According to ASTM standard types of portland cement are
1. Type 1 or normal portland cement
# general purpose cement
# used where there would be no severe climate change
# used where there is no severe exposure to sulphate attack from water or soil
2. Type 2 or moderate portland cement
# used in climate of moderate sulphate attack
# moderate heat of hydration
3. Type 3 or high early strength pc
# used where high early strength is desired,usually less than one weak
# when a structure must be put into service as quickly as possible
# less C2S and more C3S
4. Type 4 or low heat of hydration pc
# develops strength at a slower rate than does type 1
# intended for mass structures such as large gravity dams
5. Type 5 or sulfate resisting pc
# when high sulfate resistance is desired
# when concrete is to be exposed to severe sulfate action by soil or water
# contains less C3A
For more topics join @COTMp
1. Type 1 or normal portland cement
# general purpose cement
# used where there would be no severe climate change
# used where there is no severe exposure to sulphate attack from water or soil
2. Type 2 or moderate portland cement
# used in climate of moderate sulphate attack
# moderate heat of hydration
3. Type 3 or high early strength pc
# used where high early strength is desired,usually less than one weak
# when a structure must be put into service as quickly as possible
# less C2S and more C3S
4. Type 4 or low heat of hydration pc
# develops strength at a slower rate than does type 1
# intended for mass structures such as large gravity dams
5. Type 5 or sulfate resisting pc
# when high sulfate resistance is desired
# when concrete is to be exposed to severe sulfate action by soil or water
# contains less C3A
For more topics join @COTMp
๐1
Mortar is a mixture of cement, aggregate, and water. The mortar paste hardens on drying and binds the bricks, stones or concrete blocks together.
Uses of mortar:
1: Used in masonry to bind stones, bricks, and concrete block together.
2: Used for pointing the joints and to give the work a pleasing and smooth finish.
3: Bonding masonry units together, either non reinforced or reinforced.
4: Leveling or seating the units.
5: For pointing the joints of masonry.
6: For plastering the masonry to protect it from the weather and give a smooth finish.
7: In concrete, it is used to bind the particles of coarse aggregate into one solid mass.
Uses of mortar:
1: Used in masonry to bind stones, bricks, and concrete block together.
2: Used for pointing the joints and to give the work a pleasing and smooth finish.
3: Bonding masonry units together, either non reinforced or reinforced.
4: Leveling or seating the units.
5: For pointing the joints of masonry.
6: For plastering the masonry to protect it from the weather and give a smooth finish.
7: In concrete, it is used to bind the particles of coarse aggregate into one solid mass.
๐1
LAWS OF CONTRACT
according to civil code art.1675
Contract is an agreement b/n 2 parties and it needs to be
๐concent
๐legal and lawful
๐possible
๐valid before court
๐must has offeree and offerer
.
.
.etc
Purpose of contract
๐to avoid risk of non performance
๐to describe scope of work
๐to establish time frame
๐to establish cost and payment provision
๐to set for the obligation and relationships
๐to manage multiple risk
๐to minimize dispute and claim
Types of construction contract
1Lump sum:- the contractor offered to do the whole work for the total stipulated money
2 Unit rate:- amount to be received by the contractor depends up on the quantities of various items of work actually executed
3 Lump sum and Schedule:- contractor offered to do a particular work at a fixed sum within a specified time as per plan and specifications
4 Cost plus:- used in difficult situation either for the owner or contractor to predict the cost during negotiations
4.1Cost plus fixxed fee
4.2 Cost plus percentage of cost
.
.
.
For more updates join
๐๐๐๐๐๐๐
http://t.me/COTM
๐๐๐๐๐๐๐
according to civil code art.1675
Contract is an agreement b/n 2 parties and it needs to be
๐concent
๐legal and lawful
๐possible
๐valid before court
๐must has offeree and offerer
.
.
.etc
Purpose of contract
๐to avoid risk of non performance
๐to describe scope of work
๐to establish time frame
๐to establish cost and payment provision
๐to set for the obligation and relationships
๐to manage multiple risk
๐to minimize dispute and claim
Types of construction contract
1Lump sum:- the contractor offered to do the whole work for the total stipulated money
2 Unit rate:- amount to be received by the contractor depends up on the quantities of various items of work actually executed
3 Lump sum and Schedule:- contractor offered to do a particular work at a fixed sum within a specified time as per plan and specifications
4 Cost plus:- used in difficult situation either for the owner or contractor to predict the cost during negotiations
4.1Cost plus fixxed fee
4.2 Cost plus percentage of cost
.
.
.
For more updates join
๐๐๐๐๐๐๐
http://t.me/COTM
๐๐๐๐๐๐๐
๐1
Types of Joints in Construction
Construction Joints
Expansion Joints
Contraction Joints
Construction Joints
At first, we cannot pour a larger quantity of concrete in a
single time. So at that time, a certain portion has poured as
per the recommended shuttering design and the remaining
portion will be poured after a certain period.
In that, the construction joints are using to connect the old
and fresh concrete and it is also called as cold joints.
Construction Joints
Expansion Joints
Contraction Joints
Construction Joints
At first, we cannot pour a larger quantity of concrete in a
single time. So at that time, a certain portion has poured as
per the recommended shuttering design and the remaining
portion will be poured after a certain period.
In that, the construction joints are using to connect the old
and fresh concrete and it is also called as cold joints.
๐1
Specification of Construction Joints
The existing concrete should have an uneven surface
and free from dust.
A proper vibration has to be done near to the joint to
develop the proper bond between the old and new
concrete.
After pouring of new concrete the joint surface must
be clean out laitance and slurry by the wire brush.
The existing concrete should have an uneven surface
and free from dust.
A proper vibration has to be done near to the joint to
develop the proper bond between the old and new
concrete.
After pouring of new concrete the joint surface must
be clean out laitance and slurry by the wire brush.
๐1
Expansion Joints
As we discussed, the construction materials are formed by
the different raw material. The concrete may shrink or
expand due to the weather condition.
So the expansion joints gap are provided to accommodate
the movement happening by the expansion or shrinkages
and it is avoiding the disfiguration of the structure.
Mostly the expansion joint gaps are providing in large
structure & bridge girder to spread eventual stress. The joint
gaps are filled by the expansion material like fibre, bitumen
or some other special material.
As we discussed, the construction materials are formed by
the different raw material. The concrete may shrink or
expand due to the weather condition.
So the expansion joints gap are provided to accommodate
the movement happening by the expansion or shrinkages
and it is avoiding the disfiguration of the structure.
Mostly the expansion joint gaps are providing in large
structure & bridge girder to spread eventual stress. The joint
gaps are filled by the expansion material like fibre, bitumen
or some other special material.
Specification
Expansion joint might be provided in mid of each
span in bridges.
The provision of expansion joints is when the
structure length exceeding 45m.
The reinforcements should not be provided on the
expansion joint area.
The expansion joint material will be different based on
the structure.
The expansion joints are provided as per IS 3414.
Contraction Joints
It is another type of joints which controls the cracks
happening due to shrinkages. The contraction joints are
placed as a groove where the crack may form in concrete.
If the shrinkage crack is formed in the concrete slab then
the contraction joints prevent spreading on the other area.
Expansion joint might be provided in mid of each
span in bridges.
The provision of expansion joints is when the
structure length exceeding 45m.
The reinforcements should not be provided on the
expansion joint area.
The expansion joint material will be different based on
the structure.
The expansion joints are provided as per IS 3414.
Contraction Joints
It is another type of joints which controls the cracks
happening due to shrinkages. The contraction joints are
placed as a groove where the crack may form in concrete.
If the shrinkage crack is formed in the concrete slab then
the contraction joints prevent spreading on the other area.
โค1๐1
Contraction Joints
It is another type of joints which controls the cracks
happening due to shrinkages. The contraction joints are
placed as a groove where the crack may form in concrete. If the shrinkage crack is formed in the concrete slab then the contraction joints prevent spreading on the other area.
Specification The width of the groove should not be less than 5mm.
The contraction joint depth is 1/4th of the Concrete mean depth.
It should be placed in the weakest zone of the slab.
Another name of contraction joint is Control Joint .
It is another type of joints which controls the cracks
happening due to shrinkages. The contraction joints are
placed as a groove where the crack may form in concrete. If the shrinkage crack is formed in the concrete slab then the contraction joints prevent spreading on the other area.
Specification The width of the groove should not be less than 5mm.
The contraction joint depth is 1/4th of the Concrete mean depth.
It should be placed in the weakest zone of the slab.
Another name of contraction joint is Control Joint .
Ethio Construction Engineering
Photo
๐แจแปแญแแ Three Gorges Dam แ แตแแซแ แแฅแฎแฝ @COTMp
.
* แจแแตแกแ แแฐแจแต แแแตแซแต 80,000 แตแแแต แฒแ แแ แญแ
แแแต แจ20 แจแแฎแบแ แจแแแญแแญ แฅแแถแฝ แแญ แฅแฉแ แแแกแก
.
* แจแแตแก Reservoir แญแแแต 660แช.แ แแ - แญแ แ แแแต
แจแ .แ แแญแจแ แฅแแฐแแแต แแแกแก
.
*18200 MW แซแแแซแ แญแ แ 7965mw แจแแซแแแจแ
แจแแแ Kashiwazaki-Kariwa แจแแแแฝแ แตแแ แจแแแญแแญ
แแฅแแซ 230 แแญแฐแตแ แญแ แแฃแแกแก แจแ แณแด แแตแฅ แฐแ 300 แแญแฐแต/ 3 แฅแฅแ แญแ แแฃแแกแก
.
*แแแฃแณแ 30 แแแจแ แแตแญ แชแฉแฅ แฎแแญแชแต แแ แทแ - แญแ แ
แแแต 30 แแแจแ แแตแญ แชแฉแฅ แฎแแญแชแต แฐแ แ แแ 1 แแตแญ
แฒแซแแตแญ แซแแ แตแแ แฎแแญแชแต pipe แฅแแฐแซ แแแแ แ แแต แแญ
แแแญ แญแฝแแแกแก
.
*463,000 แถแ แฅแจแต แจแฐแ แแ แฒแแ - แญแ แ แซแ แ แถแ แฅแจแต
แฐแ แ แแ 63 แคแแ แณแแฎแฝแ แแแแฃแต แฅแแฝแแแแกแก
.
*แ แ แแซแ 77.5 แแตแญ width แฒแแจแ แญแ แ แจแแแแแ
แ แ แฃแซ แจแแแก แจแแณแคแ แฅแแถแฝแ แฅแแฒแแแ
แซแฐแญแแแแกแก แ แฐแจแแชแ แจแแแแฑ แจแฐแแณ แจแแ แฅแญแแแต
แ แแญแญแฎ แฐแจแแต แฅแแฒแจแแญ แ แตแญแแแกแก แจแณแแ แจแปแญแ แแแฅ
แแฅแ แจแตแแต แแญ แจแแณแญ แจแปแญแ แแแฐแแ แจแฒแชแ
แขแแแแชแแ แแคแต แแแกแก
.
*แแแฃแณแ แจ630 แขแแจแ แฅแญ แ แแญ แฒแแ แ 2012 แฐแ แแ แจ1 แแแต แจ6 แแญ แ แแ แแ แแชแแ แแแทแแกแก
.
*แแฅแณแ แแแญ แณแแฒ แ แจแขแซ แจแแณแ แฃ แจแฅแแแแต แแแฐ
55000MW แตแณแแแญ แแแซแฝแ แขแตแฎแตแซ แฐแแ แ แตแแน
45000MW แจแแ แฅแป แแแแจแต แตแฝแแแฝ
* แฅแตแซแแ แฃแแ 4000MW แ แญแแแ แจแแแแแจแแกแก
18200 MW แจแแซแแแจแ 630 แขแแจแ แฅแญ แแแต แแแต แฃแแแ แแ แแตแฅ แจแแแฐ แขแตแฎแตแซ 45000 MW แตแณแแแญ แแ แซแ แ
แฅแญ แแแแต แฅแแฐแแตแฝแ แ แตแกแตแข
แแแแแแ Hydraulic Engineering แญแ แ แซแ แ แฐแ แแ แแแ แญ แญแฝแแแกแก
.
* แจแแตแกแ แแฐแจแต แแแตแซแต 80,000 แตแแแต แฒแ แแ แญแ
แแแต แจ20 แจแแฎแบแ แจแแแญแแญ แฅแแถแฝ แแญ แฅแฉแ แแแกแก
.
* แจแแตแก Reservoir แญแแแต 660แช.แ แแ - แญแ แ แแแต
แจแ .แ แแญแจแ แฅแแฐแแแต แแแกแก
.
*18200 MW แซแแแซแ แญแ แ 7965mw แจแแซแแแจแ
แจแแแ Kashiwazaki-Kariwa แจแแแแฝแ แตแแ แจแแแญแแญ
แแฅแแซ 230 แแญแฐแตแ แญแ แแฃแแกแก แจแ แณแด แแตแฅ แฐแ 300 แแญแฐแต/ 3 แฅแฅแ แญแ แแฃแแกแก
.
*แแแฃแณแ 30 แแแจแ แแตแญ แชแฉแฅ แฎแแญแชแต แแ แทแ - แญแ แ
แแแต 30 แแแจแ แแตแญ แชแฉแฅ แฎแแญแชแต แฐแ แ แแ 1 แแตแญ
แฒแซแแตแญ แซแแ แตแแ แฎแแญแชแต pipe แฅแแฐแซ แแแแ แ แแต แแญ
แแแญ แญแฝแแแกแก
.
*463,000 แถแ แฅแจแต แจแฐแ แแ แฒแแ - แญแ แ แซแ แ แถแ แฅแจแต
แฐแ แ แแ 63 แคแแ แณแแฎแฝแ แแแแฃแต แฅแแฝแแแแกแก
.
*แ แ แแซแ 77.5 แแตแญ width แฒแแจแ แญแ แ แจแแแแแ
แ แ แฃแซ แจแแแก แจแแณแคแ แฅแแถแฝแ แฅแแฒแแแ
แซแฐแญแแแแกแก แ แฐแจแแชแ แจแแแแฑ แจแฐแแณ แจแแ แฅแญแแแต
แ แแญแญแฎ แฐแจแแต แฅแแฒแจแแญ แ แตแญแแแกแก แจแณแแ แจแปแญแ แแแฅ
แแฅแ แจแตแแต แแญ แจแแณแญ แจแปแญแ แแแฐแแ แจแฒแชแ
แขแแแแชแแ แแคแต แแแกแก
.
*แแแฃแณแ แจ630 แขแแจแ แฅแญ แ แแญ แฒแแ แ 2012 แฐแ แแ แจ1 แแแต แจ6 แแญ แ แแ แแ แแชแแ แแแทแแกแก
.
*แแฅแณแ แแแญ แณแแฒ แ แจแขแซ แจแแณแ แฃ แจแฅแแแแต แแแฐ
55000MW แตแณแแแญ แแแซแฝแ แขแตแฎแตแซ แฐแแ แ แตแแน
45000MW แจแแ แฅแป แแแแจแต แตแฝแแแฝ
* แฅแตแซแแ แฃแแ 4000MW แ แญแแแ แจแแแแแจแแกแก
18200 MW แจแแซแแแจแ 630 แขแแจแ แฅแญ แแแต แแแต แฃแแแ แแ แแตแฅ แจแแแฐ แขแตแฎแตแซ 45000 MW แตแณแแแญ แแ แซแ แ
แฅแญ แแแแต แฅแแฐแแตแฝแ แ แตแกแตแข
แแแแแแ Hydraulic Engineering แญแ แ แซแ แ แฐแ แแ แแแ แญ แญแฝแแแกแก
โค1
๐แตแ TRUSS ... @COTMp
.
*Truss แจแแแแ Axial Load (compressive & tensile force) แฅแป แจแแธแจแ แแแ แฎแฝ แแธแแกแก
แจแตแจแต แแแ แฎแฝ แจแแแแแต แ แแ แฎแแญแฝแ แแแตแ (แ แ แฅแแแ แ แฅแจแณแ แ แฅแแ ) แแ แจแแแแแตแกแก
*แแแต แ แญแแต แตแจแถแฝ แ แ Plain (2D) and Space truss (3D
แแแณแ แจแดแ แณแแฎแฝ )แกแก *แตแจแถแฝแ แแ แแแ แแตแแตแฎแฝ
แฐแแซแญ แจแแแ แต แแญแแซแต แ แแซแซแ แญแฅแฐแณแธแ แแแ แตแแแ แแแกแก แฅแแ แแฌ แตแแตแจแต แแแแซ แจแปแแแ แต แแแ แแญแแซแต แฅแ แณแญแถแฝ แแญ แจแแแฃแณ แแตแแต แตแแแแญ แ แแณแแต แแแญ แแแ แแ แซแ แ แแ::
แแแตแแ แแแฉ แตแจแถแฝ แฒแแ แฉ Axial Load แฅแป แฅแแฒแธแจแ แแ แบแญแ แแแแต แแธแจแ แ แญแฝแแ - Axial แแญแตแ แจแแธแจแแต แจแแแฃแแ แแต แแฅแณ แแแแแธแ แแญแ joint แแญ แฒแซแแฃแธแ แฅแป แแ:: แญแ แ แจแแญแฑ แแ แแฐ แแแ แฎแฝ แแถ แจแ แแ แแฐ แฎแแ แแญแ แขแ แจแแแฐแ - แณแญแต แแญ แแ แแญแแแ แแแ แแแ แฎแน แแญ แฒแ แญแฑแต แญแณแซแ - joint แแญ แแ แแ แจแต แแญแ แแณแฐแญ แซแแ แต - แณแญแต แแญ แจแแฐแจแแ แจแณแญแแต แแช แแ แแญแแ แแแต แแญแ แแแฅ แซแแฃแธแ แ แซแฃแขแแฝ แญแ แแแญ แ แณแณแข แฅแ แฃแฐแแ แแซแฐแญแต แญแฝแแแกแก
Share Share Share
.
*Truss แจแแแแ Axial Load (compressive & tensile force) แฅแป แจแแธแจแ แแแ แฎแฝ แแธแแกแก
แจแตแจแต แแแ แฎแฝ แจแแแแแต แ แแ แฎแแญแฝแ แแแตแ (แ แ แฅแแแ แ แฅแจแณแ แ แฅแแ ) แแ แจแแแแแตแกแก
*แแแต แ แญแแต แตแจแถแฝ แ แ Plain (2D) and Space truss (3D
แแแณแ แจแดแ แณแแฎแฝ )แกแก *แตแจแถแฝแ แแ แแแ แแตแแตแฎแฝ
แฐแแซแญ แจแแแ แต แแญแแซแต แ แแซแซแ แญแฅแฐแณแธแ แแแ แตแแแ แแแกแก แฅแแ แแฌ แตแแตแจแต แแแแซ แจแปแแแ แต แแแ แแญแแซแต แฅแ แณแญแถแฝ แแญ แจแแแฃแณ แแตแแต แตแแแแญ แ แแณแแต แแแญ แแแ แแ แซแ แ แแ::
แแแตแแ แแแฉ แตแจแถแฝ แฒแแ แฉ Axial Load แฅแป แฅแแฒแธแจแ แแ แบแญแ แแแแต แแธแจแ แ แญแฝแแ - Axial แแญแตแ แจแแธแจแแต แจแแแฃแแ แแต แแฅแณ แแแแแธแ แแญแ joint แแญ แฒแซแแฃแธแ แฅแป แแ:: แญแ แ แจแแญแฑ แแ แแฐ แแแ แฎแฝ แแถ แจแ แแ แแฐ แฎแแ แแญแ แขแ แจแแแฐแ - แณแญแต แแญ แแ แแญแแแ แแแ แแแ แฎแน แแญ แฒแ แญแฑแต แญแณแซแ - joint แแญ แแ แแ แจแต แแญแ แแณแฐแญ แซแแ แต - แณแญแต แแญ แจแแฐแจแแ แจแณแญแแต แแช แแ แแญแแ แแแต แแญแ แแแฅ แซแแฃแธแ แ แซแฃแขแแฝ แญแ แแแญ แ แณแณแข แฅแ แฃแฐแแ แแซแฐแญแต แญแฝแแแกแก
Share Share Share
๐4
๐แตแ Road structure components @COTMp
.
*Super Elevation = แจแแแแต Curve แแญ แแชแแ แจแแแแฑ
แแช แจแแแตแตแ Centrifugal Force แแแแแ แจแ แตแแแฑ
แจแญแญ แแชแซแแ แจแ แฐแฐแญแ แญแฐแซแ - แแนแแฉแ แแพแตแ แญแฐแฃแ แฅแแฒแแ แ แแณแ แแ แต แแ แฃแฐแแ แญแแแณแแกแก
.
*Pavement Crown = แแแณแฝ แฐแฅแ แจแ แตแแแฑ แแแ แจแณแญแแน แญแแ แจแ แฐแฐแญแ แญแฐแซแ แจแแฐแซ แฎแแแแแต แแแข แแแฝแ components แจแแญ แ แแญแธแฉ แฅแแฐแแณแฉแต แฒแแญแ แฐแฐแญแแแ
.
แแแแ แฅแแฒแณแจแต แแตแถแนแ SHARE แ แตแญแแแแข
.
*Super Elevation = แจแแแแต Curve แแญ แแชแแ แจแแแแฑ
แแช แจแแแตแตแ Centrifugal Force แแแแแ แจแ แตแแแฑ
แจแญแญ แแชแซแแ แจแ แฐแฐแญแ แญแฐแซแ - แแนแแฉแ แแพแตแ แญแฐแฃแ แฅแแฒแแ แ แแณแ แแ แต แแ แฃแฐแแ แญแแแณแแกแก
.
*Pavement Crown = แแแณแฝ แฐแฅแ แจแ แตแแแฑ แแแ แจแณแญแแน แญแแ แจแ แฐแฐแญแ แญแฐแซแ แจแแฐแซ แฎแแแแแต แแแข แแแฝแ components แจแแญ แ แแญแธแฉ แฅแแฐแแณแฉแต แฒแแญแ แฐแฐแญแแแ
.
แแแแ แฅแแฒแณแจแต แแตแถแนแ SHARE แ แตแญแแแแข
๐3
๐ แฅแตแฒ แฃแแ แฐแ แตแ Sheet Pile Wall แตแแฝ แฅแแแแซแนแข @COTMp
.
*แฅแแแ แ แจแแญ แจแแณแฉแตแ แแตแ Sheet Pile แญแฃแแ แฅแแแ แฒแตแฐแแฝ แ แแซแซแ แ แแต แแฅ แแตแแณ/wall แแแแแฃแต แฅแแ แแแฃแธแแแแกแก
*Sheet pile แแ แฅแแฐ Retaining wall, cofferdam แฅแ แฐแแณแณแญ แจ แแตแแณ แตแตแซแญแธแฎแฝ แแแแแฃแต แแแ แแแฃแธแ แฅแแฝแแแแกแก *แจแฐแแฐแแ แ แซแแธแ แแฌแต แแตแฅ แจแแแ แจแแ pile driving แแบแ แ แแ แแ แแแกแก แ แจแแญ แแถ แจแแณแจแ Larson/ U Type แญแฃแแ::
โแแแแ แฅแแฒแณแจแต แแตแถแนแ SHARE แ แตแญแแแแข
๐๐๐๐๐
Join for more updates via the link below;
t.me/COTMp
๐๐๐๐๐
.
*แฅแแแ แ แจแแญ แจแแณแฉแตแ แแตแ Sheet Pile แญแฃแแ แฅแแแ แฒแตแฐแแฝ แ แแซแซแ แ แแต แแฅ แแตแแณ/wall แแแแแฃแต แฅแแ แแแฃแธแแแแกแก
*Sheet pile แแ แฅแแฐ Retaining wall, cofferdam แฅแ แฐแแณแณแญ แจ แแตแแณ แตแตแซแญแธแฎแฝ แแแแแฃแต แแแ แแแฃแธแ แฅแแฝแแแแกแก *แจแฐแแฐแแ แ แซแแธแ แแฌแต แแตแฅ แจแแแ แจแแ pile driving แแบแ แ แแ แแ แแแกแก แ แจแแญ แแถ แจแแณแจแ Larson/ U Type แญแฃแแ::
โแแแแ แฅแแฒแณแจแต แแตแถแนแ SHARE แ แตแญแแแแข
๐๐๐๐๐
Join for more updates via the link below;
t.me/COTMp
๐๐๐๐๐
๐1
๐แ แแตแฅ แแตแแญ แแฐแ แจแ
แแ แแแฝ @COTMp
*แฅแซแ แฆ "แแแฅ (rainfall) แแแ แ cm/ mm แญแแซแ ?"
.
แแแตแฆ แจแแแซแ แจแแแฅ แแ แ แ แฅแญแแฅ (actual) แจแแแฅ แแ แ แ แญแฐแแแข แแแฅ แฒแแซ แ cm/mm แจแแแซแแค แแแฅ
แ แแแแฅแ แต แแ แต แจแแแแ แ แแแฅ แ แแญแ แแแญ แจแแแฐแตแฃ
แแฐ แ แแญ แแตแฅ แจแแตแจแ แฅแ แ แแ แแแญ แจแแฃแจแ แ แแฐแแ
แจแแแ แ แแแฅ แขแ แซแแ แจแแแฅแจแ แฅแแแต (depth) แแแข
แญแ แแแต 100cm แแแฅ แฐแแแแ แขแฃแ แจแแแ แ แแแฅ
แจแตแญแแต แฅแ แ แแญแ แแแญ แจแแแฐแ แขแณแแฅ (แแญแ แ แณแแญ แฅแแ แซแ แแ) แจ100cm แฅแแแต แ แแ แแแต แแแข แแญแ
*The depth of the resulting rain is the thickness of
the total rainwater layer. Depth and thickness are
distances are they not? That is why centimeters are their unit.
*แฅแซแ แฆ "แแแฅ (rainfall) แแแ แ cm/ mm แญแแซแ ?"
.
แแแตแฆ แจแแแซแ แจแแแฅ แแ แ แ แฅแญแแฅ (actual) แจแแแฅ แแ แ แ แญแฐแแแข แแแฅ แฒแแซ แ cm/mm แจแแแซแแค แแแฅ
แ แแแแฅแ แต แแ แต แจแแแแ แ แแแฅ แ แแญแ แแแญ แจแแแฐแตแฃ
แแฐ แ แแญ แแตแฅ แจแแตแจแ แฅแ แ แแ แแแญ แจแแฃแจแ แ แแฐแแ
แจแแแ แ แแแฅ แขแ แซแแ แจแแแฅแจแ แฅแแแต (depth) แแแข
แญแ แแแต 100cm แแแฅ แฐแแแแ แขแฃแ แจแแแ แ แแแฅ
แจแตแญแแต แฅแ แ แแญแ แแแญ แจแแแฐแ แขแณแแฅ (แแญแ แ แณแแญ แฅแแ แซแ แแ) แจ100cm แฅแแแต แ แแ แแแต แแแข แแญแ
*The depth of the resulting rain is the thickness of
the total rainwater layer. Depth and thickness are
distances are they not? That is why centimeters are their unit.
๐For Fun ... @COTMp
.
Question. : - What did the Steel say to the Concrete?
Answer. : - Don't take the Tension Bro.
.
*Column to Beam
Hey Bro, Whats up??
Beam: just enjoying "Moments"
.
*What did Reinforcement say to Concrete?
Just give me a Cover Bro!
.
*Coarse Aggregate to Sand: How are you, Bro?.
Sand: I am fine
.
โThe uniqueness of this joke can be understood
only by *CONSTRUCTION ENGINEERS...*
.
Question. : - What did the Steel say to the Concrete?
Answer. : - Don't take the Tension Bro.
.
*Column to Beam
Hey Bro, Whats up??
Beam: just enjoying "Moments"
.
*What did Reinforcement say to Concrete?
Just give me a Cover Bro!
.
*Coarse Aggregate to Sand: How are you, Bro?.
Sand: I am fine
.
โThe uniqueness of this joke can be understood
only by *CONSTRUCTION ENGINEERS...*
๐7๐2
๐ แแต แฐแจแณแฎแปแฝแ แฅแตแฒ แฃแแ แฐแ แจ @COTMp "Tip" แญแแ...
.
*แแณแแดแช แแ แ (installation) แจแแซแตแแแ แจแฃแ แคแต แตแณแแณแญแต
.
*Standards for bathroom and toilet.
.
*แแณแแดแช แแ แ (installation) แจแแซแตแแแ แจแฃแ แคแต แตแณแแณแญแต
.
*Standards for bathroom and toilet.