Ethio Construction Engineering
32.4K subscribers
6.24K photos
359 videos
1.99K files
3.23K links
๐Ÿ”จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

๐Ÿ“จ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
#ADVERTISEMENT

INTRODUCE A CUSTOMER. EARN A COMMISSION!

แ‹ฐแŠ•แ‰ แŠ› แ‹ซแˆตแ‰ฐแ‹‹แ‹แ‰แฃ แŠฎแˆšแˆฝแŠ• แ‹ซแŒแŠ™!

WELCOME TO SUNSPACE FINISHING MATERIALS!

โœจ BETTER QUALITY. LOWER PRICES.
โœจ แ‹จแ‰ฐแˆปแˆˆ แŒฅแˆซแ‰ตแฃ แ‰ แ‰ฐแˆปแˆˆ แ‹‹แŒ‹!

โœจ OUR PRODUCTS | แ‹จแˆแˆญแ‰ต แ‹“แ‹ญแАแ‰ถแ‰ปแ‰ฝแŠ•

๐Ÿ› Bathroom Solutions (WC Set, Shower Panel, Heaters & Accessories)

โœจ Ceramics and Porcelain

๐Ÿ”ง PPR Pipes & Fittings

๐Ÿ  Granite (Staircase & Kitchen Tops)

๐Ÿ’ง Construction Chemicals & Waterproofing Products

๐Ÿ“ VISIT US: Signal Shopping Centre, 1st Floor.

๐Ÿ“ž CALL US: 09 11 51 87 40

๐Ÿค SUNSPACE TRADING โ€” LETโ€™S GROW TOGETHER!

#finishing materials #construction materials
โค4
๐Ÿข EXPANSION JOINTS โ€” WHY DO BUILDINGS NEED THEM?

An expansion joint is a designed separation that accommodates specified movement between parts of a building or structure.

Materials expand, contract, shrink, and move in response to environmental conditions and structural behavior.

๐Ÿ”น Why Are Expansion Joints Used?

๐ŸŒก๏ธ To accommodate temperature-related movement.

๐Ÿงฑ To help manage movement between designated building sections.

๐Ÿ—๏ธ To reduce unwanted restraint between parts of a structure.

๐Ÿ’ง To maintain appropriate weatherproofing or waterproofing where required.

๐Ÿ”น Where Might They Be Used?

- Long building structures.
- Building envelopes and roofs.
- Floors and pavements.
- Other systems requiring designed movement accommodation.

๐Ÿ”น What Should Be Considered?

๐Ÿ“ Joint location and width.

๐Ÿงฑ Movement capacity.

๐Ÿ’ง Weatherproofing and waterstops where required.

๐Ÿ”ฉ Connections and detailing.

๐Ÿ“‹ Maintenance requirements.

โš ๏ธ Expansion joints are not interchangeable with construction joints or control joints. Each serves a different purpose and must be detailed for its intended function.

@ETCONp
โค6๐Ÿ‘1
๐Ÿ—๏ธ แ‹จแˆ…แŠ•แƒ แ‹ฒแ‹›แ‹ญแŠ• แŠฅแŠ“ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆแ‰ƒแ‹ต Approval Checklist ๐Ÿ“‹

๐Ÿ›แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆ…แŠ•แƒ แ‹ฒแ‹›แ‹ญแŠ• แˆˆแˆ›แˆตแ€แ‹ฐแ‰… แŠ แˆตแˆแˆ‹แŒŠ แ‹จแˆ†แŠ‘ แˆฐแАแ‹ถแ‰ฝแŠ•แŠ“ แ‹จDrawing แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝแŠ• แˆณแ‹ญแˆจแˆฑ แˆˆแˆ˜แˆแ‰ฐแˆฝ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ Professional PDF Checklist

โฑ๏ธ แŒŠแ‹œแ‹ŽแŠ• แ‹ญแ‰†แŒฅแ‰ก! แŠ แˆตแˆแˆ‹แŒŠ แˆฐแАแ‹ต แŠฅแŠ•แ‹ณแ‹ญแˆจแˆณ แ‹ซแ‹ตแˆญแŒ‰!

๐Ÿ—‚แ‹ญแˆ…แŠ• แ‰  PDF แ‹แ‹ญแˆ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a76b89233390_etconp
๐Ÿ‘Œ3โค1
๐Ÿ’ง DRAINAGE PIPE SLOPE โ€” WHY DOES IT MATTER?

Drainage pipes are installed with a designed gradient to help wastewater flow toward its intended destination.

An unsuitable gradient can contribute to poor drainage performance.

๐Ÿ”น Why Is Correct Slope Important?

โœ… Supports the intended flow of wastewater.

โœ… Helps reduce the risk of sediment accumulation.

โœ… Supports reliable operation of the drainage system.

โœ… Helps avoid drainage problems caused by unsuitable installation.

๐Ÿ”น What Should Be Checked on Site?

๐Ÿ“ Pipe gradient and alignment.

๐Ÿ“ Pipe diameter.

๐Ÿ”— Joint connections.

๐Ÿงฑ Pipe bedding and support.

๐Ÿ’ง Testing and inspection requirements.

๐Ÿ“‹ Compliance with approved plumbing drawings.

โš ๏ธ Too little or too much slope can be unsuitable depending on the pipe size, system, and design. Do not assume that a steeper pipe is always better.


@ETCONp
โค2
๐Ÿ“‹ WHAT IS A NONCONFORMANCE REPORT (NCR) IN CONSTRUCTION?

A Nonconformance Report, commonly called an NCR, documents work or materials that do not meet specified project requirements.

It helps the project team record the problem, assess its significance, and manage corrective action.

๐Ÿ”น When Might an NCR Be Raised?

๐Ÿงฑ Concrete that fails to meet a specified acceptance requirement.

๐Ÿ”ฉ Reinforcement installed contrary to approved drawings.

๐Ÿ“ Dimensions outside specified tolerances.

๐Ÿ“ฆ Materials that do not comply with approved requirements.

๐Ÿ”น Typical NCR Process

1๏ธโƒฃ Identify the nonconformance.

2๏ธโƒฃ Record the relevant facts and evidence.

3๏ธโƒฃ Notify the responsible parties.

4๏ธโƒฃ Assess the issue and determine the appropriate disposition.

5๏ธโƒฃ Obtain the required approval for corrective action.

6๏ธโƒฃ Complete the action and verify its effectiveness.

7๏ธโƒฃ Close the NCR in accordance with project procedures.

๐Ÿ“Œ Important: Do not conceal nonconforming work or make unauthorized changes. Structural issues may require assessment and approval by the responsible design professional.


@ETCONp
๐Ÿ‘5โค2๐Ÿฅฐ1
๐Ÿ‘‰แ‰ฃแˆแŠ‘ แ‰ฃแˆˆแ‹ แ‹‹แŒ‹ แ‹จแ‰ฐแˆฐแˆซแฃแŒจแˆจแ‰ณ แˆตแ‰ตแˆžแˆ‰แˆ แ‹จแˆšแŒ แ‰…แˆ›แ‰น แ‹จแˆ˜แŠ•แŒˆแ‹ต แˆตแˆซ BOQ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
๐Ÿ™3๐Ÿฅฐ1
๐Ÿ—๏ธ COLUMN TIES: HOOK DETAILS & CONFINEMENT

Column ties are essential components of reinforced concrete (RCC) columns. They hold the longitudinal reinforcement in position, provide lateral support to the main bars, and help confine the concrete core.

๐Ÿ”น 1. Longitudinal Bars
These are the main reinforcement bars that resist axial loads and bending moments in the column.

๐Ÿ”น 2. Closed Column Ties
Column ties are transverse reinforcement placed around the main bars to prevent them from buckling and to improve the structural integrity of the column.

๐Ÿ”น 3. Tie Spacing (s)
Tie spacing is the vertical distance between consecutive ties. Proper spacing is essential for effective confinement and reinforcement stability.

๐Ÿ”น 4. 135ยฐ Hook
A 135ยฐ hook is commonly used in seismic detailing because it provides better anchorage and is less likely to open under cyclic loading when properly detailed.

๐Ÿ”น 5. Hook Extension
The hook extension must satisfy the applicable structural code requirements, including minimum extension length and bend diameter. These depend on the code, tie-bar diameter, and detailing conditions.

โš ๏ธ 135ยฐ HOOK vs. 90ยฐ HOOK

โœ… 135ยฐ Hook

- Commonly preferred for seismic confinement.
- Provides more reliable anchorage when properly detailed.
- Helps maintain confinement during repeated earthquake loading.

โš ๏ธ 90ยฐ Hook

- May provide less reliable anchorage under cyclic loading.
- Must only be used where permitted by the applicable structural code and approved detailing requirements.

๐Ÿ“Œ IMPORTANT ENGINEERING NOTES
โœ”๏ธ Tie spacing must comply with the governing structural code.
โœ”๏ธ Concrete cover must be specified according to exposure conditions, fire requirements, and applicable standards.
โœ”๏ธ Proper ties help restrain longitudinal bars against buckling.
โœ”๏ธ Hook angles, extensions, tie spacing, and reinforcement arrangements must follow approved structural drawings.
โœ”๏ธ For Australian projects, refer to the applicable requirements of AS 3600 and any relevant seismic design provisions.

๐Ÿข Remember: Correct reinforcement detailing is essential for column strength, ductility, and structural safety. Always follow the project specifications and the structural engineer's approved drawings.

๐Ÿ’ฌ Question for civil engineers: Which hook detail is specified for your projectโ€”135ยฐ or 90ยฐ? Share your experience in the comments!

๐Ÿ“ข Follow @etconp for more civil engineering knowledge, construction techniques, and structural detailing.

Build Smarter, Build Stronger! ๐Ÿ—๏ธ

โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ€‹โ€‹
๐ŸŒแˆˆแ‰ฐแŒจแˆ›แˆช แˆ˜แˆจแŒƒ แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‹˜แˆญแ แ‹œแŠ“แ‹Žแ‰ฝ แ‹จ YouTube แŒˆแƒแ‰ฝแŠ• แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‰ แˆ˜แŒแ‰ฃแ‰ต SubScribe แŠ แˆญแŒˆแ‹ แ‰คแ‰ฐแˆฐแ‰ฅ แ‹ญแˆแŠ‘๐Ÿ‘‡

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
‎
‎@etconp
โค5
๐Ÿ—๏ธ 20 TYPES OF STAIRS IN BUILDINGS

1. Straight Stairs
2. L-Shaped Stairs
3. U-Shaped Stairs
4. Spiral Stairs
5. Curved Stairs
6. Floating Stairs
7. Cantilever Stairs
8. Winder Stairs
9. Split Stairs
10. Circular Stairs
11. Helical Stairs
12. Ladder Stairs
13. Open-Riser Stairs
14. Closed-Riser Stairs
15. Box Stairs
16. Quarter-Turn Stairs
17. Half-Turn Stairs
18. Bifurcated Stairs
19. Space-Saving Stairs
20. Monumental Stairs

๐Ÿ“Œ @ETCONP
โค4๐Ÿฅฐ1
๐Ÿ—๏ธ แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆตแˆซ แ‹แˆ แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“‘120+ แˆˆแˆตแˆซ แ‹แŒแŒ แ‹จแˆ†แŠ‘ แˆตแ‰ณแŠ•แ‹ณแˆญแ‹ต แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ
โœ… แˆˆแŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฎแ‰ฝแˆ แˆ†แА แˆˆแŠ แˆ›แŠซแˆชแ‹Žแ‰ฝ แ‰ฐแ‹˜แŒ‹แŒ…แ‰ถ แ‹จแ‰€แˆจแ‰ 
โœ… แŠจ PPA 2025 แŠฅแŠ“ FIDIC Red Book 2017 แˆ…แŒŽแ‰ฝ แŒ‹แˆญ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แ‹จแ‰ฐแŒฃแŒฃแˆ˜
โœ… แ‰  Microsoft Word แ‰ แ‰€แˆ‹แˆ‰ แŠคแ‹ฒแ‰ต แ‹จแˆšแ‹ฐแˆจแŒ (Editable) แŠจแ‰ฐแŒจแˆ›แˆช PDF แ‹แ‹ญแˆŽแ‰ฝ

๐Ÿš€ แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แˆตแˆซแ‹ŽแŠ• แ‰€แˆ‹แˆแŠ“ แ•แˆฎแŒแˆฝแŠ“แˆ แˆˆแˆ›แ‹ตแˆจแŒ แ‹แ‹ญแˆŽแ‰น แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
๐Ÿฅฐ2โค1๐Ÿ™1
๐Ÿšจ 7 CONSTRUCTION MISTAKES THAT CAN INCREASE PROJECT COSTS

Construction mistakes can lead to rework, delays, disputes, and quality problems.

๐Ÿ”น 1. Using Outdated Drawings

This can result in work that no longer matches the approved design.

๐Ÿ”น 2. Poor Setting Out

Incorrect positions or levels can affect foundations, columns, walls, and services.

๐Ÿ”น 3. Skipping Inspections

Defects may become harder and more expensive to correct after work is covered.

๐Ÿ”น 4. Improper Material Storage

Moisture, contamination, or poor handling can damage materials.

๐Ÿ”น 5. Inadequate Documentation

Missing records can complicate approvals, progress tracking, and dispute resolution.

๐Ÿ”น 6. Poor Coordination

Conflicts between structural, architectural, and service installations can cause rework.

๐Ÿ”น 7. Unauthorized Design Changes

Changing structural or other specified work without proper review can compromise compliance and performance.

โœ… How Can These Problems Be Reduced?

Use approved documents, plan inspections, communicate early, maintain records, and follow project procedures.

@ETCONP
โค4๐Ÿ‘2๐Ÿฅฐ1
๐Ÿ“˜CONSTRUCTION MATERIALS TESTING MANUAL

๐Ÿ—๏ธแ‹จแŒแŠ•แ‰ฃแ‰ณ แŒฅแˆฌ แ‹•แ‰ƒแ‹Žแ‰ฝแŠ• แ‹จแŒฅแˆซแ‰ต แˆแˆญแˆ˜แˆซ (Material Testing) แ‰ แ‰ฐแŒแ‰ฃแˆญ แˆ˜แˆ›แˆญ แ‹ญแˆแˆแŒ‹แˆ‰?

๐ŸŒŸแ‹ญแˆ… แˆ™แˆ‰ แ‹จแˆ™แ‹ซ แˆ˜แˆ˜แˆชแ‹ซ แ‹จแˆฒแˆšแŠ•แ‰ถแฃ แŠ แŒแˆชแŒŒแ‰ตแฃ แŠฎแŠ•แŠญแˆชแ‰ตแฃ แŒกแ‰ฅแฃ แ‰ฅแˆŽแŠญแฃ แ‰ฅแˆจแ‰ตแฃ แŠ แˆแˆญแฃ แ“แ‹ญแˆ แŠฅแŠ“ แ‹จแ‹แˆƒ แˆ˜แŠจแˆ‹แŠจแ‹ซ แ‰แˆณแ‰แˆถแ‰ฝแŠ• แ‹จแˆแˆญแˆ˜แˆซ แ‹˜แ‹ดแ‹Žแ‰ฝ แ‹ญแ‹Ÿแˆแข

โœ… แˆˆCivil แŠฅแŠ“ Material Engineers
โœ… แˆˆLaboratory Technicians
โœ… แˆˆQA/QC Engineers
โœ… แˆˆSite Engineers
โœ… แˆˆ COTEM แŠฅแŠ“ Civil Engineering Students

๐ŸŽฏ แ‹จแˆ™แ‹ซ แŠฅแ‹แ‰€แ‰ตแ‹ŽแŠ• แ‹ซแˆณแ‹ตแŒ‰แค แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒฅแˆซแ‰ตแŠ• แ‹ซแˆจแŒ‹แŒแŒก!

๐Ÿ“ฅแ‹ญแˆ… แˆแˆญแŒฅ แˆ˜แˆ˜แˆญแ‹ซ แˆ˜แ…แˆƒแ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ae709e5de7bd_etconp
โค1๐Ÿฅฐ1๐Ÿ‘Œ1
A raft foundation (mat foundation) is a large RCC slab that distributes building loads over a wide soil area.

๐Ÿ”น Key Components:

1๏ธโƒฃ Top Reinforcement Mesh
2๏ธโƒฃ Bottom Reinforcement Mesh
3๏ธโƒฃ Column Starter Bars
4๏ธโƒฃ Column Reinforcement Cages
5๏ธโƒฃ Concrete Cover Spacers and Chairs
6๏ธโƒฃ Perimeter Shoring
7๏ธโƒฃ Concrete Pump Delivery Line
8๏ธโƒฃ Reinforced Concrete Raft Slab

โœ… Pre-Pour Inspection Checklist:

โœ”๏ธ Check reinforcement size and spacing.
โœ”๏ธ Verify concrete cover and bar levels.
โœ”๏ธ Inspect starter bars and anchorage.
โœ”๏ธ Check formwork and excavation stability.
โœ”๏ธ Remove debris and standing water.
โœ”๏ธ Confirm concrete grade and pouring arrangements.

โš ๏ธ Engineering Note: Always follow approved structural drawings and obtain engineering approval before concrete placement.


@ETCONP
๐Ÿ‘2โค1
๐Ÿ‘ท WHAT DOES A SITE ENGINEER DO ON A CONSTRUCTION PROJECT?

A site engineer helps ensure that construction activities are executed in accordance with approved drawings, specifications, work plans, and applicable safety requirements.

๐Ÿ”น Main Responsibilities

๐Ÿ“ Setting Out: Supports the transfer of design dimensions and positions to the construction site.

๐Ÿ“‹ Drawing Interpretation: Reviews relevant drawings and clarifies discrepancies through the proper project procedures.

๐Ÿ”ฉ Reinforcement Inspection: Checks reinforcement installation against approved details.

๐Ÿงฑ Concrete Works: Coordinates required inspections, placement activities, and testing.

๐Ÿ“Š Quantity Measurement: Records quantities and supports progress measurement.

๐Ÿ” Quality Control: Helps identify defects and nonconforming work.

๐Ÿ“… Progress Monitoring: Tracks activities and reports delays or constraints.

๐Ÿฆบ Safety: Follows site safety procedures and reports hazards.

๐Ÿ“ Documentation: Maintains required inspection records, site reports, and other project documents.

๐Ÿค Coordination: Communicates with supervisors, contractors, consultants, and other disciplines.

๐Ÿ“Œ Responsibilities vary by employer, project size, contract, and level of professional authority.

๐Ÿ“˜ THE SITE ENGINEER'S ULTIMATE HANDBOOK

๐Ÿ‘ทโ€โ™‚๏ธ แˆˆแˆฒแ‰ชแˆ แŠขแŠ•แŒ‚แАแˆฎแ‰ฝ แŠฅแŠ“ แˆˆแŒแŠ•แ‰ฃแ‰ณ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝ แŠฅแŒ…แŒ แŠ แˆตแˆแˆ‹แŒŠ แˆ˜แ…แˆแ

โœ… 200 แŠ แˆตแˆแˆ‹แŒŠ แ‹จSite Engineering แŠญแˆ…แˆŽแ‰ถแ‰ฝแŠ“ แ‹ˆแˆณแŠ แŠฅแ‹แ‰€แ‰ถแ‰ฝ แ‹จแ‹ซแ‹˜

๐Ÿ—๏ธแˆตแˆˆ แ‹จแŒแŠ•แ‰ฃแ‰ณแฃ Quantity Estimationแฃ Concreteแฃ QA/QCแฃ HSEแฃ Project Management แŠฅแŠ“ แˆŒแˆŽแ‰ฝแŠ•แˆ แ‰ แ‰€แˆ‹แˆ‰ แ‹ญแˆ›แˆฉ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฅแ‹แ‰€แ‰ตแ‹Ž แ‹ซแˆตแ‰๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aca98e1644ce_etconp
โค2๐Ÿ˜ญ1
๐Ÿ—๏ธ BEFORE STARTING CONSTRUCTION โ€” CHECK THESE 10 ITEMS

Proper preparation helps reduce delays, rework, and unnecessary costs.

๐Ÿ”น 1. Approved Drawings: Confirm that the latest approved drawings are available.

๐Ÿ”น 2. Site Investigation: Understand the relevant soil and site conditions.

๐Ÿ”น 3. Setting Out: Verify the reference points, coordinates, and required levels.

๐Ÿ”น 4. Permits and Approvals: Confirm that required authorizations are in place.

๐Ÿ”น 5. Work Programme: Establish the construction sequence and planned dates.

๐Ÿ”น 6. Materials: Confirm availability and approval of specified materials.

๐Ÿ”น 7. Equipment: Arrange suitable equipment and maintenance.

๐Ÿ”น 8. Labour: Plan staffing and supervision requirements.

๐Ÿ”น 9. Safety Arrangements: Prepare the required risk assessments and safety measures.

๐Ÿ”น 10. Quality Planning: Identify required inspections, tests, and approval points.

๐Ÿ“Œ Engineering Reminder: If drawings conflict or site conditions differ from the design assumptions, seek clarification through the proper project process before proceeding with affected work.

@ETCONP
โค3๐Ÿ‘2
๐ŸŒŸแˆˆแ‹›แˆฌ แ‰ฅแ‰ป แ‹จแˆšแ‰†แ‹ญ Full แŠณแŠ•แ‰ฒแ‰ฒ แˆฐแˆญแ‰จแ‹ญแŠ•แŒ Online Course แ‹จ 25% แ‰…แŠ“แˆฝ แŠ แˆญแŒˆแŠ“แˆ แŠจแ‹šแˆ… แ‰ แ‰ฐแŒจแˆ›แˆช แ‹จ UDEMY แŠฎแˆญแˆต แŠ แŠ•แ‹ต แˆ˜แˆญแŒ แ‹ แ‰ แАแƒ แ‹ญแˆ˜แˆจแ‰…แˆ‹แ‰นแ‹‹แˆโค๏ธ

๐Ÿš€ แ‹›แˆฌแ‹แŠ‘ แ‹ญแˆ˜แ‹แŒˆแ‰ก แŠฅแŠ“ แ‹จ Quantity Surveying แŠญแˆ…แˆŽแ‰ตแ‹ŽแŠ• แ‹ˆแ‹ฐ แˆŒแˆ‹ แ‹ฐแˆจแŒƒ แ‹ซแˆณแ‹ตแŒ‰!

โญ๏ธแŠฎแˆญแˆฑ แˆˆแˆ˜แŒ€แˆ˜แˆญ๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
๐Ÿฅฐ1๐Ÿ‘Œ1๐Ÿ˜ญ1