๐ทAs construction projects vary in terms of scope, delivery, schedule, budget & parties involved, there isnโt one-size-fits-all approach to contracts between owners & contractors
๐ซ๐๐ก๐ข๐๐ก ๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ ๐๐ฒ๐ฉ๐ ๐๐ฌ ๐๐๐ฌ๐ญ?
It depends, type of contract you & owner agree to use will vary based on job requirements & owner needs Using right contract for right kind of project is critical to make sure you stay profitable & protect your company's best interest
โขWell-defined scope=lump sum
โขTransparent/open book=cost+
โขUnclear scope=T&M
โขRepeated work with undefined volume of scope=unit price
โขFixed budget presented by owners=GMP
โขOther 3 are less common & used in specific situations
๐ง๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐ฌ ๐๐ฒ๐ฉ๐๐ฌ
โญ๏ธ๐๐ฎ๐ฆ๐ฉ ๐๐ฎ๐ฆ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Fixed price contract is straightforward, establish fixed fee paid for all materials & labor to complete project, place more risk on contractor as it depends on accurate estimate & clear SOW on what is & isnโt included
โญ๏ธ๐๐ฎ๐๐ซ๐๐ง๐ญ๐๐๐ ๐๐๐ฑ๐ข๐ฆ๐ฎ๐ฆ ๐๐ซ๐ข๐๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ (๐๐๐)
Similar to lump sum, but owner can benefit from cost saving if final cost is under budget & any cost come up exceeding max amount is contractor responsibility
You act as construction manager at risk (CMAR) who must diligently oversee project to ensure actual cost not exceeding budget
โญ๏ธ๐๐จ๐ฌ๐ญ-๐๐ฅ๐ฎ๐ฌ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Reimburse for all costs+markup during construction. Isn't blank check, typically require estimate at project start so owner knows what to expect
โญ๏ธ๐๐ข๐ฆ๐ & ๐๐๐ญ๐๐ซ๐ข๐๐ฅ๐ฌ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ(๐&๐)
Owner reimburse for agreed-upon price for time & materials+profit margin, allowing for flexibility in cost of materials & labor rates
โญ๏ธ๐๐ง๐ข๐ญ ๐๐ซ๐ข๐๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Owner pay based on agreed-upon rate/unit for labor, materials, supplies, overhead cost & profit where volume of units needed is unknown & it provides transparency of costs for additional labor & material
โญ๏ธ๐๐๐ฌ๐ข๐ ๐ง-๐๐ฎ๐ข๐ฅ๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Instead of addressing design & construction as two separate processes, design-build contract addresses both sides simultaneously speeding up process but can lead to higher cost eliminating competitive bidding phase.
โญ๏ธ๐๐ง๐๐๐ง๐ญ๐ข๐ฏ๐ ๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Provide incentive if project delivered by certain date & under agreed-upon cost, help create collaborative process but require more negotiations to determine incentives & milestones.
โญ๏ธ๐๐ง๐ญ๐๐ ๐ซ๐๐ญ๐๐ ๐๐ซ๐จ๐ฃ๐๐๐ญ ๐๐๐ฅ๐ข๐ฏ๐๐ซ๐ฒ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ(๐๐๐)
Relatively new to construction industry, multi-party agreement between owner, designer & builder, all stakeholders agree to lump sum profit if project meets its designated financial outcomes spread out risk & rewards, popular for those who want to embrace collaboration
@etconp
๐ทAs construction projects vary in terms of scope, delivery, schedule, budget & parties involved, there isnโt one-size-fits-all approach to contracts between owners & contractors
๐ซ๐๐ก๐ข๐๐ก ๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ ๐๐ฒ๐ฉ๐ ๐๐ฌ ๐๐๐ฌ๐ญ?
It depends, type of contract you & owner agree to use will vary based on job requirements & owner needs Using right contract for right kind of project is critical to make sure you stay profitable & protect your company's best interest
โขWell-defined scope=lump sum
โขTransparent/open book=cost+
โขUnclear scope=T&M
โขRepeated work with undefined volume of scope=unit price
โขFixed budget presented by owners=GMP
โขOther 3 are less common & used in specific situations
๐ง๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐ฌ ๐๐ฒ๐ฉ๐๐ฌ
โญ๏ธ๐๐ฎ๐ฆ๐ฉ ๐๐ฎ๐ฆ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Fixed price contract is straightforward, establish fixed fee paid for all materials & labor to complete project, place more risk on contractor as it depends on accurate estimate & clear SOW on what is & isnโt included
โญ๏ธ๐๐ฎ๐๐ซ๐๐ง๐ญ๐๐๐ ๐๐๐ฑ๐ข๐ฆ๐ฎ๐ฆ ๐๐ซ๐ข๐๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ (๐๐๐)
Similar to lump sum, but owner can benefit from cost saving if final cost is under budget & any cost come up exceeding max amount is contractor responsibility
You act as construction manager at risk (CMAR) who must diligently oversee project to ensure actual cost not exceeding budget
โญ๏ธ๐๐จ๐ฌ๐ญ-๐๐ฅ๐ฎ๐ฌ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Reimburse for all costs+markup during construction. Isn't blank check, typically require estimate at project start so owner knows what to expect
โญ๏ธ๐๐ข๐ฆ๐ & ๐๐๐ญ๐๐ซ๐ข๐๐ฅ๐ฌ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ(๐&๐)
Owner reimburse for agreed-upon price for time & materials+profit margin, allowing for flexibility in cost of materials & labor rates
โญ๏ธ๐๐ง๐ข๐ญ ๐๐ซ๐ข๐๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Owner pay based on agreed-upon rate/unit for labor, materials, supplies, overhead cost & profit where volume of units needed is unknown & it provides transparency of costs for additional labor & material
โญ๏ธ๐๐๐ฌ๐ข๐ ๐ง-๐๐ฎ๐ข๐ฅ๐ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Instead of addressing design & construction as two separate processes, design-build contract addresses both sides simultaneously speeding up process but can lead to higher cost eliminating competitive bidding phase.
โญ๏ธ๐๐ง๐๐๐ง๐ญ๐ข๐ฏ๐ ๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ
Provide incentive if project delivered by certain date & under agreed-upon cost, help create collaborative process but require more negotiations to determine incentives & milestones.
โญ๏ธ๐๐ง๐ญ๐๐ ๐ซ๐๐ญ๐๐ ๐๐ซ๐จ๐ฃ๐๐๐ญ ๐๐๐ฅ๐ข๐ฏ๐๐ซ๐ฒ ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ(๐๐๐)
Relatively new to construction industry, multi-party agreement between owner, designer & builder, all stakeholders agree to lump sum profit if project meets its designated financial outcomes spread out risk & rewards, popular for those who want to embrace collaboration
@etconp
๐10โค6
๐Causes Of Segregation on Concrete
1.) Insufficient compaction to
concrete.
2.) Less cover to reinforcement
bars.
3.) Improper Workability in
concrete
4.) Concrete already set before
placing .
5.) High concrete free fall while
pouring
6.) Form work not watertight/
rigid.
7.) More coarse aggrgegates
than designed mix
proportions and over sized
aggregates.
8.) Improper placement of bars
at column and beam
junction.
9.) Addition of more water than
designed at site for
achieving workability.
10.) Steel congestion not
allowing concrete flow to
all corner.
๐ท แแแแฝแ แฐแซแซแฅ แตแซ แแแธแ แฃแแฐแจแฆแปแฝแ แ แแฉ!
โญ๏ธแฐแจแแช แญแ แ แแ แจแแตแแต๐
แแแแญแถแ แแฅแ แแแแซแต
@etconp
1.) Insufficient compaction to
concrete.
2.) Less cover to reinforcement
bars.
3.) Improper Workability in
concrete
4.) Concrete already set before
placing .
5.) High concrete free fall while
pouring
6.) Form work not watertight/
rigid.
7.) More coarse aggrgegates
than designed mix
proportions and over sized
aggregates.
8.) Improper placement of bars
at column and beam
junction.
9.) Addition of more water than
designed at site for
achieving workability.
10.) Steel congestion not
allowing concrete flow to
all corner.
๐ท แแแแฝแ แฐแซแซแฅ แตแซ แแแธแ แฃแแฐแจแฆแปแฝแ แ แแฉ!
โญ๏ธแฐแจแแช แญแ แ แแ แจแแตแแต๐
แแแแญแถแ แแฅแ แแแแซแต
แดแแแซแ แแญ แจแตแญ แฃแแ แแแญ:
แ t.me/ETCONpBOT
แแณแฃแฝแแ แฅแตแแฉแแแฃ แญแฐแญแฐแแ!
แฅแแ แแแแแ แแแฐแ แฅแแฐแญแณแแ
@etconp
๐33โค3
Ethio Construction Engineering
๐Slab Leak ๐ @etconp
๐A slab leak refers to a water leak that occurs beneath a concrete slab foundation. These leaks can lead to significant damage if not addressed promptly.
๐ทHere are some common reasons for slab leaks, along with descriptions:
๐ซ1. Corrosion of Pipes
- Description: Over time, the pipes (often made of copper) beneath the slab can corrode due to various factors, including water quality (high levels of acidity or alkalinity), chemical reactions, and age. Corrosion weakens the pipes, leading to leaks.
- Causes: This is often exacerbated by the electrolytic action that occurs when different metals are in contact with water.
๐ซ2. Earth Movement
- Description: Shifts in the ground beneath a building can create pressure on the pipes under the slab.
This movement can be due to factors such as settling, soil erosion, or seismic activity.
- Causes: Variations in moisture content in the soil can lead to expansion and contraction, causing the ground to settle unevenly.
๐ซ3. Improper Installation
- Description: If the plumbing pipes were not installed correctly, they may be prone to damage or leaks.
This includes improper joints, inadequate supports, or insufficient protective measures.
- Causes: Poor workmanship or lack of adherence to plumbing codes during construction can lead to long-term issues.
๐ซ4. High Water Pressure
- Description: Excessively high water pressure in the plumbing system can stress the pipes and lead to leaks. It can also cause joints to loosen over time, increasing the risk of leaks.
- Causes: High water pressure may result from municipal supply issues or problems with pressure-reducing valves.
๐ซ5. Temperature Changes
- Description: Fluctuations in temperature can cause pipes to expand and contract. This constant movement can weaken the joints and fittings over time, leading to leaks.
- Causes: Seasonal changes or hot water running through cold pipes can cause significant temperature variations.
๐ซ6. Poor Drainage
- Description: If drainage systems are inadequate or functioning poorly, water can pool around the foundation, increasing pressure on the pipes beneath the slab and leading to leaks.
- Causes: Clogged drains, improperly graded landscapes, or damaged gutters can all contribute to drainage issues.
๐ซ7. Tree Roots
- Description: The infiltration of tree roots into plumbing systems can cause pipes to crack or break. Roots may seek out moisture and can grow into and around pipes, leading to leaks.
- Causes: Trees that are too close to the buildingโs foundation or plumbing systems can inflict structural damage.
๐ซ8. Wear and Tear
- Description: Over time, pipes can simply wear out. The natural aging process can lead to cracks and weakness in the plumbing.
- Causes: Long-term use, along with exposure to various environmental stresses, can lead to pipe deterioration.
๐ซ9. Chemical Reactions
- Description: Certain chemicals found in soils, or chemical reactions between different types of pipe materials, can lead to corrosion or deterioration of pipes.
- Causes: Soil composition, exposure to corrosive chemicals, and improper installation materials can all contribute.
๐Conclusion
โบDetecting a slab leak early is crucial to prevent extensive damage to the foundation and the structure of a building. Signs of a slab leak may include unexplained increases in water bills, the sound of running water in the walls, damp or moldy spots on floors or walls, and hot spots on the floor in cases of hot water line leaks. If a slab leak is suspected, it's important to consult a professional plumber for evaluation and repair.
@etconp
๐ทHere are some common reasons for slab leaks, along with descriptions:
๐ซ1. Corrosion of Pipes
- Description: Over time, the pipes (often made of copper) beneath the slab can corrode due to various factors, including water quality (high levels of acidity or alkalinity), chemical reactions, and age. Corrosion weakens the pipes, leading to leaks.
- Causes: This is often exacerbated by the electrolytic action that occurs when different metals are in contact with water.
๐ซ2. Earth Movement
- Description: Shifts in the ground beneath a building can create pressure on the pipes under the slab.
This movement can be due to factors such as settling, soil erosion, or seismic activity.
- Causes: Variations in moisture content in the soil can lead to expansion and contraction, causing the ground to settle unevenly.
๐ซ3. Improper Installation
- Description: If the plumbing pipes were not installed correctly, they may be prone to damage or leaks.
This includes improper joints, inadequate supports, or insufficient protective measures.
- Causes: Poor workmanship or lack of adherence to plumbing codes during construction can lead to long-term issues.
๐ซ4. High Water Pressure
- Description: Excessively high water pressure in the plumbing system can stress the pipes and lead to leaks. It can also cause joints to loosen over time, increasing the risk of leaks.
- Causes: High water pressure may result from municipal supply issues or problems with pressure-reducing valves.
๐ซ5. Temperature Changes
- Description: Fluctuations in temperature can cause pipes to expand and contract. This constant movement can weaken the joints and fittings over time, leading to leaks.
- Causes: Seasonal changes or hot water running through cold pipes can cause significant temperature variations.
๐ซ6. Poor Drainage
- Description: If drainage systems are inadequate or functioning poorly, water can pool around the foundation, increasing pressure on the pipes beneath the slab and leading to leaks.
- Causes: Clogged drains, improperly graded landscapes, or damaged gutters can all contribute to drainage issues.
๐ซ7. Tree Roots
- Description: The infiltration of tree roots into plumbing systems can cause pipes to crack or break. Roots may seek out moisture and can grow into and around pipes, leading to leaks.
- Causes: Trees that are too close to the buildingโs foundation or plumbing systems can inflict structural damage.
๐ซ8. Wear and Tear
- Description: Over time, pipes can simply wear out. The natural aging process can lead to cracks and weakness in the plumbing.
- Causes: Long-term use, along with exposure to various environmental stresses, can lead to pipe deterioration.
๐ซ9. Chemical Reactions
- Description: Certain chemicals found in soils, or chemical reactions between different types of pipe materials, can lead to corrosion or deterioration of pipes.
- Causes: Soil composition, exposure to corrosive chemicals, and improper installation materials can all contribute.
๐Conclusion
โบDetecting a slab leak early is crucial to prevent extensive damage to the foundation and the structure of a building. Signs of a slab leak may include unexplained increases in water bills, the sound of running water in the walls, damp or moldy spots on floors or walls, and hot spots on the floor in cases of hot water line leaks. If a slab leak is suspected, it's important to consult a professional plumber for evaluation and repair.
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
๐5โค4๐4
โETCONp Today Quiz
๐กWhich one of the following schedules shows the specific activities necessary to complete an activity or work package? @etconp
๐กWhich one of the following schedules shows the specific activities necessary to complete an activity or work package? @etconp
Anonymous Quiz
20%
๐ A. Master schedule
28%
๐ B. Project schedule
47%
๐ C. Task schedule
4%
๐ D. Internal schedule
โค11๐7
๐Self-healing concrete
๐ซSelf-healing concrete is a novel type of cement-based material characterized by the ability of the concrete to self-seal cracks occurring due to external loading and/or exposure in aggressive environments, with chemical products within the concrete.
๐งThe most compelling benefit of self-healing concrete lies in its potential to transform the way we approach infrastructure and construction.
โบBy harnessing the power of self-repair, engineers and architects can design structures that are not only stronger and more durable but also more sustainable and resilient to the challenges of the future.
Via Yonatan Tadesse PMPยฎ
@etconp
๐ซSelf-healing concrete is a novel type of cement-based material characterized by the ability of the concrete to self-seal cracks occurring due to external loading and/or exposure in aggressive environments, with chemical products within the concrete.
๐งThe most compelling benefit of self-healing concrete lies in its potential to transform the way we approach infrastructure and construction.
โบBy harnessing the power of self-repair, engineers and architects can design structures that are not only stronger and more durable but also more sustainable and resilient to the challenges of the future.
Via Yonatan Tadesse PMPยฎ
@etconp
๐15โค1
๐The difference between footing and foundation
๐ทFootings and foundations are both essential components of a building's structural system, but they serve different purposes and have distinct characteristics.
โบHereโs a breakdown of their differences:
๐1. Definition:
โถ๏ธFooting: A footing is a specific part of the foundation that directly supports the weight of the structure.
It is typically a concrete slab or a series of concrete blocks that distribute the load over a larger area to prevent settling.
โถ๏ธFoundation: The foundation is the entire system that supports a building, including footings, walls, and any other structural elements below ground level. It transfers the load of the building to the soil.
๐. Function:
โบFooting: Its primary function is to provide stability by spreading the weight of the structure over a larger area, reducing pressure on the soil beneath.
โบFoundation: It serves to anchor the building to the ground, resist lateral forces (like wind and earthquakes), and prevent moisture from entering the structure.
๐3. Location:
โบFooting: Footings are located at the base of walls or columns, usually below the frost line in colder climates.
โบFoundation: The foundation encompasses all elements below ground level, including footings, foundation walls, and any other structural components.
๐4. Types:
โบโข Footing: Common types include spread footings, strip footings, and pad footings.
โบFoundation: Types of foundations include shallow foundations (like spread footings) and deep foundations (like piles or drilled shafts).
๐5. Construction Material:
โบBoth footings and foundations are typically made of concrete, but the specific design and reinforcement may vary based on their functions and loads.
๐Summary
In essence, the footing is a component of the foundation system, specifically designed to support and distribute loads from the structure above. The foundation as a whole includes all components that provide stability and support for a building.
Via Eagleng
@etconp
๐ทFootings and foundations are both essential components of a building's structural system, but they serve different purposes and have distinct characteristics.
โบHereโs a breakdown of their differences:
๐1. Definition:
โถ๏ธFooting: A footing is a specific part of the foundation that directly supports the weight of the structure.
It is typically a concrete slab or a series of concrete blocks that distribute the load over a larger area to prevent settling.
โถ๏ธFoundation: The foundation is the entire system that supports a building, including footings, walls, and any other structural elements below ground level. It transfers the load of the building to the soil.
๐. Function:
โบFooting: Its primary function is to provide stability by spreading the weight of the structure over a larger area, reducing pressure on the soil beneath.
โบFoundation: It serves to anchor the building to the ground, resist lateral forces (like wind and earthquakes), and prevent moisture from entering the structure.
๐3. Location:
โบFooting: Footings are located at the base of walls or columns, usually below the frost line in colder climates.
โบFoundation: The foundation encompasses all elements below ground level, including footings, foundation walls, and any other structural components.
๐4. Types:
โบโข Footing: Common types include spread footings, strip footings, and pad footings.
โบFoundation: Types of foundations include shallow foundations (like spread footings) and deep foundations (like piles or drilled shafts).
๐5. Construction Material:
โบBoth footings and foundations are typically made of concrete, but the specific design and reinforcement may vary based on their functions and loads.
๐Summary
In essence, the footing is a component of the foundation system, specifically designed to support and distribute loads from the structure above. The foundation as a whole includes all components that provide stability and support for a building.
Via Eagleng
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
๐19โค3
๐Tallest RCC dam in the world!
๐ทThe project is the natural extension of the biggest complex along the Gilgel Gibe River with the two other hydroelectric dams, Gibe I (completed and operational since 2004) and Gibe II (operational since 2010).
๐ซThe works involved a RCC dam 250 m high, with a crest length of 630 m and a total volume of 6,214,000 mยณ of concrete.
โญ๏ธLocated 450 km south west of the capital of #Ethiopia, the #hydroelectric plant boosts the national energy production by 85%, meeting the growing demand for energy within the country and enabling the development of integrated export networks to neighboring countries.
@etconp
๐ทThe project is the natural extension of the biggest complex along the Gilgel Gibe River with the two other hydroelectric dams, Gibe I (completed and operational since 2004) and Gibe II (operational since 2010).
๐ซThe works involved a RCC dam 250 m high, with a crest length of 630 m and a total volume of 6,214,000 mยณ of concrete.
โญ๏ธLocated 450 km south west of the capital of #Ethiopia, the #hydroelectric plant boosts the national energy production by 85%, meeting the growing demand for energy within the country and enabling the development of integrated export networks to neighboring countries.
@etconp
๐12๐8โค2
๐CONCRETE MATURITY TESTING METHOD
๐ทMaturity is a non-destructive approach to testing concrete that allows you to estimate the early-age and compressive strength of in-place concrete in real-time.
โบThe maturity method is defined on ASTMC1074: Standard Practice for Estimating Concrete Strength by the Maturity Method, as โa technique for estimating concrete strength that is based on the assumption that samples of a given concrete mixture attain equal strengths if they attain equal values of the maturity index.โ
It is based on the idea that the strength of concrete increases with time, and that this increase in strength follows a predictable pattern.
This pattern is known as the "maturity curve," which is a plot of the strength of the concrete as a function of time.
The maturity curve is determined by conducting experiments in which concrete specimens are cured under controlled temperature and humidity conditions, and the strength of the specimens is measured at various intervals.
Via Yonatan PMPยฎ
@etconp
๐ทMaturity is a non-destructive approach to testing concrete that allows you to estimate the early-age and compressive strength of in-place concrete in real-time.
โบThe maturity method is defined on ASTMC1074: Standard Practice for Estimating Concrete Strength by the Maturity Method, as โa technique for estimating concrete strength that is based on the assumption that samples of a given concrete mixture attain equal strengths if they attain equal values of the maturity index.โ
It is based on the idea that the strength of concrete increases with time, and that this increase in strength follows a predictable pattern.
This pattern is known as the "maturity curve," which is a plot of the strength of the concrete as a function of time.
The maturity curve is determined by conducting experiments in which concrete specimens are cured under controlled temperature and humidity conditions, and the strength of the specimens is measured at various intervals.
Via Yonatan PMPยฎ
@etconp
๐10โค2
๐แ แฐแญ แ แ แฃ แฅแแซแ แตแณแฒแจแ
๐ทแขแตแฎแตแซ แจแ แแตแต แ แแต แ แแ แจแแซแแฐแ 37แแแ แจแ แแชแซ แแแซ แแแแแแต แจแซแแฝแ แฅแ แต แแแณแซแต แฅแจแถแฝ แฅแจแฐแซแแฑ แแแ แฐแแแแข
โบแ แ แแญ แแแตแตแญ แถ/แญ แแขแญ แ แ แแต แแฌ แจแ แแชแซ แฅแแญ แณแต แฎแแแดแฌแฝแ (แซแ) แแฌแแณแแต แแตแชแต แแตแดแแ แฅแ แจแซแ แฅแซ แ แตแแแ แฎแแด แจแแฐแ แ แแซแฎแฝ แแญ แ แแแ แ แแ แแแ แแญ แซแแแ แจแ แฐแญ แ แ แฃ แตแณแฒแจแแ แ แแซ แแฅแแฐแแแข
๐งแ แณแ แณแต 2008 แ.แ แแแฃแณแ แจแฐแแแจ แจแ แฐแญ แ แ แฃ แฅแแซแ แตแณแฒแจแ 62 แบแ แฐแแฝแ แ แแแ แญ แจแแซแ แ แ แ แซแแ แฒแแแฃ แจแแแแชแซ แแแซแ แแแฃแณ แจแฐแ แแแ แ แแ แ แ แญแก แแแฐแแ แแแซแ แฐแแแฎ แ แแซแแต แแญ แญแแแแข
โบแ แ แแญ แแแตแตแญ แแขแญ แ แแแต (แถ/แญ) แ แแแธแ แฃแฐแจแแต แฅแจแต แจแแญ แแแแฌ แจแแซแตแแแแธแ แจแแแฐแ แแแซแ แฅแแซแแฝแ แแช แจแฐแฃแ แฉแต แ แจแฅ แคแแฌแถแฝ แแแแฅแต แแแธแแ แแตแแแฑ แจแแณแแต แแแข
๐ซแจแตแณแฒแจแ แแแฃแณ แแแ แ แแ แจแฅแแญ แณแต แแ แ แญ (แแ) แฅแ แจแฆแแแแญ แจแแณแแฝ แแตแฐแแแต แ แแฝแ แฐแจแ แแแฐแแ แแแซแ แฅแจแฐแแแฃ แฅแแฐแแแ แณแแแแข
๐แแฅแแซแ แตแณแฒแจแ แแแฃแณ แแแแแชแซแ แแแซแ แจ4 แขแแฎแ แฅแญ แ แแญ แแช แจแฐแฐแจแ แฒแแแฃ แจแแแฐแแ แแแซแ แแแฃแณ แฃแชแซ แแแ แตแฃ แแแ แญ แแแ แแฃ แจแฐแ แฐแซแฝ แแญแ แแแฃแณแฃ แแแแ แจแฐแ แแแต แซแแซ แแแ แแฃ แณแแแต แฒแตแฐแ แแแญแแตแฃ แจแแญแชแแ แฆแณแแฝแฃ แจแฐแซแแพแฝ แจแแแแแ แแณ แฅแ แแแฝ แฅแซแแฝแ แ แแตแก แซแซแตแณแแข
@etconp
๐ทแขแตแฎแตแซ แจแ แแตแต แ แแต แ แแ แจแแซแแฐแ 37แแแ แจแ แแชแซ แแแซ แแแแแแต แจแซแแฝแ แฅแ แต แแแณแซแต แฅแจแถแฝ แฅแจแฐแซแแฑ แแแ แฐแแแแข
โบแ แ แแญ แแแตแตแญ แถ/แญ แแขแญ แ แ แแต แแฌ แจแ แแชแซ แฅแแญ แณแต แฎแแแดแฌแฝแ (แซแ) แแฌแแณแแต แแตแชแต แแตแดแแ แฅแ แจแซแ แฅแซ แ แตแแแ แฎแแด แจแแฐแ แ แแซแฎแฝ แแญ แ แแแ แ แแ แแแ แแญ แซแแแ แจแ แฐแญ แ แ แฃ แตแณแฒแจแแ แ แแซ แแฅแแฐแแแข
๐งแ แณแ แณแต 2008 แ.แ แแแฃแณแ แจแฐแแแจ แจแ แฐแญ แ แ แฃ แฅแแซแ แตแณแฒแจแ 62 แบแ แฐแแฝแ แ แแแ แญ แจแแซแ แ แ แ แซแแ แฒแแแฃ แจแแแแชแซ แแแซแ แแแฃแณ แจแฐแ แแแ แ แแ แ แ แญแก แแแฐแแ แแแซแ แฐแแแฎ แ แแซแแต แแญ แญแแแแข
โบแ แ แแญ แแแตแตแญ แแขแญ แ แแแต (แถ/แญ) แ แแแธแ แฃแฐแจแแต แฅแจแต แจแแญ แแแแฌ แจแแซแตแแแแธแ แจแแแฐแ แแแซแ แฅแแซแแฝแ แแช แจแฐแฃแ แฉแต แ แจแฅ แคแแฌแถแฝ แแแแฅแต แแแธแแ แแตแแแฑ แจแแณแแต แแแข
๐ซแจแตแณแฒแจแ แแแฃแณ แแแ แ แแ แจแฅแแญ แณแต แแ แ แญ (แแ) แฅแ แจแฆแแแแญ แจแแณแแฝ แแตแฐแแแต แ แแฝแ แฐแจแ แแแฐแแ แแแซแ แฅแจแฐแแแฃ แฅแแฐแแแ แณแแแแข
๐แแฅแแซแ แตแณแฒแจแ แแแฃแณ แแแแแชแซแ แแแซแ แจ4 แขแแฎแ แฅแญ แ แแญ แแช แจแฐแฐแจแ แฒแแแฃ แจแแแฐแแ แแแซแ แแแฃแณ แฃแชแซ แแแ แตแฃ แแแ แญ แแแ แแฃ แจแฐแ แฐแซแฝ แแญแ แแแฃแณแฃ แแแแ แจแฐแ แแแต แซแแซ แแแ แแฃ แณแแแต แฒแตแฐแ แแแญแแตแฃ แจแแญแชแแ แฆแณแแฝแฃ แจแฐแซแแพแฝ แจแแแแแ แแณ แฅแ แแแฝ แฅแซแแฝแ แ แแตแก แซแซแตแณแแข
@etconp
๐13๐3
Ethio Construction Engineering
@etconp
๐แฅแตแณแต แแญ แจแแ แจแ แจแ แแชแซ แ แแตแแต แตแญแ
แต แจแฐแแฐแจแฐแ แต แ แณแซแฝ แฅแตแณแฑ แฐแ แแ
แ แแฌ แฐแแจแแกแก
๐งแจแฐแฃแ แฉแต แแแแตแณแต แตแญแ แต แแ แแแ แ แแถแแฎ แแดแฌแแฃ แ แ แแญ แแแตแตแญ แแขแญ แ แ แแตแฃ แจแ แแชแซ แ แฅแจแต แฎแแฝแ แฎแแฝแแญ แแณ แแ แแ แแต แฅแแฒแแ แจแฐแแซแฉ แแแซแต แ แแฃแณแฐแฎแฝ แ แฐแแแ แต แจแแจแ แตแ - แตแญแแฑ แฅแจแฐแซแแฐ แญแแแแข
โบแจแแฌ 61 แแแณแต แ แแต แ แแตแ แ แ แซแฉ แจแ แแชแซ แ แแตแแต แตแญแ แต แจแ แแ แจแ แแชแซ แ แฅแจแต แจแฐแแฐแจแฐแ แต แ แ แแชแซ แขแฎแแแญ แฎแแฝแ แ แฅแญ แแข แจแแแแ โโแจแ แแชแซ แ แณแซแฝโโ แฅแตแณแต แแญ แฅแแฐแแ แญ แแแจแแฝแ แแ แญแกแก
โบแจแ แแแ แฃแแคแต แจแแแ แ แฐแฃแฃแฉแต แแแแตแณแต แตแญแ แต แจแ แแชแซ แขแฎแแแญ แฎแแฝแ(ECA) แแฅแตแณแต แตแซแ 57 แแแฎแ แถแแญ แแช แ แตแญแแแกแก
โบแ แแแ 61 แแแณแตแ แซแตแแ แจ แ แแแ แ แซแฑ แ แญแต แฅแแฐแแแ แ แแตแก แจแซแแธแ แ แญแถแฝแ แ แแ แฅแแต แฅแญแ แ แจแฐแซแซแแธแ แ แแแ แฅแตแณแฑ แฅแแณแตแแแแ แจแแฌ แ แแ แแแฅแแแฝ แญแแต แฅแแฐแแแ แจแแแฃแณแ แจแฒแชแแ แจแ แญแชแดแญแธแซแ แตแซแแฝ แฐแแฃแฃแช แจแแแต แ แถ แแณแธแ แ แญแ แซ แแแจแแแแกแก
โบแณแชแซแแ แ แแ แจแแ แ แแแ แจแแแ แ แแแจแ แแ แจแแแต แ แถ แแณแธแ แ แแตแกแ แ แแชแซ แจแฃแญแแตแ แจแ แ แแแต แ แแต แฅแแฒแแ แ แแแ แซแแตแ แแแญ แจแแซแณแญ แ แแฐแญ แ แญแฒแตแต แ แแแญแ แฐแญแ แจแฐแณแ แจแแตแณแแต แแญ แตแแ แฅแแฒแแ แ แ แ แแแแฐแแ แจแตแ แตแแ แฐแแชแแฝ แจแณแฐแฐแ แจแแแแชแซแแ แจแ แแชแซ แ แแตแแต แตแญแ แต แจแแตแจแณ แปแญแฐแญ แจแแจแ แจ32 แจแ แแชแซ แแแซแต แแชแแฝแ แจแแซแณแญ แจแแญแแณ แแญ แตแแแ แจแแฎ 7 แจแแฐแญแฑ แจแตแ แฅแ แฅ แตแซแแฝ แฅแแณแแ แ แแแแแกแก
โบแ แฐแจแแชแ 50 แ แแถ แจแ แญแต แฅแแ แจแฐแฐแจแแแธแ แจแแแแชแซแแน แจแ แฅแจแฑ แแฐแฅแฐแขแซ แ แณแซแฝ แแตแฅ แซแ แแแ แฎแฝแฃแจแฐแแซแฉ แแแซแต แ แตแฆแณ แจแแฐแ แจแจแฑ แ แญแถแฝ แแฅแญแณ แจแแแญแกแ แต แแ แคแแแฅแฝแ แแแจแแ แญแแแ แฅแแแแกแก
โบแ แ แแแ แจแแแแชแซ แญแแ แฅแแแ แ แจแ แแตแแธแแ แขแตแฎแตแซ แแ แฅแจแฑ แแตแจแณ แจแแ แซแต แ แตแฐแแฆ แจแแซแณแฉ แจแตแแ แตแซแแฝแ แญแแแกแก
โบแแแฐแแ แญแแ แจแแ แ แแชแซแแแแ แฅแแ แตแแดแ แจแฉแแตแฎแ แ แตแฐแแ แฆ แจแแณแญแ แตแคแ 3แแ แญแแ แฐแแ แจแ แแชแซ แขแฎแแแญ แฎแแฝแแ แจแฐแฃแ แฉแต แแแแตแณแต แตแญแ แตแ แณแชแญ แจแแซแณแฉ แจแฅแฐ แฅแ แฅ แตแซแแฝ แแซแแแ แ แถ แแณแธแ แซแฅแซแซแแกแก
โบแจแ แแชแซ แ แณแซแฝ แ แแญแแ แแณแแ แแญแ แตแแด แฐแแแฅแถแ แฅแญ 29 แแ 1953แ.แ แฐแแญแ แจแ แแชแซ แ แแตแแต แตแญแ แต แแฐแฅแฐแขแซ แ แณแซแฝ แญแแ แแแต แ แแแฑ แจแฐแ แจแจแฐ แฅแแฐแแ แญแ แจแ แแ แจแ แแชแซ แ แฅแจแต แ แแ แฅแตแจแแแแฃ แตแจแต แจแ แฅแจแฑ แแฐแฅแฐแขแซ แฅแแฐแแ แญแ แณแชแญ แญแแแจแแแกแก
Via Sheger FM
@etconp
๐งแจแฐแฃแ แฉแต แแแแตแณแต แตแญแ แต แแ แแแ แ แแถแแฎ แแดแฌแแฃ แ แ แแญ แแแตแตแญ แแขแญ แ แ แแตแฃ แจแ แแชแซ แ แฅแจแต แฎแแฝแ แฎแแฝแแญ แแณ แแ แแ แแต แฅแแฒแแ แจแฐแแซแฉ แแแซแต แ แแฃแณแฐแฎแฝ แ แฐแแแ แต แจแแจแ แตแ - แตแญแแฑ แฅแจแฐแซแแฐ แญแแแแข
โบแจแแฌ 61 แแแณแต แ แแต แ แแตแ แ แ แซแฉ แจแ แแชแซ แ แแตแแต แตแญแ แต แจแ แแ แจแ แแชแซ แ แฅแจแต แจแฐแแฐแจแฐแ แต แ แ แแชแซ แขแฎแแแญ แฎแแฝแ แ แฅแญ แแข แจแแแแ โโแจแ แแชแซ แ แณแซแฝโโ แฅแตแณแต แแญ แฅแแฐแแ แญ แแแจแแฝแ แแ แญแกแก
โบแจแ แแแ แฃแแคแต แจแแแ แ แฐแฃแฃแฉแต แแแแตแณแต แตแญแ แต แจแ แแชแซ แขแฎแแแญ แฎแแฝแ(ECA) แแฅแตแณแต แตแซแ 57 แแแฎแ แถแแญ แแช แ แตแญแแแกแก
โบแ แแแ 61 แแแณแตแ แซแตแแ แจ แ แแแ แ แซแฑ แ แญแต แฅแแฐแแแ แ แแตแก แจแซแแธแ แ แญแถแฝแ แ แแ แฅแแต แฅแญแ แ แจแฐแซแซแแธแ แ แแแ แฅแตแณแฑ แฅแแณแตแแแแ แจแแฌ แ แแ แแแฅแแแฝ แญแแต แฅแแฐแแแ แจแแแฃแณแ แจแฒแชแแ แจแ แญแชแดแญแธแซแ แตแซแแฝ แฐแแฃแฃแช แจแแแต แ แถ แแณแธแ แ แญแ แซ แแแจแแแแกแก
โบแณแชแซแแ แ แแ แจแแ แ แแแ แจแแแ แ แแแจแ แแ แจแแแต แ แถ แแณแธแ แ แแตแกแ แ แแชแซ แจแฃแญแแตแ แจแ แ แแแต แ แแต แฅแแฒแแ แ แแแ แซแแตแ แแแญ แจแแซแณแญ แ แแฐแญ แ แญแฒแตแต แ แแแญแ แฐแญแ แจแฐแณแ แจแแตแณแแต แแญ แตแแ แฅแแฒแแ แ แ แ แแแแฐแแ แจแตแ แตแแ แฐแแชแแฝ แจแณแฐแฐแ แจแแแแชแซแแ แจแ แแชแซ แ แแตแแต แตแญแ แต แจแแตแจแณ แปแญแฐแญ แจแแจแ แจ32 แจแ แแชแซ แแแซแต แแชแแฝแ แจแแซแณแญ แจแแญแแณ แแญ แตแแแ แจแแฎ 7 แจแแฐแญแฑ แจแตแ แฅแ แฅ แตแซแแฝ แฅแแณแแ แ แแแแแกแก
โบแ แฐแจแแชแ 50 แ แแถ แจแ แญแต แฅแแ แจแฐแฐแจแแแธแ แจแแแแชแซแแน แจแ แฅแจแฑ แแฐแฅแฐแขแซ แ แณแซแฝ แแตแฅ แซแ แแแ แฎแฝแฃแจแฐแแซแฉ แแแซแต แ แตแฆแณ แจแแฐแ แจแจแฑ แ แญแถแฝ แแฅแญแณ แจแแแญแกแ แต แแ แคแแแฅแฝแ แแแจแแ แญแแแ แฅแแแแกแก
โบแ แ แแแ แจแแแแชแซ แญแแ แฅแแแ แ แจแ แแตแแธแแ แขแตแฎแตแซ แแ แฅแจแฑ แแตแจแณ แจแแ แซแต แ แตแฐแแฆ แจแแซแณแฉ แจแตแแ แตแซแแฝแ แญแแแกแก
โบแแแฐแแ แญแแ แจแแ แ แแชแซแแแแ แฅแแ แตแแดแ แจแฉแแตแฎแ แ แตแฐแแ แฆ แจแแณแญแ แตแคแ 3แแ แญแแ แฐแแ แจแ แแชแซ แขแฎแแแญ แฎแแฝแแ แจแฐแฃแ แฉแต แแแแตแณแต แตแญแ แตแ แณแชแญ แจแแซแณแฉ แจแฅแฐ แฅแ แฅ แตแซแแฝ แแซแแแ แ แถ แแณแธแ แซแฅแซแซแแกแก
โบแจแ แแชแซ แ แณแซแฝ แ แแญแแ แแณแแ แแญแ แตแแด แฐแแแฅแถแ แฅแญ 29 แแ 1953แ.แ แฐแแญแ แจแ แแชแซ แ แแตแแต แตแญแ แต แแฐแฅแฐแขแซ แ แณแซแฝ แญแแ แแแต แ แแแฑ แจแฐแ แจแจแฐ แฅแแฐแแ แญแ แจแ แแ แจแ แแชแซ แ แฅแจแต แ แแ แฅแตแจแแแแฃ แตแจแต แจแ แฅแจแฑ แแฐแฅแฐแขแซ แฅแแฐแแ แญแ แณแชแญ แญแแแจแแแกแก
Via Sheger FM
@etconp
๐10โค2
Intercon Construction Chemicals
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แแแ แ แ แแต แฆแณ แจแแซแแแ แต แฅแ แแแแ แ แญแฅ
๐ฐแแ แญแแแแ?
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแตแแซแจแฅ แแตแ แณแต แแญแแ แแณแ แ แจแแแ แฅแแณแซแตแก แแแแ แแฝแแฝ แ แตแแฅแฐแแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ 1. แแญแซแถ
แ.1 แ แจแญ แคแ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐แแแ แ แ แแต แฆแณ แจแแซแแแ แต แฅแ แแแแ แ แญแฅ
๐ฐแแ แญแแแแ?
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแตแแซแจแฅ แแตแ แณแต แแญแแ แแณแ แ แจแแแ แฅแแณแซแตแก แแแแ แแฝแแฝ แ แตแแฅแฐแแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ 1. แแญแซแถ
แ.1 แ แจแญ แคแ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐5
๐FIBER REINFORCED CONCRETE
๐ทAs the name implies, we are talking about concrete that incorporates various types of fiber in an attempt to improve its flexural strength and most of all its ductility, its ability to deform without braking.
โบIt is well known that one of the biggest weaknesses of concrete is its brittleness. Although it can handle massive loads when compressed, it will break easily when submitted to bending forces, as its flexural strength is typically 6-10 times lower than its compressive strength.
โบIt is in other words a very strong but rigid material that cannot bend without breaking.
โถ๏ธThat is why reinforced concrete was introduced in the first place, to help concrete overcome its fundamental weakness by working together with steel, to combine the strengths of both materials and make concrete more flexible, resulting in much slimmer construction elements that enabled erection of high-rise buildings.
๐ซWhen designing fiber reinforced ready-mix concrete, the following things should be taken into consideration:-
1. The type of fiber used: there is a variety of available fibers (steel, glass, carbon, cellulose, polypropylene, structural synthetic) in different sizes and shapes, suitable for different applications.
Generally, steel and structural synthetic fibers are used for industrial floors in sizes that range from 2-6 cm length and 0.5-2 mm thickness.
An important parameter is the aspect ratio of the fiber, ranging from 30 to 120 for steel fibers, as it dictates the maximum quantity of fibers that can be incorporated in concrete.
The most important property of fibers is of course their flexural strength, which ranges from 650 MPa for structural synthetic to 1,100 MPa for steel fibers.
In case of a corrosive environment, the use of synthetic fibers instead of steel fibers is recommended, as steel is easily corroded.
2. The quantity of fibers used: it ranges from 20 to 60 kg/m3 of concrete for steel fibers, 1-3 kg/m3 for synthetic structural and 600-900 g/m3 for polypropylene fibers, although a study is always necessary to determine the quantity that gives the best results of strength with minimum impact on workability of concrete.
3. The maximum grain of concrete: for industrial floor applications, maximum grain will vary from 10 โ 30 mm, depending on the thickness of the floor.
Usually, 10 mm is the maximum gravel size for floors up to 10 cm thickness, while 20-30 mm gravel is used for floors of higher thickness.
4. Compressive strength: typically, for industrial floors, a minimum C25/30 concrete is required to achieve the minimum surface wear and prolong service life.
5.Workability: fiber reinforced concrete has generally lower workability compared to normal concrete as a result of the entanglement of fibers and their bridging effect, therefore it is essential to aim for higher workability.
6.Pumpability: although fiber reinforced concrete is usually applied without pump, there are cases where the use of a normal or stationery pump is required.
Fiber reinforced concrete can be pumped, but the curve of the aggregates, the cement content, type and dosage of superplasticizer, workability and maximum dosage of fibers must be carefully adjusted.
Yonatan Tadesse PMPยฎ
@etconp
๐ทAs the name implies, we are talking about concrete that incorporates various types of fiber in an attempt to improve its flexural strength and most of all its ductility, its ability to deform without braking.
โบIt is well known that one of the biggest weaknesses of concrete is its brittleness. Although it can handle massive loads when compressed, it will break easily when submitted to bending forces, as its flexural strength is typically 6-10 times lower than its compressive strength.
โบIt is in other words a very strong but rigid material that cannot bend without breaking.
โถ๏ธThat is why reinforced concrete was introduced in the first place, to help concrete overcome its fundamental weakness by working together with steel, to combine the strengths of both materials and make concrete more flexible, resulting in much slimmer construction elements that enabled erection of high-rise buildings.
๐ซWhen designing fiber reinforced ready-mix concrete, the following things should be taken into consideration:-
1. The type of fiber used: there is a variety of available fibers (steel, glass, carbon, cellulose, polypropylene, structural synthetic) in different sizes and shapes, suitable for different applications.
Generally, steel and structural synthetic fibers are used for industrial floors in sizes that range from 2-6 cm length and 0.5-2 mm thickness.
An important parameter is the aspect ratio of the fiber, ranging from 30 to 120 for steel fibers, as it dictates the maximum quantity of fibers that can be incorporated in concrete.
The most important property of fibers is of course their flexural strength, which ranges from 650 MPa for structural synthetic to 1,100 MPa for steel fibers.
In case of a corrosive environment, the use of synthetic fibers instead of steel fibers is recommended, as steel is easily corroded.
2. The quantity of fibers used: it ranges from 20 to 60 kg/m3 of concrete for steel fibers, 1-3 kg/m3 for synthetic structural and 600-900 g/m3 for polypropylene fibers, although a study is always necessary to determine the quantity that gives the best results of strength with minimum impact on workability of concrete.
3. The maximum grain of concrete: for industrial floor applications, maximum grain will vary from 10 โ 30 mm, depending on the thickness of the floor.
Usually, 10 mm is the maximum gravel size for floors up to 10 cm thickness, while 20-30 mm gravel is used for floors of higher thickness.
4. Compressive strength: typically, for industrial floors, a minimum C25/30 concrete is required to achieve the minimum surface wear and prolong service life.
5.Workability: fiber reinforced concrete has generally lower workability compared to normal concrete as a result of the entanglement of fibers and their bridging effect, therefore it is essential to aim for higher workability.
6.Pumpability: although fiber reinforced concrete is usually applied without pump, there are cases where the use of a normal or stationery pump is required.
Fiber reinforced concrete can be pumped, but the curve of the aggregates, the cement content, type and dosage of superplasticizer, workability and maximum dosage of fibers must be carefully adjusted.
Yonatan Tadesse PMPยฎ
@etconp
๐6โค1
๐Key Performance indicators for construction management
๐ซKey Performance Indicators (KPIs) that support better schedule tracking, cost management, resource utilization, and quality control.
๐The following pictures illustrate 10 basic KPIs with their basic explanations.
Via Yonatan Tadesse PMPยฎ
@etconp
๐ซKey Performance Indicators (KPIs) that support better schedule tracking, cost management, resource utilization, and quality control.
๐The following pictures illustrate 10 basic KPIs with their basic explanations.
Via Yonatan Tadesse PMPยฎ