‹แŠ“ แ‹“แˆ‹แˆ› แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แ‹ˆแŒช แ‹˜แˆ‹แ‰‚ แˆแˆ›แ‰ตแŠ• แŠฅแŠ•แ‹ฒแ‹ฐแŒแ แˆ›แ‹ตแˆจแŒ แŠฅแŠ“ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒˆแŠ•แ‹˜แ‰ฅ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ (Value for Money) แŠฅแŠ•แ‹ฒแ‹ซแŒˆแŠ แˆ›แˆตแ‰ปแˆ แАแ‹แกแก

แ‹ญแˆ… แ‰ แŠฅแŠ•แ‹ฒแˆ… แŠฅแŠ•แ‹ณแˆˆ แˆŒแˆŽแ‰ฝ แ‹แˆญแ‹แˆญ แ‹“แˆ‹แˆ›แ‹Žแ‰ฝ แ‹ญแŠ–แˆฉแ‰ณแˆแกแก แŠฅแŠ•แ‹šแˆ…แˆ แ‹จแˆ˜แŠ•แŒแˆตแ‰ตแŠ• แˆ€แ‰ฅแ‰ต แ‰ แ‰ฅแ‰ƒแ‰ต แˆ˜แŒ แ‰€แˆแŠ• แˆ›แ‰ แˆจแ‰ณแ‰ณแ‰ตแฃ แŠ แŠซแ‰ฃแ‰ขแŠ• แˆ˜แŒ แ‰ แ‰…แฃ แˆ›แˆ…แ‰ แˆซแ‹Š แแ‰ตแˆƒแ‹ŠแАแ‰ตแŠ• แŠฅแŠ“ แ‹จแˆฐแ‰ฅแŠ แ‹Š แˆ˜แ‰ฅแ‰ถแ‰ฝแŠ• แˆ˜แ‹ฐแŒˆแแฃ แ‹˜แˆ‹แ‰‚ แ‹จแŠขแŠฎแŠ–แˆš แ‹•แ‹ตแŒˆแ‰ตแŠ• แˆ›แ‰ แˆจแ‰ณแ‰ณแ‰ตแฃ แŒแˆแŒฝแАแ‰ตแŠ• แŠฅแŠ“ แ‰ฐแŒ แ‹ซแ‰‚แАแ‰ตแŠ• แˆ›แŒ แŠ“แŠจแˆญแฃ แˆแŒ แˆซแŠ• แŠฅแŠ“ แŠ แˆจแŠ•แŒ“แ‹ด แ‰ดแŠญแŠ–แˆŽแŒ‚แ‹Žแ‰ฝแŠ• แˆ›แ‰ แˆจแ‰ณแ‰ณแ‰ตแฃ แˆ€แŒˆแˆญ แ‰ แ‰€แˆ แ‰ฐแ‰‹แˆ›แ‰ตแŠ• แŠฅแŠ“ แŠ แАแˆตแ‰ฐแŠ› แ‹ตแˆญแŒ…แ‰ถแ‰ฝแŠ• แˆ˜แ‹ฐแŒˆแ แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‰ฐแ‹ซแ‹ซแ‹ฅ แŒ‰แ‹ณแ‹ฎแ‰ฝแˆ แˆŠแŒ แ‰€แˆฑ แ‹ญแ‰ฝแˆ‹แˆ‰แกแก

โ–ถ๏ธ แˆตแˆˆแˆ†แАแˆ แ‹ญแˆ… แ‹จแŒแ‹ฅ แˆตแˆญแ‹“แ‰ต แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แ‰ฐแ‰‹แˆ›แ‰ต แ‹จแˆšแŒ แ‰€แˆ™แ‰ต แ‹•แ‰ƒแ‹Žแ‰ฝแŠ• แŠฅแŠ“ แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝแŠ• แˆˆแˆ›แŒแŠ˜แ‰ต แ‰ฅแ‰ป แˆณแ‹ญแˆ†แŠ• แˆฐแ‹ แ‹ซแˆ‰ แ‹จแ‰ฅแˆ”แˆซแ‹Š แˆแˆ›แ‰ต แŒแ‰ฆแ‰ฝแŠ•แˆ แˆˆแˆ›แˆณแŠซแ‰ต แŒญแˆแˆญ แŠฅแŠ•แ‹ฐแˆ†แА แ‹จแˆšแ‹ซแˆตแŒˆแАแ‹แ‰ฅ แАแ‹แข แ‰ แ‹‹แŠ“แАแ‰ต แ‹จแ‹˜แˆ‹แ‰‚ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ฅ (Sustainable Public Procurement) แŒ‰แ‹ณแ‹ฎแ‰ฝแŠ• แ‰ณแˆณแ‰ข แ‹ซแ‹ฐแˆจแŒˆ แАแ‹แข
แ‹˜แˆ‹แ‰‚ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ฅ (Sustainable Public Procurement) แˆฆแˆตแ‰ต แ‹‹แŠ“ แ‹‹แŠ“ แŒ‰แ‹ณแ‹ฎแ‰ฝแŠ• แ‰ณแˆณแ‰ข แ‹ซแ‹ฐแˆจแŒˆ แАแ‹ แˆฒแ‰ฃแˆ แˆแŠ• แˆ›แˆˆแ‰ต แАแ‹?

โ–ถ๏ธ แ‹˜แˆ‹แ‰‚ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ฅ (Sustainable Public Procurement) แŠจแŠ แŠ•แ‹ต แŠ แ‰…แŒฃแŒซ แ‰ฅแ‰ป แ‹จแˆšแ‰ณแ‹ญ แŠ แ‹ญแ‹ฐแˆˆแˆแกแก

แˆ›แˆˆแ‰ตแˆ แŒแ‹ฅแ‹แŠ• แˆˆแˆ˜แˆแŒธแˆ แ‹แ‰…แ‰ฐแŠ› แ‹‹แŒ‹แŠ• แŠฅแŠ•แ‹ฐ แˆ˜แˆตแˆแˆจแ‰ต แˆ˜แ‹แˆฐแ‹ต แ‰ แ‰‚ แŠ แ‹ญแ‹ฐแˆˆแˆแค แ‹จแŠฅแ‰ƒแ‹แŠ• แŒฅแˆซแ‰ตแˆ แŠฅแŠ•แ‹ฐ แŒแ‹ฅ แˆ˜แˆตแˆแˆญแ‰ต แ‹ˆแˆตแ‹ถ แŒแ‹ฅแ‹แŠ• แˆ˜แˆแŒธแˆ แ‰ แ‰‚ แŠ แ‹ญแ‹ฐแˆˆแˆแกแก แ‹ญแˆแ‰แŠ•แˆ แŒแ‹ฅแ‹แŠ• แˆˆแˆ˜แˆแŒธแˆ แŠจแˆ‹แ‹ญ แŠจแŒˆแˆˆแŒธแŠ“แ‰ธแ‹ แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ แ‰ แ‰ฐแŒจแˆ›แˆช แ‹ซแˆˆแ‹แŠ• แŠขแŠฎแŠ–แˆšแ‹ซแ‹Š แŒ แ‰€แˆšแ‰ณแฃ แ‰ แŠ แŠซแ‰ฃแ‰ข แˆ‹แ‹ญ แ‰ฐแŒฝแ‹•แŠ– แ‹จแˆ›แ‹ซแˆณแ‹ตแˆญ แˆ˜แˆ†แŠ‘แฃ แˆ›แˆ…แ‰ แˆซแ‹Š แŠ แŒˆแˆแŒแˆŽแ‰ต แˆ‹แ‹ญ แ‹ซแˆˆแ‹ แŠ แˆตแ‰ฐแ‹‹แŒฝแ‹–แฃ แŠ แˆจแŠ•แŒ“แ‹ด แˆแˆ›แ‰ตแŠ• แˆ˜แ‹ตแŒˆแ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ แˆ˜แˆ†แŠ‘แŠ“ แˆŒแˆŽแ‰ฝ แˆ˜แˆฐแˆ แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ แŠจแŒแˆแ‰ต แ‹แˆตแŒฅ แ‹จแˆšแŒˆแ‰ก แŠ“แ‰ธแ‹แกแก แ‰ แ‹แˆญแ‹แˆญ แˆˆแˆ˜แˆ˜แˆแŠจแ‰ต แ‹ซแˆ…แˆแฆ

โ–ถ๏ธ แ‹จแŠขแŠฎแŠ–แˆš แ‹˜แˆ‹แ‰‚แАแ‰ต (Economic sustainability)แฆ แ‹จแŠขแŠฎแŠ–แˆš แ‹˜แˆ‹แ‰‚แАแ‰ต แ‰ แˆแˆญแ‰ถแ‰ฝ แŠฅแŠ“ แ‰ แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝ แ‹จแˆ…แ‹ญแ‹ˆแ‰ต แ‹‘แ‹ฐแ‰ต แ‹แˆตแŒฅ แˆˆแ‰ฐแŠจแˆแˆˆแ‹ แŒˆแŠ•แ‹˜แ‰ฅ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ (Value for Money) แˆ›แˆจแŒ‹แŒˆแŒฅ แˆ‹แ‹ญ แ‹ซแ‰ฐแŠฉแˆซแˆแข

แ‹ญแˆ…แˆ แ‹จแ‹ˆแŒช แ‹แŒคแ‰ณแˆ›แАแ‰ตแŠ• (Cost efficiency)แฃ แ‹จแŒฅแˆซแ‰ต แˆ›แˆปแˆปแ‹ซแŠ• (Quality improvement)แฃ แ‹˜แˆ‹แ‰‚แАแ‰ตแŠ• (Durability)แฃ แ‹จแŒฅแŒˆแŠ“ แ‹ˆแŒช แˆ˜แ‰€แАแˆตแŠ•  (Reduction of maintenance costs) แŠฅแŠ“ แ‹จแˆจแŒ…แˆ แŒŠแ‹œ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰แŒ แ‰ฃแŠ• (Long-term financial savings) แˆ˜แˆฐแˆจแ‰ต แ‹ซแ‹ฐแˆจแŒˆ แАแ‹แกแก

แˆตแˆˆแˆ†แАแˆ แ‰ แ‹šแˆ… แˆ‚แ‹ฐแ‰ต แ‹แˆตแŒฅ แ‹จแŒแ‹ฅ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝ แ‹จแˆ˜แŒแ‹ฃ แ‹‹แŒ‹ แˆ‹แ‹ญ แ‰ฅแ‰ป  แŠ แ‹ซแ‰ฐแŠฉแˆฉแˆ แ‹ญแˆแ‰แŠ•แˆ แŠจแˆ˜แŒแ‹ฃ แ‹‹แŒ‹แ‹ แ‰ แ‰ฐแŒจแˆ›แˆช แ‹จแˆฅแˆซ แˆ›แˆตแŠฌแŒƒ แ‹ˆแŒชแ‹Žแ‰ฝแŠ•แฃ แ‹จแŒฅแŒˆแŠ“ แ‹ˆแŒชแ‹Žแ‰ฝแŠ• แŠฅแŠ“ แ‹จแˆ›แˆตแ‹ˆแŒˆแŒƒ แ‹ˆแŒชแ‹Žแ‰ฝแŠ•แˆ แŒแŠ•แ‹›แ‰คแ‹ แ‹แˆตแŒฅ แ‹ซแˆตแŒˆแ‰ฃแˆ‰แข

โ–ถ๏ธ แ‹จแŠ แŠซแ‰ฃแ‰ข แ‹˜แˆ‹แ‰‚แАแ‰ต (Environmental sustainability)แก- แ‹จแŠ แŠซแ‰ฃแ‰ข แ‹˜แˆ‹แ‰‚แАแ‰ต แ‹จแŒแ‹ฅ แˆ‚แ‹ฐแ‰ถแ‰ฝ แŒแ‹ฅแ‹ แ‰ แŠ แŠซแ‰ฃแ‰ข แˆ‹แ‹ญ แ‹จแˆšแ‹ซแˆตแŠจแ‰ตแˆˆแ‹แŠ• แŠ แˆ‰แ‰ณแ‹Š แ‰ฐแ…แ‹•แŠ– แˆ˜แ‰€แАแˆต แˆ‹แ‹ญ แ‹ซแ‰ฐแŠฉแˆซแˆแข แŠจแˆ‹แ‹ญ แˆˆแˆ˜แŒแˆˆแŒฝ แŠฅแŠ•แ‹ฐแˆžแŠจแˆญแАแ‹ แ‹จแˆšแŒˆแ‹™ แŒแ‹ฅแ‹Žแ‰ฝ แ‰ แŠ แŠซแ‰ฃแ‰ข แˆ‹แ‹ญ แ‰ฅแŠญแˆˆแ‰ตแŠ• แ‹จแˆ›แ‹ซแˆตแŠจแ‰ตแˆ‰ แˆ˜แˆ†แŠ“แ‰ธแ‹ แˆ˜แˆจแŒ‹แŒˆแŒฅ แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแกแก

แ‹ญแˆ…แŠ• แˆตแŠ•แˆ แ‹จแˆšแŒˆแ‹™ แˆแˆญแ‰ถแ‰ฝ แ‰ฅแŠญแˆˆแ‰ตแŠ• แ‹จแˆšแ‰€แŠ•แˆฑแฃ แŠƒแ‹ญแˆแŠ• แ‹จแˆšแ‰†แŒฅแ‰กแฃ แŠฅแŠ•แ‹ฐแŒˆแŠ“ แŒฅแ‰…แˆ แˆ‹แ‹ญ แˆŠแ‹แˆ‰ แ‹จแˆšแ‰ฝแˆ‰ แ‰แˆณแ‰แˆถแ‰ฝแŠ• แ‹จแˆšแŒ แ‰€แˆ™แฃ แ‹จแŒแˆชแŠ• แˆ€แ‹แˆต แŒ‹แ‹žแ‰ฝแŠ• แ‹จแˆšแ‰€แŠ•แˆฑ แŠฅแŠ“ แ‰ณแ‹ณแˆฝ แŠƒแ‹ญแˆแŠ• แ‹จแˆšแ‹ซแ‰ แˆจแ‰ณแ‰ฑ แˆ˜แˆ†แŠ“แ‰ธแ‹ แŒแŠ•แ‹›แ‰ค แ‹แˆตแŒฅ แˆ˜แŒแ‰ฃแ‰ต แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแกแก

แˆแŠญแŠ•แ‹ซแ‰ฑแˆ แ‹จแŠ แŠซแ‰ฃแ‰ข แ‰ฐแˆตแˆ›แˆš แŒแ‹ฅ (Environmental Sustainability Procurement) แ‹จแŠ แ‹จแˆญ แŠ•แ‰ฅแˆจแ‰ต แˆˆแ‹แŒฅแŠ• แˆˆแˆ˜แ‰€แАแˆต แŠฅแŠ“ แ‹จแ‰ฐแˆแŒฅแˆฎ แˆ€แ‰ฅแ‰ถแ‰ฝแŠ• แˆˆแˆ˜แŒ แ‰ แ‰… แŠ แˆตแ‰ฐแ‹‹แ…แŠฆ แ‹ซแ‹ฐแˆญแŒ‹แˆแข

โ–ถ๏ธ แˆ›แˆ…แ‰ แˆซแ‹Š แ‹˜แˆ‹แ‰‚แАแ‰ต (Social Sustainability):-  แˆ›แˆ…แ‰ แˆซแ‹Š แ‹˜แˆ‹แ‰‚แАแ‰ต แ‹จแˆ›แˆ…แ‰ แˆซแ‹Š แ‹ฐแˆ…แŠ•แАแ‰ตแŠ• แˆˆแˆ›แˆปแˆปแˆ แŠฅแŠ“ แˆฅแА-แˆแŒแ‰ฃแˆซแ‹Š แ‹จแŠ•แŒแ‹ต แŠ แˆ แˆซแˆฎแ‰ฝ แˆ›แˆจแŒ‹แŒˆแŒฅ แˆ‹แ‹ญ แ‹จแˆšแ‹ซแ‰ฐแŠฉแˆญ แˆฒแˆ†แŠ• แแ‰ตแˆƒแ‹Š แ‹จแˆฅแˆซ แˆแˆแ‹ถแ‰ฝแฃ แ‹จแˆฐแ‰ฅแŠ แ‹Š แˆ˜แ‰ฅแ‰ถแ‰ฝ แŒฅแ‰ แ‰ƒแฃ แ‹จแˆฅแˆซ แ‰ฆแ‰ณ แ‹ฐแˆ…แŠ•แАแ‰ตแฃ แ‹จแ†แ‰ณ แŠฅแŠฉแˆแАแ‰ตแฃ แ‹จแˆฅแˆซ แ‹•แ‹ตแˆ แˆแŒ แˆซ แŠฅแŠ“ แˆˆแ‰ฐแŒ‹แˆ‹แŒญ แ‰กแ‹ตแŠ–แ‰ฝ แ‹ตแŒ‹แ แˆ˜แˆตแŒ แ‰ตแŠ• แ‹จแˆšแ‹ซแ‰ แˆจแ‰ณแ‰ณ แАแ‹แกแก

@etconp
โค7๐Ÿ‘3
๐Ÿ—๏ธ Futuristic Engineering Meets Structural Innovation ๐ŸŒ

This visionary elevated building concept redefines modern urban construction by combining architectural creativity with advanced structural engineering.

Suspended on a massive reinforced concrete core, the structure showcases exposed concrete frames, unfinished slabs, external zigzag staircases, and active construction zones โ€” highlighting the raw beauty of engineering in progress.

A bold fusion of functionality, realism, and futuristic infrastructure that demonstrates how modern cities could maximize space while pushing the limits of structural design.

@etconp
โค2
๐ŸŒ‰ Arched Bridge Engineering โ€” Strength Beneath the Structure

This realistic engineering visualization highlights the anatomy of a modern arch bridge, where reinforced concrete, deep foundations, drainage systems, and slope stabilization work together to ensure maximum durability and structural performance.

Built over challenging red-soil terrain, every component reflects precision civil engineering and advanced infrastructure design.

๐Ÿ—๏ธ Modern infrastructure powered by innovation, safety, and structural excellence.

#CivilEngineering
#BridgeDesign
#Infrastructure #StructuralEngineering #MegaProjects

@etconp
โค3
๐Ÿ‘‰ INTERCON Construction Chemicals 

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Wall Putty, Prime Coat
โ— Concrete Repair Mortar
โ— Floor hardener, Epoxy
โ— Grout, Self-level mortar
โ— Quartz paint, Contextra
โ— Tile Adhesive & Tile Joint Fillers 
โ— Geotextiles and other construction chemicals and materials

โ˜Ž๏ธ Tel: 0961955555

๐Ÿ”น Address 1: Signal road, around
Dinberwa Hospital

๐Ÿ”น Addres 2: Wellosefer, Infront of
Dani Plaza
โค4
๐Ÿ‘‰Steel calculation in construction is a crucial step in ensuring the strength, durability, and safety of reinforced concrete structures.

The infographic you shared highlights the typical percentage of steel used in different structural members, which is based on standard engineering practices. Letโ€™s break it down in detail:

๐Ÿ”น Importance of Steel in Concrete

Concrete is strong in compression but weak in tension.

Steel reinforcement bars (rebars) are added to resist tensile forces, making the structure balanced and safe.

The percentage of steel varies depending on the type of structural member and the loads it carries.

๐Ÿ”น Steel Percentages in Structural Members

- Slab: About 1% of the total concrete volume. Slabs mainly resist distributed loads, so less steel is required compared to beams or columns.
- Beam: Around 2% of the concrete volume. Beams carry bending and shear forces, hence they need more reinforcement.
- Column: Approximately 2.5% of the concrete volume. Columns bear axial loads and moments, requiring higher steel content for stability.
- Footing: Roughly 0.8% of the concrete volume.

Footings distribute loads to the soil, so reinforcement is relatively lower but still essential.

๐Ÿ”น Engineering Significance

- Proper steel calculation ensures structural safety and prevents collapse.
- Overuse of steel increases cost, while underuse compromises strength.
- Following standard percentages helps maintain economy and efficiency in construction.
- Engineers often adjust these values based on design codes, load conditions, and soil properties.

๐Ÿ”น Visual Understanding
The 3D and top-view

illustrations of reinforcement grids show how rebars are arranged to form a strong skeleton inside the concrete.

This skeletal framework is what gives reinforced concrete its reliability.

#SteelCalculation #StructuralDesign #ConstructionSafety

@etconp
โค10๐Ÿ‘1
๐Ÿ‘‰Reactions at Supports
The beam is supported at two points, A and B. By applying equilibrium principles, the upward reactions at these supports are determined. Support B carries the larger share of the load, while support A carries the smaller portion.

This balance ensures the beam remains stable under the applied loads and moment.

๐Ÿ”น Shear Force Diagram (S.F.D.)

The shear force diagram shows how vertical forces vary along the beam.

It is drawn by considering the algebraic sum of vertical loads at different sections.

The point where the shear force changes sign is critical, as it indicates the location of maximum bending moment.

๐Ÿ”น Bending Moment Diagram (B.M.D.)

The bending moment diagram is derived from the shear force diagram.

It represents how bending stresses develop along the beam.

The maximum bending moment occurs exactly where the shear force crosses zero, highlighting the most stressed section of the beam.

๐Ÿ”น Key Concepts Recap

- Use equilibrium to find reactions at supports.
- Shear force is based on vertical load distribution.
- Bending moment is obtained from the shear force diagram.
- The most critical point is where shear changes sign, as this is where maximum bending occurs.

This process is fundamental in structural analysis and helps civil engineers design beams that can safely resist applied loads.

#StructuralAnalysis #CivilEngineering #BeamDesign #SFD #BMD

@etconp
โค8
Crank Bar in Shallow Beam

A crank bar is a bent reinforcement bar used in RCC beams to resist both bending moment and shear force near supports. It is usually bent at 45ยฐ (or 30ยฐ in shallow beams) to transfer tension safely from the bottom to the top of the beam.

Main Purposes:

Resists negative (hogging) moment

Helps resist high shear force at supports

Reduces chances of brittle failure

Saves reinforcement steel and improves structural strength

Common Use:

Crank bars are mainly used in shallow beams, slabs, and continuous beams for better load distribution and durability.

#CrankBar #ShallowBeam #RCCBeam #BeamReinforcement #CivilEngineering #StructuralEngineering #ConstructionDetail #ReinforcedConcrete #ShearForce #BendingMoment #BeamDesign #SiteEngineering

@etconp
โค9๐Ÿ™1
The ratio of maximum velocity and average velocity in laminar poiseullie flow between two parallel plates is
Anonymous Quiz
19%
2
42%
1.5
31%
1.25
9%
0.8
โค4๐Ÿ‘2
The heaviest I-section for same depth is
Anonymous Quiz
22%
(a) ISMB
33%
(b) ISLB
33%
(c) ISHB
12%
(d) ISWB
โค3
As per relevant IS code , the inside clearance for a soil sampler should be
Anonymous Quiz
36%
1% to 3%
27%
4% to 7%
23%
8% to 10%
14%
12% to 15%
๐Ÿ‘2โค1
For a ribbed span, the minimum thickness of the ribs & that of the in-situ ribs are respectively?
Anonymous Quiz
19%
54 mm & 65 mm
25%
65 mm & 54 mm
21%
40 mm & 25 mm
34%
25 mm & 40 mm
โค1