๐Ÿ‘‰WHAT IS DAMP PROOF MEMBRANE (DPM)?

๐ŸšงA damp proof membrane (DPM) is a thin, sheet material used to prevent moisture transmission. Typically, a damp proof membrane is a polyethylene sheet laid under a concrete slab to prevent the concrete from gaining moisture from the ground.

๐ŸทWhy is Damp Proof Membrane Important?

๐Ÿ’ซA damp-proof membrane is an essential tool during construction to enable safety and prevent rising dampness and damage By carefully placing the DPM under concrete during construction, you can prevent a series of issues.

๐ŸทHere's a list of potential issues that would arise if a DPM is not installed:

โบMould Growth
โบFungal Decay
โบSkirting boards in complete disrepair
โบDecolourisation of wallpapers
โบDamp patches along the wall

@etconp
๐Ÿ‘11โค3
๐Ÿ‘‰แ‹จแ‰ฃแˆ•แˆญ แ‹ณแˆญ แ‹“แˆˆแˆ แŠ แ‰€แ แˆตแ‰ณแ‹ฒแ‹จแˆ แŒแŠ•แ‰ฃแ‰ณ แŠฅแŠ•แ‹ฒแŒ แŠ“แ‰€แ‰… แˆ›แˆณแˆณแˆฐแ‰ขแ‹ซ แ‰ฐแˆฐแŒ 

๐Ÿšงแ‹จแ‰ฃแˆ•แˆญ แ‹ณแˆญ แ‹“แˆˆแˆ แŠ แ‰€แ แˆตแ‰ณแ‹ฒแ‹จแˆ แŒแŠ•แ‰ฃแ‰ณ แŠฅแŠ•แ‹ฒแŒ แŠ“แ‰€แ‰… แ‹จแˆดแ‰ถแ‰ฝแฃ แˆ…แŒปแŠ“แ‰ต แŠฅแŠ“ แˆ›แŠ…แ‰ แˆซแ‹Š แŒ‰แ‹ณแ‹ญ แ‰‹แˆš แŠฎแˆšแ‰ด แˆ›แˆณแˆณแˆฐแ‰ขแ‹ซ แˆฐแŒ แข

๐Ÿ’ซแŠ แˆšแŠฎ แŠฅแŠ•แ‹ฐแ‹˜แŒˆแ‰ แ‹ แ‰ แŠ แˆ›แˆซ แŠญแˆแˆ แˆแŠญแˆญ แ‰คแ‰ต แ‹จแˆดแ‰ถแ‰ฝแฃ แˆ•แŒปแŠ“แ‰ต แŠฅแŠ“ แˆ›แŠ…แ‰ แˆซแ‹Š แŒ‰แ‹ณแ‹ญ แ‰‹แˆš แŠฎแˆšแ‰ด แ‹จแ‹ˆแŒฃแ‰ถแ‰ฝ แŠฅแŠ“ แˆตแ–แˆญแ‰ต แ‰ขแˆฎ แ‹จ2016 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แ‹จแˆฅแˆซ แŠ แˆแŒปแŒธแˆ แŒˆแˆแŒแˆŸแˆแข

โญ๏ธแ‹จแ‰ขแˆฎแ‹ แŠƒแˆ‹แŠ แŠฅแˆญแ‹šแ‰… แŠขแˆฃ แˆชแ–แˆญแ‰ต แ‹ซแ‰€แˆจแ‰ก แˆฒแˆ†แŠ•แฅ แˆชแ–แˆญแ‰ฑแŠ• แ‹ซแ‹ณแˆ˜แŒกแ‰ต แ‹จแ‰‹แˆš แŠฎแˆšแ‰ด แŠ แ‰ฃแˆ‹แ‰ตแˆ แ‹จแ‰ฃแˆ•แˆญ แ‹ณแˆญ แ‹“แˆˆแˆ แŠ แ‰€แ แˆตแ‰ณแ‹ฒแ‹จแˆ แŒแŠ•แ‰ฃแ‰ณ แ‰ แ‹จแ‹“แˆ˜แ‰ฑ แ‰ แŒ€แ‰ต แŠฅแ‹จแ‰ฐแ‹ซแ‹˜แˆˆแ‰ต แАแŒˆแˆญ แŒแŠ• แŠ แˆˆแˆ˜แŒ แŠ“แ‰€แ‰ แŠ แˆณแˆณแ‰ข แŠฅแŠ•แ‹ฐแˆ†แА แŠ แŠ•แˆตแ‰ฐแ‹‹แˆแข

๐ŸทแŒแŠ•แ‰ฃแ‰ณแ‹ แ‰ตแŠฉแˆจแ‰ต แ‰ฐแˆฐแŒฅแ‰ถแ‰ต แŠฅแŠ•แ‹ฒแŒ แŠ“แ‰€แ‰…แˆ แˆ›แˆณแˆฐแ‰ขแ‹ซ แˆฐแŒฅแ‰ฐแ‹‹แˆแข

Via Arada Fm

@etconp
๐Ÿ‘9โค1
Consider the following theories of failure.

1. Maximum principal stress theory 2 Maximum strain theory 3. Maximum shear stress theory 4. Maximum distortion energy theory The most suitable for ductile materials is
Anonymous Quiz
34%
1 and 2
28%
3 and 4
26%
1 and 3
11%
1 and 4
๐Ÿ‘11โค2
โœจSecure your home or business effortlessly with the Tessa Assa Abloy door lock. This modern lock combines advanced security features with easy-to-use keyless entry and smart connectivity. Enjoy peace of mind knowing your property is protected by the trusted expertise of Assa Abloy. Choose Tessa for a blend of safety, style, and simplicity.

๐Ÿ“Head Office
Location: Derar Mall 9th floor opposite to Sahlite Mihret Church

๐Ÿ“ฑ +251 929 53 1707

#ethiopia #theklinker #ektceramics #construction #admixture #ceramic #paint #sika #jotun #aquapa #primacera #hanbon #tesaassaabloy #spc #tiles #pprpipe #doorlock #sanitarywares #buildingmaterials
๐Ÿ†2
# 1 แ‰€แŠ• แ‰ฅแ‰ป แ‰€แˆจ๐Ÿ˜Š๐Ÿ˜Š
แАแŒˆ แ‰…แ‹ณแˆœ แ‹ญแŒ€แˆแˆซแˆ (แˆ€แˆแˆŒ _13)

Price
Ms_project  3000    2200 birr๐Ÿ˜ฑ
Primavera    2800    2300๐Ÿ˜ฑ
Auto_CAD   4200
    2000๐Ÿ˜ฑ
ETABS          2800    2100๐Ÿ˜ฑ


๐Ÿ‘ฉโ€๐Ÿฆฝ๐Ÿ‘ฉโ€๐Ÿฆฏ๐Ÿƒ๐Ÿƒโ€โ™€Come and learn

For more information contact us
๐Ÿ‘‰  0993749494
@YEHAEngineering
๐ŸŒ http://yehaengineeringplc.com

#training #traininginstitute #structuraldesign #engineering #engineeringsoftware #autocad #civilsoftwaretraining #etabs #constructionsoftware #civil


แ‹ญแŠจแ‰ฐแˆ‰แŠ•๐Ÿ‘‰ Telegram | Instagram | Facebook | LinkedIn | Twitter | Tumblr


#Address:- Mexico  around st. lideta, แŒแ‹›แŠญ แ‹จแŒˆแ‰ แ‹ซ แˆ›แ‹•แŠจแˆ 7th floor, #701

"Let's walk what we talk!"
๐Ÿ‘4๐Ÿ‘Œ4โค2
๐Ÿ‘‰What Is Bearing Capacity Of Soil?

๐ŸšงThe maximum load per unit area which the soil can carry without any settlement or displacement is termed as bearing capacity of the soil.

๐ŸทBearing capacity of soil is determined by the following two methods:-

1. Dropping weight method.
2. Slowly applying load method.

๐Ÿ’ซUltimate Bearing Capacity Of Soil:

โบThe minimum load on unit area causing failure is called the ultimate bearing capacity of the soil.

๐ŸŒŸSafe Bearing Capacity Of Soil:

โบThe maximum intensity of loading that the soil will safely carry without the risk of shear failure is called safe bearing capacity of the soil.

โบIt is obtained by dividing the ultimate bearing capacity by a certain factor of safety which is used in the design of foundation.

โ–ถ๏ธThe value of factor of safety varies from 2 to 3 depending upon the nature of the soil.

โ‡๏ธMaximum Safe Bearing Capacity Of Different Types Of Soil:

1. Soft, wet clay or muddy clay โ€” 5,000 kg/m2
2. Soft clay  โ€” 10,000 kg/m2
3. Fine, loose and dry sand  โ€” 10,000 kg/m2
4. Black cotton soil  โ€” 15,000 kg/m2
5. Moist clay and sand clay Mixture โ€” 15,000 kg/m2
6. Loose gravel โ€” 25,000 kg/m2
7. Medium clay โ€” 25,000 kg/m2
8. Medium, compact and dry sand โ€” 25,000 kg/m2
9. Compact clay โ€” 45,000 kg/m2
10. Compact sand โ€” 45,000 kg/m2
11. Compact gravel โ€” 45,000 kg/m2
12. Soft rocks โ€” 45,000 kg/m2
13. Laminated rock such as sand stone &  Lime stone โ€” 165,000 kg/m2
14. Hard rocks such as granite, diorite, trapโ€“  330,000 kg/m2

@etconp
๐Ÿ‘23โค2๐Ÿ‘1๐Ÿ˜ข1
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ‘‰แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‹จแˆšแ‹ซแŒˆแŠ™แ‰ แ‰ต แŠฅแŠ“ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

๐Ÿ”ฐแˆแŠ• แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โœ‚๏ธแˆ‹แˆœแˆซ แˆ›แˆตแ‰†แˆซแˆจแŒฅ แˆ›แˆตแ‰ แˆณแ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠจแˆแˆˆแŒ‰  แŠฅแŠ•แ‹ณแ‹ซแˆตแ‰ก แˆแˆ‰แŠ•แˆ แˆ›แˆฝแŠ–แ‰ฝ แŠ แˆตแŒˆแ‰ฅแ‰ฐแŠ“แˆ

๐Ÿ”—แŒแˆฎ (แ‰ถแŠ•แ‹ฒแŠ–) แŒฅแˆญแˆต แˆ›แˆตแ‰ แŒ€แ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠซแˆฐแ‰ก แˆˆแˆฑแˆ แˆ›แˆฝแŠ‘ แ‰ แŒƒแ‰ฝแŠ• แАแ‹‰

๐Ÿ“แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแˆฐแˆฉ แ‰ฅแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแˆ แŠ แˆ‰แŠ•

โ˜Ž๏ธแ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

แŠ แ‹ตแˆซแˆปแ‰ฝแŠ•แฆ แ‰.1 แŠ แ‹‰แ‰ถแ‰ฅแˆต แ‰ฐแˆซ(แˆ˜แˆณแˆˆแˆšแ‹ซ)
                    แ‰.2 แˆ˜แˆญแŠซแ‰ถ
                    แ‰.3 แ‰ฐแŠญแˆˆแˆ€แ‹ญแˆ›แŠ–แ‰ต

0904040477
0911016833
๐Ÿ‘1
๐Ÿ‘‰Waffle Slab

๐ŸšงWaffle slab is a reinforced concrete roof or floor containing square grids with deep sides and it is also called as grid slabs.

โ–ถ๏ธThis kind of slab is majorly used at the entrance of hotels, Malls, Restaurants for good pictorial view and to install artificial lighting.

โ–ถ๏ธThis a  type of slab where we find a hollow hole in the slab when the formwork is removed.  Firstly PVC trays (pods) are placed on shuttering then reinforcement is provided between the pods and steel mesh is provided at top of the pods and then concrete is filled. After concrete sets, the formwork is removed and PVC pods are not removed.

โ–ถ๏ธThis forms a hollow hole in it in which hole is closed at one end.

โ–ถ๏ธThe concrete waffle slab is often used for industrial and commercial buildings while wood and metal waffle slabs are used in many other construction sites.

โ–ถ๏ธThis is one of the types of concrete slabs.

๐Ÿ’ซWhere to use Waffle Slab & Waffle slab details:

โบA waffle slab has a holes underneath, giving an appearance of waffles.

โบIt is usually used where large spans are required (e.g auditorium, cinema halls) to avoid many columns interfering with space. Hence thick slabs spanning between wide beams (to avoid the beams protruding below for aesthetic reasons) are required.

โบThe main purpose of employing this technology is for its strong foundation characteristics of crack and sagging resistance.

โบWaffle slab also holds a greater amount of load compared with conventional concrete slabs.

๐Ÿ”ฐTypes of Waffle slabs:

โ–ถ๏ธBased on the shape of Pods (PVC Trays) waffle slabs are classified into the following types:

โนTriangular pod system and
Square pod system

๐ŸŽฒAdvantages of Waffle slabs:

โ‡๏ธWaffle slabs are able to carry heavier loads and span longer distances than flat slabs as these systems are light in weight.

โ‡๏ธWaffle slab can be used as both ceiling and floor slab.
Suitable for spans of 7m โ€“ 16m; longer spans may be possible with post-tensioning.

โ‡๏ธThese systems are light in weight and hence considerable saving is ensured in the framework as the light framework is required

๐ŸทDisadvantages of Waffle slabs:

โบWaffle slab is not used in typical construction projects.

โบThe casting forms or moulds required for precast units are very costly and hence only economical when large scale production of similar units are desired.

โบConstruction requires strict supervision and skilled labour.

@etconp
๐Ÿ‘9โค2
Soundness of aggregate test is important for which of the following types of atmosphere conditions?
Anonymous Quiz
26%
Concrete exposed to action of sunlight
15%
Concrete exposed to action of rain
29%
Concrete exposed to action of water
30%
Concrete exposed to action of frost
๐Ÿ‘11๐Ÿ™3
๐Ÿ‘‰TYPES OF CLAIMS

๐Ÿ’ซChange Order Claims

โญ๏ธClaims for additional compensation or time due to changes in the scope of work.

โบThese changes can be initiated by the owner or discovered during construction.

๐Ÿ’ซDelay Claims

โญ๏ธClaims for additional time or compensation due to delays. These can be caused by the owner, contractor, subcontractors, suppliers, or external factors such as weather.

๐Ÿ’ซDisruption Claims

โญ๏ธClaims arising from events that disrupt the planned work sequence, leading to inefficiencies and increased costs.

๐Ÿ’ซAcceleration Claims

โญ๏ธClaims for additional costs incurred when a contractor is required to speed up work to meet deadlines, often due to delays for which they are not responsible.

๐Ÿ’ซDiffering Site Conditions Claims

โญ๏ธClaims due to unexpected site conditions that differ significantly from those described in the contract documents or reasonably anticipated.

๐Ÿ’ซDefective Work Claims

โญ๏ธClaims related to the repair or replacement of defective or non-conforming work.

๐Ÿ’ซBreach of Contract Claims

โญ๏ธClaims arising from one party not fulfilling their contractual obligations, such as failure to pay, poor workmanship, or not meeting deadlines.

๐Ÿ’ซTermination Claims

โญ๏ธClaims resulting from the termination of the contract, whether for convenience or cause.

๐Ÿ’ซPayment Claims

โญ๏ธClaims for non-payment or delayed payment for work completed or materials supplied.

๐Ÿ’ซForce Majeure Claims

โญ๏ธClaims for delays or additional costs due to unforeseen events beyond the parties' control, such as natural disasters or political instability.

๐Ÿ’ซWarranty Claims

โญ๏ธClaims arising from defects discovered after project completion during the warranty period.

๐Ÿ’ซMisrepresentation Claims

โญ๏ธClaims based on incorrect or misleading information provided by one party that leads to increased costs or delays.

๐Ÿ’ซSubcontractor Claims

โญ๏ธClaims made by subcontractors against the main contractor or vice versa, are often related to payment issues or scope changes.

๐Ÿ’ซProlongation Claims

โญ๏ธProlongation claims refer to the claim for additional costs incurred by a contractor due to extending the project duration beyond the originally agreed-upon completion date.

@etconp
๐Ÿ‘27โค4
The surface width of cracks should not normally exceed in case of very aggressive
Anonymous Quiz
22%
0.1 mm
34%
3 mm
27%
0.2 mm
16%
0.3 mm
๐Ÿ‘18โค1๐Ÿ˜ข1
๐Ÿ‘10โค6
๐Ÿ‘‰แ‹จแˆ˜แŠ–แˆชแ‹ซ แ‰คแ‰ต แ‰ฝแŒแˆญแŠ• แˆˆแˆ˜แ‰…แˆจแ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ แˆ˜แˆญแˆ แŒแ‰ฅแˆฎแ‰ฝแŠ• แАแ‹ตแแ‹ซแˆˆแˆ - แŠฎแˆญแ–แˆฌแˆฝแŠ‘

แ‰ แŠจแ‰ฐแˆžแ‰ฝ แ‹จแˆšแˆตแ‰ฐแ‹‹แˆˆแ‹แŠ• แ‹จแˆ˜แŠ–แˆชแ‹ซ แ‰คแ‰ต แ‰ฝแŒแˆญ แˆˆแˆ˜แ‰…แˆจแ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ แˆ˜แˆญแˆ แŒแ‰ฅแˆฎแ‰ฝแŠ• แˆ˜แŠ•แ‹ฐแ‰แŠ• แ‹จแŒแ‹ฐแˆซแˆ แ‰คแ‰ถแ‰ฝ แŠฎแˆญแ–แˆฌแˆฝแŠ• แŠ แˆตแ‰ณแ‹ˆแ‰€แกแก

แˆ˜แˆญแˆ แŒแ‰ฅแˆฎแ‰นแŠ• แ‰ฐแŒแ‰ฃแˆซแ‹Š แˆˆแˆ›แ‹ตแˆจแŒ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แŠ แ‰…แˆ™แŠ• แˆˆแˆ›แŒ แŠ“แŠจแˆญ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ‰ แˆฅแˆซแ‹Žแ‰ฝแŠ• แŠฅแ‹ซแŠจแŠ“แ‹ˆแА แˆ˜แˆ†แŠ‘แŠ• แŠฎแˆญแ–แˆฌแˆฝแŠ‘ แ‰ 2016 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แŠ แˆแƒแ€แˆแŠ“ แ‰ 2017 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แŠฅแ‰…แ‹ต แˆ‹แ‹ญ แ‰ฃแ‹ฐแˆจแŒˆแ‹ แ‹แ‹ญแ‹ญแ‰ต แˆ‹แ‹ญ แŠ แˆตแ‰ณแ‹แ‰‹แˆแกแก

แ‰ แ‰ฐแŒ แŠ“แ‰€แ‰€แ‹ แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แŠฎแˆญแ–แˆฌแˆฝแŠ‘ 4 แАแŒฅแ‰ฅ 2 แ‰ขแˆŠแ‹จแŠ• แ‰ฅแˆญ แŒˆแ‰ข แˆ›แŒแŠ˜แ‰ฑแŠ•แŠ“ แ‹จแŠฎแˆชแ‹ฐแˆญ  แˆแˆ›แ‰ต แŠ แŠซแˆ แ‰ แˆ†แŠ‘ แ‹จแŠฎแˆญแ–แˆฌแˆฝแŠ‘ แˆ•แŠ•แŒปแ‹Žแ‰ฝแŠ“ แ‹ญแ‹žแ‰ณแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‹จแ‹•แ‹ตแˆณแ‰ตแŠ“ แ‹จแˆ›แˆตแ‹‹แ‰ฅ แˆฅแˆซ แˆ˜แˆตแˆซแ‰ฑ แ‰ฐแˆ˜แˆ‹แŠญแ‰ทแˆแกแก

แŒแŠ•แ‰ฃแ‰ณแ‰ธแ‹ แ‹จแ‰ฐแŒ แŠ“แ‰€แ‰ แˆ•แŠ•แŒปแ‹Žแ‰ฝ แ‹ˆแ‹ฐ แŠ แŒˆแˆแŒแˆŽแ‰ต แŠฅแŠ•แ‹ฒแŒˆแ‰ก แˆ˜แ‹ฐแˆจแŒ‰แŠ•แŠ“ แ‰ แˆ˜แŒ แŠ“แ‰€แ‰… แˆ‹แ‹ญ แ‹จแˆšแŒˆแŠ™ แŒแŠ•แ‰ฃแ‰ณแ‹Žแ‰ฝ แ‹ฐแŒแˆž แ‹จแˆ›แŒ แŠ“แ‰€แ‰‚แ‹ซ แˆตแˆซแ‹Žแ‰ฝ แ‰ แแŒฅแАแ‰ต แŠฅแ‹จแ‰ฐแŠจแŠ“แ‹ˆแŠ‘ แˆ˜แˆ†แŠ‘แŠ• แŒˆแˆแŒฟแˆแกแก 

แ‰ แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แŠจแ‰ฐแˆ› แŠจ86 แ‰ แˆ‹แ‹ญ แˆ…แŠ•แƒแ‹Žแ‰ฝแŠ• แ‰ แˆ›แ‹ฐแˆต แ‹จแŠจแ‰ฐแˆ›แ‹‹แŠ• แˆ˜แˆตแˆแˆญแ‰ต แŠฅแŠ•แ‹ฒแ‹ซแˆŸแˆ‰แŠ“ แ‹แ‰ฅ แŒˆแŒฝแ‰ณ แŠฅแŠ•แ‹ฒแˆ‹แ‰ แˆฑ แˆ›แ‹ตแˆจแŒ แˆ˜แ‰ปแˆ‰แˆ แ‰ฐแАแˆตแ‰ทแˆแกแก

แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒแ‰ฅแ‹“แ‰ต แŠฅแŒฅแˆจแ‰ตแŠ• แˆ›แ‰ƒแˆˆแˆ แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ‰ แ‰ฅแˆŽแˆ แŠฅแŠ•แ‹ฐแˆ€แŒˆแˆญ แ‰ฐแŒจแˆ›แˆช แŠ แ‰…แˆ แˆ˜แˆ†แŠ• แ‹จแˆšแ‰ฝแˆ แ‹จแŠ แˆญแˆ›แ‰ณ แ‹แˆ…แ‹ตแŠ“ แ‰ฅแˆŽแŠฌแ‰ต แˆ›แˆแˆจแ‰ป แˆ›แ‹•แŠจแˆแŠ• แ‰ฐแŠจแˆ‹แ‹แŠ• แ‰ แˆ›แŒ แŠ“แ‰€แ‰… แ‹ˆแ‹ฐ แˆฅแˆซ แˆ›แˆตแŒˆแ‰ฃแ‰ต แˆ˜แ‰ปแˆ‰แˆ แ‰ฐแŒˆแˆแŒฟแˆแกแก

Via FBC

@etconp
๐Ÿ‘14๐Ÿ˜ข3โค1๐Ÿ•Š1
๐Ÿ‘‰แ‰ แ‰ปแ‹ญแŠ“ แ‰ แ‹ฐแˆจแˆฐ แ‹จแ‹ตแˆแ‹ตแ‹ญ แˆ˜แ‹ฐแˆญแˆ˜แˆต แŠ แ‹ฐแŒ‹ 11 แˆฐแ‹Žแ‰ฝ แˆฒแˆžแ‰ฑ 30 แˆฐแ‹Žแ‰ฝ แ‹ฐแ‰ฅแ‹›แ‰ธแ‹ แŒ แ‹

๐Ÿšงแ‰ แ‰ปแ‹ญแŠ“ แˆปแŠ•แ‹ข แŒแ‹›แ‰ต แ‰ แ‹ฐแˆจแˆฐ แ‹จแ‹ตแˆแ‹ตแ‹ญ แˆ˜แ‹ฐแˆญแˆ˜แˆต แŠ แ‹ฐแŒ‹ 11 แˆฐแ‹Žแ‰ฝ แˆฒแˆžแ‰ฑ 30 แˆฐแ‹Žแ‰ฝ แ‹ฐแ‰ฅแ‹›แ‰ธแ‹ แŒ แแ‰ทแˆแกแก

โญ๏ธแ‰ แˆปแŠ•แ‹ข แŒแ‹›แ‰ต แˆปแŠ•แŒแˆŽ แŠจแ‰ฐแˆ› แ‰ แŠจแ‰ฃแ‹ต แŒŽแˆญแ แˆแŠญแŠ•แ‹ซแ‰ต แ‹ตแˆแ‹ตแ‹ญ แ‰ฐแ‹ฐแˆญแˆแˆถ แ‰ฐแˆฝแŠจแˆญแŠซแˆชแ‹Žแ‰ฝ  แŠจแ‹ตแˆแ‹ตแ‹ฉ แ‰ แ‰ณแ‰ฝ แ‹ˆแ‹ฐแˆšแŒˆแŠ˜แ‹ แ‹ˆแŠ•แ‹ แ‹แˆตแŒฅ แ‹ˆแ‹ตแ‰€แ‹‹แˆแกแก

๐Ÿ’ซแ‰ แŠ แ‹ฐแŒ‹แ‹ แ‹ˆแ‹ฐ แ‹ˆแŠ•แ‹ แ‹จแ‹ˆแ‹ฐแ‰ แˆ˜แŠชแŠ–แ‰ฝ แ‰แŒฅแˆญ แ‰ฃแ‹ญแ‰ณแ‹ˆแ‰…แˆ แŠฅแˆตแŠซแˆแŠ• แŠ แˆแˆตแ‰ต แ‰ฐแˆฝแŠจแˆญแŠซแˆชแ‹Žแ‰ฝ แˆ›แŒแŠ˜แ‰ณแ‰ธแ‹แŠ• แŠฅแŠ“ แˆŒแˆŽแ‰ฝแŠ• แ‹จแˆ›แ‹ณแŠ• แˆฅแˆซ แŠฅแ‹จแˆฐแˆฉ แˆ˜แˆ†แŠ‘แŠ• แ‹จแАแแˆต แŠ แ‹ตแŠ• แ‰กแ‹ตแŠ• แˆฐแˆซแ‰ฐแŠžแ‰ฝ แˆ›แˆตแ‰ณแ‹ˆแ‰ƒแ‰ธแ‹แŠ• แ‹˜ แŒ‹แˆญแ‹ฒแ‹ซแŠ• แ‹˜แŒแ‰งแˆแกแก

๐Ÿทแ‹จแ‰ปแ‹ญแŠ“ แ‰ฅแˆ”แˆซแ‹Š แ‹จแŠฅแˆณแ‰ต แŠ แ‹ฐแŒ‹ แˆ˜แŠจแˆ‹แŠจแˆ แŠฅแŠ“ แАแแˆต แŠ แ‹ตแŠ• แ‰กแ‹ตแŠ• 736 แˆฐแ‹Žแ‰ฝแฃ 76 แ‰ฐแˆฝแŠจแˆญแŠซแˆชแ‹Žแ‰ฝแฃ 18 แŒ€แˆแ‰ฃแ‹Žแ‰ฝ แŠฅแŠ“ 32 แˆฐแ‹ แŠ แˆแ‰ฃ แŠ แ‹แˆฎแ•แˆ‹แŠ–แ‰ฝแŠ• แˆˆแАแแˆต แŠ แ‹ตแŠ• แˆตแˆซแ‹Žแ‰ฝ แ‹ˆแ‹ฐ แ‰ฆแ‰ณแ‹ แˆ˜แˆ‹แŠฉแŠ• แŒˆแˆแŒฟแˆแข

Via walta Addis

@etconp
๐Ÿ‘14๐Ÿ˜ข4โค2๐Ÿ’”1
Intercon Construction Chemicals 
    
๐Ÿ‘‰ Authorized agent of MC (Conmix), Weber and SIMENTEK

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Concrete Repair, Grout   
โ— Tile Adhesive & Tile Joint Fillers 
โ— Wall Putty, Prime Coat, Rush Coat
โ— Quartz, Contextra
โ— Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ— Floor hardener, Epoxy              
โ— Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐Ÿ‘7