Shear Strength of Soil by Vane Shear Test

Apparatus

Apparatus required for vane shear test are:

Vane shear apparatusSoil specimen containerVernier callipers.

Vane shear apparatus consists high tensile steel rod to which four steel blades (vanes) are fixed at right angles to each other at the bottom of rod.



Procedure of Vane Shear Test

Test procedure of vane shear test contains following steps:

Clean the vane shear apparatus and apply grease to the lead screw for better movement of handles.Take the soil specimen in container which is generally 75 mm in height and 37.5 mm in diameter.Level the soil surface on the top and mount the container on the base of vane shear test apparatus using screws provided.Lower the vane gradually into the soil specimen until the top of vane is at a depth of 10 to 20 mm below the top of soil specimen.
Note down the reading of pointer on circular graduated scale which is initial reading.Rotate the vane inside the soil specimen using torque applying handle at a rate of 0.1o per second.When the specimen fails, the strain indicator pointer will move backwards on the circular graduated scale and at this point stop the test and note down the final reading of pointer.The difference between Initial and final readings is nothing but the angle of torque.Repeat the procedure on two more soil specimens and calculate the average shear strength value.Measure the diameter and height of vane using Vernier callipers.Sensitivity of given soil sample is determined by repeating the above test procedure on remolded soil which is nothing but soil obtained after rapid stirring of vane in the above test.

Sensitivity of soil = undisturbed shear strength/ remolded shear strength.

Observations and Calculations of Vane Shear Test

Shear strength of given soil sample is calculated from below observations.

Diameter of vane, D = _ cmHeight of vane, H = __ cmTorque, T = (Spring constant /180)*(initial reading-final reading)

Shear strength of soil (S) is calculated from below formula.
.
http://t.me/COTMp
Human resource management in construction lecture notes
ሸገር ኣዱ ገነት❤️
፡
ወብ ምሽት ተመኘን
This media is not supported in your browser
VIEW IN TELEGRAM
This helmet fan keeps you cool in the summer.
This media is not supported in your browser
VIEW IN TELEGRAM
3 ways for demolishing skyscrapers
This media is not supported in your browser
VIEW IN TELEGRAM
how unsafe the use of mobile during work !!!
This media is not supported in your browser
VIEW IN TELEGRAM
Efficiently remove manholes with the help of this machine.
This media is not supported in your browser
VIEW IN TELEGRAM
Workers can prevent injuries with the help of this gorilla gripper
👉Great Today Tip 👆👆👆
.
➡ለዛሬ የተለያዩ ጠቃሚ ቪዲዮዎች እንካቹ ብሎናል
.
🅾በኢትዮጵያ ለመጀመሪያ ጊዜ
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Design Of Columns As Per ACI 

1- Maximum and Minimum Reinforcement Ratio
The minimum reinforcement ratio of 1 % is to be used in tied or spirally reinforced columns. This minimum reinforcement is needed to safeguard against any bending, reduce the effect of shrinkage and creep and enhance the ductility of columns.

2- Minimum Number of Reinforcing Bars
Minimum four bars within rectangular or circular sections; or one bar in each corner of the cross-section for other shapes and a minimum of six bars in spirally reinforced columns should be used.

3- Clear Distance between Reinforcing Bars
For tied or spirally reinforced columns, clear distance between bars should not be less than the larger of 150 times bar diameter or 4 cm.

4- Concrete Protection Cover
The clear concrete cover should not be less than 4 cm for columns not exposed to weather or in contact with the ground. It is essential for protecting the reinforcement from corrosion or fire hazards.

5- Minimum Cross-Sectional Dimensions
For practical considerations, column dimensions can be taken as multiples of 5 cm.

6- Lateral Reinforcement

Ties are effective in restraining the longitudinal bars from buckling out through the surface of the column, holding the reinforcement cage together during the construction process, confining the concrete core and when columns are subjected to horizontal forces, they serve as shear reinforcement. Spirals, on the other hand, serve in addition to these benefits in compensating for the strength loss due to spalling of the outside concrete shell at ultimate column strength
7- Ties
For longitudinal bars, 32 mm or smaller, lateral ties 10 mm in diameter should be used. In some countries, ties of 8 mm dia are used for column construction.
This media is not supported in your browser
VIEW IN TELEGRAM
👆🏾Take a look at this video see how water closet work
Steps in Concrete Curing Process 

Curing the method in which freshly cast concrete is provided with wet conditions or moist conditions for specific time once compaction is completed. Curing is accomplished to finish the hydration reaction. Minimum 28 days are needed for normal method of curing.
The following steps are involved in curing method :-

1. SPRAYING WATER: Under this method water is sprinkled on the concrete via a hose or bucket, several times throughout each day as soon as shuttering or the framework is detached. This method is effective for small works. Proper care should be taken while implementing this method. Once the concrete becomes dry, water should be sprinkled.

2. WET GUNNY BAGS: This method is ideal for vertical surfaces of concrete like sides of column. Gunny bags are formed with jute and covered around the concrete and are retained constantly wet. Gunny bags consume water and keep moisture for a prolonged period. Gunny bags are utilized for several times and this method is very inexpensive.

3. CURING BY INFRA-RED RADIATIONS: This method is best suited for hollow concrete products where the infra-red heaters are arranged in the hollow section of the pre-cast components. This method is mostly effective in cold climatic area due to rapid gain of strength and the rapid initial temperature does not lead to reduction in ultimate strength.

4. MEMBRANE CURING: Membrane curing can be applied in the areas where the problem is extreme for water shortage. Water mixed at the time of producing fresh concrete is normally adequate for the complete hydration reaction.
Under this method a sealing membrane is used over concrete that will entrap the water inside so that the water can’t get out through evaporation. Membrane is generally a sheet of polythene or developed with application of chemicals.
The following types of sealing compounds are utilized in membrane curing:
a. Rubber latex emulsions.
2. Bituminous and asphalt emulsions.
c. Emulsions of paraffin or boiled linseed oil.

5. STEAM CURING: Steam curing is suitable for pre-cast concrete products. Because of steam, the components are heated homogeneously and the strength is achieved at a very rapid rate. Steam can pass and infiltrate through small gaps of stacked pre-cast concrete products and strength is obtained consistently from all sides.
Steam curing is performed in the following ways:
a. LOW PRESSURE STEAM CURING: Under this method the steam curing is performed at atmospheric pressure and about 70% of the 28-days strength is gained in 16-24 hours.
b. HIGH PRESSURE STEAM CURING: Under this method steam curing is performed at a pressure of 8 atmospheres that is 800KN/m2. Due to rapid curing, the temperature is increased quickly and the strength is decreased. This problems can be resolved with high pressure. High pressure steam curing provides greater stability to concrete.
▶️ ሽረ እንዳ ስላሰ❤️
፡
👉የናንተ ከተማም ላኩልን
፡
🙏ወብ ምሽት ተመኘን😍
Impressive infrastructure Guangzhou China 🇨🇳
ይህ በምስሉ ላይ የምትመለከቱት ሕንፃ የሚገኘው አዲስ አበባ ልደታ አካባቢ ሲሆን @COTMp ያኮራ ዲዛይን ነው፡፡👌
.
እስቲ እናንተም ከኮራችሁበት like በማረግ ግለፁልን፡፡
Earthwork?
Earthwork is the phase during a highways construction when the right of way is converted to section and the grades prescribed in the plans.

Earthwork is highly influenced by geometric design of a road and type of soil.

Objectives? Of Earthwork
--identify location of quantities
--Distance of earth moving
--Compute volumes of cut and fill and
--Estimate costs of moving earth
For the construction of a house, among other factors, the following requirements must be satisfied:
1. A site on which to build the house,
2. Permission from local authorities to build the house,
3. Materials for building the house,
4. skilled laborers for the erection of the house,
5. Financial source and
6. Professionals, such as architects and engineers.

As each one of these requires money, the financial aspect is therefore very important and the costs must always be considered during all the planning and building stages. However, this does not mean that it is always economical to save money or build cheaply. "The poorest often builds the dearest" is too often proven true.