đPlumb Bob â A Simple Tool for Accurate Vertical Alignment
đŤA plumb bob is one of the oldest and most reliable tools used in civil engineering, construction, and surveying to establish a true vertical reference line.
đާIt works purely on the principle of gravity, making it highly accurate without requiring electricity or calibration.
đ§Key Components:
⢠String: High-strength nylon cord for suspension.
⢠Top Eye: Secure attachment point for the string.
⢠Body: Heavy steel or brass body that provides stability.
⢠Hardened Tip: Sharp point for precise alignment.
⢠Storage Pin: Used to wind and store the string neatly.
đˇCommon Applications:
â Checking the verticality of walls and columns.
â Aligning formwork and scaffolding.
â Transferring points from one level to another.
â Surveying and layout work.
â Masonry and structural construction.
đŤľHow to Use:
1. Tie the string to a secure point.
2. Let the plumb bob hang freely until it stops swinging.
3. Use the pointed tip as the true vertical reference.
4. Mark or align the structure accordingly.
âśď¸Engineering Tip:
Always protect the plumb bob from strong wind and ensure the string is straight and untangled for the most accurate readings.
đ§á¨ YouTube ááá˝á áááááá á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
đŤA plumb bob is one of the oldest and most reliable tools used in civil engineering, construction, and surveying to establish a true vertical reference line.
đާIt works purely on the principle of gravity, making it highly accurate without requiring electricity or calibration.
đ§Key Components:
⢠String: High-strength nylon cord for suspension.
⢠Top Eye: Secure attachment point for the string.
⢠Body: Heavy steel or brass body that provides stability.
⢠Hardened Tip: Sharp point for precise alignment.
⢠Storage Pin: Used to wind and store the string neatly.
đˇCommon Applications:
â Checking the verticality of walls and columns.
â Aligning formwork and scaffolding.
â Transferring points from one level to another.
â Surveying and layout work.
â Masonry and structural construction.
đŤľHow to Use:
1. Tie the string to a secure point.
2. Let the plumb bob hang freely until it stops swinging.
3. Use the pointed tip as the true vertical reference.
4. Mark or align the structure accordingly.
âśď¸Engineering Tip:
Always protect the plumb bob from strong wind and ensure the string is straight and untangled for the most accurate readings.
đ§á¨ YouTube ááá˝á áááááá á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
â¤8đ2đĽ°1
đáááᣠá¨áá°áá áĽáá ááĽáá áĽáŁáŤáš á áľáá˝ áááľ áŁáŤáááá áŁááš áá á¨áľ áĽáľá¨ á
áłá áááᣠá áŤááááá Micro Soft Project (Ms) áŚáááá áŽááľ áááá á¨ááááš á á°ááŁáŁá áá áááááĄâ¤ď¸
@etconp
đŠááááá áĽáŤá á˛áá @Philemona7 ááá á 0925446661 áá°ááááđ
@etconp
đŠááááá áĽáŤá á˛áá @Philemona7 ááá á 0925446661 áá°ááááđ
â¤2đ2
đá¨áŠáᣠáááá ፠(á¨áá) - ááźá ááááľ ááŽáááľ á á°áťá á¨áááŁáł áĽáá
áľáá´ áá áááá
đ§á¨á°ááł - ááźá ááááľ ááŽáááľ á áŤá á¨ážáá á¨áŠáᣠáááá ፠(á¨áá) - ááźá ááá áááľ ááááľ ááŽáááľ á á°áťá á¨áááŁáł áĽáá áľáá´ áá ááááá˘
á¨ááááľ ááŽáááą 44 ááĽáĽ 68 áŞáááľá á¨áá¸áá á˛ážáἠá¨áá áá°á á¨á°á´ á ááá˛áŤ á áŠá ááźá áĽá ááá á á¨á°áá˝ áá°á¨á á¨áá á¨áá á¨á á áá á¨ááŤáłáĽá ááᢠá¨áá á á á°á¨á᪠áá° áłáŞáŤáá á¨ááá á áá á á áĽáŤá°-áááľá˛áŤááľ áĽá á¨ááá˝ ááłááľ ááłá¨áťáá˝ ááš á ááľá¨á á¨áąáŞáľáľ áá°áąá á¨ááŤáááĽá ááá˘
á á áŤáŁá˘á áŁáá á¨á¸áĽáł áá°áá¨áľ ááááŤáľ á¨áááŁáł ááĽá áľ áĽá áá˝ááŞáá˝ á á ááŚáľ ááľá°áááᣠá áĽáŤ á°ááŤáŠ á¨á á á áĽáĽá¨áśá˝ áĽáá˛áá á¨áá°á ááľá¨á á áá á¨á°áŤáŤá á˝ááŽá˝ á áááŁáłá áá°áľ áá á°á˝áá á áłáľá¨ááá˘
áá˝ááŽáš ááá áááľá áááľá áľáŁ á°ááá˝á á¨ááĽá°áłáľá áĽá á¨á¸áĽáł ááá á á áŤááľ áĽáá˛áá á¨áĽáŤ á°ááŤáŠ áá á áážá áŁá°á¨áá á¨áśáľáľáŽá˝ áĽá¨áľáĽ á¨á˝ááŽáš áá á á á¨áá ááááľ á°á˝ááá˘
á á°ááá á¨áŽá áĽá ááźá á¨á°áá˝á á¨áᎠ12 áŞáááľá á¨áážááá á¨áááŁáłá ááá áááá áŽááľáľáŤáá˝á áŽáááŹá˝á á áááľ á°ááŤáááľ áá°á áąá¤ ááŽáááą á¨áá á¨á áľ ááá ááá ááťáťá áĽáá˛áŤáłá á áááá˘
á á áá áá áľ á ááŽáááą á¨á áá áááŽáŁ á¨áá¨áŁá áááľ áĽáŤáá˝áŁ á¨áá ááá°áť áąáŚáá˝ áá áŤáŁ á¨á°áĽá¤á ááá áᣠá¨á¤ááŽááľ á á á ááá¨áľ áĽá á¨á¨áá¨ááľ áááŁáł áĽáŤáá˝ á áľááľ áĽá¨á°á¨ááá ááááá˘
á¨ááááľ áááŁáłáá ááá-á áá áŽá´á áŽááľáľáŤáá˝á á áá¨ááá áá á˛ážáἠáá ááľ á˛ááá áĽá áááŁáł áŽáááŹá˝á á¨ááŽáááąá áĽáŤáľ áĽá ááĽáĽá áĽáŤ á áá¨ááá áá ááááᢠáááŽáááą 1 ááĽáĽ 8 á˘ááŽá áĽá á¨áá°áŤá ááááĽáľ á ááľ á°ááľá§áá˘
ááŽáááą á˛á ááá á¨áá á á¨á°áĄá á¨áľáŤááľáááľ á˝áá áĽá áĽááááľ áŤáľááŤáᢠá¨á¨ááᣠáŽá áĽá ááźá á¨á°áá˝á á¨áᎠá¨á°ááŤáŠ á¨á°áá˝á á ááľá°áłá°á á¨ááἠáááἠáááἠáááááąá áŤá áááŤáá˘
á¨á˘áľáŽáľáŤ ááááśá˝ á áľá°áłá°á
@etconp
đ§á¨á°ááł - ááźá ááááľ ááŽáááľ á áŤá á¨ážáá á¨áŠáᣠáááá ፠(á¨áá) - ááźá ááá áááľ ááááľ ááŽáááľ á á°áťá á¨áááŁáł áĽáá áľáá´ áá ááááá˘
á¨ááááľ ááŽáááą 44 ááĽáĽ 68 áŞáááľá á¨áá¸áá á˛ážáἠá¨áá áá°á á¨á°á´ á ááá˛áŤ á áŠá ááźá áĽá ááá á á¨á°áá˝ áá°á¨á á¨áá á¨áá á¨á á áá á¨ááŤáłáĽá ááᢠá¨áá á á á°á¨á᪠áá° áłáŞáŤáá á¨ááá á áá á á áĽáŤá°-áááľá˛áŤááľ áĽá á¨ááá˝ ááłááľ ááłá¨áťáá˝ ááš á ááľá¨á á¨áąáŞáľáľ áá°áąá á¨ááŤáááĽá ááá˘
á á áŤáŁá˘á áŁáá á¨á¸áĽáł áá°áá¨áľ ááááŤáľ á¨áááŁáł ááĽá áľ áĽá áá˝ááŞáá˝ á á ááŚáľ ááľá°áááᣠá áĽáŤ á°ááŤáŠ á¨á á á áĽáĽá¨áśá˝ áĽáá˛áá á¨áá°á ááľá¨á á áá á¨á°áŤáŤá á˝ááŽá˝ á áááŁáłá áá°áľ áá á°á˝áá á áłáľá¨ááá˘
áá˝ááŽáš ááá áááľá áááľá áľáŁ á°ááá˝á á¨ááĽá°áłáľá áĽá á¨á¸áĽáł ááá á á áŤááľ áĽáá˛áá á¨áĽáŤ á°ááŤáŠ áá á áážá áŁá°á¨áá á¨áśáľáľáŽá˝ áĽá¨áľáĽ á¨á˝ááŽáš áá á á á¨áá ááááľ á°á˝ááá˘
á á°ááá á¨áŽá áĽá ááźá á¨á°áá˝á á¨áᎠ12 áŞáááľá á¨áážááá á¨áááŁáłá ááá áááá áŽááľáľáŤáá˝á áŽáááŹá˝á á áááľ á°ááŤáááľ áá°á áąá¤ ááŽáááą á¨áá á¨á áľ ááá ááá ááťáťá áĽáá˛áŤáłá á áááá˘
á á áá áá áľ á ááŽáááą á¨á áá áááŽáŁ á¨áá¨áŁá áááľ áĽáŤáá˝áŁ á¨áá ááá°áť áąáŚáá˝ áá áŤáŁ á¨á°áĽá¤á ááá áᣠá¨á¤ááŽááľ á á á ááá¨áľ áĽá á¨á¨áá¨ááľ áááŁáł áĽáŤáá˝ á áľááľ áĽá¨á°á¨ááá ááááá˘
á¨ááááľ áááŁáłáá ááá-á áá áŽá´á áŽááľáľáŤáá˝á á áá¨ááá áá á˛ážáἠáá ááľ á˛ááá áĽá áááŁáł áŽáááŹá˝á á¨ááŽáááąá áĽáŤáľ áĽá ááĽáĽá áĽáŤ á áá¨ááá áá ááááᢠáááŽáááą 1 ááĽáĽ 8 á˘ááŽá áĽá á¨áá°áŤá ááááĽáľ á ááľ á°ááľá§áá˘
ááŽáááą á˛á ááá á¨áá á á¨á°áĄá á¨áľáŤááľáááľ á˝áá áĽá áĽááááľ áŤáľááŤáᢠá¨á¨ááᣠáŽá áĽá ááźá á¨á°áá˝á á¨áᎠá¨á°ááŤáŠ á¨á°áá˝á á ááľá°áłá°á á¨ááἠáááἠáááἠáááááąá áŤá áááŤáá˘
á¨á˘áľáŽáľáŤ ááááśá˝ á áľá°áłá°á
@etconp
â¤5đ3
#ADVERTISEMENT
đŤá¨á¤áśáá (á¨á áááá) á¨ááá˝áá áľáŤ áá°áŤáľ ááááá? áĽááá˛áŤááľ á°áŹ á¨ááá˝áá áľáŤ á áá::
*á¨á áĽá°á áľáŤ
*áááá á¨á᪠ááááł á áŚá˝
*á¨ááá áľáŤáá˝
*á¨ááĽáŤáľ ááááłá áá á(fitting)
*á¨á´áŤáá áľáŤá¤áĽáá˛áá á á áá á¨áááŁáł á¨ááá˝áá áľáŤáá áĽáá°áŤááłááá˘
đá áľáŤáť: á á˛áľ á á ᣠáĽáá˛áá á ááá á¨ááá á¨á°áá˝ áĽáááááá˘
đ˛ 0935210071 ááá 0960332429 áá°ááááđ
đŤá¨á¤áśáá (á¨á áááá) á¨ááá˝áá áľáŤ áá°áŤáľ ááááá? áĽááá˛áŤááľ á°áŹ á¨ááá˝áá áľáŤ á áá::
*á¨á áĽá°á áľáŤ
*áááá á¨á᪠ááááł á áŚá˝
*á¨ááá áľáŤáá˝
*á¨ááĽáŤáľ ááááłá áá á(fitting)
*á¨á´áŤáá áľáŤá¤áĽáá˛áá á á áá á¨áááŁáł á¨ááá˝áá áľáŤáá áĽáá°áŤááłááá˘
đá áľáŤáť: á á˛áľ á á ᣠáĽáá˛áá á ááá á¨ááá á¨á°áá˝ áĽáááááá˘
đ˛ 0935210071 ááá 0960332429 áá°ááááđ
â¤4
Ethio Construction Engineering
đá á á፠ááá á°áá á¸á áá á¨ááááá á á á
áá áááľáľáŠ á°ááá áľáŤ á¨ááᨠá ááłáľá áŤáľáá á¨á á¨ááááľáľ áĽá á¨áá á˝ááá á¨ááá ááá á¨áá áá˝áá á˛áááś á¨á
áἠáá áá˛á
á á°ááá˝ áĽá¨á°áá°á ááááᢠđŤá¨ááŤáľ á ááľ á 1200-1500 áĽá áá¸áĽ á¨áá á¨á áá
á˛áááś á áá áá ááá á áĽáĽá á¨áᎠá°áĽá¨áĽááá á¨á°á áá áĽáľá¨ 2500 áĽá áĽá¨á°á¸á ááááᢠááĽáŞáŤá áĽá¨á°áááá áľâŚ
đâáá áá˝áá á˛áááś ááĽáŞáŤá á á°ááá¨á° á¨á°ááá ááłá ááłááá˝!
đŤâá á áᥠá áĽááłáŽ áá¨áł á áľá°áŁáŁáŞ á ááŤáŽá˝á á áá áá˝áá á˛áááś ááĽáŞáŤ á ááŤáŽá˝ ááŤá¨á á ááĽáŞáŤá áá áłá á á áŤáá á˝ááŽá˝ ááŞáŤ á¨áááá ááľá¨á á°áŤááś á¨áá¨á°ááľ ááłááá˝ á°áááááá˘
đ§áá áá á¨ááłá ááĽáŚá˝áŚ
âá¨áľáŤááá á¨áľáŤááľáááľ áá°áľáŚ á˛áááś ááá á¨ááᥠá°á˝á¨ááŤáŞáá˝ á¨á¨á°á á᪠áŁáá á¨5 áŞ.á á¨áŽáááŞáľ á áľáááľ ááááľ áĽáť áĽáá˛á áá á°ááľááá˘
á¨ááá áááŞáá áŚáłá á ááááľ á¨áľáŤáá áá¨ááá á ááááłáľ áľááááľ á°á°ááˇáá˘
âá¨á°á áááľá á¨ááá˘áŤ áĽáááľáŚ áŤá áŤááľ áá° ááĽáŞáŤá á áĽá áᢠáááŁáľ á áášá á¨á°á¨áá¨á ááᢠá¨áŤááľ á˛áľá°á á¨24 á°ááľ áá° 48 á°ááľ áĽáá˛áťáťá á°á°áááá˘
âá¨á°ááá˝ ááááľáŚ á ááá áá á á-áἠá°ááá˝ á¨ááĽáŞáŤá á áĽá áᢠáĽáá˛áááą áĽáĽá á°ááᎠá°á°áĽáˇáá˘
âá¨á°áá áá˝ á áááááľáŚ á¨á°á°áŤá ááŁáśá˝ á°áá áá˝á áŤá áĽááááľ áĽáá˛áŤááááá áááŤáá˝ áĽáá˛áľá°áŤá¨á á á áŁáŤ á°ááá§áá˘
âá¨áááľá áĽáŹ áá ááťáťáŤáŚ á¨á˛áááś áĽáĽá¨áľá ááá á¨á á¨á áĄá˛ áá°áĽ 96,000 áśá á¨áľááá á¨á°á á 300 ááŞááá˝ áĽáá˛ááá á°ááľááᤠáĽáá˛áá á¨áá á¨á 1 ááá¨áĽ áá° 2 á¨á áĽááá˘
âááľáľáá áĽáááľáŚ á ááĽáŞáŤá áá ááááá á á-áἠáľáááľ á˛áá¸á á¨ááĽáł á áŤááľá á¨ááᢠá á á áľá°á᪠áĽááá áááľáłáᢠáááąá áá°á áááá˝ ááľáá á áá ááááľ áá°áŤá¨áąá áá¨ááἠáĽáá°ááᣠá°ááľááá˘
âá¨áá¨áłá á áľá°áłáłáŞ á áś á á¨á á¨á á áááᣠááááľáľá áá á á¨á°áĄ áááĽáŞáŤá áá°á¨á° áááľ áĽá áá ááľáľá ááľá¨á áĽááłááŁá¸á á á˝ááŚáľ á°áĽá°ááá˘
âáá¨áá á¨á°á¨á°á á¨áĽááłáŽ áá¨áł ááááľáľ áŽáááŹá˝á á˝á ááľ á¤áľ áá
@etconp
đŤâá á áᥠá áĽááłáŽ áá¨áł á áľá°áŁáŁáŞ á ááŤáŽá˝á á áá áá˝áá á˛áááś ááĽáŞáŤ á ááŤáŽá˝ ááŤá¨á á ááĽáŞáŤá áá áłá á á áŤáá á˝ááŽá˝ ááŞáŤ á¨áááá ááľá¨á á°áŤááś á¨áá¨á°ááľ ááłááá˝ á°áááááá˘
đ§áá áá á¨ááłá ááĽáŚá˝áŚ
âá¨áľáŤááá á¨áľáŤááľáááľ áá°áľáŚ á˛áááś ááá á¨ááᥠá°á˝á¨ááŤáŞáá˝ á¨á¨á°á á᪠áŁáá á¨5 áŞ.á á¨áŽáááŞáľ á áľáááľ ááááľ áĽáť áĽáá˛á áá á°ááľááá˘
á¨ááá áááŞáá áŚáłá á ááááľ á¨áľáŤáá áá¨ááá á ááááłáľ áľááááľ á°á°ááˇáá˘
âá¨á°á áááľá á¨ááá˘áŤ áĽáááľáŚ áŤá áŤááľ áá° ááĽáŞáŤá á áĽá áᢠáááŁáľ á áášá á¨á°á¨áá¨á ááᢠá¨áŤááľ á˛áľá°á á¨24 á°ááľ áá° 48 á°ááľ áĽáá˛áťáťá á°á°áááá˘
âá¨á°ááá˝ ááááľáŚ á ááá áá á á-áἠá°ááá˝ á¨ááĽáŞáŤá á áĽá áᢠáĽáá˛áááą áĽáĽá á°ááᎠá°á°áĽáˇáá˘
âá¨á°áá áá˝ á áááááľáŚ á¨á°á°áŤá ááŁáśá˝ á°áá áá˝á áŤá áĽááááľ áĽáá˛áŤááááá áááŤáá˝ áĽáá˛áľá°áŤá¨á á á áŁáŤ á°ááá§áá˘
âá¨áááľá áĽáŹ áá ááťáťáŤáŚ á¨á˛áááś áĽáĽá¨áľá ááá á¨á á¨á áĄá˛ áá°áĽ 96,000 áśá á¨áľááá á¨á°á á 300 ááŞááá˝ áĽáá˛ááá á°ááľááᤠáĽáá˛áá á¨áá á¨á 1 ááá¨áĽ áá° 2 á¨á áĽááá˘
âááľáľáá áĽáááľáŚ á ááĽáŞáŤá áá ááááá á á-áἠáľáááľ á˛áá¸á á¨ááĽáł á áŤááľá á¨ááᢠá á á áľá°á᪠áĽááá áááľáłáᢠáááąá áá°á áááá˝ ááľáá á áá ááááľ áá°áŤá¨áąá áá¨ááἠáĽáá°ááᣠá°ááľááá˘
âá¨áá¨áłá á áľá°áłáłáŞ á áś á á¨á á¨á á áááᣠááááľáľá áá á á¨á°áĄ áááĽáŞáŤá áá°á¨á° áááľ áĽá áá ááľáľá ááľá¨á áĽááłááŁá¸á á á˝ááŚáľ á°áĽá°ááá˘
âáá¨áá á¨á°á¨á°á á¨áĽááłáŽ áá¨áł ááááľáľ áŽáááŹá˝á á˝á ááľ á¤áľ áá
@etconp
â¤6đ2
đHydroelectric Dam â How It Works
1. Reservoir â Stores water at a high level, creating potential energy.
2. Intake Gates â Control the flow of water into the dam.
3. Penstock â Large steel pipes carry water to the turbines.
4. Turbine â Fast-moving water spins the turbine blades.
5. Generator â Converts the turbine's mechanical energy into electricity.
6. Transformer â Increases voltage for efficient power transmission.
7. Transmission Lines â Deliver electricity to the power grid.
8. Tailrace â Returns the used water back to the river.
9. Spillway â Safely releases excess water to prevent overflow.
đSummary: A hydroelectric dam converts the potential energy of stored water into clean electrical energy using turbines and generators.
âď¸Please Subscribe Our Youtube Channelđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
1. Reservoir â Stores water at a high level, creating potential energy.
2. Intake Gates â Control the flow of water into the dam.
3. Penstock â Large steel pipes carry water to the turbines.
4. Turbine â Fast-moving water spins the turbine blades.
5. Generator â Converts the turbine's mechanical energy into electricity.
6. Transformer â Increases voltage for efficient power transmission.
7. Transmission Lines â Deliver electricity to the power grid.
8. Tailrace â Returns the used water back to the river.
9. Spillway â Safely releases excess water to prevent overflow.
đSummary: A hydroelectric dam converts the potential energy of stored water into clean electrical energy using turbines and generators.
âď¸Please Subscribe Our Youtube Channelđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
đ5â¤4
â
Construction safety net
Size 2Ă50=6650
â belak wir 1.5m=245birr kg
â belak wir 2.5m= 258birr kg
â wire mesh 2Ă1 =2500birr
ááľáá áśá˝ á¨ááŽááá á áááááľ áĽáá áŁáá
áľáá. 0912955969
0949434363
Telgram = @FAR7957
Size 2Ă50=6650
â belak wir 1.5m=245birr kg
â belak wir 2.5m= 258birr kg
â wire mesh 2Ă1 =2500birr
ááľáá áśá˝ á¨ááŽááá á áááááľ áĽáá áŁáá
áľáá. 0912955969
0949434363
Telgram = @FAR7957
â¤4đ1
đBeamâColumn Reinforcement Detail
đ§A beamâcolumn joint is one of the most critical parts of an RCC structure because it transfers loads safely from beams to columns.
đˇProper reinforcement detailing ensures strength, ductility, and long-term durability, especially during seismic and heavy loading conditions.
đˇKey Details:
âśď¸Column main bars should remain continuous through the joint.
âśď¸Beam top and bottom reinforcement must be properly anchored into the column with the required development length.
âśď¸Beam stirrups and column ties should be closely spaced near the joint to improve shear resistance and confinement.
âśď¸L-shaped anchorage bars provide better bonding and load transfer.
âśď¸Maintain the specified concrete cover to protect reinforcement from corrosion.
âśď¸Reinforcement spacing, bar diameter, and dimensions should follow the structural design and applicable building codes.
âśď¸Proper reinforcement detailing minimizes cracking and improves structural performance.
@etconp
đ§A beamâcolumn joint is one of the most critical parts of an RCC structure because it transfers loads safely from beams to columns.
đˇProper reinforcement detailing ensures strength, ductility, and long-term durability, especially during seismic and heavy loading conditions.
đˇKey Details:
âśď¸Column main bars should remain continuous through the joint.
âśď¸Beam top and bottom reinforcement must be properly anchored into the column with the required development length.
âśď¸Beam stirrups and column ties should be closely spaced near the joint to improve shear resistance and confinement.
âśď¸L-shaped anchorage bars provide better bonding and load transfer.
âśď¸Maintain the specified concrete cover to protect reinforcement from corrosion.
âśď¸Reinforcement spacing, bar diameter, and dimensions should follow the structural design and applicable building codes.
âśď¸Proper reinforcement detailing minimizes cracking and improves structural performance.
@etconp
đ3â¤2đ1
đż áááľáá ÂŤLow Carbon CementÂť?
âáŁá ááá á¨á˛áááś áááľ áá°áľ á¨áá°á á¨áááľ áá á áľáááááá á¨áŁáľ á¨áŹááŤá áááŚá˝á áľáááŤá°ááᣠá¨áá°á áá á áŤáá áŤááŚá áłááŚááłááľ áá° á á¨á ááááá˘
ÂŤLow Carbon CementÂť áá á¨áá¨á°ááľá á áá áá áá áá áááľ ááááłááŚ
⢠âá°ááá áĽáŹ áááá˝áŚ á áááľ áá°áą ááľáĽ áĽáá° á¨á˘ááąáľáľáŞ á°á¨á áááśá˝ (Industrial byproducts) áŤá ááĽááśá˝á á áá áá á¨áŹááŤáá áááľ ááááľá˘
⢠âá¨ááá ááŁá˘ááľáŚ áááą á ááŤááľá áľ áá áľ á ááľá°á á¨áááľ áá á áĽáá˛á áá á ááľá¨á á¨ááłá áááłáá áááľá ááľá°áŤá¨áá˘
⢠âá¨áááááľ áááľáጠááááŁáł ááá á¨ááŤáľááááá áĽááŤáŹ áłááááľáŁ á¨á áŤáŁá˘ áĽá á ááŚá˝á á¨ááŤáłáŤ á¨á´áááá áá¤áľ ááá˘
âđ§ą ááá á áľááá áá?
1. âá¨á á¨á ááĽá¨áľ áááĽá ááá¨áá¨áጠá¨áááŁáł á˘ááąáľáľáŞá áááááá á¨áŤááŚá áááľ áľáá á áľá°áá ጠáľáááᣠáá áá ááá ááá á á á ááŤá áááľá ááá˘
2. âá¨á᪠ááŁá˘ááľáŚ áĽáá° á áłá áłáááľá á´áááá áŠáá¨áá˛á˛ áŤá á°áááľ áĽáá°áááľáŁ á¨ááá ááľáĽ ááĽááśá˝á á áá áá á¨ááá¨áą á˛áááśáá˝ á¨áá ááááŹá áááá ἠáá¨áłáá˘
3. âá¨áĽáŤáľ ááľáľáጠá¨áŤááŚá áá á á ááľá°á á˘áááᣠáááááľáŁ áá ááťá áááá˝ á¨áááŁáł á áááśá˝ á¨ááŤáľááááá á¨áá°á áĽááŤáŹ áłááááľ ááľá áľ áá˝ááá˘
đ§á¨ YouTube ááá˝á áááááá á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
âáŁá ááá á¨á˛áááś áááľ áá°áľ á¨áá°á á¨áááľ áá á áľáááááá á¨áŁáľ á¨áŹááŤá áááŚá˝á áľáááŤá°ááᣠá¨áá°á áá á áŤáá áŤááŚá áłááŚááłááľ áá° á á¨á ááááá˘
ÂŤLow Carbon CementÂť áá á¨áá¨á°ááľá á áá áá áá áá áááľ ááááłááŚ
⢠âá°ááá áĽáŹ áááá˝áŚ á áááľ áá°áą ááľáĽ áĽáá° á¨á˘ááąáľáľáŞ á°á¨á áááśá˝ (Industrial byproducts) áŤá ááĽááśá˝á á áá áá á¨áŹááŤáá áááľ ááááľá˘
⢠âá¨ááá ááŁá˘ááľáŚ áááą á ááŤááľá áľ áá áľ á ááľá°á á¨áááľ áá á áĽáá˛á áá á ááľá¨á á¨ááłá áááłáá áááľá ááľá°áŤá¨áá˘
⢠âá¨áááááľ áááľáጠááááŁáł ááá á¨ááŤáľááááá áĽááŤáŹ áłááááľáŁ á¨á áŤáŁá˘ áĽá á ááŚá˝á á¨ááŤáłáŤ á¨á´áááá áá¤áľ ááá˘
âđ§ą ááá á áľááá áá?
1. âá¨á á¨á ááĽá¨áľ áááĽá ááá¨áá¨áጠá¨áááŁáł á˘ááąáľáľáŞá áááááá á¨áŤááŚá áááľ áľáá á áľá°áá ጠáľáááᣠáá áá ááá ááá á á á ááŤá áááľá ááá˘
2. âá¨á᪠ááŁá˘ááľáŚ áĽáá° á áłá áłáááľá á´áááá áŠáá¨áá˛á˛ áŤá á°áááľ áĽáá°áááľáŁ á¨ááá ááľáĽ ááĽááśá˝á á áá áá á¨ááá¨áą á˛áááśáá˝ á¨áá ááááŹá áááá ἠáá¨áłáá˘
3. âá¨áĽáŤáľ ááľáľáጠá¨áŤááŚá áá á á ááľá°á á˘áááᣠáááááľáŁ áá ááťá áááá˝ á¨áááŁáł á áááśá˝ á¨ááŤáľááááá á¨áá°á áĽááŤáŹ áłááááľ ááľá áľ áá˝ááá˘
đ§á¨ YouTube ááá˝á áááááá á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
â¤8đ2
đRoad Superelevation & Formula
đ§Superelevation is the upward slope (banking) of the outer edge of a road on a horizontal curve.
đާIt helps counter centrifugal force, improving vehicle stability and safety.
âď¸Formula:
e + f = V^2/127R
đWhere:
e = Superelevation (decimal)
f = Side friction factor
V = Design speed (km/h)
R = Radius of curve (m)
đWhy it matters:
Reduces skidding risk
Prevents vehicle overturning
Improves passenger comfort
Allows safer travel at higher speeds on curves
@etconp
đ§Superelevation is the upward slope (banking) of the outer edge of a road on a horizontal curve.
đާIt helps counter centrifugal force, improving vehicle stability and safety.
âď¸Formula:
e + f = V^2/127R
đWhere:
e = Superelevation (decimal)
f = Side friction factor
V = Design speed (km/h)
R = Radius of curve (m)
đWhy it matters:
Reduces skidding risk
Prevents vehicle overturning
Improves passenger comfort
Allows safer travel at higher speeds on curves
@etconp
â¤15đ4
đáááᣠá¨áá°áá áĽáá ááĽáá áĽáŁáŤáš á áľáá˝ áááľ áŁáŤáááá áŁááš áá á¨áľ áĽáľá¨ á
áłá áááᣠá áŤááááá Micro Soft Project (Ms) áŚáááá áŽááľ áááá á¨ááááš á á°ááŁáŁá áá áááááĄâ¤ď¸
@etconp
đŠááááá áĽáŤá á˛áá @Philemona7 ááá á 0925446661 áá°ááááđ
@etconp
đŠááááá áĽáŤá á˛áá @Philemona7 ááá á 0925446661 áá°ááááđ
â¤1
This media is not supported in your browser
VIEW IN TELEGRAM
á á˛áą á¨á¤áľ áŞáŤá áá áĽáľáłáľ áĽá á¨áá᪠áŁáŞáŤ á á°ááá¨á°
1. á2019 á ááľ áááľ á¨áá°áá á¨á á¨á¤áľ áŞáŤá á ááłá áá᪠áŁáŞáŤ 11.5 á ááś áá á¸áľááá˘
2. á¨á áá á á°áŤá á᪠á¨áá°á¨á "á¨ááá°á ááá˝" áá˝á á¨á°á¨áá¨á áááá¸áá áĽá á¨á°ááá á á áá á°áá á᪠á¨ááŤáľá¨áá á á¨áŤáŽá˝ á á á á°á áŤá áŤáá ááá á°áááťáá˘
3. á¨áá áĽáľáłáľ áááŤá¸á á áá á á¨áŤáá á°á¨áŤáá á áĽá¨á áá¨á áĽáľáłáľ áłááá˝á áĽáľá¨ áááľ áá á¨áአá¨á ááľ áá á¨á¤áľ áŞáŤá á áŁáľ áááŁáá˘
4. áá áłáŤáľáą áśáľáľ áá áĽá á¨á፠á áá á¨áአá°áá á¨áááľ áá á¨á¤áľ áŞáŤá á áŁáľ á¨áá¨áá ááááá˘
5. á á˛áľ á°á¨áŤá á áľááĽá°á áá áŤáá°áą áĽá áŤááľáááᥠá¨á ááľ áá á¨á¤áľ áŞáŤá áááŁááĄ
6. á¨áá áá á˛áŤáá á á¨áŤáŠ ááá áá°áľ áĽá ááłáá áá´áł áĽááłáá áľ á°á áááá˘
@etconp
1. á2019 á ááľ áááľ á¨áá°áá á¨á á¨á¤áľ áŞáŤá á ááłá áá᪠áŁáŞáŤ 11.5 á ááś áá á¸áľááá˘
2. á¨á áá á á°áŤá á᪠á¨áá°á¨á "á¨ááá°á ááá˝" áá˝á á¨á°á¨áá¨á áááá¸áá áĽá á¨á°ááá á á áá á°áá á᪠á¨ááŤáľá¨áá á á¨áŤáŽá˝ á á á á°á áŤá áŤáá ááá á°áááťáá˘
3. á¨áá áĽáľáłáľ áááŤá¸á á áá á á¨áŤáá á°á¨áŤáá á áĽá¨á áá¨á áĽáľáłáľ áłááá˝á áĽáľá¨ áááľ áá á¨áአá¨á ááľ áá á¨á¤áľ áŞáŤá á áŁáľ áááŁáá˘
4. áá áłáŤáľáą áśáľáľ áá áĽá á¨á፠á áá á¨áአá°áá á¨áááľ áá á¨á¤áľ áŞáŤá á áŁáľ á¨áá¨áá ááááá˘
5. á á˛áľ á°á¨áŤá á áľááĽá°á áá áŤáá°áą áĽá áŤááľáááᥠá¨á ááľ áá á¨á¤áľ áŞáŤá áááŁááĄ
6. á¨áá áá á˛áŤáá á á¨áŤáŠ ááá áá°áľ áĽá ááłáá áá´áł áĽááłáá áľ á°á áááá˘
@etconp
â¤7
đ8 Must-Know Basics for Civil Engineers on Construction Sites
đŤUnderstanding drawings, setting out correctly, checking levels, maintaining concrete quality, inspecting reinforcement, following QA/QC procedures, prioritizing safety, and keeping proper documentation are the foundation of every successful project.
đ§Key Takeaways:
Read and understand construction drawings before starting work.
Verify site layout using grid lines, benchmarks (BM), and centerlines.
Check levels and alignment regularly with proper surveying equipment.
Follow correct concrete mix design, placement, vibration, and curing practices.
Inspect reinforcement for bar size, spacing, lap length, cover, and anchorage.
Perform quality control tests such as slump test and cube test.
Always wear PPE and maintain a safe, clean worksite.
Keep accurate daily records, inspection reports, and test documentation.
Master these basics to improve construction quality, reduce errors, and build durable, safe structures.
@etconp
đŤUnderstanding drawings, setting out correctly, checking levels, maintaining concrete quality, inspecting reinforcement, following QA/QC procedures, prioritizing safety, and keeping proper documentation are the foundation of every successful project.
đ§Key Takeaways:
Read and understand construction drawings before starting work.
Verify site layout using grid lines, benchmarks (BM), and centerlines.
Check levels and alignment regularly with proper surveying equipment.
Follow correct concrete mix design, placement, vibration, and curing practices.
Inspect reinforcement for bar size, spacing, lap length, cover, and anchorage.
Perform quality control tests such as slump test and cube test.
Always wear PPE and maintain a safe, clean worksite.
Keep accurate daily records, inspection reports, and test documentation.
Master these basics to improve construction quality, reduce errors, and build durable, safe structures.
@etconp
đ4â¤3
â
Construction safety net
Size 2Ă50=6650
â belak wir 1.5m=245birr kg
â belak wir 2.5m= 258birr kg
â wire mesh 2Ă1 =2500birr
ááľáá áśá˝ á¨ááŽááá á áááááľ áĽáá áŁáá
áľáá. 0912955969
0949434363
Telgram = @FAR7957
Size 2Ă50=6650
â belak wir 1.5m=245birr kg
â belak wir 2.5m= 258birr kg
â wire mesh 2Ă1 =2500birr
ááľáá áśá˝ á¨ááŽááá á áááááľ áĽáá áŁáá
áľáá. 0912955969
0949434363
Telgram = @FAR7957
â¤5
đâá áááŤáś áááá á¨áá ፠ááá¨á áááᣠáá!
đ§âá á ááŤá˝á ááłáá á¨áááľ ááá¨á áááŤáśáŁ áá áἠááááá á á áá áŤáááá á¨áá ፠ááá¨á ááááŁááľ áááá á¨áá´áŤá á¤áśá˝ áŽáááŹá˝á á áľáłáááá˘
đˇâá¨ááŽáááą áááá áááłáŚ
âá¨ááľá áááłáŚ á¨á°á¨á á áłá˝ á¨áá 100 ááŁá á¨áááľ áąáá˝á˘
âá á˛áą áá áľáŚ ááŁáŽášá á áááłáľ 1 áşá á áá áąáá˝á á¨áŤá áŁá 5 ááá áááť ááááŁáľá˘
âáááጠá¨ááŹáľ á á áááá á áááá áĽá ááá˝á á°á áá ááľá¨á áĽá á¨áááľ áĽáá áľáá´áá ááłá°áá˘
âáááŁá á°á¨áŤáŽá˝ á¨á°á°á ááĽáŤáŞáŤáŚ
áŽáááŹá˝á áááŁáłáá á á°ááá¨á° á°á¨áŤáŽá˝ á¨áááľ áááľ á ááľ á á á áľá ááľá ááá፠áĽáá°á°á°áŁá¸á áááżáá˘
á áá áľááááą áá á¨áľ áŽáááŹá˝á á áľááá áá á˛áŤááá ááĽá¨áąá á¨áá¨á¨áĽ ááĽáľ áĽááłáá áĽá á°á¨áŤáŽášá á á˛áą áááŁáł á˛á ááá á¨áá¨áŤá¨áľ á áľá፠ááľá áĽáá°áááŤá¸á á áľáłáááá˘
âá¨áŽáááŹá˝á á áááŚ
á50 áááłáľ á á ááľá°á á¨áŞáŤá áá á áá አáąáá˝ á°á áá á¨áá አá ááłááľ á áŤááľáŁ ááá˝ ááá˝á á°á áá á¨ááŤá°áááá áá áá á¨áááľ áľáŤ á áááá á¨ááŤáááĄáľ á áŹáł á°áᢠá ááááá áŽáááŹá˝á á áááá˘
âá¨áá´áŤá á¤áśá˝ áŽáááŹá˝á áááŁáłá á á áá áá á°á áá áá áááááľ áĽáá°áá á á á¨ááá§áá˘
âđ áá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
đ§âá á ááŤá˝á ááłáá á¨áááľ ááá¨á áááŤáśáŁ áá áἠááááá á á áá áŤáááá á¨áá ፠ááá¨á ááááŁááľ áááá á¨áá´áŤá á¤áśá˝ áŽáááŹá˝á á áľáłáááá˘
đˇâá¨ááŽáááą áááá áááłáŚ
âá¨ááľá áááłáŚ á¨á°á¨á á áłá˝ á¨áá 100 ááŁá á¨áááľ áąáá˝á˘
âá á˛áą áá áľáŚ ááŁáŽášá á áááłáľ 1 áşá á áá áąáá˝á á¨áŤá áŁá 5 ááá áááť ááááŁáľá˘
âáááጠá¨ááŹáľ á á áááá á áááá áĽá ááá˝á á°á áá ááľá¨á áĽá á¨áááľ áĽáá áľáá´áá ááłá°áá˘
âáááŁá á°á¨áŤáŽá˝ á¨á°á°á ááĽáŤáŞáŤáŚ
áŽáááŹá˝á áááŁáłáá á á°ááá¨á° á°á¨áŤáŽá˝ á¨áááľ áááľ á ááľ á á á áľá ááľá ááá፠áĽáá°á°á°áŁá¸á áááżáá˘
á áá áľááááą áá á¨áľ áŽáááŹá˝á á áľááá áá á˛áŤááá ááĽá¨áąá á¨áá¨á¨áĽ ááĽáľ áĽááłáá áĽá á°á¨áŤáŽášá á á˛áą áááŁáł á˛á ááá á¨áá¨áŤá¨áľ á áľá፠ááľá áĽáá°áááŤá¸á á áľáłáááá˘
âá¨áŽáááŹá˝á á áááŚ
á50 áááłáľ á á ááľá°á á¨áŞáŤá áá á áá አáąáá˝ á°á áá á¨áá አá ááłááľ á áŤááľáŁ ááá˝ ááá˝á á°á áá á¨ááŤá°áááá áá áá á¨áááľ áľáŤ á áááá á¨ááŤáááĄáľ á áŹáł á°áᢠá ááááá áŽáááŹá˝á á áááá˘
âá¨áá´áŤá á¤áśá˝ áŽáááŹá˝á áááŁáłá á á áá áá á°á áá áá áááááľ áĽáá°áá á á á¨ááá§áá˘
âđ áá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
â¤2đ2
Forwarded from Ethiopian Construction Vacancy & Tender
đ˘ VACANCY ANNOUNCEMENT
ENJEFO CONSTRUCTION invites qualified and experienced professionals to apply for the following positions for its ongoing building construction projects in Addis Ababa.
Available Positions
1. Site Engineer (2 Positions)
Minimum 6 years of relevant building construction experience.
2. Office Engineer (1 Position)
Minimum 4 years of relevant building construction experience.
3. Foreman (1 Position)
Minimum 10 years of proven building construction experience.
đ Duty Station: Addis Ababa
đ° Salary: Negotiable, based on qualifications and experience.
How to Apply
Interested and qualified applicants are invited to submit their CV via Telegram to: @enjefo or 0963371366
Application Deadline: July 14, 2026
For future job opportunities and project updates, join our Telegram channel: @enjefocon
ENJEFO CONSTRUCTION invites qualified and experienced professionals to apply for the following positions for its ongoing building construction projects in Addis Ababa.
Available Positions
1. Site Engineer (2 Positions)
Minimum 6 years of relevant building construction experience.
2. Office Engineer (1 Position)
Minimum 4 years of relevant building construction experience.
3. Foreman (1 Position)
Minimum 10 years of proven building construction experience.
đ Duty Station: Addis Ababa
đ° Salary: Negotiable, based on qualifications and experience.
How to Apply
Interested and qualified applicants are invited to submit their CV via Telegram to: @enjefo or 0963371366
Application Deadline: July 14, 2026
For future job opportunities and project updates, join our Telegram channel: @enjefocon
â¤3
á ááἠááŤá¨á áá á¨áŤáľá ááťááľá á¸áĽáł á¨ááááá áľááľ áľááľáááŤá á á¨á°á á˛áááá¸á ááľáĽ áľáá
á áá ááááľ ááľá°ááłáá¤
á ááἠááááťáá˝á á á°áŁáŁáŽá˝ áá á¨áááᥠá ááłááľ á¨áŁáĽá ááá áŽá˝ (benches) áááá¸á áá ÂŤá¨á¸áĽáł áá°áÂť á¨ááŁá áľááá˝ áá¨áááŤáá˝á áłáľáŚáŁá¸ááá¤
ááአá˛áŤáŠáľ á°áŤ á¨á˛ááá áĽá ἠáááľá áá˝ááᤠááá áá á áŚáłá áá á¨áááĽá¨á áľááľ áášá á¨á°áᨠááá¤
áá áĽááá˛á ÂŤá¨áľááľ áĽáááľÂť
á¨áłá¨áá áľ á¨á¨á°á ááá ááᢠá¨ááἠáá°áĽá°á˘áŤ áŚáłáá˝ á°áá˝á áááááľ áĽááłááŁá¸á ááᣠá°á áĽáťááąáá á¨ááľáĽ á¸áĽáłáá á¨ááťá áľá á á˝á áľá ááá á áĽááłááŁá¸á áŤáľá°áá¨ááá˘
@etconp
á ááἠááááťáá˝á á á°áŁáŁáŽá˝ áá á¨áááᥠá ááłááľ á¨áŁáĽá ááá áŽá˝ (benches) áááá¸á áá ÂŤá¨á¸áĽáł áá°áÂť á¨ááŁá áľááá˝ áá¨áááŤáá˝á áłáľáŚáŁá¸ááá¤
áá á˛ááá áááľ áá˝á á¨ááá°ááá áĽáááśá˝ á á ááľ ááá á áá á°ááŁáĽáá á˘ááᥠáĽááł á¨ááľ áááŹáŁ áááá áĽááł ááá áááááťá¸áľ áĽááłáááᥠáŤá°ááá¸ááá¤
ááአá˛áŤáŠáľ á°áŤ á¨á˛ááá áĽá ἠáááľá áá˝ááᤠááá áá á áŚáłá áá á¨áááĽá¨á áľááľ áášá á¨á°áᨠááá¤
á áá°áá á°ááጠááľáłááťáá á˛áŤááĽáŁ á ááśáĄáľ á˛á áĽá ááá áĽáá˛á á¨áŤáą áá á˛áŤááᣠáááá á°áá á¨áá áŤáá ááá á á áá ááťááľ áá ááá áľ áá˝ááᢠáá¨áááŤá á°áášá á ááŤá á¨ááŤáŤáá áłáááᣠááĽáŤááłááłá¸á áĽááľ á¨áĽáťááľá á¨á°áá áľáá (pocket of privacy) á ááľááłá á¨áá¸á ááá¤
áá áĽááá˛á ÂŤá¨áľááľ áĽáááľÂť
á¨áłá¨áá áľ á¨á¨á°á ááá ááᢠá¨ááἠáá°áĽá°á˘áŤ áŚáłáá˝ á°áá˝á áááááľ áĽááłááŁá¸á ááᣠá°á áĽáťááąáá á¨ááľáĽ á¸áĽáłáá á¨ááťá áľá á á˝á áľá ááá á áĽááłááŁá¸á áŤáľá°áá¨ááá˘
á ááłááľ áá á¨á ááľ á¨á°á áᎠáášá áłá˘ á¨áááá áľááá á ááá áááŁáłáá˝á á áá°áá°á áĽáť á áá°ááᤠá¨á°áá áá á¨áá á áĽáá á áľááśá˝ á á áĽá á áá¨áłáľ áĽááᢠáááľáᣠá á ááľ áľá፠áá á áĽáŽ á¨áááá áá áľ áłáŤáĄáŁ á¨ááľáĽ á°ááá á áĽá á¨áááá áłáá áĽá ἠá ááľá°áá!
@etconp
â¤17đ3đĽ2đ1
@etconp 2018 4TH QUARTER CONSTRUCTION WORKS DIRECT COST.pdf
27.1 MB
đˇá 2018 á.á á áŤá°á áŠáĽ áááľ á°ááŁáŤá á¨áá°á¨á á¨áááŁáł áĽáŤáá˝ ááá ááĽá°á áá á°áá (4th Quarter Construction Works of Direct Cost)
đá á°áá á¨áá á°áá (BOQ - Priced bill of Quantities) áááłáᥠá¨á˛ááá á ááŤáŞáá˝ áĽá á¨ááŽáááľ áááá˛áśá˝ áá áá˝ááá˘
đŤá ááá˝ á¨áááŞáą áááá˝ á¨ááľáá á¨áŽááľáľáŤáá˝á áŁáááŤáá˝á áĽáá°áááť ááłáĽ áá á áá˝ááá˘
đˇYouTubeđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
đVacancy And Tenderđ
https://t.me/ETCONpWORK
@etconp
đá á°áá á¨áá á°áá (BOQ - Priced bill of Quantities) áááłáᥠá¨á˛ááá á ááŤáŞáá˝ áĽá á¨ááŽáááľ áááá˛áśá˝ áá áá˝ááá˘
đŤá ááá˝ á¨áááŞáą áááá˝ á¨ááľáá á¨áŽááľáľáŤáá˝á áŁáááŤáá˝á áĽáá°áááť ááłáĽ áá á áá˝ááá˘
đˇYouTubeđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
đVacancy And Tenderđ
https://t.me/ETCONpWORK
@etconp
â¤16đ1
đ Daily Site Productivity Report â The Key to Successful Construction Management
đŤA well-maintained Daily Site Productivity Report helps engineers, contractors, and project managers monitor site performance, improve efficiency, reduce delays, and keep projects on schedule. Recording labour strength, equipment utilization, executed work quantities, material consumption, safety observations, and quality inspections every day provides accurate data for decision-making and cost control.
đ§This report includes
â Project information
â Labour attendance and productivity
â Equipment utilization tracking
â Daily work executed (planned vs. achieved)
â Productivity calculations and KPIs
â Material consumption records
â Delay analysis and reasons
â Safety and quality inspections
â Tomorrow's work plan
đConsistent daily reporting improves productivity, minimizes waste, increases accountability, and ensures better project planning and execution.
@etconp
đŤA well-maintained Daily Site Productivity Report helps engineers, contractors, and project managers monitor site performance, improve efficiency, reduce delays, and keep projects on schedule. Recording labour strength, equipment utilization, executed work quantities, material consumption, safety observations, and quality inspections every day provides accurate data for decision-making and cost control.
đ§This report includes
â Project information
â Labour attendance and productivity
â Equipment utilization tracking
â Daily work executed (planned vs. achieved)
â Productivity calculations and KPIs
â Material consumption records
â Delay analysis and reasons
â Safety and quality inspections
â Tomorrow's work plan
đConsistent daily reporting improves productivity, minimizes waste, increases accountability, and ensures better project planning and execution.
@etconp
â¤9đ6
đ§ á¨áá ááᎠá¨áá 1 áá° áá 3 á¨áááľá°á ááááľ á15 á°á¨áłáłá áááľ ááááâđŁď¸
đď¸ á¨á á˛áľ á á ᣠá¨á°á ááááśá˝ áŁááĽááŁá á áááś ááľááłá á áŤáŁá˘ á¨ááá á á°áá ááá¨áá¨á á¨áŚááľ á¨áá¨ááľ (Box Culvert) á áľá¸áłá á¨áááŁáł áĽáŤ áĽáŤá¨ááá áááá á áľáłáááᢠđ§ď¸đď¸
đ á¨ááá 4 áá 2018 á.á ááᎠá15 áááľáŁ á¨áá 1 ááĽáŤáľ áá° áá 3 á á°áŁáŁá á¨áááľá°á ááááľ ááľáŤáá áá ááááᢠđâ
đ á ááŤá ááááśá˝
âĄď¸ á¨áá 1 â áá 3 á¨ááá á á˝á¨ááŤáŞáá˝ á áááś ááľááłá ááᣠáŤááá ááááľ áá ááá˘
âŹ ď¸ á¨áá 3 â áá 1 á¨ááᥠá á˝á¨ááŤáŞáá˝ á ááŤá ááá´áł ááłá á áŠá á áŤááᎠá á°áŁáŁá áááᢠđŁď¸
đ áŁááĽááŁá ááááŁáłá ááĽááľ áĽá áľáŹáľ á á˝á¨ááŤáŞáá˝ á¨á°ááá° áľáĽáĽáŤá¸áá áĽáá˛áŤá°áá áĽáŞ á á áá§áá˘
đ ááá: á¨á á˛áľ á á ᣠá¨á°á ááááśá˝ áŁááĽááŁá
@etconp
đď¸ á¨á á˛áľ á á ᣠá¨á°á ááááśá˝ áŁááĽááŁá á áááś ááľááłá á áŤáŁá˘ á¨ááá á á°áá ááá¨áá¨á á¨áŚááľ á¨áá¨ááľ (Box Culvert) á áľá¸áłá á¨áááŁáł áĽáŤ áĽáŤá¨ááá áááá á áľáłáááᢠđ§ď¸đď¸
đ á¨ááá 4 áá 2018 á.á ááᎠá15 áááľáŁ á¨áá 1 ááĽáŤáľ áá° áá 3 á á°áŁáŁá á¨áááľá°á ááááľ ááľáŤáá áá ááááᢠđâ
đ á ááŤá ááááśá˝
âĄď¸ á¨áá 1 â áá 3 á¨ááá á á˝á¨ááŤáŞáá˝ á áááś ááľááłá ááᣠáŤááá ááááľ áá ááá˘
âŹ ď¸ á¨áá 3 â áá 1 á¨ááᥠá á˝á¨ááŤáŞáá˝ á ááŤá ááá´áł ááłá á áŠá á áŤááᎠá á°áŁáŁá áááᢠđŁď¸
đ áŁááĽááŁá ááááŁáłá ááĽááľ áĽá áľáŹáľ á á˝á¨ááŤáŞáá˝ á¨á°ááá° áľáĽáĽáŤá¸áá áĽáá˛áŤá°áá áĽáŞ á á áá§áá˘
đ ááá: á¨á á˛áľ á á ᣠá¨á°á ááááśá˝ áŁááĽááŁá
@etconp
â¤12