Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.31K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
#ADVERTISEMENT

👉ለግንባታዎ ውበት እኛን ስለ ምናስፈልግዎ ከግንባታ በኋላ ወደ እኛ ይደውሉ።

💫AR Building Finishing & Water Proofing Works ለህንፃዎች ውበት ፈጣሪዎች ነን

🚧በልዩ ጥራት የፊኒሽንግ ስራውን አጠናቀን ቤትዎ ውበት አጎናፅፈን እናስረክብዎታለን።

🌟ከመኖሪያ ቤት እስከ ትልልቅ ህንፃዎች አሻራችንን አሳርፈናል።
▶️Contextra
▶️Fine quartez
▶️Stone paint
▶️ Water Proofing Chemicals
▶️ Membranes በጥራት እንሰራለን።

📍አድራሻ:—ኡራኤል ሀይላለም ህንፃ
            ስልክ  0977 67 67 90
                      0912 23 04 71

💫AR Building Finishing & Water Proofing Works

ቴሌግራም:
@antearb
@antearb
👍5❤3
👉How to check the final inspection of the asphalt concrete layer?

🚧The final inspection of asphalt concrete works is critical to ensure that the pavement meets project specifications, quality standards, and performance requirements.

🏷Below is a checklist of key aspects to inspect during and after the completion of asphalt concrete paving:

⭐️1. Surface Quality

Smoothness: Check for surface irregularities such as bumps, dips, or depressions using a straightedge or a profilometer.

Evenness: Ensure the surface is uniform with no visible segregation, streaking, or surface tearing.

Texture: Verify the pavement has a consistent surface texture suitable for skid resistance.

⭐️2. Thickness

Core Samples: Take core samples to measure the actual thickness of the asphalt layers and compare them to the design specifications.

Depth Verification: Confirm that each lift of asphalt meets the required compacted thickness.

⭐️3. Density and Compaction

Compaction Testing: Use a nuclear density gauge or other approved methods to verify that the asphalt has been compacted to the required density (usually 92-96% of maximum theoretical density).

Joint Density: Pay special attention to longitudinal and transverse joints, ensuring proper compaction to prevent future cracking or separation.

⭐️4. Gradation and Mix Compliance

Asphalt Mix: Verify that the asphalt mix used matches the approved mix design.

Aggregate Gradation: Confirm the size and distribution of aggregates are within the specified tolerances.

Binder Content: Check that the asphalt binder content meets the project requirements.

⭐️5. Temperature Control

Paving Temperature: Ensure the asphalt was placed within the specified temperature range (typically 275–300°F for hot mix asphalt). etconp

Compaction Temperature: Confirm compaction was completed before the asphalt cooled below the recommended temperature for proper bonding.

⭐️6. Joints

Alignment: Check that joints are straight and aligned properly with adjacent lanes.

Bonding: Inspect the bonding at longitudinal and transverse joints for gaps or loose edges.

Sealing (if required): Verify that joints have been sealed with the appropriate material to prevent water infiltration.

⭐️7. Drainage

Grade and Slope: Ensure the pavement is graded to allow for proper drainage, avoiding areas where water could pond.

Catch Basins and Inlets: Verify that drainage structures are clean, properly aligned, and free of obstructions.

⭐️8. Edges and Shoulders

Edge Alignment: Inspect the edges for straightness and uniformity. etconp

Shoulder Material: Ensure shoulders are compacted and smoothly transition to the asphalt pavement.

⭐️9. Markings and Signage

Pavement Markings: Confirm that lane markings, crosswalks, and other painted symbols are applied according to specifications and are properly aligned.

Reflectivity: Check that reflective beads are embedded in markings, where required, for nighttime visibility

⭐️10. Documentation

Test Records: Review all quality control and quality assurance test results, including compaction, density, and asphalt mix compliance.

Inspection Reports: Ensure all stages of work have been inspected and approved.

Punch List: Address any outstanding issues or deficiencies noted during the inspection etconp

❇️11. Final Approval

Walkthrough Inspection: Conduct a final walkthrough with project stakeholders (contractor, inspector, and owner) to confirm all work meets contractual requirements.

Acceptance Certificate: Obtain written approval or a certificate of acceptance from the relevant authority.

📜By systematically inspecting these aspects, you ensure the asphalt pavement is constructed to high standards and will perform effectively over its design life.

@etconp
👍17❤7
👉ከ አርክቴክቶች ማህበር የተሰጠ በ ህንፃ አዋጅ ረቂቅ 02/2017 ላይ የተሰጠ መግለጫ

https://t.me/ETCONpWORK

@etconp
👍15
Media is too big
VIEW IN TELEGRAM
👉የተማሪዎች ፕሮጀክት

💫የወልቂጤ ዩኒቨርስቲ አራተኛ አመት የኪነህንጻ ተማሪዎች የንድፍ ትምህርት ፕሮጀክት።

@etconp
👍15❤1🥰1
👉የኢትዮጵያ አየር መንገድ በ5 ቢሊየን ፓውንድ በቢሾፍቱ ከተማ የሚገነባው "ሜጋ ኤርፖርት ከተማ" ፕሮጀክት ይፋ ተደረገ!!

ከ አዲስ አበባ በ25 ማይል ርቀት ላይ በምትገኘው ቢሾፍቱ አቅራቢያ የሚገኘው ይህ የወደፊት አየር ማረፊያ በ2029 ሲጠናቀቅ እስከ 110 ሚሊዮን መንገደኞችን በዓመት የሚያስተናግድ ትልቅ ተርሚናል እና አራት ማኮብኮቢያዎችን ይይዛል።

በኢትዮጵያ አየር መንገድ ከዳር አል ሀንዳሳ አማካሪዎች ጋር በመተባበር የሚመራው ይህ የ5 ቢሊዮን ፓውንድ ፕሮጀክት ኢትዮጵያን በአለም አቀፍ ንግድና ቱሪዝም ዋና ተዋናይ ለማድረግ ያለመ ነው።

አዲሱ ተቋም እንደ ዱባይ እና ሄትሮው ያሉ አለምአቀፍ አየር ማረፊያዎችን ለመወዳደር ተዘጋጅቷል።

በአሁኑ ወቅት የአዲስ አበባ ቦሌ ዓለም አቀፍ ኤርፖርት መጨናነቅ ቢያጋጥመውም "ሜጋ ኤርፖርት ከተማ" ይህን ችግር በመቅረፍ የኢትዮጵያን ኢኮኖሚ ያሳድጋል።

ይህ ፕሮጀክት ኢትዮጵያ የአለምአቀፍ የአቪዬሽን ማዕከል ለመሆን ያላትን ቁርጠኝነት የሚያሳይ ነው።

@etconp
👍36❤4😭2
#ADVERTISEMENT

💫Specialized Retrofitting (Jacketing) Services for:

✅ Columns – Enhance load-carrying capacity and structural integrity.
✅ Footings – Improve stability and prevent settlement.
✅ Beams – Restore and upgrade strength for better performance.

🚧Why Retrofitting?

🔹 Extend Structural Lifespan – Protect your investment for years to come.
🔹 Improve Safety – Ensure compliance with modern building codes and standards.
🔹 Cost-Effective – Avoid expensive replacements by strengthening existing structures.
🔹 Resilience Against Disasters – Strengthen your building to withstand seismic activity and heavy loads.

📞 Contact Us Today!

📩 @pragmaengineering
📱 +251975889929 | +251941099797

Pragma Engineering – Your Trusted Partner in Structural Excellence!
👍8👏3
👉Four Main Types of Irrigation Systems

🚧1. Surface irrigating

Ideal for landscapes with medium to fine soil textures, a surface irrigation system can use one of three methods: basin irrigation, furrow irrigation, and border irrigation. Properties with mild or regular slopes are well-suited to surface irrigation. However, one disadvantage to this method is the minimal filtration rate, leading to salt/mineral buildup in the soil.

🚧2. Sprinkler irrigation

In sprinkler irrigation, a standard sprinkler system provides water to plants.

A system of pipes supplies water to the spray heads, which then spray tiny droplets into the area.

Although sprinkler irrigation helps any slope, the water distribution can sometimes become unpredictable in hot or windy weather.

Also, it is typically the most expensive of irrigation methods and consumes a significant amount of energy.

🚧3. Drip irrigation

Drip irrigation, also called micro-irrigation or trickle irrigation, does double duty to preserve both water and nutrients.

Water is applied in the plants’ root zone, from a drip system either above or below the soil. One of the most significant advantages is the ability to customize water drip rates depending on the soil or plant type using individual emitters.

When properly designed, installed, and operated, a drip irrigation system can be the most efficient method available – and result in a beautifully flourishing landscape.

🚧4. Subsurface irrigation

A subsurface irrigation system is one of the most popular options, delivering water underneath the soil.

If the water table is low, trickle or drip devices placed below the below can be used as a “back-up,” watering at the plants’ roots.

Because the water is beneath the surface, this method decreases usage by avoiding evaporation. Depending on the property, setting up and maintaining subsurface irrigation systems can become costly.

Choosing the Best Type of Irrigation for Your Property

@etconp
👍16❤1
Design_of_Reinforced_Concrete @etconp.pdf
70.4 MB
👉Design of reinforced concrete structures

🚧This book has two parts

🏷Part I- THEORY

1. Analysis of composite sections by elastic theory
2. Singly reinforced beams
3. Doubly reinforced beams
4. Shear in beams
5. Bond
6. Reinforcement
7. T- beams
8. Axially loaded columns
9. Combined bending and direct stress

🏷Part II- Design

10. Slab
11. Beam
12. Foundations
13. Retaining walls
14. Stair cases

⏺And other hydraulic structures

⚡️የ ፋይሉ መጠን 70.4MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል

📜ለሁሉም ኮንስትራክሽን ኢንጅነሮች ሊኖር የሚገባ 1476 ገፆች ያሉት መፅሀፍ

@etconp
🙏18👍16❤3
👉LST Testing?

🚧Low Strain Integrity Testing (LST), also known as Pile Integrity Testing (PIT) or Sonic Echo Test, is a non-destructive test method used to assess the quality and integrity of piles or deep foundations, especially bored piles or driven piles.

▶️The test is designed to detect potential issues such as cracks, voids, reductions in cross-sectional areas, or other abnormalities that may affect the pile's performance.

🏷Purpose of Low Strain Integrity Testing:

Quality Assurance: To verify that the pile has been constructed according to design specifications.

Defect Detection: To detect flaws such as cracks, necking (reduction in diameter), bulging, soil inclusions, or voids.

Length Verification: To estimate the length of the pile if documentation is unavailable or uncertain.

Post-Construction Assessment: To check for damage after installation, particularly for driven piles.

💫How It Works:

LST involves generating low-strain stress waves at the top of the pile and measuring their response.

The process uses the principle of wave propagation, where stress waves reflect off changes in material properties, such as discontinuities or changes in pile cross-section.

💫Equipment Used:

Hammer or Hand-held Impactor: A small hammer is used to tap the top of the pile, generating low-strain stress waves that propagate through the pile.

Accelerometer/Geophone: This sensor is placed on the pile head to measure the velocity of the reflected waves.

Data Acquisition System: The system records the response of the pile (reflected waves) and displays it on a computer screen for analysis.

💫Test Procedure:

1. Preparation:

The top of the pile should be accessible and clean, with a flat, smooth surface to ensure proper wave propagation.

Attach an accelerometer or geophone to the top of the pile.

2. Impact:

A light impact (typically with a handheld hammer) is applied to the pile head.

3. Data Collection:

The stress wave generated by the impact travels down the pile. Any changes in the pile's material or cross-section, such as cracks or voids, reflect part of the wave back to the pile head.

The accelerometer records these reflections, and the data is displayed as a time-domain graph (velocity or displacement vs. time).

4. Analysis:

The time taken for the wave to travel down the pile and reflect back is analyzed to identify any anomalies.

A sharp change in the graph indicates a potential defect or change in material properties.

The pile length can be estimated by measuring the time it takes for the wave to reflect from the pile toe and using the wave speed in concrete.

💫Results Interpretation:

Good Pile: A smooth wave reflection at the expected time, with no intermediate reflections, indicates a pile free from major defects.

💫Defects or Anomalies:

Cracks or Voids: Intermediate reflections (before the wave reaches the pile toe) indicate cracks or voids.

Necking (Reduction in Diameter): A reflection indicating a sudden reduction in the cross-sectional area.

Bulging (Increase in Diameter): A change in wave reflection pattern that suggests an increase in pile diameter or material stiffness.

Pile Breakage: A large reflection occurring much earlier than expected indicates the pile may be broken or has a significant defect at that depth.

💫Advantages:

Non-Destructive: No damage is done to the pile during testing.

Fast and Efficient: Testing can be performed quickly, and results are typically available immediately.
Cost-Effective: Compared to more invasive methods like core drilling, LST is relatively inexpensive.

Limitations:
Shallow Depth Sensitivity: LST is more effective at detecting defects near the top of the pile and may not always identify deeper defects accurately, especially in long piles.

Interpretation Skill: The accuracy of the results depends on the experience of the operator and the complexity of the pile or soil conditions.

Not Suitable for All Piles: LST works best on concrete piles and may not be suitable for piles with highly variable materials or non-uniform cross-sections.

@etconp
👍16❤2🔥1
👉Advantages & Disadvantages of Cost Planning

🏷Cost Planning (CP) is a statement of how design team proposes to distribute available money among building elements & can be adjusted to design requirement.

⏺Starts with development of a figure (or cost) to allow client to decide whether project is feasible.

💫Early cost planning has major benefits for construction projects.

▶️Is used to monitor & control estimated project construction costs to ensure you get accurate expenditure & progress information at every stage.

💫Cost Planning is the use of Cost Model for "Should-Cost" Forecasting to make informed decisions for:

•Budget Requirement Requests
•Cost Estimations
•Output Quantities
•Capacity Management
•Risk Analysis
•Various Time Frames
•Standard Rates
•Defining Targets to Measure Efficiency & Effectiveness

⏺Quantity Surveyors prove there is added value in getting them involved on the ground level of a new project, rather than at the end of the design process.

✓Advantage Of Cost Planning:

•Early cost checks ensure preliminary estimate is more accurate.
•Better understanding of market conditions.
QS has an in-depth understanding of the property market & access to historical information which can assist developers in evaluating various feasibility options for a particular site or project.
•Saves time & money if the architect of redrawing, quantity surveyor creating budgets & contractor on agreeing amendments.
•Balanced expenditure distribution may produce more rationalized design
•Rational expenditure distribution throughout design is achieved
•Closer alliance between design team assist in understanding each other.
•QS is familiar with design at earliest stags
•Better chance of comparing different projects
•Working drawings are likely to be available sooner
•Cost consideration will be given more attention since QS is involved in early stage of design process.
•Since there is checking system on cost, there is a possibility that fewer changes will be made to BQ. Discussions among designers can be made before production of final design saving time in making an adjustment to any changes to cost & design.
•Cost planning provides basic information on cost comparison between different projects.

✓Disadvantage Of Cost Planning:

•More preparation is necessary for early stages of design
•Architect is likely to be more restricted in his method of working
•QS requires greater knowledge of design factors pricing that affect cost
•Architect & QS are likely to be involved in more work
•Designers may have some limitation in their work style
•QS need to be equipped with past experience & knowledge pertaining to cost & factors influencing cost

@etconp
👍11
Ethio Construction Engineering
👉The effect of earthquake on building structures can be controlled using one of the three options. ⏺𝗼𝗽𝘁𝗶𝗼𝗻 1: To provide the building with unreasonable high strength(not economical) ⏺𝗼𝗽𝘁𝗶𝗼𝗻 2: To design the building to have a normal strength following damage…
👉continued
🚧 𝗕𝗮𝘀𝗲 𝗶𝘀𝗼𝗹𝗮𝘁𝗶𝗼𝗻 is a passive structural control technique where a collection of structural elements is used to substantially decouple a building from its foundations resting on shaking ground, thus protecting the building's structural integrity.
The main feature of the base isolation technology is that it introduces flexibility into the connection between the structure and the foundation. In addition to allowing movement, the isolators are often designed to absorb energy and thus add damping to the system. This helps in further reducing the seismic response of the building.
There are two basic types of base isolation systems; elastomeric bearings and sliding systems.
In this approach, the building or structure is decoupled from the horizontal components of the earthquake ground motion by interposing a layer with low horizontal stiffness between the structure and the foundation.
The second basic type of base isolation system is typified by the sliding system. This works by limiting the transfer of shear across the isolation interface. Many sliding systems have been proposed and some have been used. One commonly used sliding system called is “spherical sliding bearing" In this system, the building is supported by bearing pads that have a curved surface and low friction. During an earthquake the building is free to slide on the bearings. Since the bearings have a curved surface, the building slides both horizontally and vertically. The forces needed to move the building slightly upwards place a limit on the horizontal or lateral forces.

Follow us on tiktok
👉 http://www.tiktok.com/@etconp7

@etconp
👍9