#101. In Bulk Excavation the item on the BoQ is differ based on their depth with a multiple of 1.5m, such as up to 3m and up to 4.5m. Which one of the following is necessarily true about this categorization ?
Anonymous Quiz
8%
A. For Easy of Calculation
28%
B. The productivity varies
61%
C. Nature of the soil varies
3%
D. It's the trends
👍3❤1
#102. One of the following does not affect construction project price determination
Anonymous Quiz
69%
A. Tender Evaluation
11%
B. Labor productivity forecast
10%
C. Location of the project
9%
D. Size of the project
❤6🔥1
#103. In your construction project if you have a minimum of four crews for specific activity how many Form are required for that specific activity?
Anonymous Quiz
39%
A. 4.
16%
B. 2
14%
C. 8
31%
D. 1
👍3❤1
#104. The Fine Aggregates are having a size less than:___________
Anonymous Quiz
23%
A. 2.36mm
48%
B. 4.75mm
14%
C. 5mm
16%
D. 75Microns
❤5👍3🔥1
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
❤3🙏1
Ethio Construction Engineering
👉ሰላም ውድ ቤተሰቦቻችን ብዝዎች በጠየቃቹን መሰረት የ ETABS ቲቶርያል ቪድዮ በአማርኛ ቋንቋ ከ introduction ጀምሮ Analysis እና Design ኣካተን ምርጥ ቪድዮ ኣዘጋጅተንላቹዋል። 🫵እንሆ ዛሬ ክፍል 1 ይዘንላቹ መጥተናል👇 https://youtu.be/yB1KO_nYByc @etconp
YouTube
🚀 ETABS Full Course 2026 – Part 9 | ከጀማሪ እስከ Advanced | ETABS Tutorial በአማርኛ 🏗️📐
🚀 ETABS Full Course – Part 9 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 9, we continue the ETABS workflow…
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 9, we continue the ETABS workflow…
🙏3
👉በኔፓል በቅርቡ ከተከሰተው አስከፊ የጎርፍ አደጋ መካከል ተርፎ የቆመው አንድ ፎቅ ቤት የብዙዎችን ቀልብ በመሳብ የዓለም መነጋገሪያ ሆኗል።
🏛የሰፈራቸው ሰው፣ጎረቤት ሁሉም በጎርፉ ሲወሰዱ በዚህ ቤት ውስጥ የሚኖሩ ቤተሰቦች ብቻ ተርፈዋል።
✍አስተያየት ስጡበት
@etconp
🏛የሰፈራቸው ሰው፣ጎረቤት ሁሉም በጎርፉ ሲወሰዱ በዚህ ቤት ውስጥ የሚኖሩ ቤተሰቦች ብቻ ተርፈዋል።
✍አስተያየት ስጡበት
@etconp
❤7👍2
🕌ስለ መስጊድ አርክቴክቸር እና ግንባታ በተግባር ለመማር የሚረዳ 4 ምርጥ መፅሐፍ በአንድ ላይ አዘጋጅተናል📚
📐 የሚያካትተው፦
✅ Mosque Architecture
✅ Concept & Geometry
✅ Space Planning
✅ Design Synthesis & Form
✅ የአርክቴክቸራል እና Structural Drawings የምሳሌ ፕሮጀክቶች
✅ ለመማርና ለፕሮጀክት ማጣቀሻ የሚሆኑ ዝርዝር ማብራሪያዎች ያለው ነው🌙
💫እነዚህ መፅሐፍ ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
📐 የሚያካትተው፦
✅ Mosque Architecture
✅ Concept & Geometry
✅ Space Planning
✅ Design Synthesis & Form
✅ የአርክቴክቸራል እና Structural Drawings የምሳሌ ፕሮጀክቶች
✅ ለመማርና ለፕሮጀክት ማጣቀሻ የሚሆኑ ዝርዝር ማብራሪያዎች ያለው ነው🌙
💫እነዚህ መፅሐፍ ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
❤9🥰1
🏗️ TYPES OF LOADS ON COLUMNS EVERY STRUCTURAL ENGINEER MUST CONSIDER
A column is not simply a vertical concrete or steel member—it is a critical load-transfer element that carries forces from beams, slabs, walls, and upper floors safely to the foundation.
Before designing a column, the engineer must identify all relevant actions and load combinations.
🔹 1. DEAD LOAD (G)
Permanent loads from:
• Self-weight of columns, beams & slabs
• Masonry/block walls
• Finishes and screeds
• Roof systems
• Permanent MEP installations
🔹 2. LIVE LOAD (Q)
Variable loads caused by occupants and movable items:
• People
• Furniture
• Equipment
• Storage
• Maintenance activities
🔹 3. WIND LOAD (W)
Wind produces lateral forces and overturning effects on the building. Columns may experience:
• Bending moment
• Shear force
• Axial compression/tension
🔹 4. EARTHQUAKE LOAD (E)
For seismic regions, columns are subjected to significant:
• Axial forces
• Shear forces
• Bending moments
⚠️ Seismic design is not just about calculating lateral load—the column must also satisfy ductility and capacity-design requirements.
🔹 5. ROOF & SPECIAL LOADS
Depending on the building:
• Roof live load
• Rain/water ponding
• Snow load where applicable
• Solar panels
• Water tanks
• Heavy rooftop equipment
🔹 6. PARTITION & WALL LOADS
Walls supported by beams or slabs ultimately transfer their loads to columns and foundations. These should not be ignored simply because they are “non-structural.”
🔹 7. IMPACT & MACHINE LOADS
Industrial and special buildings may require consideration of:
• Crane loads
• Vibrating machinery
• Vehicle impact
• Equipment loads
🔹 8. TEMPERATURE & SHRINKAGE EFFECTS
Thermal movement, concrete shrinkage and creep can generate additional forces, particularly in restrained structures.
🔹 9. EARTH PRESSURE / RETAINING EFFECTS
Columns connected to basement or retaining systems may receive forces associated with:
• Lateral earth pressure
• Groundwater pressure
• Surcharge
📐 IMPORTANT DESIGN CHECK
A column should not be designed using axial load alone.
The engineer should generally check the interaction of:
N – Axial Force
M – Bending Moment
V – Shear Force
For reinforced concrete columns, the critical design concept is often P–M interaction (axial load–bending moment interaction).
🔥 ENGINEERING RULE:
Never design a column from its tributary floor load alone. Trace the complete load path from roof → slabs → beams → columns → foundations → soil.
A professional structural engineer asks:
“Where does every load come from, how is it transferred, and what combination produces the critical design effect?”
📌 Next Part: How to Calculate Column Load Step-by-Step — From Slab Load to Foundation
#StructuralEngineering #ColumnDesign #StructuralDesign #CivilEngineering #Construction #EngineeringEducation #EthiopianEngineers #ReinforcedConcrete #LoadAnalysis #BuildingDesign
@etconp
A column is not simply a vertical concrete or steel member—it is a critical load-transfer element that carries forces from beams, slabs, walls, and upper floors safely to the foundation.
Before designing a column, the engineer must identify all relevant actions and load combinations.
🔹 1. DEAD LOAD (G)
Permanent loads from:
• Self-weight of columns, beams & slabs
• Masonry/block walls
• Finishes and screeds
• Roof systems
• Permanent MEP installations
🔹 2. LIVE LOAD (Q)
Variable loads caused by occupants and movable items:
• People
• Furniture
• Equipment
• Storage
• Maintenance activities
🔹 3. WIND LOAD (W)
Wind produces lateral forces and overturning effects on the building. Columns may experience:
• Bending moment
• Shear force
• Axial compression/tension
🔹 4. EARTHQUAKE LOAD (E)
For seismic regions, columns are subjected to significant:
• Axial forces
• Shear forces
• Bending moments
⚠️ Seismic design is not just about calculating lateral load—the column must also satisfy ductility and capacity-design requirements.
🔹 5. ROOF & SPECIAL LOADS
Depending on the building:
• Roof live load
• Rain/water ponding
• Snow load where applicable
• Solar panels
• Water tanks
• Heavy rooftop equipment
🔹 6. PARTITION & WALL LOADS
Walls supported by beams or slabs ultimately transfer their loads to columns and foundations. These should not be ignored simply because they are “non-structural.”
🔹 7. IMPACT & MACHINE LOADS
Industrial and special buildings may require consideration of:
• Crane loads
• Vibrating machinery
• Vehicle impact
• Equipment loads
🔹 8. TEMPERATURE & SHRINKAGE EFFECTS
Thermal movement, concrete shrinkage and creep can generate additional forces, particularly in restrained structures.
🔹 9. EARTH PRESSURE / RETAINING EFFECTS
Columns connected to basement or retaining systems may receive forces associated with:
• Lateral earth pressure
• Groundwater pressure
• Surcharge
📐 IMPORTANT DESIGN CHECK
A column should not be designed using axial load alone.
The engineer should generally check the interaction of:
N – Axial Force
M – Bending Moment
V – Shear Force
For reinforced concrete columns, the critical design concept is often P–M interaction (axial load–bending moment interaction).
🔥 ENGINEERING RULE:
Never design a column from its tributary floor load alone. Trace the complete load path from roof → slabs → beams → columns → foundations → soil.
A professional structural engineer asks:
“Where does every load come from, how is it transferred, and what combination produces the critical design effect?”
📌 Next Part: How to Calculate Column Load Step-by-Step — From Slab Load to Foundation
#StructuralEngineering #ColumnDesign #StructuralDesign #CivilEngineering #Construction #EngineeringEducation #EthiopianEngineers #ReinforcedConcrete #LoadAnalysis #BuildingDesign
@etconp
❤12👏1
Ethio Construction Engineering pinned «👉የQuantity Surveying እና Building Construction Estimation ከ ሀ አስከ ፐ ችሎታዎን በተግባራዊ ምሳሌዎች የሚያሳድጉበት ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇 https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp»
#105. In Transport Engineering the abbreviation AADT stands for
Anonymous Quiz
11%
A. Average access daily traffic
72%
B. Annual average daily traffic
10%
C. Annual access daily traffic
7%
D. Access annual daily traffic
👌4
#106. What is the amaount od domestic preference considered for domestic bidders in international Competitive bidding of works?
Anonymous Quiz
24%
A. 5.0%
40%
B.7.5%
24%
C.15.0%
12%
D. 2.5%
❤3
👍7
#108. At what moisture Content the soil passes from plastic to the liquid state?
Anonymous Quiz
29%
A. Liquid Limit
26%
B. Plasticity Index
18%
C. Liquid Index
26%
D. Plastic Limit
❤7
109.Consider activity-A, if everything goes extremely well, it can be completed in 6days but if everything occurs at its worst, it can be completed in 10days. Its most likely Completion time is assumed to be 8. What is the expected duration of activity A?
Anonymous Quiz
19%
A. 12 days
21%
B. 7 days
11%
C. 9 days
50%
D. 8 days
❤3
👉ሙሉ የኮንስትራክሽን ስራዎች ላይ ቼክ ሊስት ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ👇
⬇️Construction Work Permit Cheaklist Package
✅Excavation & Earthwork Checklists
✅Foundation & Substructure Checklists
✅Reinforced Concrete (RC) Work Checklists
✅Formwork & Reinforcement Checklists
✅Concrete Casting Checklists
✅Masonry & Block Work Checklists እና ሌሎች ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
⬇️Construction Work Permit Cheaklist Package
✅Excavation & Earthwork Checklists
✅Foundation & Substructure Checklists
✅Reinforced Concrete (RC) Work Checklists
✅Formwork & Reinforcement Checklists
✅Concrete Casting Checklists
✅Masonry & Block Work Checklists እና ሌሎች ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
❤3🥰2
110. Gypsum plastering is not recommended in one of the following area:
Anonymous Quiz
3%
A. Living and dining
92%
B. Toilet
3%
C. Internal Corridor
3%
D. Bed Room
❤9🥰6
✈️ Airport Runway – Construction Concept
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
🔹 Runway Dimensions: 3000 m long × 30 m wide
🔹 Shoulders: 7.5 m on each side
🔹 Total Formation Width: 45 m
🔹 Pavement Type: Flexible Pavement
🔹 Design Aircraft: A320 / B737
🔹 Design Life: 20 years
🔹 Cross Slope: 2.5% from centreline toward the edges
🛣️ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course – 50 mm
2. Asphalt Binder Course – 70 mm
3. Asphalt Base Course – 100 mm
4. Crushed Aggregate Base – 250 mm
5. Subbase Course – 300 mm
6. Compacted Subgrade
📏 Total Pavement Thickness: 770 mm
🌧️ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
🏗️ Main Construction Elements
✔️ Runway pavement
✔️ Asphalt shoulders
✔️ Drainage channels
✔️ Taxiway connection
✔️ Airport terminal and services
✔️ Runway markings and lighting
✔️ Compacted subgrade and granular layers
🔨 Typical Construction Sequence
1️⃣ Clearing and grubbing
2️⃣ Earthworks and subgrade preparation
3️⃣ Subbase and base laying
4️⃣ Asphalt pavement construction
5️⃣ Shoulder construction
6️⃣ Drainage channel construction
7️⃣ Runway marking and lighting installation
8️⃣ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
🔹 Runway Dimensions: 3000 m long × 30 m wide
🔹 Shoulders: 7.5 m on each side
🔹 Total Formation Width: 45 m
🔹 Pavement Type: Flexible Pavement
🔹 Design Aircraft: A320 / B737
🔹 Design Life: 20 years
🔹 Cross Slope: 2.5% from centreline toward the edges
🛣️ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course – 50 mm
2. Asphalt Binder Course – 70 mm
3. Asphalt Base Course – 100 mm
4. Crushed Aggregate Base – 250 mm
5. Subbase Course – 300 mm
6. Compacted Subgrade
📏 Total Pavement Thickness: 770 mm
🌧️ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
🏗️ Main Construction Elements
✔️ Runway pavement
✔️ Asphalt shoulders
✔️ Drainage channels
✔️ Taxiway connection
✔️ Airport terminal and services
✔️ Runway markings and lighting
✔️ Compacted subgrade and granular layers
🔨 Typical Construction Sequence
1️⃣ Clearing and grubbing
2️⃣ Earthworks and subgrade preparation
3️⃣ Subbase and base laying
4️⃣ Asphalt pavement construction
5️⃣ Shoulder construction
6️⃣ Drainage channel construction
7️⃣ Runway marking and lighting installation
8️⃣ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
❤10🎉3
Ethio Construction Engineering
👉ሰላም ውድ ቤተሰቦቻችን ብዝዎች በጠየቃቹን መሰረት የ ETABS ቲቶርያል ቪድዮ በአማርኛ ቋንቋ ከ introduction ጀምሮ Analysis እና Design ኣካተን ምርጥ ቪድዮ ኣዘጋጅተንላቹዋል። 🫵እንሆ ዛሬ ክፍል 1 ይዘንላቹ መጥተናል👇 https://youtu.be/yB1KO_nYByc @etconp
YouTube
🚀 ETABS Full Course 2026 – Part 10 | ከጀማሪ እስከ Advanced | ETABS Tutorial በአማርኛ 🏗️📐
🚀 ETABS Full Course – Part 10 | Structural Design & Analysis Tutorial
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABS…
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABS…
👍2❤1👏1
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
❤5🥰2👏1
👉ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) እና ዲዛይን ቢዩልድ(Design build)(DB)
🌟ዲዛይን_ቢድ_ቢዩልድ(Design bid build)(DBB)
በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
🌟ዲዛይን ቢዩልድ(Design build)(DB)
በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን/የግንባታውን ባለቤት አይነካውም፡፡
ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነው በአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እና በአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ የፕሮጀክት አይነት ነው፡፡
ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።
FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
ስለዚሁም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemnity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ አይደለም።
ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን አልፎ አልፎ ይጠቀምበታል።
በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ነው ተብሎ ይታመናል።
@etconp
🌟ዲዛይን_ቢድ_ቢዩልድ(Design bid build)(DBB)
በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
🌟ዲዛይን ቢዩልድ(Design build)(DB)
በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን/የግንባታውን ባለቤት አይነካውም፡፡
ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነው በአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እና በአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ የፕሮጀክት አይነት ነው፡፡
ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።
FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
ስለዚሁም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemnity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ አይደለም።
ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን አልፎ አልፎ ይጠቀምበታል።
በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ነው ተብሎ ይታመናል።
@etconp
❤7👍5🥰2👏2🔥1