Ethio Construction Engineering
๐What is horizontal directional drilling? @etconp๐๐๐
๐What is horizontal directional drilling?
๐ทHorizontal Directional Drilling (HDD) is a construction technique whereby a tunnel is drilled under a waterway or other designated area, and a pipeline or other utility is pulled through the drilled underground tunnel.
โบThe underground tunnel follows an arc line from the entry point, down under the special crossing area, and then resurfaces on the opposite side.
โบUsing advanced technology and highly trained technicians, a drill head guides the drilling pipe electronically to ensure the angle, depth, and exit point adhere to carefully designed engineering plans.
โถ๏ธThroughout the drilling process, the tunnel is kept open and lubricated by circulating a watery mud-slurry mixture, typically composed of about 95% water and 5% bentonite clayโa natural, non-toxic substance.
โบThe drilling mud also helps coat the walls of the tunnel and remove drill cuttings.
โญ๏ธWhen the tunnel is 12 inches wider than the diameter of the pipe going through it, the welded pipeline segment can be pulled through the underground arched tunnel from one end to the other end.
โบThese pipeline segments are typically made of thicker steel and have a protective first layer of coating to prevent corrosion and a second abrasionresistant coating to protect the pipe during the pull through the tunnel.
๐ซThe two ends of the pipeline segment can then be welded together with the rest of that pipeline system.
@etconp
๐ทHorizontal Directional Drilling (HDD) is a construction technique whereby a tunnel is drilled under a waterway or other designated area, and a pipeline or other utility is pulled through the drilled underground tunnel.
โบThe underground tunnel follows an arc line from the entry point, down under the special crossing area, and then resurfaces on the opposite side.
โบUsing advanced technology and highly trained technicians, a drill head guides the drilling pipe electronically to ensure the angle, depth, and exit point adhere to carefully designed engineering plans.
โถ๏ธThroughout the drilling process, the tunnel is kept open and lubricated by circulating a watery mud-slurry mixture, typically composed of about 95% water and 5% bentonite clayโa natural, non-toxic substance.
โบThe drilling mud also helps coat the walls of the tunnel and remove drill cuttings.
โญ๏ธWhen the tunnel is 12 inches wider than the diameter of the pipe going through it, the welded pipeline segment can be pulled through the underground arched tunnel from one end to the other end.
โบThese pipeline segments are typically made of thicker steel and have a protective first layer of coating to prevent corrosion and a second abrasionresistant coating to protect the pipe during the pull through the tunnel.
๐ซThe two ends of the pipeline segment can then be welded together with the rest of that pipeline system.
@etconp
๐4๐2โค1
๐The temperature of the asphalt plant mix depends on the type of asphalt mix being produced and the specifications of the project.
๐ซGeneral guidelines are:
๐ง1. Hot Mix Asphalt (HMA):
Mixing temperature: 275โ325ยฐF (135โ165ยฐC)
Typically used for road construction.
๐ง2. Warm Mix Asphalt (WMA):
Mixing temperature: 200โ275ยฐF (95โ135ยฐC)
Preferred for environmentally friendly projects due to reduced emissions.
๐ง3. Cold Mix Asphalt:
No heating is involved, as it uses emulsified asphalt or cutback.
The exact temperature depends on factors like:
The type of binder (e.g., viscosity and grade).
Aggregate properties.
Weather and environmental conditions.
Plant specifications and operational standards.
Itโs essential to follow the mix design or code requirements (e.g., AASHTO, ASTM, or local standards) for accurate temperature ranges.
@etconp
๐ซGeneral guidelines are:
๐ง1. Hot Mix Asphalt (HMA):
Mixing temperature: 275โ325ยฐF (135โ165ยฐC)
Typically used for road construction.
๐ง2. Warm Mix Asphalt (WMA):
Mixing temperature: 200โ275ยฐF (95โ135ยฐC)
Preferred for environmentally friendly projects due to reduced emissions.
๐ง3. Cold Mix Asphalt:
No heating is involved, as it uses emulsified asphalt or cutback.
The exact temperature depends on factors like:
The type of binder (e.g., viscosity and grade).
Aggregate properties.
Weather and environmental conditions.
Plant specifications and operational standards.
Itโs essential to follow the mix design or code requirements (e.g., AASHTO, ASTM, or local standards) for accurate temperature ranges.
@etconp
โค8๐4
๐แตแซ แแแแแฝ แ แฐแแญแ แ แฒแต แแฉแแ แตแซ แฅแแแแแแ แจแแ แ แญแ แญแฃแชแแฝ แฐแ แแแโผ๏ธ
@etconp
https://t.me/ETCONpWORK/2714?single
@etconp
https://t.me/ETCONpWORK/2714?single
Telegram
Ethio Con Work
๐3๐2
๐แจแตแแ แฆแญแ แญแแแแแ แจแฐแฃแแ แจ17 แขแแจแ แถแแญ แแแ แแฎแแญแต
๐งแแญแจแฆแฝ แ แตแแ แฆแญ แ แฉแ แแแแ แจแแแตแตแฃแธแแ แแ แฅแตแจ 15 แแแต แแณแ แญ แญแฝแแ แฐแฅแแ แ แ แแแแแฑ แจแแฅแนแ แตแแ แฆแญ แญแแแแแ แจแฐแฃแ แแแ แจแแแแต แแฎแแญแต แแฐ แฐแแฃแญ แแแแฃแต แจแฅแ แต แตแซแ แ แแ แแแ แแญ แฅแแฐแแแ แฐแฐแแทแแข
๐ท17 แขแแจแ แถแแญ แซแแฃแ แจแฐแฃแแ แแ แแฎแแญแต แจ1198 แชแแแตแญ แ แแญ แฅแญแแแ แฅแแฐแแแจแ แฐแแแฎแแณแแข
โบแแแซแฅ แฅแตแซ แฅแ แ แแฎแแ แ แแแแแต แซแแฐแแซแจแ แจแแญแต แแแแญ แซแณแแฃแ แจแฐแฃแ แฒแแแค แแแฑ แ แ แแฎแฝ แแญแต แแแแแแฅ แ แตแแ แฆแญ แแญ แซแแธแแ แฅแแแแต แฅแแฐแแแแต แฐแตแ แฐแฅแแ แณแ แจแแแแต แแแฃแณแ แแแปแแ แจแฑแญแญ แฐแแแแ แตแแ แญ แ แตแญแ แฅแตแจ แฐแกแฃแ แจแแญแต แฃแ แจ แฐแแค แตแจแต แญแแจแแแข
โบแจแแแแต แฃ แจแฃแกแญ แแฒแต แฃ แจแแฐแฅ แฅแ แจแจแฐแ แแแแถแฝแ แจแแแญ แ แแซแญ แแแแถแฝ แแญ แแแแแตแ แซแแแ แญแ แแ แแฎแแญแต แ แฅแตแซ แฅแ แ แ แแฎแ แแซแจแ แซแแแ แจแแ แแ แแแแแต แซแแ แแแกแก
โบแ แแแฑ แ แ แแซแต แแซแจแ แแแแแ แขแฎแแแซแ แแแแแต แแณแ แจแแแต แแตแแญ แแแแ แจแแฅแน แตแแ แฆแญ แฐแแซแซแช แจแแแ แฅแตแแ แจแแฐแ แแแ แฐแแแญแทแ แข
แฑแญแญ แแญ แจแแแต แฎแชแฐแญ แจแแจแ แ แแ แจแขแซแ แ แแแ แ แแ แฐแฐแแแต แฅแแฒแแ แจแแแญ แแตแฅ แขแฎแแแแ แฅแ แแ แจแฐ แแแตแ แซแ แแญแซแ แฐแฅแ แญแ แ แแแข
แจแขแซแ แ แ แแญ แแแตแตแญ แแแแต แบแ แ แแฑแณแ แแฎแแญแฑ แ แแแแแต แจแแณแ แฅแแแแต แจแฐแแแ แขแฎแแแ แแแแแฃแต แจแแแแ แตแแแญ แแ แซแ แฒแแแค แขแซแ แแ แ แซแฃแขแแ แจแแ แ แ แแแ แแ แตแตแตแญ แฅแ แแขแฎแแ แแ แฐแต แจแแแจแแ แตแญแป แจแแฐแ แตแแแแ แ แแตแฐแแ::
แจแขแซแ โแจแแซแแต แแ แแญแตโ แ แแ แแแแต แจแแฐแแแ แแญแถแฝแ แญแแ แจแแแก แแญแจแฆแฝแ แแแตแฐแแแต แแแแแต แฐแฅแแ แณแแกแก
แฅแแฐ แแแชแฑ แจแตแซแแตแแญแต แแแตแตแญ แแจแ แจแแ แญแ แแฐแฅ แฅแตแจ19.5 แแตแญ แฅแแแต แซแแธแ แตแแแ แจแแแต แแญแจแฆแฝแ แแตแฐแแแต แญแฝแแแข
แจแแฅแน แตแแ แซแแ แแญ แฒแแแแญแ แ แแ แแ แจ12 แฅแตแจ 15 แแแต แแแ แฅ แฅแแฐแแฝแแ แฐแฐแแทแแกแก
แแแตแตแฉ แซแแ แแแขแต แ แแณแณแ โแ แแ แแฎแแญแต แขแซแ แฅแ แฑแญแญ แจแแฆแแแฒแซแ แ แแแณ แซแแแแค แแแญ แแ แแ แ แแ แจแแแฒแซ แจแธแณ แขแฎแแ แแญ แซแฐแฎแจ แฅแป แญแแแโ แฅแแแแกแก
แ แถแตแต แ แแต แแแ แแแ แฅแ แต แจแฐแซแแแต แแ แแฎแแญแต แ แ แญแซแณ แฐแ แแ แแฃแช แแแซแต แตแแ แซแแ แฒแแแค แ แจแฅ แคแแฌแตแต แฅแ แจแณแณแญ แแแแตแณแต แฃแแแ แญแจแแต แ แแฎแแญแฑ แจแแซ แแแต แแญแซ แตแแแแต แฐแแซแญแแแแข
Via Alain
@etconp
๐งแแญแจแฆแฝ แ แตแแ แฆแญ แ แฉแ แแแแ แจแแแตแตแฃแธแแ แแ แฅแตแจ 15 แแแต แแณแ แญ แญแฝแแ แฐแฅแแ แ แ แแแแแฑ แจแแฅแนแ แตแแ แฆแญ แญแแแแแ แจแฐแฃแ แแแ แจแแแแต แแฎแแญแต แแฐ แฐแแฃแญ แแแแฃแต แจแฅแ แต แตแซแ แ แแ แแแ แแญ แฅแแฐแแแ แฐแฐแแทแแข
๐ท17 แขแแจแ แถแแญ แซแแฃแ แจแฐแฃแแ แแ แแฎแแญแต แจ1198 แชแแแตแญ แ แแญ แฅแญแแแ แฅแแฐแแแจแ แฐแแแฎแแณแแข
โบแแแซแฅ แฅแตแซ แฅแ แ แแฎแแ แ แแแแแต แซแแฐแแซแจแ แจแแญแต แแแแญ แซแณแแฃแ แจแฐแฃแ แฒแแแค แแแฑ แ แ แแฎแฝ แแญแต แแแแแแฅ แ แตแแ แฆแญ แแญ แซแแธแแ แฅแแแแต แฅแแฐแแแแต แฐแตแ แฐแฅแแ แณแ แจแแแแต แแแฃแณแ แแแปแแ แจแฑแญแญ แฐแแแแ แตแแ แญ แ แตแญแ แฅแตแจ แฐแกแฃแ แจแแญแต แฃแ แจ แฐแแค แตแจแต แญแแจแแแข
โบแจแแแแต แฃ แจแฃแกแญ แแฒแต แฃ แจแแฐแฅ แฅแ แจแจแฐแ แแแแถแฝแ แจแแแญ แ แแซแญ แแแแถแฝ แแญ แแแแแตแ แซแแแ แญแ แแ แแฎแแญแต แ แฅแตแซ แฅแ แ แ แแฎแ แแซแจแ แซแแแ แจแแ แแ แแแแแต แซแแ แแแกแก
โบแ แแแฑ แ แ แแซแต แแซแจแ แแแแแ แขแฎแแแซแ แแแแแต แแณแ แจแแแต แแตแแญ แแแแ แจแแฅแน แตแแ แฆแญ แฐแแซแซแช แจแแแ แฅแตแแ แจแแฐแ แแแ แฐแแแญแทแ แข
แฑแญแญ แแญ แจแแแต แฎแชแฐแญ แจแแจแ แ แแ แจแขแซแ แ แแแ แ แแ แฐแฐแแแต แฅแแฒแแ แจแแแญ แแตแฅ แขแฎแแแแ แฅแ แแ แจแฐ แแแตแ แซแ แแญแซแ แฐแฅแ แญแ แ แแแข
แจแขแซแ แ แ แแญ แแแตแตแญ แแแแต แบแ แ แแฑแณแ แแฎแแญแฑ แ แแแแแต แจแแณแ แฅแแแแต แจแฐแแแ แขแฎแแแ แแแแแฃแต แจแแแแ แตแแแญ แแ แซแ แฒแแแค แขแซแ แแ แ แซแฃแขแแ แจแแ แ แ แแแ แแ แตแตแตแญ แฅแ แแขแฎแแ แแ แฐแต แจแแแจแแ แตแญแป แจแแฐแ แตแแแแ แ แแตแฐแแ::
แจแขแซแ โแจแแซแแต แแ แแญแตโ แ แแ แแแแต แจแแฐแแแ แแญแถแฝแ แญแแ แจแแแก แแญแจแฆแฝแ แแแตแฐแแแต แแแแแต แฐแฅแแ แณแแกแก
แฅแแฐ แแแชแฑ แจแตแซแแตแแญแต แแแตแตแญ แแจแ แจแแ แญแ แแฐแฅ แฅแตแจ19.5 แแตแญ แฅแแแต แซแแธแ แตแแแ แจแแแต แแญแจแฆแฝแ แแตแฐแแแต แญแฝแแแข
แจแแฅแน แตแแ แซแแ แแญ แฒแแแแญแ แ แแ แแ แจ12 แฅแตแจ 15 แแแต แแแ แฅ แฅแแฐแแฝแแ แฐแฐแแทแแกแก
แแแตแตแฉ แซแแ แแแขแต แ แแณแณแ โแ แแ แแฎแแญแต แขแซแ แฅแ แฑแญแญ แจแแฆแแแฒแซแ แ แแแณ แซแแแแค แแแญ แแ แแ แ แแ แจแแแฒแซ แจแธแณ แขแฎแแ แแญ แซแฐแฎแจ แฅแป แญแแแโ แฅแแแแกแก
แ แถแตแต แ แแต แแแ แแแ แฅแ แต แจแฐแซแแแต แแ แแฎแแญแต แ แ แญแซแณ แฐแ แแ แแฃแช แแแซแต แตแแ แซแแ แฒแแแค แ แจแฅ แคแแฌแตแต แฅแ แจแณแณแญ แแแแตแณแต แฃแแแ แญแจแแต แ แแฎแแญแฑ แจแแซ แแแต แแญแซ แตแแแแต แฐแแซแญแแแแข
Via Alain
@etconp
๐20๐ฅ1
Modernism in Africa.pdf
63.7 MB
๐แ แฒแต แจแแฝแแ แฅแแ
๐ซModernism in Africa.
โญ๏ธแ แแ แ แ แแชแซ แ แแซแต แซแแตแ แจแแแแแแ แแญแค แ แแป แแตแ แจแฐแฐแแฐแแ แต แฅแ แ แ แแ แแฝแแ แ แ แญแ แแจแฅ แ แแป แจแฐแแแ แฒแแ แแฝแแแ แจแแญ แ แฐแซแซแแ แแฒแคแ แ แแญแถ แแแ แฅ แญแปแแแกแก
@etconp
๐ซModernism in Africa.
โญ๏ธแ แแ แ แ แแชแซ แ แแซแต แซแแตแ แจแแแแแแ แแญแค แ แแป แแตแ แจแฐแฐแแฐแแ แต แฅแ แ แ แแ แแฝแแ แ แ แญแ แแจแฅ แ แแป แจแฐแแแ แฒแแ แแฝแแแ แจแแญ แ แฐแซแซแแ แแฒแคแ แ แแญแถ แแแ แฅ แญแปแแแกแก
@etconp
๐ฅ9๐8๐2
#ADVERTISEMENTS
๐แจ แแแแต แแแฃแณ แฒแแญแ แตแซ แแฐแซแต แญแแแแ?
๐ทแ แแแแต แตแซ แแญ แจแ แแญ แแ แ แฅแ แแ แตแแตแฃแจ แ แตแแแต แแแฃแ แตแแตแฃแแ แจ แตแตแซแญแธแซแ แตแฎแแแ แตแซ แ แแฅแแต แฅแ แ แฅแซแต แฐแญแฐแ แฅแแตแจแญแฃแแแข
๐งแฅแแฒแแ Civil 3D แฒแถแญแซแ แชแตแฎ แจแ แแ แแฐแชแซแ
แจ Girder Birdge Working Drawing แจแ 3D modelแ แแ แแฐแชแซแ แชแตแฎ แ แฐแจแแช แแแแแ แจแแแแต แตแซ แแญแแฝ แฅแ แดแแแแถแฝ แ แแแข
๐ซแจแณแฝ แฃแแต แฃแแซแฎแฝ แญแแฅแแ
YouTube: http://www.youtube.com/@musfide
แตแ แจ แแ :- www.musfide.com
แดแแแซแ แแ :- https://t.me/musafide
แแแญแฐแ:- https://www.linkedin.com/in/musfide
แแญแ แ +251905666664 แจแฐแแ แซแแแแ๐
๐แจ แแแแต แแแฃแณ แฒแแญแ แตแซ แแฐแซแต แญแแแแ?
๐ทแ แแแแต แตแซ แแญ แจแ แแญ แแ แ แฅแ แแ แตแแตแฃแจ แ แตแแแต แแแฃแ แตแแตแฃแแ แจ แตแตแซแญแธแซแ แตแฎแแแ แตแซ แ แแฅแแต แฅแ แ แฅแซแต แฐแญแฐแ แฅแแตแจแญแฃแแแข
๐งแฅแแฒแแ Civil 3D แฒแถแญแซแ แชแตแฎ แจแ แแ แแฐแชแซแ
แจ Girder Birdge Working Drawing แจแ 3D modelแ แแ แแฐแชแซแ แชแตแฎ แ แฐแจแแช แแแแแ แจแแแแต แตแซ แแญแแฝ แฅแ แดแแแแถแฝ แ แแแข
๐ซแจแณแฝ แฃแแต แฃแแซแฎแฝ แญแแฅแแ
YouTube: http://www.youtube.com/@musfide
แตแ แจ แแ :- www.musfide.com
แดแแแซแ แแ :- https://t.me/musafide
แแแญแฐแ:- https://www.linkedin.com/in/musfide
แแญแ แ +251905666664 แจแฐแแ แซแแแแ๐
๐10
๐Curing Time According to ACI ๐๐๏ธ
โญ๏ธThe American Concrete Institute (ACI) provides specific guidelines for curing to ensure concrete achieves its designed strength and durability:
๐ซ1. Beam ๐ชต
Initial Curing: 24-48 hours ๐ง๏ธ๐
Final Curing: Minimum 7 days for normal cement or 3 days for high-early-strength cement.
Recommended as per ACI 308R-16.
๐ซ2. Column ๐๏ธ
Initial Curing: 24-48 hours ๐ง๏ธ
Final Curing: Same as beams, 7 days minimum for normal cement or 3 days for high-early-strength cement.
๐ซ3. Slab ๐
Initial Curing: 24-48 hours ๐ง๏ธ๐ (Cover with plastic sheets, wet burlap, or curing blankets).
Final Curing: Minimum 7 days (ponding or sprinkling for slabs is highly recommended).
๐ก According to ACI 308-92, the curing period can be adjusted based on factors like cement type, ambient conditions, and strength requirements. Proper curing is vital for reducing shrinkage, cracking, and ensuring durability!
@etconp
โญ๏ธThe American Concrete Institute (ACI) provides specific guidelines for curing to ensure concrete achieves its designed strength and durability:
๐ซ1. Beam ๐ชต
Initial Curing: 24-48 hours ๐ง๏ธ๐
Final Curing: Minimum 7 days for normal cement or 3 days for high-early-strength cement.
Recommended as per ACI 308R-16.
๐ซ2. Column ๐๏ธ
Initial Curing: 24-48 hours ๐ง๏ธ
Final Curing: Same as beams, 7 days minimum for normal cement or 3 days for high-early-strength cement.
๐ซ3. Slab ๐
Initial Curing: 24-48 hours ๐ง๏ธ๐ (Cover with plastic sheets, wet burlap, or curing blankets).
Final Curing: Minimum 7 days (ponding or sprinkling for slabs is highly recommended).
๐ก According to ACI 308-92, the curing period can be adjusted based on factors like cement type, ambient conditions, and strength requirements. Proper curing is vital for reducing shrinkage, cracking, and ensuring durability!
@etconp
๐15๐8โค3
๐Borrow material and Selected material
๐งIn construction, borrow material is a naturally occurring material used to create fill and structural elements, while selected material is a material chosen to meet specific project requirements:
๐ซBorrow material
๐ทA naturally occurring material that's excavated from a borrow pit and used to create fill and structural elements like embankments.
โบBorrow material is selected to meet the project's grading, stability, and load-bearing capacity requirements.
๐ซSelected material
๐ทA material chosen to meet specific project requirements. When selecting construction materials, factors to consider include strength, durability, cost, availability, and climate.
โญ๏ธWhen selecting a borrow area, it's important to consider the quantity and quality of the fill, as well as the type of equipment that will be used.
@etconp
๐งIn construction, borrow material is a naturally occurring material used to create fill and structural elements, while selected material is a material chosen to meet specific project requirements:
๐ซBorrow material
๐ทA naturally occurring material that's excavated from a borrow pit and used to create fill and structural elements like embankments.
โบBorrow material is selected to meet the project's grading, stability, and load-bearing capacity requirements.
๐ซSelected material
๐ทA material chosen to meet specific project requirements. When selecting construction materials, factors to consider include strength, durability, cost, availability, and climate.
โญ๏ธWhen selecting a borrow area, it's important to consider the quantity and quality of the fill, as well as the type of equipment that will be used.
@etconp
๐14
๐Bleeding & Segregation in Concrete
๐งBleeding
โก๏ธBleeding is a form of segregation in which water present in the concrete mix is pushed upwards due to the settlement of cement and aggregate.
โก๏ธThe specific gravity of water is low, due to this water tends to move upwards.
โก๏ธBleeding ordinarily occurs in the wet mix of concrete.
โก๏ธThe Prime factor for bleeding in concrete is the high dosage of Water cement ratio.
โก๏ธHigher water-cement ratio weakens concrete and leads to excessive bleeding.
โก๏ธThe bleeding in concrete is not harmful if the rate of evaporation of water is equal to the rate of bleeding.
โก๏ธNormal bleeding is quite good, and it enhances the workability of concrete.
โก๏ธWhen the concrete is fully plastic, bleeding may not cause much harm. However, concrete is still in the plastic stage later it is subsidized and compacted.
๐งSegregation
โถ๏ธSegregation is the โSeparation of constituent materials in concrete"
โก๏ธIn concrete technology segregation is of three types
โบ1. Separation of Coarse aggregate from the concrete mixture.
โบ2. Separation of Cement pastes from the concrete during its plastic stage.
โบ3. Separation of water from the concrete mix (Bleeding in concrete)
===================
Invite your friends to this channel
====================
@etconp
๐งBleeding
โก๏ธBleeding is a form of segregation in which water present in the concrete mix is pushed upwards due to the settlement of cement and aggregate.
โก๏ธThe specific gravity of water is low, due to this water tends to move upwards.
โก๏ธBleeding ordinarily occurs in the wet mix of concrete.
โก๏ธThe Prime factor for bleeding in concrete is the high dosage of Water cement ratio.
โก๏ธHigher water-cement ratio weakens concrete and leads to excessive bleeding.
โก๏ธThe bleeding in concrete is not harmful if the rate of evaporation of water is equal to the rate of bleeding.
โก๏ธNormal bleeding is quite good, and it enhances the workability of concrete.
โก๏ธWhen the concrete is fully plastic, bleeding may not cause much harm. However, concrete is still in the plastic stage later it is subsidized and compacted.
๐งSegregation
โถ๏ธSegregation is the โSeparation of constituent materials in concrete"
โก๏ธIn concrete technology segregation is of three types
โบ1. Separation of Coarse aggregate from the concrete mixture.
โบ2. Separation of Cement pastes from the concrete during its plastic stage.
โบ3. Separation of water from the concrete mix (Bleeding in concrete)
===================
Invite your friends to this channel
====================
@etconp
๐17โค2
๐แ แแแฃแณ แตแซ แแญ แแฐแฐแแฉ แฐแแซแฎแฝแ แ แแซแชแแฝ แจแฐแแแแ แจแแ
แ แแแฃแณ แตแแ แ แฅแจแฐแฐแ แแ
แ แ แฒแต แ แ แฃ แฒแแญแแ แแแฃแณ แตแซแแฝ แขแฎ แจแฐแแแแแ แตแฉแจแฑแ Construction Material Management แฅแ Construction Human Resource Management แแญ แซแฐแจแแ แจแแ แ แแแฃแณ แตแแ แ แฅแจแฐแฐแ แญแแแแกแก
แ แขแฎแ แ แฐแจแณแณแญแแต แฅแจแฐแฐแก แจแแแแ แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแแ แแ แ แจแแซแแแฅแฑ แตแแ แแแฝ แแตแฅ แ แแฑ แ แแแ แ แแ แตแแ แ แ แ แฒแต แ แ แฃ แจแฐแ แจแแแ 250 แตแซ แฐแแซแฎแฝ แฅแ แ แแซแชแแฝ แฅแจแฐแณแฐแ แญแแแแกแก
แ แแฃแญแ แ แแแฐแ แแญ Construction Claim and Dispute Resolution แ แแ แจแตแแ แ แญแแต แแญ แตแแ แแ แ แแฐแแแฅแ แจแขแฎแ แจแแ แ แแแฃแณ แณแญแฌแญแถแฌแต แซแแแแ แแจแ แซแณแซแแข
แขแฎแ แ แญแซแณ แแแฃแแฝแ แ แฅแซแต แ แแจแแแ แแ แแแแแต แฅแซแแ แจแแแ แแแแแ แจแขแแฑแตแตแชแแ แฐแแแซแ แแ แ แจแแซแแแฅแฑ แฐแจแณแณแญ แตแแ แแแฝแ แ แแตแ แต แจแจแฐแแ แฎแแตแตแซแญแฝแ แแตแแต แแญ แจแแ แจแตแญแป แฅแซแ แจแจแฐ แญแแแแข
แจแ แฒแต แ แ แฃ แฒแแญแแ แแแฃแณ แตแซแแฝ แขแฎ แฎแแแฌแฝแ แแณแฎแฝ แณแญแฌแญแถแฌแต แณแ แณแต 2/2017 แ.แ
@etconp
แ แ แฒแต แ แ แฃ แฒแแญแแ แแแฃแณ แตแซแแฝ แขแฎ แจแฐแแแแแ แตแฉแจแฑแ Construction Material Management แฅแ Construction Human Resource Management แแญ แซแฐแจแแ แจแแ แ แแแฃแณ แตแแ แ แฅแจแฐแฐแ แญแแแแกแก
แ แขแฎแ แ แฐแจแณแณแญแแต แฅแจแฐแฐแก แจแแแแ แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแแ แแ แ แจแแซแแแฅแฑ แตแแ แแแฝ แแตแฅ แ แแฑ แ แแแ แ แแ แตแแ แ แ แ แฒแต แ แ แฃ แจแฐแ แจแแแ 250 แตแซ แฐแแซแฎแฝ แฅแ แ แแซแชแแฝ แฅแจแฐแณแฐแ แญแแแแกแก
แ แแฃแญแ แ แแแฐแ แแญ Construction Claim and Dispute Resolution แ แแ แจแตแแ แ แญแแต แแญ แตแแ แแ แ แแฐแแแฅแ แจแขแฎแ แจแแ แ แแแฃแณ แณแญแฌแญแถแฌแต แซแแแแ แแจแ แซแณแซแแข
แขแฎแ แ แญแซแณ แแแฃแแฝแ แ แฅแซแต แ แแจแแแ แแ แแแแแต แฅแซแแ แจแแแ แแแแแ แจแขแแฑแตแตแชแแ แฐแแแซแ แแ แ แจแแซแแแฅแฑ แฐแจแณแณแญ แตแแ แแแฝแ แ แแตแ แต แจแจแฐแแ แฎแแตแตแซแญแฝแ แแตแแต แแญ แจแแ แจแตแญแป แฅแซแ แจแจแฐ แญแแแแข
แจแ แฒแต แ แ แฃ แฒแแญแแ แแแฃแณ แตแซแแฝ แขแฎ แฎแแแฌแฝแ แแณแฎแฝ แณแญแฌแญแถแฌแต แณแ แณแต 2/2017 แ.แ
@etconp
๐12โค3
Intercon Construction Chemicals
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐3โค1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แตแ STAIRS แตแแฝ แ แแ แแณแฅ แฅแแแแญ ๐
๐งCalculations for the construction of stairs, ramps and guards are set out in various national building regulations.
๐ซThe guidelines here are based on German standards.
โถ๏ธDwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio.
โบStairs governed by building regulations must have a width of 1.00m and a ratio of 17/28.
โบIn high rise flats they must be 1.25 m wide
โบThe length of stair runs from 23 steps up to 18 steps --> @ Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m).
โบDoors opening into the stairwell must not restrict the effective width.
โถ๏ธThe time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent.
โถ๏ธA staircase at a side entrance or emergency stairs should make a rapid descent easy.
โถ๏ธThe experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps.
โบClimbing stairs takes on average seven times as much energy as walking on the flat.
โบFrom the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30ยฐ and a ratio of rise of: rise of step/going of step; r/g= 17/29.
โถ๏ธThe angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied: 2r+ g= 63cm (1 stride)
โถ๏ธIn the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
โถ๏ธNot only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable.
โนHowever, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly.
โบEvery main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
@etconp
๐งCalculations for the construction of stairs, ramps and guards are set out in various national building regulations.
๐ซThe guidelines here are based on German standards.
โถ๏ธDwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio.
โบStairs governed by building regulations must have a width of 1.00m and a ratio of 17/28.
โบIn high rise flats they must be 1.25 m wide
โบThe length of stair runs from 23 steps up to 18 steps --> @ Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m).
โบDoors opening into the stairwell must not restrict the effective width.
โถ๏ธThe time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent.
โถ๏ธA staircase at a side entrance or emergency stairs should make a rapid descent easy.
โถ๏ธThe experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps.
โบClimbing stairs takes on average seven times as much energy as walking on the flat.
โบFrom the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30ยฐ and a ratio of rise of: rise of step/going of step; r/g= 17/29.
โถ๏ธThe angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied: 2r+ g= 63cm (1 stride)
โถ๏ธIn the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
โถ๏ธNot only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable.
โนHowever, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly.
โบEvery main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
@etconp
๐18โค2
๐แฅแตแฒ แฃแแ แฐแ แตแ lap length , Development length,Anchorage length แตแแฝ แฅแแแแซแนแข
๐ท1. แแ แแแแ (lap length) - แฐแแแ แจแฅแจแต (แแฎ) แญแแแต
แแฅแจแตแ (stresses) แจแ แแต แฅแจแต แแฐแแ แจแแฐแแแแ แต แแ
โบThe lap length varies from member to member. Lap length for tension members = 40d
โบLap length for compression members = 50d Where, d = Diameter of bars.
๐ท2. แฐแจแแแแแต แแแแ (Development length) -แฐแแแ
แจแฅแจแต แญแแแต แแฅแจแตแ (stresses) แจแฅแจแฑ แแฐ แฎแแญแชแฑ แจแแฐแแแแ แต แแแข
๐ท3. แ แแฎแฌแ แแแแ (Anchorage length) - แญแ แญแแแต แ แญแแต แ แ แจแแ แฐแจแแแแแต แแแแ (development
length ) แ แแแฃแธแ แ Support / fixed ends แแญ provide แจแแแจแแ แญแแแต แแแข
@etconp
๐ท1. แแ แแแแ (lap length) - แฐแแแ แจแฅแจแต (แแฎ) แญแแแต
แแฅแจแตแ (stresses) แจแ แแต แฅแจแต แแฐแแ แจแแฐแแแแ แต แแ
โบThe lap length varies from member to member. Lap length for tension members = 40d
โบLap length for compression members = 50d Where, d = Diameter of bars.
๐ท2. แฐแจแแแแแต แแแแ (Development length) -แฐแแแ
แจแฅแจแต แญแแแต แแฅแจแตแ (stresses) แจแฅแจแฑ แแฐ แฎแแญแชแฑ แจแแฐแแแแ แต แแแข
๐ท3. แ แแฎแฌแ แแแแ (Anchorage length) - แญแ แญแแแต แ แญแแต แ แ แจแแ แฐแจแแแแแต แแแแ (development
length ) แ แแแฃแธแ แ Support / fixed ends แแญ provide แจแแแจแแ แญแแแต แแแข
@etconp
๐14โค10๐1
#ADVERTISEMENT
๐ซSpecialized Retrofitting (Jacketing) Services for:
โ Columns โ Enhance load-carrying capacity and structural integrity.
โ Footings โ Improve stability and prevent settlement.
โ Beams โ Restore and upgrade strength for better performance.
๐งWhy Retrofitting?
๐น Extend Structural Lifespan โ Protect your investment for years to come.
๐น Improve Safety โ Ensure compliance with modern building codes and standards.
๐น Cost-Effective โ Avoid expensive replacements by strengthening existing structures.
๐น Resilience Against Disasters โ Strengthen your building to withstand seismic activity and heavy loads.
๐ Contact Us Today!
๐ฉ @pragmaengineering
๐ฑ +251975889929 | +251941099797
Pragma Engineering โ Your Trusted Partner in Structural Excellence!
๐ซSpecialized Retrofitting (Jacketing) Services for:
โ Columns โ Enhance load-carrying capacity and structural integrity.
โ Footings โ Improve stability and prevent settlement.
โ Beams โ Restore and upgrade strength for better performance.
๐งWhy Retrofitting?
๐น Extend Structural Lifespan โ Protect your investment for years to come.
๐น Improve Safety โ Ensure compliance with modern building codes and standards.
๐น Cost-Effective โ Avoid expensive replacements by strengthening existing structures.
๐น Resilience Against Disasters โ Strengthen your building to withstand seismic activity and heavy loads.
๐ Contact Us Today!
๐ฉ @pragmaengineering
๐ฑ +251975889929 | +251941099797
Pragma Engineering โ Your Trusted Partner in Structural Excellence!
๐4๐4โค1