đEthiopiaâs First 100 m Flagpole â Structural Analysis & Design | Arada Park, Addis Ababa
Proud to have designed the structural system of Ethiopiaâs first 100 m high flagpole,one of the technically demanding structures I have worked on, carrying a 26 m Ă 13 m flag.
The design involved structural modeling, wind-load assessment, along-wind response, vortex-induced cross-wind effects,global stability analysis, foundation design, connection and anchorage considerations, and constructability review.
The main engineering challenge was addressing both the along-wind and vortex-induced cross-wind responses of the 100 m slender structure, together with the resulting overturning, stability, and foundation demands.
A project that required engineering judgment beyond simply satisfying code requirements â from global structural behavior to foundation, connections, and constructability.
Proud to have designed and contributed my structural engineering expertise to this landmark project.
Via đŠ @Abebaw_16
@etconp
Proud to have designed the structural system of Ethiopiaâs first 100 m high flagpole,one of the technically demanding structures I have worked on, carrying a 26 m Ă 13 m flag.
The design involved structural modeling, wind-load assessment, along-wind response, vortex-induced cross-wind effects,global stability analysis, foundation design, connection and anchorage considerations, and constructability review.
The main engineering challenge was addressing both the along-wind and vortex-induced cross-wind responses of the 100 m slender structure, together with the resulting overturning, stability, and foundation demands.
A project that required engineering judgment beyond simply satisfying code requirements â from global structural behavior to foundation, connections, and constructability.
Proud to have designed and contributed my structural engineering expertise to this landmark project.
Via đŠ @Abebaw_16
@etconp
â¤16
đŚşHEALTH AND SAFETY: 25 ESSENTIAL ITEMS FOR A SAFER WORKSITE
Safety is the foundation of every successful construction and industrial project.
Using the right Personal Protective Equipment (PPE), safety devices, and site facilities helps prevent accidents, injuries, fires, and exposure to hazardous substances.
This guide highlights 25 essential health and safety items that every worker and worksite should consider:
1ď¸âŁ Hard Hat â Protects the head from falling objects and impacts.
2ď¸âŁ Safety Goggles â Protect eyes from dust, particles, and splashes.
3ď¸âŁ Safety Gloves â Protect hands from cuts, abrasion, chemicals, and sharp objects.
4ď¸âŁ Face Mask / Respirator â Helps protect against dust, fumes, and harmful airborne particles.
5ď¸âŁ Anti-Slip Mat â Reduces the risk of slips and falls in wet or oily areas.
6ď¸âŁ Smoke Detector â Provides early warning of smoke and potential fire.
7ď¸âŁ High-Visibility Vest â Makes workers more visible, especially near vehicles and equipment.
8ď¸âŁ Fire Extinguisher â Helps control small fires before they spread.
9ď¸âŁ Steel-Toe Safety Boots â Protect feet from heavy objects, punctures, and impact hazards.
đ Extractor Hood â Removes dust, fumes, and harmful gases from enclosed work areas.
1ď¸âŁ1ď¸âŁ Face Shield â Provides additional protection from sparks, splashes, and flying debris.
1ď¸âŁ2ď¸âŁ Respirator â Provides enhanced respiratory protection where hazardous contaminants are present.
1ď¸âŁ3ď¸âŁ Safety Harness â Essential fall-protection equipment for work at height.
1ď¸âŁ4ď¸âŁ Life Jacket â Protects workers performing duties near or over water.
1ď¸âŁ5ď¸âŁ Storage Cage â Keeps tools, materials, and hazardous items securely stored.
1ď¸âŁ6ď¸âŁ Knee Pads â Protect knees during prolonged kneeling and rough-surface work.
1ď¸âŁ7ď¸âŁ Protective Apron â Protects the body from heat, sparks, and other workplace hazards.
1ď¸âŁ8ď¸âŁ Tool Box â Keeps tools organized, protected, and easily accessible.
1ď¸âŁ9ď¸âŁ Earplugs â Help protect hearing in high-noise environments.
2ď¸âŁ0ď¸âŁ Fire Alarm â Alerts workers and occupants quickly in case of fire.
2ď¸âŁ1ď¸âŁ Scaffolding â Provides safe access and working platforms at height when properly erected and inspected.
2ď¸âŁ2ď¸âŁ Chemical Waste Containers â Ensure hazardous waste is safely collected, labeled, and disposed of correctly.
2ď¸âŁ3ď¸âŁ Life Buoy â Provides emergency flotation support during water-related incidents.
2ď¸âŁ4ď¸âŁ Ventilation Fan â Supplies fresh air and helps remove contaminated air from confined spaces.
2ď¸âŁ5ď¸âŁ Warning Cone â Clearly marks hazards, restricted zones, and temporary work areas.
â ď¸ Remember: PPE is only one part of workplace safety. Proper training, risk assessment, equipment inspection, housekeeping, supervision, and compliance with site safety procedures are equally important.
Be Safe ⢠Be Aware ⢠Stay Protected đˇââď¸đŚşđď¸
đConstruction Safety & Compliance Kit â ááŽáá˝áá Safety Templates áĽá á ááááá?đŚş
đ Safety Checklists
đŁď¸ Toolbox Talk Templates
đ Incident Report Forms
â ď¸ JSA Templates
𼞠PPE Inspection Sheets
â Editable Word Documentđ
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
Safety is the foundation of every successful construction and industrial project.
Using the right Personal Protective Equipment (PPE), safety devices, and site facilities helps prevent accidents, injuries, fires, and exposure to hazardous substances.
This guide highlights 25 essential health and safety items that every worker and worksite should consider:
1ď¸âŁ Hard Hat â Protects the head from falling objects and impacts.
2ď¸âŁ Safety Goggles â Protect eyes from dust, particles, and splashes.
3ď¸âŁ Safety Gloves â Protect hands from cuts, abrasion, chemicals, and sharp objects.
4ď¸âŁ Face Mask / Respirator â Helps protect against dust, fumes, and harmful airborne particles.
5ď¸âŁ Anti-Slip Mat â Reduces the risk of slips and falls in wet or oily areas.
6ď¸âŁ Smoke Detector â Provides early warning of smoke and potential fire.
7ď¸âŁ High-Visibility Vest â Makes workers more visible, especially near vehicles and equipment.
8ď¸âŁ Fire Extinguisher â Helps control small fires before they spread.
9ď¸âŁ Steel-Toe Safety Boots â Protect feet from heavy objects, punctures, and impact hazards.
đ Extractor Hood â Removes dust, fumes, and harmful gases from enclosed work areas.
1ď¸âŁ1ď¸âŁ Face Shield â Provides additional protection from sparks, splashes, and flying debris.
1ď¸âŁ2ď¸âŁ Respirator â Provides enhanced respiratory protection where hazardous contaminants are present.
1ď¸âŁ3ď¸âŁ Safety Harness â Essential fall-protection equipment for work at height.
1ď¸âŁ4ď¸âŁ Life Jacket â Protects workers performing duties near or over water.
1ď¸âŁ5ď¸âŁ Storage Cage â Keeps tools, materials, and hazardous items securely stored.
1ď¸âŁ6ď¸âŁ Knee Pads â Protect knees during prolonged kneeling and rough-surface work.
1ď¸âŁ7ď¸âŁ Protective Apron â Protects the body from heat, sparks, and other workplace hazards.
1ď¸âŁ8ď¸âŁ Tool Box â Keeps tools organized, protected, and easily accessible.
1ď¸âŁ9ď¸âŁ Earplugs â Help protect hearing in high-noise environments.
2ď¸âŁ0ď¸âŁ Fire Alarm â Alerts workers and occupants quickly in case of fire.
2ď¸âŁ1ď¸âŁ Scaffolding â Provides safe access and working platforms at height when properly erected and inspected.
2ď¸âŁ2ď¸âŁ Chemical Waste Containers â Ensure hazardous waste is safely collected, labeled, and disposed of correctly.
2ď¸âŁ3ď¸âŁ Life Buoy â Provides emergency flotation support during water-related incidents.
2ď¸âŁ4ď¸âŁ Ventilation Fan â Supplies fresh air and helps remove contaminated air from confined spaces.
2ď¸âŁ5ď¸âŁ Warning Cone â Clearly marks hazards, restricted zones, and temporary work areas.
â ď¸ Remember: PPE is only one part of workplace safety. Proper training, risk assessment, equipment inspection, housekeeping, supervision, and compliance with site safety procedures are equally important.
Be Safe ⢠Be Aware ⢠Stay Protected đˇââď¸đŚşđď¸
đConstruction Safety & Compliance Kit â ááŽáá˝áá Safety Templates áĽá á ááááá?đŚş
đ Safety Checklists
đŁď¸ Toolbox Talk Templates
đ Incident Report Forms
â ď¸ JSA Templates
𼞠PPE Inspection Sheets
â Editable Word Documentđ
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
â¤5đ1
Maximum load that a structure member can bear
Anonymous Quiz
80%
Ultimate load
13%
Safe load
5%
Crippling load
1%
Curtail load
â¤8
#108. At what moisture Content the soil passes from plastic to the liquid state?
Anonymous Quiz
41%
A. Liquid Limit
22%
B. Plasticity Index
12%
C. Liquid Index
25%
D. Plastic Limit
đ4â¤3
132. In addition to workability, what other aspect does the flow table test help evaluate?
Anonymous Quiz
9%
A) Color consistency
17%
B) Aggregate size distribution
67%
C) Consistency of the concrete mix
7%
D) Temperature of the mix
â¤8
đááἠ120 áŤáŹ áá á¨ááŤáá á¨ááá፠á¤áľ áá á˛ááá á¨ááľááá á¨áłá˝ áŁáá ááá áŤáááąđ
https://ye-buna.com/etconp?ref=product_detail&product=6a62fd7b49a15_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a62fd7b49a15_etconp
đĽ°3â¤2
đThe Most Common Site Inspection Failures đď¸
Effective site inspection is essential for maintaining construction quality, structural safety, and compliance with approved drawings and specifications.
Some of the most common issues inspectors should watch for include:
1. Poor Workmanship â Honeycombing, voids, exposed aggregate, uneven finishes, improper compaction, and segregation can compromise concrete quality.
2. Inadequate Documentation â Ensure approved drawings, test reports, inspection records, approvals, method statements, and as-built information are properly maintained and updated.
3. Incorrect Reinforcement Placement â Check bar diameter, spacing, concrete cover, lap lengths, anchorage, stirrup spacing, and proper tying according to structural drawings.
4. Insufficient Curing â Concrete should be cured promptly and continuously using appropriate methods. For ordinary Portland cement concrete, 7 days is a common minimum reference, subject to the project specification and applicable code.
5. Safety Violations â Verify proper PPE, safe access, barricading, edge protection, housekeeping, warning signs, and compliance with site safety procedures.
6. Deviation from Approved Drawings â Confirm dimensions, levels, reinforcement, locations, and construction details against the latest approved drawings. Any proposed change should go through the required RFI/approval process before execution.
â Remember: Early inspection helps identify defects before they become expensive or dangerous problems.
Right Construction ⢠Right Inspection ⢠Right Quality ⢠Stronger Future
@etconp
Effective site inspection is essential for maintaining construction quality, structural safety, and compliance with approved drawings and specifications.
Some of the most common issues inspectors should watch for include:
1. Poor Workmanship â Honeycombing, voids, exposed aggregate, uneven finishes, improper compaction, and segregation can compromise concrete quality.
2. Inadequate Documentation â Ensure approved drawings, test reports, inspection records, approvals, method statements, and as-built information are properly maintained and updated.
3. Incorrect Reinforcement Placement â Check bar diameter, spacing, concrete cover, lap lengths, anchorage, stirrup spacing, and proper tying according to structural drawings.
4. Insufficient Curing â Concrete should be cured promptly and continuously using appropriate methods. For ordinary Portland cement concrete, 7 days is a common minimum reference, subject to the project specification and applicable code.
5. Safety Violations â Verify proper PPE, safe access, barricading, edge protection, housekeeping, warning signs, and compliance with site safety procedures.
6. Deviation from Approved Drawings â Confirm dimensions, levels, reinforcement, locations, and construction details against the latest approved drawings. Any proposed change should go through the required RFI/approval process before execution.
â Remember: Early inspection helps identify defects before they become expensive or dangerous problems.
Right Construction ⢠Right Inspection ⢠Right Quality ⢠Stronger Future
@etconp
â¤11đ1
110. Gypsum plastering is not recommended in one of the following area:
Anonymous Quiz
4%
A. Living and dining
90%
B. Toilet
3%
C. Internal Corridor
2%
D. Bed Room
đĽ°5â¤3
116. Which one of the following is a structural members designed to support the loads of the portion of the wall situated above the openings?
Anonymous Quiz
10%
A. Frame
6%
B. Window Sill
81%
C. Lintel
4%
D. Panel
â¤3
130. What is the primary purpose of the flow table test?
Anonymous Quiz
10%
A) To measure the compressive strength of concrete
75%
B) To assess the workability and flowability of concrete mixtures
10%
C) To determine the air content in concrete
5%
D) To evaluate the durability of hardened concrete
đĽ3đ1
đᨠRC á˛ááá áá áá á´ááááśá˝ á¨ááá áááľá
âşCalculation of Design Coefficients
âşDesign of Slabs
âşDesign of Flat Slabs
âşDesign of Beams
âşDesign of Sections Under M & N
âşShear Design & Checks
âşDesign for Torsion
âşDesign of Rectangular Columns
âşDesign of Circular Columns
âşDesign of Isolated Footings
Isolated Footings Under Moment áĽá ááá˝đ
https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
âşCalculation of Design Coefficients
âşDesign of Slabs
âşDesign of Flat Slabs
âşDesign of Beams
âşDesign of Sections Under M & N
âşShear Design & Checks
âşDesign for Torsion
âşDesign of Rectangular Columns
âşDesign of Circular Columns
âşDesign of Isolated Footings
Isolated Footings Under Moment áĽá ááá˝đ
https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
â¤11đĽ°2
đá¨áááŁáłá á¨áá
ááľáľá Drawing ááááśá˝
đá Construction & Engineering ááŽáááľ ááľáĽ á¨áááá Drawing ááááśá˝ áĽáá° ááŽáááą ááááľá áá á áááŤáŤáá˘
1ď¸âŁ Architectural Drawings
á¨ááááá á ááááĽáŁ á°ááŁáŤá á á áááá áá˝áł á¨ááŤáłáŠ Drawingsá˘
đš Site Plan â áááá á ááŹáą áá áŤáá áľá áŚáłáŁ á¨ááŹáľ áá°áᣠááááľáŁ áááŞááᣠLandscaping áĽá Utilities áŤáłáŤáá˘
đš Floor Plan â á¨áááá˝áŁ ááľááłáá˝áŁ á áŽá˝áŁ ááľáŽáśá˝á Dimensions á ááááĽá áŤáłáŤáá˘
đš Roof Plan â á¨áŁáŞáŤ á ááááĽáŁ SlopeᣠDrainage áĽá Parapet áŤáłáŤáá˘
đš Elevation Drawing â ááááá á¨á°ááŤáŠ á á áŁáŤáá˝ á˛áłá áŤááá ááŤá áá˝áł áŤáłáŤáá˘
đš Section Drawing â ááááá á áááľ ááጠFoundationᣠFloorᣠSlabᣠCeilingᣠRoofᣠLevels áĽá ááá˝ áááá˝á áŤáłáŤáá˘
đš Reflected Ceiling Plan (RCP) â á¨CeilingᣠLightingᣠAccess Panel ááá° á áááἠáŤáłáŤáá˘
đš Door & Window Schedule â á¨á áá ááľáŽáľ ááááľáŁ SizeᣠMaterialᣠNumber áĽá Location áŤáłáŤáá˘
đš Finishing Schedule â á¨FloorᣠWall áĽá Ceiling Finishes ááááśá˝á ááááťáá˘
đš Detail Drawing â áĽáá° StaircaseᣠDoorᣠWindowᣠParapet áĽá Wall Junction áŤá áááá˝á á á°áᨠáááá áŤáłáŤáá˘
2ď¸âŁ Structural Drawings
á¨ááááá Load-Bearing Elements áĽá Reinforcement ááááŽá˝ á¨ááŤáłáŠ Drawingsá˘
đš Foundation Plan â á¨Foundation áŚáłáŁ SizeᣠType áĽá Level áŤáłáŤáá˘
đš Column Layout â á¨Columns áŚáłáŁ Size áĽá Identification áŤáłáŤáá˘
đš Beam Layout â á¨Beams áŚáłáŁ Size áĽá Identification áŤáłáŤáá˘
đš Slab Layout â á¨Slab TypeᣠThicknessᣠLevel áĽá Arrangement áŤáłáŤáá˘
đš Reinforcement Drawing â á¨Rebar DiameterᣠSpacingᣠLocationᣠShape áĽá Anchorage/Development ááááŽá˝á áŤáłáŤáá˘
đš Bar Bending Schedule (BBS) â á¨Reinforcement Bars ááá¨áŤáŁ ááłá ááŤáŁ ShapeᣠLength áĽá Quantity áá¨á ááááá˘
đš Retaining Wall Drawing â á¨Retaining Wall GeometryᣠFoundationᣠReinforcement áĽá Drainage áŤáłáŤáá˘
đš Structural Detail Drawing â á¨Beam-Column ConnectionᣠJointᣠReinforcement áĽá ááá˝ Structural Details áŤáłáŤáá˘
3ď¸âŁ Plumbing & Sanitary Drawings
đš Water Supply Layout â á¨Water PipesᣠValvesᣠTanksᣠPumps áĽá Fixtures á ááááĽá˘
đš Sanitary/Drainage Layout â á¨Wastewater áĽá Soil Pipes á ááááĽá˘
đš Stormwater Drainage Plan â á¨ááἠáá áá°áĽá°á˘áŤá ááľááá áľáááľá˘
đš Plumbing Isometric Drawing â á¨Plumbing Network á Isometric áĽááł á¨ááŤáłá Drawingá˘
đš Riser Diagram â á¨á§áá§ áľáááľá á Vertical á ááŤá¨áĽ á¨ááŤáłá Diagramá˘
đš Manhole/Inspection Chamber Detail â á¨Manhole áĽá Inspection Chamber áá áᣠLevel áĽá Construction Detailsá˘
4ď¸âŁ Electrical Drawings
đš Lighting Layout â á¨Lighting Fixtures áĽá Switches á ááááĽá˘
đš Power Layout â á¨SocketsᣠOutlets áĽá Electrical Equipment Connectionsá˘
đš Single-Line Diagram (SLD) â á¨Electrical Distribution System á ááá á ááŤá¨áĽ á¨ááŤáłá Diagramá˘
đš Distribution Board Schedule â á¨Electrical CircuitsᣠBreakers áĽá Loads áá¨áá˘
đš Earthing/Grounding Drawing â á¨Earthing/Grounding System á ááááĽá˘
đš Lightning Protection Drawing â á¨Lightning Protection System á ááááĽá˘
đš Cable Routing Drawing â á¨Cables ááááľá Routing áŤáłáŤáá˘
5ď¸âŁ Mechanical & HVAC Drawings
đš HVAC Layout â á¨HeatingᣠVentilation áĽá Air Conditioning Equipment á ááááĽá˘
đš Ductwork Drawing â á¨Air Ducts ááááľáŁ Size áĽá Fittingsá˘
đš Mechanical Piping Drawing â á¨Mechanical Piping Network á ááááĽá˘
đš Equipment Layout â á¨Mechanical Equipment áŚáłá Arrangementá˘
đš HVAC Schematic â á¨HVAC System á á°áŤáá Connections á¨ááŤáłá Diagramá˘
6ď¸âŁ Civil / Site Development Drawings
đš Topographic Survey Plan â á¨ááŁáŠá Ground ElevationᣠContours áĽá Existing Features áŤáłáŤáá˘
đš Grading Plan â á¨áłáá°áá Ground Level áĽá Slope áŤáłáŤáá˘
đš Road Layout â á¨Road AlignmentᣠWidth áĽá Geometry áŤáłáŤáá˘
đš Longitudinal Profile â á Road Alignment á á áŁáŤ á¨Ground áĽá Proposed Levels áááĽá áŤáłáŤáá˘
đš Cross-Section Drawing â á á°áá°á Chainages á¨Road/Earthwork áááá áŤáłáŤáá˘
đš Earthwork Plan â á¨ExcavationᣠFilling áĽá Grading áá¨á áŤáłáŤáá˘
đš Pavement Drawing â á¨Pavement Layers áĽá Thicknesses áŤáłáŤáá˘
đš Drainage Drawing â á¨CulvertsᣠDitchesᣠChannels áĽá Stormwater Systems á ááááĽá˘
đš Culvert Drawing â á¨Culvert DimensionsᣠReinforcement áĽá Construction Detailsá˘
7ď¸âŁ Survey Drawings
đš Topographical Survey Drawing â á¨Existing Terrain áĽá Ground Features áá¨áá˘
@etconp đ
đá Construction & Engineering ááŽáááľ ááľáĽ á¨áááá Drawing ááááśá˝ áĽáá° ááŽáááą ááááľá áá á áááŤáŤáá˘
1ď¸âŁ Architectural Drawings
á¨ááááá á ááááĽáŁ á°ááŁáŤá á á áááá áá˝áł á¨ááŤáłáŠ Drawingsá˘
đš Site Plan â áááá á ááŹáą áá áŤáá áľá áŚáłáŁ á¨ááŹáľ áá°áᣠááááľáŁ áááŞááᣠLandscaping áĽá Utilities áŤáłáŤáá˘
đš Floor Plan â á¨áááá˝áŁ ááľááłáá˝áŁ á áŽá˝áŁ ááľáŽáśá˝á Dimensions á ááááĽá áŤáłáŤáá˘
đš Roof Plan â á¨áŁáŞáŤ á ááááĽáŁ SlopeᣠDrainage áĽá Parapet áŤáłáŤáá˘
đš Elevation Drawing â ááááá á¨á°ááŤáŠ á á áŁáŤáá˝ á˛áłá áŤááá ááŤá áá˝áł áŤáłáŤáá˘
đš Section Drawing â ááááá á áááľ ááጠFoundationᣠFloorᣠSlabᣠCeilingᣠRoofᣠLevels áĽá ááá˝ áááá˝á áŤáłáŤáá˘
đš Reflected Ceiling Plan (RCP) â á¨CeilingᣠLightingᣠAccess Panel ááá° á áááἠáŤáłáŤáá˘
đš Door & Window Schedule â á¨á áá ááľáŽáľ ááááľáŁ SizeᣠMaterialᣠNumber áĽá Location áŤáłáŤáá˘
đš Finishing Schedule â á¨FloorᣠWall áĽá Ceiling Finishes ááááśá˝á ááááťáá˘
đš Detail Drawing â áĽáá° StaircaseᣠDoorᣠWindowᣠParapet áĽá Wall Junction áŤá áááá˝á á á°áᨠáááá áŤáłáŤáá˘
2ď¸âŁ Structural Drawings
á¨ááááá Load-Bearing Elements áĽá Reinforcement ááááŽá˝ á¨ááŤáłáŠ Drawingsá˘
đš Foundation Plan â á¨Foundation áŚáłáŁ SizeᣠType áĽá Level áŤáłáŤáá˘
đš Column Layout â á¨Columns áŚáłáŁ Size áĽá Identification áŤáłáŤáá˘
đš Beam Layout â á¨Beams áŚáłáŁ Size áĽá Identification áŤáłáŤáá˘
đš Slab Layout â á¨Slab TypeᣠThicknessᣠLevel áĽá Arrangement áŤáłáŤáá˘
đš Reinforcement Drawing â á¨Rebar DiameterᣠSpacingᣠLocationᣠShape áĽá Anchorage/Development ááááŽá˝á áŤáłáŤáá˘
đš Bar Bending Schedule (BBS) â á¨Reinforcement Bars ááá¨áŤáŁ ááłá ááŤáŁ ShapeᣠLength áĽá Quantity áá¨á ááááá˘
đš Retaining Wall Drawing â á¨Retaining Wall GeometryᣠFoundationᣠReinforcement áĽá Drainage áŤáłáŤáá˘
đš Structural Detail Drawing â á¨Beam-Column ConnectionᣠJointᣠReinforcement áĽá ááá˝ Structural Details áŤáłáŤáá˘
3ď¸âŁ Plumbing & Sanitary Drawings
đš Water Supply Layout â á¨Water PipesᣠValvesᣠTanksᣠPumps áĽá Fixtures á ááááĽá˘
đš Sanitary/Drainage Layout â á¨Wastewater áĽá Soil Pipes á ááááĽá˘
đš Stormwater Drainage Plan â á¨ááἠáá áá°áĽá°á˘áŤá ááľááá áľáááľá˘
đš Plumbing Isometric Drawing â á¨Plumbing Network á Isometric áĽááł á¨ááŤáłá Drawingá˘
đš Riser Diagram â á¨á§áá§ áľáááľá á Vertical á ááŤá¨áĽ á¨ááŤáłá Diagramá˘
đš Manhole/Inspection Chamber Detail â á¨Manhole áĽá Inspection Chamber áá áᣠLevel áĽá Construction Detailsá˘
4ď¸âŁ Electrical Drawings
đš Lighting Layout â á¨Lighting Fixtures áĽá Switches á ááááĽá˘
đš Power Layout â á¨SocketsᣠOutlets áĽá Electrical Equipment Connectionsá˘
đš Single-Line Diagram (SLD) â á¨Electrical Distribution System á ááá á ááŤá¨áĽ á¨ááŤáłá Diagramá˘
đš Distribution Board Schedule â á¨Electrical CircuitsᣠBreakers áĽá Loads áá¨áá˘
đš Earthing/Grounding Drawing â á¨Earthing/Grounding System á ááááĽá˘
đš Lightning Protection Drawing â á¨Lightning Protection System á ááááĽá˘
đš Cable Routing Drawing â á¨Cables ááááľá Routing áŤáłáŤáá˘
5ď¸âŁ Mechanical & HVAC Drawings
đš HVAC Layout â á¨HeatingᣠVentilation áĽá Air Conditioning Equipment á ááááĽá˘
đš Ductwork Drawing â á¨Air Ducts ááááľáŁ Size áĽá Fittingsá˘
đš Mechanical Piping Drawing â á¨Mechanical Piping Network á ááááĽá˘
đš Equipment Layout â á¨Mechanical Equipment áŚáłá Arrangementá˘
đš HVAC Schematic â á¨HVAC System á á°áŤáá Connections á¨ááŤáłá Diagramá˘
6ď¸âŁ Civil / Site Development Drawings
đš Topographic Survey Plan â á¨ááŁáŠá Ground ElevationᣠContours áĽá Existing Features áŤáłáŤáá˘
đš Grading Plan â á¨áłáá°áá Ground Level áĽá Slope áŤáłáŤáá˘
đš Road Layout â á¨Road AlignmentᣠWidth áĽá Geometry áŤáłáŤáá˘
đš Longitudinal Profile â á Road Alignment á á áŁáŤ á¨Ground áĽá Proposed Levels áááĽá áŤáłáŤáá˘
đš Cross-Section Drawing â á á°áá°á Chainages á¨Road/Earthwork áááá áŤáłáŤáá˘
đš Earthwork Plan â á¨ExcavationᣠFilling áĽá Grading áá¨á áŤáłáŤáá˘
đš Pavement Drawing â á¨Pavement Layers áĽá Thicknesses áŤáłáŤáá˘
đš Drainage Drawing â á¨CulvertsᣠDitchesᣠChannels áĽá Stormwater Systems á ááááĽá˘
đš Culvert Drawing â á¨Culvert DimensionsᣠReinforcement áĽá Construction Detailsá˘
7ď¸âŁ Survey Drawings
đš Topographical Survey Drawing â á¨Existing Terrain áĽá Ground Features áá¨áá˘
@etconp đ
â¤7
đš Boundary Survey Plan â á¨Property Boundary áĽá Coordinatesá˘
đš Setting-Out Drawing â á¨CoordinatesᣠGrid LinesᣠBenchmarks áĽá Construction Control Points áá¨áá˘
đš As-Surveyed Drawing â áĽáá°á°á°ááŹá á¨á°áááá áá Existing Condition á¨ááŤáłá Drawingá˘
đš Survey Control Plan â á¨Survey Control PointsᣠBenchmarks áĽá Reference System áŤáłáŤáá˘
8ď¸âŁ Infrastructure Drawings
âś Water Supply Network Drawing â á¨Water Supply Network á ááááĽá˘
âś Irrigation Layout Drawing â á¨Irrigation System á ááááĽá˘
âś Canal Profile Drawing â á¨Canal áááłá ááŽáááá˘
âś Canal Cross-Section Drawing â á¨Canal ááľááá áááá˘
âś Dam General Arrangement Drawing â á¨Dam á á ááá á ááááĽá˘
âś Spillway Drawing â á¨Spillway á ááááĽá ááááá˘
âś Intake Structure Drawing â á¨Water Intake Structure ááááá˘
âś Bridge General Arrangement (GA) Drawing â á¨Bridge á á ááá á ááááĽá˘
âś Bridge Structural Drawing â á¨DeckᣠAbutmentᣠPierᣠFoundation áĽá Reinforcement ááááŽá˝á˘
9ď¸âŁ Construction & Execution Drawings
đš Construction Drawing â áľáŤáá á Site áá áááá¸á á¨ááŤáááá Drawingá˘
đš Issued for Construction (IFC) Drawing â á°ááááá á°áá áś áConstruction á áá á¨á°á°á Drawingá˘
đš Shop Drawing â á ContractorᣠSubcontractor ááá Supplier á¨áááá ᣠá ááľ Component áĽáá´áľ áĽáá°ááá¨áľ/áĽáá°ááŤá á áááá á¨ááŤáłá Drawingá˘
đš Fabrication Drawing â á ááľ Component áááá¨áľ á¨ááŤáľááá áľáááá DimensionsᣠMaterials áĽá Details á¨ááŤáłá Drawingá˘
đš Installation/Erection Drawing â Components áĽáá´áľ áĽáá°áááŁá áá áĽáá°áá°á¨á á¨ááŤáłá Drawingá˘
đ Coordination Drawings
đš Combined Services Drawing â ArchitecturalᣠStructuralᣠElectricalᣠPlumbing áĽá Mechanical Services á á ááľ Drawing áá á¨ááŤáłáá˘
đš MEP Coordination Drawing â MechanicalᣠElectrical áĽá Plumbing Systems áĽááľ á ááľ áĽááłááአáááľá°áŁá á á¨ááŤáááá Drawingá˘
đš Clash Detection Drawing/Model â á á°ááŤáŠ Systems ááŤá¨á á¨ááá አá¨Physical Clash á˝ááŽá˝á áááá¨áľ á¨ááŤááááá˘
đš Builder's Work Drawing â áMEP Services á¨ááŤáľááá OpeningsᣠSleevesᣠPenetrations áĽá Embedded Items á¨ááŤáłá Drawingá˘
1ď¸âŁ1ď¸âŁ Tender & Contract Drawings
đš Tender/Bid Drawing â á°áŤáŤážá˝ á¨áľáŤáá áá ááááááľ á¨Tender Documents áá á¨áá°áĽ Drawingá˘
đš Design Drawing â áĽáá´áľ ááááŁáľ áĽááłáá áľ á¨ááŤáłá á¨Design áá¨áá˘
đš Approved Drawing â á ClientᣠConsultant ááá á áááá¨á°á Authority á°áááá á¨á¸á°á Drawingá˘
đš Revision Drawing â á ááľá Drawing áá á¨á°á°á¨á áááŚá˝á á¨áŤá á á˛áľ Revisioná˘
đš As-Built Drawing â á Construction áá¨á¨áť áá á á°ááŁá áĽáá°á°áááŁá á¨ááŤáłá á¨áá¨á¨áť Drawingá˘
đš Record Drawing â á¨á°á ááááá Project áľáááá áááł ááá°ááľ Reference á¨ááááἠDrawingá˘
đááἠá¤ááááľ áŤáá G+5 á áá áááľá á ááá´áá¸áŤááŁáľáľáŤáá¸áŤááŁá¤áááľáŞáŤá áĽá áłáá°áŞ áŤáŤá°á° á Auto Cad á¨á°á°áŤ á˛ááá á¨ááá á¨áłá˝ áŁáá ááá áŤáááąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a75638f22910_etconp
@etconp
đš Setting-Out Drawing â á¨CoordinatesᣠGrid LinesᣠBenchmarks áĽá Construction Control Points áá¨áá˘
đš As-Surveyed Drawing â áĽáá°á°á°ááŹá á¨á°áááá áá Existing Condition á¨ááŤáłá Drawingá˘
đš Survey Control Plan â á¨Survey Control PointsᣠBenchmarks áĽá Reference System áŤáłáŤáá˘
8ď¸âŁ Infrastructure Drawings
âś Water Supply Network Drawing â á¨Water Supply Network á ááááĽá˘
âś Irrigation Layout Drawing â á¨Irrigation System á ááááĽá˘
âś Canal Profile Drawing â á¨Canal áááłá ááŽáááá˘
âś Canal Cross-Section Drawing â á¨Canal ááľááá áááá˘
âś Dam General Arrangement Drawing â á¨Dam á á ááá á ááááĽá˘
âś Spillway Drawing â á¨Spillway á ááááĽá ááááá˘
âś Intake Structure Drawing â á¨Water Intake Structure ááááá˘
âś Bridge General Arrangement (GA) Drawing â á¨Bridge á á ááá á ááááĽá˘
âś Bridge Structural Drawing â á¨DeckᣠAbutmentᣠPierᣠFoundation áĽá Reinforcement ááááŽá˝á˘
9ď¸âŁ Construction & Execution Drawings
đš Construction Drawing â áľáŤáá á Site áá áááá¸á á¨ááŤáááá Drawingá˘
đš Issued for Construction (IFC) Drawing â á°ááááá á°áá áś áConstruction á áá á¨á°á°á Drawingá˘
đš Shop Drawing â á ContractorᣠSubcontractor ááá Supplier á¨áááá ᣠá ááľ Component áĽáá´áľ áĽáá°ááá¨áľ/áĽáá°ááŤá á áááá á¨ááŤáłá Drawingá˘
đš Fabrication Drawing â á ááľ Component áááá¨áľ á¨ááŤáľááá áľáááá DimensionsᣠMaterials áĽá Details á¨ááŤáłá Drawingá˘
đš Installation/Erection Drawing â Components áĽáá´áľ áĽáá°áááŁá áá áĽáá°áá°á¨á á¨ááŤáłá Drawingá˘
đ Coordination Drawings
đš Combined Services Drawing â ArchitecturalᣠStructuralᣠElectricalᣠPlumbing áĽá Mechanical Services á á ááľ Drawing áá á¨ááŤáłáá˘
đš MEP Coordination Drawing â MechanicalᣠElectrical áĽá Plumbing Systems áĽááľ á ááľ áĽááłááአáááľá°áŁá á á¨ááŤáááá Drawingá˘
đš Clash Detection Drawing/Model â á á°ááŤáŠ Systems ááŤá¨á á¨ááá አá¨Physical Clash á˝ááŽá˝á áááá¨áľ á¨ááŤááááá˘
đš Builder's Work Drawing â áMEP Services á¨ááŤáľááá OpeningsᣠSleevesᣠPenetrations áĽá Embedded Items á¨ááŤáłá Drawingá˘
1ď¸âŁ1ď¸âŁ Tender & Contract Drawings
đš Tender/Bid Drawing â á°áŤáŤážá˝ á¨áľáŤáá áá ááááááľ á¨Tender Documents áá á¨áá°áĽ Drawingá˘
đš Design Drawing â áĽáá´áľ ááááŁáľ áĽááłáá áľ á¨ááŤáłá á¨Design áá¨áá˘
đš Approved Drawing â á ClientᣠConsultant ááá á áááá¨á°á Authority á°áááá á¨á¸á°á Drawingá˘
đš Revision Drawing â á ááľá Drawing áá á¨á°á°á¨á áááŚá˝á á¨áŤá á á˛áľ Revisioná˘
đš As-Built Drawing â á Construction áá¨á¨áť áá á á°ááŁá áĽáá°á°áááŁá á¨ááŤáłá á¨áá¨á¨áť Drawingá˘
đš Record Drawing â á¨á°á ááááá Project áľáááá áááł ááá°ááľ Reference á¨ááááἠDrawingá˘
đááἠá¤ááááľ áŤáá G+5 á áá áááľá á ááá´áá¸áŤááŁáľáľáŤáá¸áŤááŁá¤áááľáŞáŤá áĽá áłáá°áŞ áŤáŤá°á° á Auto Cad á¨á°á°áŤ á˛ááá á¨ááá á¨áłá˝ áŁáá ááá áŤáááąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a75638f22910_etconp
@etconp
Ye-Buna
Complete B+G+5 Mixed-Use Building AutoCAD Drawings Editable DWG Files
Get a complete B+G+5 Mixed-Use Building AutoCAD drawing⌠499 ETB ¡ 12 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay withâŚ
â¤8đ3đĽ°2
đá¨áłáááą ááá á áá á¨áŽááľáľáŤáá˝á áááá˝á á´áááááá˝ đď¸đ
ââááá áłáááľ ááá á áá á¨áŽááľáľáŤáá˝á áĽá á¨áŞá áľá´áľ ááá áľáŠá¨áľá á¨áłáĄ áá áá ááľá°áśá˝áŁ á¨áááá á´áááá áá áŤáá˝ áĽá á¨áááŁáł ááťáťáŤáá˝ á¨áá á áłá˝ á°áááá¨áááŚ
âá áá´ááťá á˘áá°ááááľ (AI) á áááŁáł á°á áááľ ááĽáĽá áá á á ááŽá áĽá á á°áá á ááŞáŤ á¨ááá áááŁá áá°á á¨áŽááľáľáŤáá˝á áŠáŁááŤáá˝ á¨á°á áááľ áŤááŤáá˝á ᨠAI á´áááá áá á áááááľ á áááŁáł áŚáłáá˝ áá áá¨á°áą á¨áá˝á á á°ááá˝á á áľááľá á¨áá áá áĽáááľ á áľááľ áĽá¨á°á ááá áľ ááááá˘
á´ááááá á áŤá°áá˝ á¨áááŁáł áĽááá˝á (áááłá ááááľ áĽá á¨á°á áááľ áá°áŞáŤáá˝á) á áľááá ááĽááá¸áá á áŤáľ-á°á á áá¨áłá°á á¨áĽáŤ áá á á°ááá˝á á á¨áá°á áááł ááááľ á˝ááá˘
âá¨áŤááŚá áááľ á ááł á á˛áááś ááá¨áťáá˝
ááá á áá á¨á˛áááś á ááŤážá˝ áá á á áŁááŁá á á˛áľ áŞáááľ áá°á¨áľáŁ á áááŁáł ááĽá áśá˝ ááá á¨áááŁáá á¨áŤááŚá áłááŚááłááľ áááľ á ááá˝ áááááľ á¨ááŤáľá˝á á áłá˛áľ 'ááŞá á˛áááś' (Green Cement) á ááŤáŽá˝ á°á ááá¨á ááĽáááá˘
á á°áá áĽáá° áŽááŤá á á˝ áĽá á á˘ááąáľáľáŞ ááťáťáá˝ áá á¨á°áá°á¨áą á¨á˛áááś ááá¨áť á´áááááá˝ á áá¨ááłá áĽá áááá á áľááľ áá° áĽáŤ áĽá¨áᥠáá¸áá˘
âá¨áľááá á¨á°áá˝ á¨á¨áá° ááľá áá á¨á° áááľ áĽá á ááśááľáľ áŚá ááááá˝
á áĽáľáŤ áĽáŤá°á áŁá ááŤá¨áá áĽá áłááá á¨á°áá˝áŁ á¨áľáŤáá áá¨ááá á áĽá á¨á§áá§ ááľáá áĽáá áá°ááá˝á ááá á¨á áŁá áĽá á°á¨á á¨á¨áá° ááľá áá á¨á° áááľ ááľáááŽá˝ áĽá¨á°ááᥠááááá˘
áĽááá ááŽáááśá˝ áá á áá á áŽáŚá˛ááľ áĽá á á˛ááłá áááł (Digital Twin) á´áááááá˝ á¨ááłáá á˛ááᣠá¨á¨á°áá˝á á¨á¨á á áá áááááľ áĽáŤá¨ááᥠááááá˘
đĽâá á áľá-áááŁáł
(Prefabrication) áĽá áááá á áááá˝ áá á¨ááłá¨á ááľááľ á á ááŞáŤ áĽá á Middle East (ááŤá¨ááá ááľáŤá ) á¨áŞá áľá´áľ áá ፠á¨áá áĽá á¨á᪠ááŁá˘ááąá á¨á áááľá¨á á ááĽáŞáŤ á°á ááá á¨ááá á á¨áááá á áááá˝ ááááľ á¨áááľ áá° áááľ áĽá¨á¨áᨠááá˘
áá á á°áŤá á¨áááŁáł ááá áĽáľá¨ 40 á ááś ááááľ áĽáá°áťá á¨ááá áĽááśá˝ áŤááááłáá˘
đáá°á¨á᪠ááá á áá áĽá á¨ááá ááľáĽ á¨áŽááľáľáŤáá˝á áá¨ááá˝ áááá á¨á´áááŤá áťááá˝áá áááááá˘
https://t.me/ETCONpWORK
ââááá áłáááľ ááá á áá á¨áŽááľáľáŤáá˝á áĽá á¨áŞá áľá´áľ ááá áľáŠá¨áľá á¨áłáĄ áá áá ááľá°áśá˝áŁ á¨áááá á´áááá áá áŤáá˝ áĽá á¨áááŁáł ááťáťáŤáá˝ á¨áá á áłá˝ á°áááá¨áááŚ
âá áá´ááťá á˘áá°ááááľ (AI) á áááŁáł á°á áááľ ááĽáĽá áá á á ááŽá áĽá á á°áá á ááŞáŤ á¨ááá áááŁá áá°á á¨áŽááľáľáŤáá˝á áŠáŁááŤáá˝ á¨á°á áááľ áŤááŤáá˝á ᨠAI á´áááá áá á áááááľ á áááŁáł áŚáłáá˝ áá áá¨á°áą á¨áá˝á á á°ááá˝á á áľááľá á¨áá áá áĽáááľ á áľááľ áĽá¨á°á ááá áľ ááááá˘
á´ááááá á áŤá°áá˝ á¨áááŁáł áĽááá˝á (áááłá ááááľ áĽá á¨á°á áááľ áá°áŞáŤáá˝á) á áľááá ááĽááá¸áá á áŤáľ-á°á á áá¨áłá°á á¨áĽáŤ áá á á°ááá˝á á á¨áá°á áááł ááááľ á˝ááá˘
âá¨áŤááŚá áááľ á ááł á á˛áááś ááá¨áťáá˝
ááá á áá á¨á˛áááś á ááŤážá˝ áá á á áŁááŁá á á˛áľ áŞáááľ áá°á¨áľáŁ á áááŁáł ááĽá áśá˝ ááá á¨áááŁáá á¨áŤááŚá áłááŚááłááľ áááľ á ááá˝ áááááľ á¨ááŤáľá˝á á áłá˛áľ 'ááŞá á˛áááś' (Green Cement) á ááŤáŽá˝ á°á ááá¨á ááĽáááá˘
á á°áá áĽáá° áŽááŤá á á˝ áĽá á á˘ááąáľáľáŞ ááťáťáá˝ áá á¨á°áá°á¨áą á¨á˛áááś ááá¨áť á´áááááá˝ á áá¨ááłá áĽá áááá á áľááľ áá° áĽáŤ áĽá¨áᥠáá¸áá˘
âá¨áľááá á¨á°áá˝ á¨á¨áá° ááľá áá á¨á° áááľ áĽá á ááśááľáľ áŚá ááááá˝
á áĽáľáŤ áĽáŤá°á áŁá ááŤá¨áá áĽá áłááá á¨á°áá˝áŁ á¨áľáŤáá áá¨ááá á áĽá á¨á§áá§ ááľáá áĽáá áá°ááá˝á ááá á¨á áŁá áĽá á°á¨á á¨á¨áá° ááľá áá á¨á° áááľ ááľáááŽá˝ áĽá¨á°ááᥠááááá˘
áĽááá ááŽáááśá˝ áá á áá á áŽáŚá˛ááľ áĽá á á˛ááłá áááł (Digital Twin) á´áááááá˝ á¨ááłáá á˛ááᣠá¨á¨á°áá˝á á¨á¨á á áá áááááľ áĽáŤá¨ááᥠááááá˘
đĽâá á áľá-áááŁáł
(Prefabrication) áĽá áááá á áááá˝ áá á¨ááłá¨á ááľááľ á á ááŞáŤ áĽá á Middle East (ááŤá¨ááá ááľáŤá ) á¨áŞá áľá´áľ áá ፠á¨áá áĽá á¨á᪠ááŁá˘ááąá á¨á áááľá¨á á ááĽáŞáŤ á°á ááá á¨ááá á á¨áááá á áááá˝ ááááľ á¨áááľ áá° áááľ áĽá¨á¨áᨠááá˘
áá á á°áŤá á¨áááŁáł ááá áĽáľá¨ 40 á ááś ááááľ áĽáá°áťá á¨ááá áĽááśá˝ áŤááááłáá˘
đáá°á¨á᪠ááá á áá áĽá á¨ááá ááľáĽ á¨áŽááľáľáŤáá˝á áá¨ááá˝ áááá á¨á´áááŤá áťááá˝áá áááááá˘
https://t.me/ETCONpWORK
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
đŠ @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
đŠ @Philemona7
â¤8
đá¨á áľáááľ ááááśá˝ ááá áá°ááŁá áá? đŁď¸â ď¸
á ááááľ áá áĽáá° á á ááł á¨áááľá áĽá áľááá˝ áľááĽáá˝ á áá°á áŤááá? đŻ
áá Alligator Cracking (Fatigue Cracking) á¨ááŁá á¨ááááľ ááŁá ááľá¨á ááááľ ááᢠááááą ááá áĽáá˛á áááá?
đš 1. á¨áá á á áá áááľ đ
ááááą á¨á°á°áááľ á¨á áá á¨áŁáľ ááŞááá˝ á á°á°ááá á˛áŤááá áľáŁ ááŁá á áá áá°áľ áá°áááá˘
đš 2. á°áŤá á¨ááááľ áá á¨áľ đď¸
á¨á áľáááą á áłá˝ áŤáá áá á¨áľ á á áŤáá°á áá¨á¨ ááá á¨áá¸á¨á á á á áá á°á á¨ááᣠááááą ááľááĽá áá°ááŁá á ááááŤáá˘
đš 3. áá đ§
áá á áľááĽáá˝ áá° ááááą áá á¨áľ á¨áᣠá ááŠá ááŤáá áá˝ááᢠá á°ááá áĽáŠ á¨áá ááľááá áľáááľ á¨áá á˝áአááŁáŁáłáá˘
đš 4. á¨á áľáááľ áĽáá áá á¨áááľ ááἠâď¸đ§ď¸
á áľáááľ á áá áá°áľ á°ááááááąá áŤáŁáᢠá¨áááľ áááŚá˝á áľááĽáá˝ áĽáá˛áá áŠá áĽáá˛áľáá ááŤá°áá áá˝ááá˘
đ áľááá ááááľ ááĽáŤáľ áĽáť á áá áá áľáááá á¨ááááľ áá á¨áľáŁ áĽáŠ á¨áá ááľááá áľáááľáŁ á¨áááľ ááĽáĽá áĽá áá áłá áĽáá áŤá á¨ááááąá ááľá ááŤáá ááťááđŁď¸
áĽááľá á á áŤáŁá˘á áĽáá˛á ááááľ á¨ááááľ áľááĽá á áá°áá? ááááŤáą áá áááľáááłá? đ
ââđáá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
á ááááľ áá áĽáá° á á ááł á¨áááľá áĽá áľááá˝ áľááĽáá˝ á áá°á áŤááá? đŻ
áá Alligator Cracking (Fatigue Cracking) á¨ááŁá á¨ááááľ ááŁá ááľá¨á ááááľ ááᢠááááą ááá áĽáá˛á áááá?
đš 1. á¨áá á á áá áááľ đ
ááááą á¨á°á°áááľ á¨á áá á¨áŁáľ ááŞááá˝ á á°á°ááá á˛áŤááá áľáŁ ááŁá á áá áá°áľ áá°áááá˘
đš 2. á°áŤá á¨ááááľ áá á¨áľ đď¸
á¨á áľáááą á áłá˝ áŤáá áá á¨áľ á á áŤáá°á áá¨á¨ ááá á¨áá¸á¨á á á á áá á°á á¨ááᣠááááą ááľááĽá áá°ááŁá á ááááŤáá˘
đš 3. áá đ§
áá á áľááĽáá˝ áá° ááááą áá á¨áľ á¨áᣠá ááŠá ááŤáá áá˝ááᢠá á°ááá áĽáŠ á¨áá ááľááá áľáááľ á¨áá á˝áአááŁáŁáłáá˘
đš 4. á¨á áľáááľ áĽáá áá á¨áááľ ááἠâď¸đ§ď¸
á áľáááľ á áá áá°áľ á°ááááááąá áŤáŁáᢠá¨áááľ áááŚá˝á áľááĽáá˝ áĽáá˛áá áŠá áĽáá˛áľáá ááŤá°áá áá˝ááá˘
đ áľááá ááááľ ááĽáŤáľ áĽáť á áá áá áľáááá á¨ááááľ áá á¨áľáŁ áĽáŠ á¨áá ááľááá áľáááľáŁ á¨áááľ ááĽáĽá áĽá áá áłá áĽáá áŤá á¨ááááąá ááľá ááŤáá ááťááđŁď¸
áĽááľá á á áŤáŁá˘á áĽáá˛á ááááľ á¨ááááľ áľááĽá á áá°áá? ááááŤáą áá áááľáááłá? đ
ââđáá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
â¤17đ1
đáŁáá áŁáá áá á¨á°á°áŤáŁá¨á¨áł áľáľááá á¨áá á
ááš á¨ááááľ áľáŤ BOQ á¨ááá á¨áłá˝ áŁáá ááá áŤáááąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
Ye-Buna
Professional Road Construction Cost Estimation & BOQ Excel Template
Professional Road Construction Cost Estimation & BOQ Excel⌠499 ETB ¡ â
4.2 (5 reviews) ¡ 16 sold. Instant download from Ethio Construction Engineering onâŚ
â¤2đĽ1
đá ááᎠáľáŤ áá
áľ á¨áŚáá˛áŤá ááá (Automatic Level) áĽá á¨á¤ááľáŤáŹá°á á
áá
áľ! đđ
đâá ááľá áá áĽáá°ááłáŠáľ á¨ááááľ ááá á¨ááłá˝ ááľáá ááᎠ(Excavation Work) á ááŤááľá áľ áá áľ á á¤ááľáŤáŹá°á á¨áá°áŤáá ááᎠá áŚáá˛áŤá ááá (Level Instrument) áĽá¨á°ááŁá áá áĽáááááá˘
á áá áá áľ á¨áá°á¨á á¨ááá ááĽáĽá áĽá áá˝áŚ
â1ď¸âŁ á¨áá á á áá áááŽá áá¨áá¨á (Prevents Over-excavation)ጠá¨á°áá°ááá á˛ááá áĽáááľ (Design Depth) á áá á¨áááá á¨áááŁá á¨á áá áĽá á¨á ááľ áĽáááľ áá¨áá¨ááá˘
2ď¸âŁ áľáááá á áá°á ááľá áľ (Ensuring Proper Slope/Gradient)ጠá¨ááłá˝ ááá á¨ááἠáá ááľááŽá˝ á áľááááá á áá°á áĽáá˛ááą á¨á¨ááłá áá áł áááŤáąá á á¨á°á¨áá áá¨áłá°ááá˘
3ď¸âŁ á áľááááá á¨áá°á¨áľ á áá á°á¨á áá¨ááἠ(Subgrade Formation Level)ጠáááŁá á¨á á á ááŁá (Sub-base/Base-course) ááá á¨ááááá á°á¨á á áľááá áááľááἠáá¨áłáá˘
âáĽáŤáľ áŤáá áľáŤ á¨áá¨ááá á á ááłáŞáŤáá˝ áľááá á áĽááá á áá°á¨á á¨áłááľ ááĽáĽá áá! đ¤
ââââââââââââââ
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
đâá ááľá áá áĽáá°ááłáŠáľ á¨ááááľ ááá á¨ááłá˝ ááľáá ááᎠ(Excavation Work) á ááŤááľá áľ áá áľ á á¤ááľáŤáŹá°á á¨áá°áŤáá ááᎠá áŚáá˛áŤá ááá (Level Instrument) áĽá¨á°ááŁá áá áĽáááááá˘
á áá áá áľ á¨áá°á¨á á¨ááá ááĽáĽá áĽá áá˝áŚ
â1ď¸âŁ á¨áá á á áá áááŽá áá¨áá¨á (Prevents Over-excavation)ጠá¨á°áá°ááá á˛ááá áĽáááľ (Design Depth) á áá á¨áááá á¨áááŁá á¨á áá áĽá á¨á ááľ áĽáááľ áá¨áá¨ááá˘
2ď¸âŁ áľáááá á áá°á ááľá áľ (Ensuring Proper Slope/Gradient)ጠá¨ááłá˝ ááá á¨ááἠáá ááľááŽá˝ á áľááááá á áá°á áĽáá˛ááą á¨á¨ááłá áá áł áááŤáąá á á¨á°á¨áá áá¨áłá°ááá˘
3ď¸âŁ á áľááááá á¨áá°á¨áľ á áá á°á¨á áá¨ááἠ(Subgrade Formation Level)ጠáááŁá á¨á á á ááŁá (Sub-base/Base-course) ááá á¨ááááá á°á¨á á áľááá áááľááἠáá¨áłáá˘
âáĽáŤáľ áŤáá áľáŤ á¨áá¨ááá á á ááłáŞáŤáá˝ áľááá á áĽááá á áá°á¨á á¨áłááľ ááĽáĽá áá! đ¤
ââââââââââââââ
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
â¤5đ2
đComplete Guide to Reading Building Drawings
đáá áá á¨á ááá áľáŽááá á á°ááŁá ááá¨áłáľ áĽá áľá á á áá á ááá´áá¸á áłáááľ á¨ááłáľáľ ááἠáá áá á¨áłá˝ áŁáá ááá áŤááŠáąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
đáá áá á¨á ááá áľáŽááá á á°ááŁá ááá¨áłáľ áĽá áľá á á áá á ááá´áá¸á áłáááľ á¨ááłáľáľ ááἠáá áá á¨áłá˝ áŁáá ááá áŤááŠáąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
Ye-Buna
Complete Guide to Reading Building Drawings Architecture And Structural Plans
Complete Guide to Reading Building Drawings Architecture⌠399 ETB ¡ 8 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay withâŚ
â¤2đ2
âđď¸á¨áŽááľáľáŤáá˝á á´áá˛
đá¨ááááľ áĽá á¨áľáŹáľ áá á¨áľ
âá áŽááľáľáŤáá˝á á˘ááąáľáľáŞ ááľáĽ á°á áááľ (Construction Safety) á ááŤá á¨ááá á¨áĽáŤá˝á áἠááá˘
đáááŁáłáá˝ á áłáá°áá¸á ááᣠá á ááľ áĽá á áĽáŤáľ áĽáá˛á ááá á¨á áŤá°ááťá˝á á°á áááľ ááááá á áľá፠áá°á á áááŁáá˘
ââ ď¸ 3áą áá áá á¨áŽááľáľáŤáá˝á á á°á áá¨áá¨áŤ áá°áśáá˝
âŹď¸âá¨áá áá¨áá¨áŤ áááá˝ (PPE): ááááľáŁ á¨á°á áááľ áŤáᣠááá˝á áĽá á áá¸áŁáŤá ááĽáśá˝á ááááá á áĽáŤ áŚáł áá á á ááŁáĄ áá áá áá´áł ááá˘
đâá¨áááľ áĽáŤáá˝ á°á áááľ: áá°áá áĽá áľáŤááá˛áá (Scaffolding) á¨áá ááá á ááľ á˝á áááá¸áá áá¨ááἠáĽáá˛áá á¨á°á áááľ áá á á፠áááľ (Safety Harness) áá°á¨áá áá¨áááĽá˘
đâá¨á áŤáŁá˘ áááá¤: á áĽáŤ ááá¨á ááľáĽ áá¨á°áą á¨áá˝á á á°ááá˝á ááľá á ááááἠá¨á°á áááľ ááááśá˝á ááá á áĽá á¨áá°á áĽááá ááľá¨áá˘
đâááłá°á˘áŤ: á°á áááą á¨á°á á á á¨áĽáŤ áŚáł á¨áááľ áĽáŤáľá áá¨ááŤáᤠá¨á¤á°á°áĽáá ááááľ á¨ááá ááłá°ááᢠ"á°á áááľ ááłáá á¨áĽáŤá˝á áá፠áá!"
Via Ethio Con
@etconp
đá¨ááááľ áĽá á¨áľáŹáľ áá á¨áľ
âá áŽááľáľáŤáá˝á á˘ááąáľáľáŞ ááľáĽ á°á áááľ (Construction Safety) á ááŤá á¨ááá á¨áĽáŤá˝á áἠááá˘
đáááŁáłáá˝ á áłáá°áá¸á ááᣠá á ááľ áĽá á áĽáŤáľ áĽáá˛á ááá á¨á áŤá°ááťá˝á á°á áááľ ááááá á áľá፠áá°á á áááŁáá˘
ââ ď¸ 3áą áá áá á¨áŽááľáľáŤáá˝á á á°á áá¨áá¨áŤ áá°áśáá˝
âŹď¸âá¨áá áá¨áá¨áŤ áááá˝ (PPE): ááááľáŁ á¨á°á áááľ áŤáᣠááá˝á áĽá á áá¸áŁáŤá ááĽáśá˝á ááááá á áĽáŤ áŚáł áá á á ááŁáĄ áá áá áá´áł ááá˘
đâá¨áááľ áĽáŤáá˝ á°á áááľ: áá°áá áĽá áľáŤááá˛áá (Scaffolding) á¨áá ááá á ááľ á˝á áááá¸áá áá¨ááἠáĽáá˛áá á¨á°á áááľ áá á á፠áááľ (Safety Harness) áá°á¨áá áá¨áááĽá˘
đâá¨á áŤáŁá˘ áááá¤: á áĽáŤ ááá¨á ááľáĽ áá¨á°áą á¨áá˝á á á°ááá˝á ááľá á ááááἠá¨á°á áááľ ááááśá˝á ááá á áĽá á¨áá°á áĽááá ááľá¨áá˘
đâááłá°á˘áŤ: á°á áááą á¨á°á á á á¨áĽáŤ áŚáł á¨áááľ áĽáŤáľá áá¨ááŤáᤠá¨á¤á°á°áĽáá ááááľ á¨ááá ááłá°ááᢠ"á°á áááľ ááłáá á¨áĽáŤá˝á áá፠áá!"
Via Ethio Con
@etconp
â¤13đ1đ1đ1