Ethio Construction Engineering
32.3K subscribers
6.28K photos
359 videos
1.99K files
3.34K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
This media is not supported in your browser
VIEW IN TELEGRAM
👆🏾Take a look at this video see how water closet work
Steps in Concrete Curing Process 

Curing the method in which freshly cast concrete is provided with wet conditions or moist conditions for specific time once compaction is completed. Curing is accomplished to finish the hydration reaction. Minimum 28 days are needed for normal method of curing.
The following steps are involved in curing method :-

1. SPRAYING WATER: Under this method water is sprinkled on the concrete via a hose or bucket, several times throughout each day as soon as shuttering or the framework is detached. This method is effective for small works. Proper care should be taken while implementing this method. Once the concrete becomes dry, water should be sprinkled.

2. WET GUNNY BAGS: This method is ideal for vertical surfaces of concrete like sides of column. Gunny bags are formed with jute and covered around the concrete and are retained constantly wet. Gunny bags consume water and keep moisture for a prolonged period. Gunny bags are utilized for several times and this method is very inexpensive.

3. CURING BY INFRA-RED RADIATIONS: This method is best suited for hollow concrete products where the infra-red heaters are arranged in the hollow section of the pre-cast components. This method is mostly effective in cold climatic area due to rapid gain of strength and the rapid initial temperature does not lead to reduction in ultimate strength.

4. MEMBRANE CURING: Membrane curing can be applied in the areas where the problem is extreme for water shortage. Water mixed at the time of producing fresh concrete is normally adequate for the complete hydration reaction.
Under this method a sealing membrane is used over concrete that will entrap the water inside so that the water can’t get out through evaporation. Membrane is generally a sheet of polythene or developed with application of chemicals.
The following types of sealing compounds are utilized in membrane curing:
a. Rubber latex emulsions.
2. Bituminous and asphalt emulsions.
c. Emulsions of paraffin or boiled linseed oil.

5. STEAM CURING: Steam curing is suitable for pre-cast concrete products. Because of steam, the components are heated homogeneously and the strength is achieved at a very rapid rate. Steam can pass and infiltrate through small gaps of stacked pre-cast concrete products and strength is obtained consistently from all sides.
Steam curing is performed in the following ways:
a. LOW PRESSURE STEAM CURING: Under this method the steam curing is performed at atmospheric pressure and about 70% of the 28-days strength is gained in 16-24 hours.
b. HIGH PRESSURE STEAM CURING: Under this method steam curing is performed at a pressure of 8 atmospheres that is 800KN/m2. Due to rapid curing, the temperature is increased quickly and the strength is decreased. This problems can be resolved with high pressure. High pressure steam curing provides greater stability to concrete.
▶️ ሽረ እንዳ ስላሰ❤️
፡
👉የናንተ ከተማም ላኩልን
፡
🙏ወብ ምሽት ተመኘን😍
Impressive infrastructure Guangzhou China 🇨🇳
ይህ በምስሉ ላይ የምትመለከቱት ሕንፃ የሚገኘው አዲስ አበባ ልደታ አካባቢ ሲሆን @COTMp ያኮራ ዲዛይን ነው፡፡👌
.
እስቲ እናንተም ከኮራችሁበት like በማረግ ግለፁልን፡፡
Earthwork?
Earthwork is the phase during a highways construction when the right of way is converted to section and the grades prescribed in the plans.

Earthwork is highly influenced by geometric design of a road and type of soil.

Objectives? Of Earthwork
--identify location of quantities
--Distance of earth moving
--Compute volumes of cut and fill and
--Estimate costs of moving earth
For the construction of a house, among other factors, the following requirements must be satisfied:
1. A site on which to build the house,
2. Permission from local authorities to build the house,
3. Materials for building the house,
4. skilled laborers for the erection of the house,
5. Financial source and
6. Professionals, such as architects and engineers.

As each one of these requires money, the financial aspect is therefore very important and the costs must always be considered during all the planning and building stages. However, this does not mean that it is always economical to save money or build cheaply. "The poorest often builds the dearest" is too often proven true.
❤1
👉What is meant by air entrained concrete?
▶️Why is air content important in concrete?
▶️Any disadvantages?
.
Write your answer on @COTMp
👌ሸገር ኣዱ ገነት❤️
፡
🙏ውብ ምሽት ተመኘን🙏
Amazing penthouse
👉🏿Brain test
which building is in front?
Use discussion group
Be logical
MOST USED SOFTWARE IN CONSTRUCTION ENGINEERING
.
1. Ms Excel
Lets you store any complex data and simplIfy complicated calculations
2. ETABS
Lets you do analysis & design of different structural members
3. SAP 2000
Lets you do analysis & design of different structural members
The difference with ETABS is that it is more broad in scope.
4. Auto CAD
Lets you draw & print out useful drawings in variety of attractive layouts.
5. MS Project
Lets you manage huge projects (money,time,resources)
6. Archi CAD
It is more of architectural design of different structures.
7. Civil3D
It is one of the newly leading software that autodesk has launched so far.
It can do both what Auto CAD & highway designing software are designed to perform.
8. Water CAD
9. Primavera - for scheduling
10. Revit - for architectural design and for structural design and there is construction template in there and it’s very essential to calculate the wind load and seismic load
11. Safe- it’s for structural design and the difference between safe and ETABS is that it gives your the shape of the bar
HIGHWAY DESIGN SOFTWARES
1. Inroad
2. Eagle point
3. MX Road
4. CIVIL3D
❤1
✅A typical building project will include the following
.
💠A.Substructure
1.Excavation & Earth work
2.Concrete Work
3.Masonry Work
.
💠B.Super structure
1.Concrete work
2.Roofing
3.Masonry works
4.Metal Work
5.Finishing work
6.Glazing
7.Electrical Installation
8.Carpentry & Joinery
9.Sanitary Installation
10.Fence Work
.
🔴General factors to be considered for determining depth of foundation are:
1,Load applied from structure to the foundation.
2,Bearing capacity of soil.
3,Depth of water level below the ground surface.
4,Types of soil and depth of layers in case of layered soil.
5,Depth of adjacent foundation.