๐Bioconcrete
๐ทBio concrete is an innovative material that incorporates bacteria capable of producing calcite when exposed to water and oxygen. ๐๐๐
@etconp
๐ทBio concrete is an innovative material that incorporates bacteria capable of producing calcite when exposed to water and oxygen. ๐๐๐
@etconp
๐5โค3
Ethio Construction Engineering
๐Bioconcrete ๐ทBio concrete is an innovative material that incorporates bacteria capable of producing calcite when exposed to water and oxygen. ๐๐๐ @etconp
๐Bioconcrete
๐ทBio concrete is an innovative material that incorporates bacteria capable of producing calcite when exposed to water and oxygen.
These bacteria, encapsulated in the concrete, are activated when cracks form and naturally repair them. This process enhances the durability of structures, reduces maintenance costs, and contributes to sustainability by minimizing the need for conventional repairs.
Bio concrete has great potential for various infrastructure applications, offering an eco-friendly and cost-effective solution.
๐งSeveral processes are available for the production of bioconcrete:
- Adding bacteria of the genus Bacillus. Bacteria are placed in the concrete mixture in biodegradable capsules with calcium lactate to provide them with nutrients.
Once the capsule dissolves, the microorganisms come to life and in the process produce limestone that fills cracks in the concrete.
- The addition of spores of the fungus Trichoderma reesei. Without access to water and air, the fungi are at rest, but as soon as moisture and air enter the concrete structure through cracks, they begin to grow actively, producing calcium carbonate, which fills microcracks.
๐ซAdvantages:
- Resistance to the action of adverse natural factors.
- Reducing the time, labor and financial costs of routine and major repairs of buildings and structures.
- Prevention of damage to concrete structures during operation.
Self-restoring concrete is not yet widespread in the construction industry, because its cost is 2 times higher than conventional concrete mixes.
But if you calculate the benefits in the subsequent operation of facilities built with bioconcrete, the benefits of this material become apparent.
Specialists in the construction industry are confident that the future belongs to such materials.
Via Yonatan Tadesse PMP
@etconp
๐ทBio concrete is an innovative material that incorporates bacteria capable of producing calcite when exposed to water and oxygen.
These bacteria, encapsulated in the concrete, are activated when cracks form and naturally repair them. This process enhances the durability of structures, reduces maintenance costs, and contributes to sustainability by minimizing the need for conventional repairs.
Bio concrete has great potential for various infrastructure applications, offering an eco-friendly and cost-effective solution.
๐งSeveral processes are available for the production of bioconcrete:
- Adding bacteria of the genus Bacillus. Bacteria are placed in the concrete mixture in biodegradable capsules with calcium lactate to provide them with nutrients.
Once the capsule dissolves, the microorganisms come to life and in the process produce limestone that fills cracks in the concrete.
- The addition of spores of the fungus Trichoderma reesei. Without access to water and air, the fungi are at rest, but as soon as moisture and air enter the concrete structure through cracks, they begin to grow actively, producing calcium carbonate, which fills microcracks.
๐ซAdvantages:
- Resistance to the action of adverse natural factors.
- Reducing the time, labor and financial costs of routine and major repairs of buildings and structures.
- Prevention of damage to concrete structures during operation.
Self-restoring concrete is not yet widespread in the construction industry, because its cost is 2 times higher than conventional concrete mixes.
But if you calculate the benefits in the subsequent operation of facilities built with bioconcrete, the benefits of this material become apparent.
Specialists in the construction industry are confident that the future belongs to such materials.
Via Yonatan Tadesse PMP
@etconp
๐20๐ฅ2
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐2
๐When performing tensile test...
๐ทType of fracture you observe can reveal a lot about material's properties.
โญ๏ธLet's quick Learn about it.
โฌ ๐๐๐ฐ๐๐ถ๐น๐ฒ ๐๐ฟ๐ฎ๐ฐ๐๐๐ฟ๐ฒ โฌ
โ Cup-and-Cone Shape : Fracture surface is typically rough & fibrous, indicating significant plastic deformation.
โ High Energy Absorption : Ductile materials can absorb a lot of energy before failing, making them tough & less prone to catastrophic failure.
โ Elongation : Noticeable elongation & reduction in cross-sectional area occur before material breaks, observable as material necks down.
โ Microvoid Coalescence : Fracture process involves the nucleation, growth, & coalescence of microvoids, leading to material's separation.
โช Examples of Ductile Materials :
- Copper
- Mild Steel
- Aluminum
โฌ ๐๐ฟ๐ถ๐๐๐น๐ฒ ๐๐ฟ๐ฎ๐ฐ๐๐๐ฟ๐ฒ โฌ
โ Flat and Smooth Surface : Fracture surface appears smooth & shiny, often with a granular or crystalline appearance.
โ Low Energy Absorption : Brittle materials absorb less energy before fracturing, making them more susceptible to sudden failure under stress.
โ No Significant Elongation : Little to no necking or plastic deformation occurs before the material breaks.
โ Cleavage Planes : Brittle fracture often occurs along specific crystallographic planes, known as cleavage planes, where atomic bonds are weakest.
โช Examples of Brittle Materials :
- Glass
- Cast Iron
- Ceramics
- High-Carbon Steel
- - - - - - - - -
โ Factors Influencing Fracture Behavior:
- Strain Rate
- Temperature
- Microstructure
- Material Composition
โ Testing for Ductile and Brittle Fracture:
- Tensile Testing
- Charpy Impact Testing
- Fracture Toughness Testing
โ Real-World Example: Titanic Disaster ๐ข
- Sinking of Titanic is famous example of brittle fracture. Ship's hull was made of steel that became brittle at freezing temperatures of North Atlantic. When Titanic struck an iceberg, the hull plates fractured suddenly, leading to the catastrophic sinking of the ship.
@etconp
๐ทType of fracture you observe can reveal a lot about material's properties.
โญ๏ธLet's quick Learn about it.
โฌ ๐๐๐ฐ๐๐ถ๐น๐ฒ ๐๐ฟ๐ฎ๐ฐ๐๐๐ฟ๐ฒ โฌ
โ Cup-and-Cone Shape : Fracture surface is typically rough & fibrous, indicating significant plastic deformation.
โ High Energy Absorption : Ductile materials can absorb a lot of energy before failing, making them tough & less prone to catastrophic failure.
โ Elongation : Noticeable elongation & reduction in cross-sectional area occur before material breaks, observable as material necks down.
โ Microvoid Coalescence : Fracture process involves the nucleation, growth, & coalescence of microvoids, leading to material's separation.
โช Examples of Ductile Materials :
- Copper
- Mild Steel
- Aluminum
โฌ ๐๐ฟ๐ถ๐๐๐น๐ฒ ๐๐ฟ๐ฎ๐ฐ๐๐๐ฟ๐ฒ โฌ
โ Flat and Smooth Surface : Fracture surface appears smooth & shiny, often with a granular or crystalline appearance.
โ Low Energy Absorption : Brittle materials absorb less energy before fracturing, making them more susceptible to sudden failure under stress.
โ No Significant Elongation : Little to no necking or plastic deformation occurs before the material breaks.
โ Cleavage Planes : Brittle fracture often occurs along specific crystallographic planes, known as cleavage planes, where atomic bonds are weakest.
โช Examples of Brittle Materials :
- Glass
- Cast Iron
- Ceramics
- High-Carbon Steel
- - - - - - - - -
โ Factors Influencing Fracture Behavior:
- Strain Rate
- Temperature
- Microstructure
- Material Composition
โ Testing for Ductile and Brittle Fracture:
- Tensile Testing
- Charpy Impact Testing
- Fracture Toughness Testing
โ Real-World Example: Titanic Disaster ๐ข
- Sinking of Titanic is famous example of brittle fracture. Ship's hull was made of steel that became brittle at freezing temperatures of North Atlantic. When Titanic struck an iceberg, the hull plates fractured suddenly, leading to the catastrophic sinking of the ship.
@etconp
๐8โค4
๐แ แแฝ แแแฐแซ แแแ แจแฃแกแญ แแแแต แแแฃแณ แแฎแแญแตแ แแแ แแแ
แแญแแแต แจแแแแแ แฅแซ แญแจแแแแ
๐งแ แแฝ แแแฐแซ แแซ แแ แซแ แแซแแ แซ แแแ แจแฃแกแญ แแแแตแ แแแฃแณแ แแแ แแแ แแญแแแต แจแแแแแ แฅแซ แฅแซแจแแแ แฅแแฐแแแ แจแขแตแฎแตแซ แแตแญ แฃแกแญ แฎแญแแฌแฝแ แ แตแณแแแกแก
๐ทแจแฎแญแแฌแฝแ แแญแตแ แแ แฅแซ แ แตแแปแ แแฑ แแแ (แข/แญ) แแขแแต แฅแแฐแแแนแตแฃ แ แแฝ แแแฐแซแฃ แแซแแ แซแ แจแแซแแ แซ แแแ แจแฃแกแญ แแแแต แแฎแแญแตแ แแแ แแแ แแญแแแต แจแแแแแ แฅแซ แฅแจแฐแฐแซ แญแแแแข
๐ซแ แแฝ แแแฐแซ แแซ แแ แซ แจแฃแกแญ แแแแต แแฎแแญแต 99 แ แแถ แฐแญแถ แฅแแฐแแ แญ แ แ แฐแแฃ แ แฐแแ แฆแญแแต แ แแฐแจแฐ แแแถแฝ แแญ แ แฐแจแฐ แ แฐแ แณแขแซ แแฐ แแ แแแแฑแ แแแธแแแกแก
โญ๏ธแ แ แแ แแ แจแฐแแ แแแณแ แฅแจแฐแจแแ แ แแแ แจแแฐแก แแฐแจแฐ แแแถแฝแ แแแถ แแแตแซแตแ แจแฃแกแญ แแแแถแนแ แแแ แแแ แจแแญแแแต แ แแซแฎแฝ แฅแจแฐแแแ แฅแแฐแแแ แฐแแแจแแแกแก
Via แข แ แต
@etconp
๐งแ แแฝ แแแฐแซ แแซ แแ แซแ แแซแแ แซ แแแ แจแฃแกแญ แแแแตแ แแแฃแณแ แแแ แแแ แแญแแแต แจแแแแแ แฅแซ แฅแซแจแแแ แฅแแฐแแแ แจแขแตแฎแตแซ แแตแญ แฃแกแญ แฎแญแแฌแฝแ แ แตแณแแแกแก
๐ทแจแฎแญแแฌแฝแ แแญแตแ แแ แฅแซ แ แตแแปแ แแฑ แแแ (แข/แญ) แแขแแต แฅแแฐแแแนแตแฃ แ แแฝ แแแฐแซแฃ แแซแแ แซแ แจแแซแแ แซ แแแ แจแฃแกแญ แแแแต แแฎแแญแตแ แแแ แแแ แแญแแแต แจแแแแแ แฅแซ แฅแจแฐแฐแซ แญแแแแข
๐ซแ แแฝ แแแฐแซ แแซ แแ แซ แจแฃแกแญ แแแแต แแฎแแญแต 99 แ แแถ แฐแญแถ แฅแแฐแแ แญ แ แ แฐแแฃ แ แฐแแ แฆแญแแต แ แแฐแจแฐ แแแถแฝ แแญ แ แฐแจแฐ แ แฐแ แณแขแซ แแฐ แแ แแแแฑแ แแแธแแแกแก
โญ๏ธแ แ แแ แแ แจแฐแแ แแแณแ แฅแจแฐแจแแ แ แแแ แจแแฐแก แแฐแจแฐ แแแถแฝแ แแแถ แแแตแซแตแ แจแฃแกแญ แแแแถแนแ แแแ แแแ แจแแญแแแต แ แแซแฎแฝ แฅแจแฐแแแ แฅแแฐแแแ แฐแแแจแแแกแก
Via แข แ แต
@etconp
๐8๐1
๐แจแ แแ แตแแตแญ แแแฃแณ 40 แ แแถ แ แแแแ แแญ แฐแญแทแ
๐งแ แ แแ แญแแ แจแฐแ แฅแฉแแฝ แฒแฃแฃ แคแแแ แแตแแณแ แ แซแฃแข แจแแแแ แจแ แแ แแแ แแปแแชแซ แตแแตแญ แจแแแฃแณ แตแซ 40 แ แแถ แ แแแแ แแญ แฐแญแทแแกแก
แจแตแแตแฉแ แแแฃแณ แฅแชแ แฎแแตแตแซแญแฝแ แจแฐแฃแ แแแญ แ แแ แจแตแซ แฐแแซแญ แจ447 แแฅแฅ 3 แแแฎแ แฅแญ แ แแญ แ แแ แแช แฅแซแจแแแแ แฒแแแฃ แจแแแจแญแ แจแแฅแฅแฉแ แตแซ แฐแแ แตแณแฒแซ แ แแซแช แตแญแ แต แฅแจแฐแจแณแฐแแ แญแแแแกแก
แจแแแฃแณ แตแซแ แ แฒแแญแ แแแฅ แฅแ แ แแฉ แแฉ แแญแแซแถแฝ แ แฐแซแแแต แจแแ แแฐแฅ แแตแฅ แณแญแ แแแ แแซแทแแกแก
แ แฃแแฅแแฃแ แแตแชแซ แคแฑ แแ แณแญแฌแญแฐแญ แจแฐแแซ แจแฐแแ แ แแซแญแ แจแฅแซ แแชแแฝ แกแตแ แ แแแฃแณ แฅแแซแ แ แแแแต แจแแตแญ แแแจแณ แซแฐแจแ แฒแแแฃ แจแตแแตแฉ แแแฃแณ แ แแฅแแต แ แแ แแแ แ แต แแแณแ แแญ แ แ แฃแซ แฐแฐแฅแทแแกแก
แ แแ แแญ แจแตแแตแฉ แแแฃแณ 2 แแ แแ แฐแธแซแแแฝ แฅแ 12 แแฐแตแแฝ แแซแจแ 50 แ แแถ แจแแแแ แตแซ แ แแแฃแฐแต แแญ แฒแแแฃ แจแแ แแ แแแ แจแตแแตแฉแ แจแแญแแแ แญแแ แแชแซแตแต แจแแแจแต แตแซ แฅแจแฐแจแแแ แญแแแแกแก
แจแ แแ แตแแตแญ แแแฃแณ แแ แ แแ แฒแ แแแ แค แจแแแฒ แถแณแ แ แแฎ แตแแแต แแฐ แ แ แแ แจแฐแ แฅแ แแฐ แฑแ แฒแแฑ แ แฐแฃแฃแญ แจแแฐแจแแแ แจแตแซแแญ แแฐแต แจแฐแแแ แ แ แแตแจแ แแ แซแฃแขแ แขแฎแแแซแแ แแ แ แซแ แฅแแ แตแแด แแปแปแ แจแแฐแ แ แตแฐแแ แฆ แฅแแฐแแซแ แจแญแต แญแณแแแแกแก
Via แจแ แฒแต แ แ แฃ แจแฐแ แแแแถแฝ แฃแแฅแแฃแ
@etconp
๐งแ แ แแ แญแแ แจแฐแ แฅแฉแแฝ แฒแฃแฃ แคแแแ แแตแแณแ แ แซแฃแข แจแแแแ แจแ แแ แแแ แแปแแชแซ แตแแตแญ แจแแแฃแณ แตแซ 40 แ แแถ แ แแแแ แแญ แฐแญแทแแกแก
แจแตแแตแฉแ แแแฃแณ แฅแชแ แฎแแตแตแซแญแฝแ แจแฐแฃแ แแแญ แ แแ แจแตแซ แฐแแซแญ แจ447 แแฅแฅ 3 แแแฎแ แฅแญ แ แแญ แ แแ แแช แฅแซแจแแแแ แฒแแแฃ แจแแแจแญแ แจแแฅแฅแฉแ แตแซ แฐแแ แตแณแฒแซ แ แแซแช แตแญแ แต แฅแจแฐแจแณแฐแแ แญแแแแกแก
แจแแแฃแณ แตแซแ แ แฒแแญแ แแแฅ แฅแ แ แแฉ แแฉ แแญแแซแถแฝ แ แฐแซแแแต แจแแ แแฐแฅ แแตแฅ แณแญแ แแแ แแซแทแแกแก
แ แฃแแฅแแฃแ แแตแชแซ แคแฑ แแ แณแญแฌแญแฐแญ แจแฐแแซ แจแฐแแ แ แแซแญแ แจแฅแซ แแชแแฝ แกแตแ แ แแแฃแณ แฅแแซแ แ แแแแต แจแแตแญ แแแจแณ แซแฐแจแ แฒแแแฃ แจแตแแตแฉ แแแฃแณ แ แแฅแแต แ แแ แแแ แ แต แแแณแ แแญ แ แ แฃแซ แฐแฐแฅแทแแกแก
แ แแ แแญ แจแตแแตแฉ แแแฃแณ 2 แแ แแ แฐแธแซแแแฝ แฅแ 12 แแฐแตแแฝ แแซแจแ 50 แ แแถ แจแแแแ แตแซ แ แแแฃแฐแต แแญ แฒแแแฃ แจแแ แแ แแแ แจแตแแตแฉแ แจแแญแแแ แญแแ แแชแซแตแต แจแแแจแต แตแซ แฅแจแฐแจแแแ แญแแแแกแก
แจแ แแ แตแแตแญ แแแฃแณ แแ แ แแ แฒแ แแแ แค แจแแแฒ แถแณแ แ แแฎ แตแแแต แแฐ แ แ แแ แจแฐแ แฅแ แแฐ แฑแ แฒแแฑ แ แฐแฃแฃแญ แจแแฐแจแแแ แจแตแซแแญ แแฐแต แจแฐแแแ แ แ แแตแจแ แแ แซแฃแขแ แขแฎแแแซแแ แแ แ แซแ แฅแแ แตแแด แแปแปแ แจแแฐแ แ แตแฐแแ แฆ แฅแแฐแแซแ แจแญแต แญแณแแแแกแก
Via แจแ แฒแต แ แ แฃ แจแฐแ แแแแถแฝ แฃแแฅแแฃแ
@etconp
๐12โค1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ แ.1 แ แแถแฅแต แฐแซ(แแณแแแซ)
แ.2 แแญแซแถ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ แ.1 แ แแถแฅแต แฐแซ(แแณแแแซ)
แ.2 แแญแซแถ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐5
๐ซOne-Way Slab(L/B > 2)
๐ซTwo-Way Slab (L/B โค 2)
๐ฐOne-Way Slab
Load Transfer: Loads are transferred primarily in one direction (along the shorter span) to the supports.
Support Condition: Supported on two opposite sides (beams or walls).
Reinforcement: Main reinforcement is provided in one direction (shorter span) and distribution reinforcement in the other direction.
Span Ratio: Used when the longer span (L) to shorter span (B) ratio is greater than 2 (L/B > 2).
Thickness: Typically thinner compared to two-way slabs for the same spans.
Applications: Walkways, corridors, narrow rooms, or slabs supported by two parallel beams.
๐ฐTwo-Way Slab
Load Transfer: Loads are transferred in both directions (shorter and longer spans) to the supports.
Support Condition: Supported on all four sides (beams or walls).
Reinforcement: Main reinforcement is provided in both directions (shorter and longer spans).
Span Ratio: Used when the longer span (L) to shorter span (B) ratio is less than or equal to 2 (L/B โค 2).
Thickness: Typically thicker than one-way slabs for the same spans.
๐ฐApplications: Floors in multistorey buildings, parking structures, and flat slabs with supports on all sides.
Key Differences
Aspect One-Way Slab Two-Way Slab
Load Transfer In one direction In two directions
Supports Two opposite sides All four sides
Reinforcement One direction Both directions
Span Ratio (L/B) > 2 โค 2
Typical Use Narrow spans Wider spans
The choice between the two depends on the structural requirements, support conditions, and span dimensions.
@etconp
๐ซTwo-Way Slab (L/B โค 2)
๐ฐOne-Way Slab
Load Transfer: Loads are transferred primarily in one direction (along the shorter span) to the supports.
Support Condition: Supported on two opposite sides (beams or walls).
Reinforcement: Main reinforcement is provided in one direction (shorter span) and distribution reinforcement in the other direction.
Span Ratio: Used when the longer span (L) to shorter span (B) ratio is greater than 2 (L/B > 2).
Thickness: Typically thinner compared to two-way slabs for the same spans.
Applications: Walkways, corridors, narrow rooms, or slabs supported by two parallel beams.
๐ฐTwo-Way Slab
Load Transfer: Loads are transferred in both directions (shorter and longer spans) to the supports.
Support Condition: Supported on all four sides (beams or walls).
Reinforcement: Main reinforcement is provided in both directions (shorter and longer spans).
Span Ratio: Used when the longer span (L) to shorter span (B) ratio is less than or equal to 2 (L/B โค 2).
Thickness: Typically thicker than one-way slabs for the same spans.
๐ฐApplications: Floors in multistorey buildings, parking structures, and flat slabs with supports on all sides.
Key Differences
Aspect One-Way Slab Two-Way Slab
Load Transfer In one direction In two directions
Supports Two opposite sides All four sides
Reinforcement One direction Both directions
Span Ratio (L/B) > 2 โค 2
Typical Use Narrow spans Wider spans
The choice between the two depends on the structural requirements, support conditions, and span dimensions.
@etconp
๐16โค2
๐Calculating Bitumen Asphalt Quantity for Pavement
๐ทUnderstanding the Components Before we delve into the calculations, let's clarify the key components involved in asphalt pavement:
* Bitumen: This is the binder that holds the aggregate (rocks and sand) together. It's a sticky, black substance derived from petroleum.
* Aggregate: This is the granular material that provides the structural strength and stability to the asphalt pavement. It's typically a mixture of crushed stone, gravel, and sand.
๐ทFactors Affecting Bitumen Quantity
๐ซThe amount of bitumen required for a pavement project depends on several factors:
* Type of Pavement: Different pavement types (e.g., asphalt concrete, bituminous macadam) have varying bitumen content.
* Traffic Load: Heavier traffic loads necessitate a higher bitumen content to ensure durability.
* Climate: Extreme temperatures and weather conditions can affect the performance of asphalt, influencing the bitumen content.
* Aggregate Type and Grading: The type and size distribution of the aggregate affect how much bitumen is needed to bind it together.
๐งCalculation Steps
* Determine the Volume of Asphalt:
* Calculate the area of the pavement surface: Area = Length ร Width
* Multiply the area by the desired thickness of the asphalt layer: Volume = Area ร Thickness
* Calculate the Bitumen Content:
* The bitumen content is typically expressed as a percentage of the total asphalt mixture.
* This percentage is determined based on the factors mentioned earlier and is often specified in the project's design specifications.
* Calculate the Quantity of Bitumen:
* Multiply the volume of asphalt by the bitumen content percentage: Bitumen Quantity = Volume ร Bitumen Content (%)
* Convert to Metric Tons (Optional):
* If you need the bitumen quantity in metric tons, multiply the volume of bitumen by its density (typically around 1.05 tonnes per cubic meter): Bitumen Quantity (tonnes) = Bitumen Volume (cubic meters) ร 1.05 tonnes/cubic meter
Example
Let's assume we have a 100-meter-long road that is 7 meters wide. We want to lay a 5-centimeter-thick asphalt layer, and the bitumen content is specified as 5%.
* Calculate the volume of asphalt:
* Area = 100 meters ร 7 meters = 700 square meters
* Volume = 700 square meters ร 0.05 meters = 35 cubic meters
* Calculate the bitumen quantity:
* Bitumen Quantity = 35 cubic meters ร 0.05 = 1.75 cubic meters
* Convert to metric tons:
* Bitumen Quantity (tonnes) = 1.75 cubic meters ร 1.05 tonnes/cubic meter = 1.84 tonnes
โบTherefore, for this specific example, we would need approximately 1.75 cubic meters or 1.84 metric tons of bitumen.
โญ๏ธNote: This is a simplified calculation. In real-world projects, engineers and contractors use more sophisticated methods and consider various factors to accurately determine the bitumen quantity.
๐งAdditional Considerations:
* Waste and Losses: Account for potential waste and losses during transportation, storage, and application.
* Quality Control: Regular testing and quality control measures are essential to ensure the asphalt mixture meets the desired specifications.
* Environmental Regulations: Adhere to local environmental regulations regarding bitumen handling and disposal.
By following these steps and considering the relevant factors, you can effectively calculate the quantity of bitumen asphalt required for your pavement project.
@etconp
๐ทUnderstanding the Components Before we delve into the calculations, let's clarify the key components involved in asphalt pavement:
* Bitumen: This is the binder that holds the aggregate (rocks and sand) together. It's a sticky, black substance derived from petroleum.
* Aggregate: This is the granular material that provides the structural strength and stability to the asphalt pavement. It's typically a mixture of crushed stone, gravel, and sand.
๐ทFactors Affecting Bitumen Quantity
๐ซThe amount of bitumen required for a pavement project depends on several factors:
* Type of Pavement: Different pavement types (e.g., asphalt concrete, bituminous macadam) have varying bitumen content.
* Traffic Load: Heavier traffic loads necessitate a higher bitumen content to ensure durability.
* Climate: Extreme temperatures and weather conditions can affect the performance of asphalt, influencing the bitumen content.
* Aggregate Type and Grading: The type and size distribution of the aggregate affect how much bitumen is needed to bind it together.
๐งCalculation Steps
* Determine the Volume of Asphalt:
* Calculate the area of the pavement surface: Area = Length ร Width
* Multiply the area by the desired thickness of the asphalt layer: Volume = Area ร Thickness
* Calculate the Bitumen Content:
* The bitumen content is typically expressed as a percentage of the total asphalt mixture.
* This percentage is determined based on the factors mentioned earlier and is often specified in the project's design specifications.
* Calculate the Quantity of Bitumen:
* Multiply the volume of asphalt by the bitumen content percentage: Bitumen Quantity = Volume ร Bitumen Content (%)
* Convert to Metric Tons (Optional):
* If you need the bitumen quantity in metric tons, multiply the volume of bitumen by its density (typically around 1.05 tonnes per cubic meter): Bitumen Quantity (tonnes) = Bitumen Volume (cubic meters) ร 1.05 tonnes/cubic meter
Example
Let's assume we have a 100-meter-long road that is 7 meters wide. We want to lay a 5-centimeter-thick asphalt layer, and the bitumen content is specified as 5%.
* Calculate the volume of asphalt:
* Area = 100 meters ร 7 meters = 700 square meters
* Volume = 700 square meters ร 0.05 meters = 35 cubic meters
* Calculate the bitumen quantity:
* Bitumen Quantity = 35 cubic meters ร 0.05 = 1.75 cubic meters
* Convert to metric tons:
* Bitumen Quantity (tonnes) = 1.75 cubic meters ร 1.05 tonnes/cubic meter = 1.84 tonnes
โบTherefore, for this specific example, we would need approximately 1.75 cubic meters or 1.84 metric tons of bitumen.
โญ๏ธNote: This is a simplified calculation. In real-world projects, engineers and contractors use more sophisticated methods and consider various factors to accurately determine the bitumen quantity.
๐งAdditional Considerations:
* Waste and Losses: Account for potential waste and losses during transportation, storage, and application.
* Quality Control: Regular testing and quality control measures are essential to ensure the asphalt mixture meets the desired specifications.
* Environmental Regulations: Adhere to local environmental regulations regarding bitumen handling and disposal.
By following these steps and considering the relevant factors, you can effectively calculate the quantity of bitumen asphalt required for your pavement project.
@etconp
๐24
#Advertising #แแตแณแแแซ #MusaFide
Our Services Include:
๐ป Civil 3D Full Tutorials (4K Video)
Tutorials with project files used throughout the video for hands-on learning.
๐ All Supporting Materials
Access materials, including PKT Files, Superelevation Excels, & ERA Manual XML, to streamline your design work.
๐ Girder Bridge Working Drawing Preparation
Complete working drawings for Girder Bridges, including all materials used in the tutorial, & the 3D model created in SketchUp.
๐ Highway Design Expertise
Professional highway design services
๐ Template Production & PKT Development Template creation & PKT development as per your project standards.
๐ Earthwork & Pavement Quantity Preparation
Earthwork & pavement quantity preparation to ensure precise cost estimation.
๐ Structural Working Drawing Preparation
Detailed structural working drawings Preparation
Connect with Us:
YouTube: http://www.youtube.com/@musfide
Telegram: https://t.me/musafide
WhatsApp: https://bit.ly/musfide
Call Us: +251 905 666 664
Our Services Include:
๐ป Civil 3D Full Tutorials (4K Video)
Tutorials with project files used throughout the video for hands-on learning.
๐ All Supporting Materials
Access materials, including PKT Files, Superelevation Excels, & ERA Manual XML, to streamline your design work.
๐ Girder Bridge Working Drawing Preparation
Complete working drawings for Girder Bridges, including all materials used in the tutorial, & the 3D model created in SketchUp.
๐ Highway Design Expertise
Professional highway design services
๐ Template Production & PKT Development Template creation & PKT development as per your project standards.
๐ Earthwork & Pavement Quantity Preparation
Earthwork & pavement quantity preparation to ensure precise cost estimation.
๐ Structural Working Drawing Preparation
Detailed structural working drawings Preparation
Connect with Us:
YouTube: http://www.youtube.com/@musfide
Telegram: https://t.me/musafide
WhatsApp: https://bit.ly/musfide
Call Us: +251 905 666 664
๐2โค1
#ADVERTISEMENTS
๐แแฉ แจ Interior Design แฅแ Software แตแแ แ แจแฐแญแฐแแฌแต แแญ
๐ 0984121839
๐แจแแณ
แฐแ - แฅแแต (แจ11:30-1:30)
๐แจแ แณแ แฅแ แฅแแต
แ แณแ แ แแต 3:00 - 6:00 แฃ แจแฐแแต 7:30-10:30
แฅแแต แ แแต 3:00 - 6:00 แฃ แจแฐแแต 7:30-10:30
โ แแแต แฃแแธแ แจแฉแแจแญแฒแฒ แแแ แซแ แ แ แญแญแดแญแถแฝ แจแแฐแฅ แแฉ แตแแ แแข
โ แญแ Course แตแ Interior Design, แแแ แซแแฆแตแ แแแแ แแฐแจแณแ แแแฎแฝ แจแแซแซแตแต แแ
โณ๏ธ แจแฎแญแฑ แแญแแฎแฝ
โ Fundamental of Interior Design
โ Archicad 3D For Interior Design
โ Rendering in Lumion
โณ๏ธ แ แฐแแฃแฃแ แแ 15, 000 ETB แ3 แแญ!
๐ 0984121839
๐ฅ
Telegram:- https://t.me/archidemyy
๐แแฉ แจ Interior Design แฅแ Software แตแแ แ แจแฐแญแฐแแฌแต แแญ
๐ 0984121839
๐แจแแณ
แฐแ - แฅแแต (แจ11:30-1:30)
๐แจแ แณแ แฅแ แฅแแต
แ แณแ แ แแต 3:00 - 6:00 แฃ แจแฐแแต 7:30-10:30
แฅแแต แ แแต 3:00 - 6:00 แฃ แจแฐแแต 7:30-10:30
โ แแแต แฃแแธแ แจแฉแแจแญแฒแฒ แแแ แซแ แ แ แญแญแดแญแถแฝ แจแแฐแฅ แแฉ แตแแ แแข
โ แญแ Course แตแ Interior Design, แแแ แซแแฆแตแ แแแแ แแฐแจแณแ แแแฎแฝ แจแแซแซแตแต แแ
โณ๏ธ แจแฎแญแฑ แแญแแฎแฝ
โ Fundamental of Interior Design
โ Archicad 3D For Interior Design
โ Rendering in Lumion
โณ๏ธ แ แฐแแฃแฃแ แแ 15, 000 ETB แ3 แแญ!
๐ 0984121839
๐ฅ
Telegram:- https://t.me/archidemyy
๐2
๐แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแช แจแฃแแตแญแป แ แซแแต แจแแญแญแญ แแตแจแญ แฅแจแฐแซแแฐ แญแแแ
แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแช แจแฃแแตแญแป แ แซแแต แจแแญแญแญ แแตแจแญ แแแฒ แ แแแแ แจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แจแแแแต แแญแแญ แแแจแ แฅแจแฐแซแแฐ แญแแแแข
แจแฎแแตแตแซแญแฝแ แฅแแญแณ แแแแญ แแแฃแณ แ แแ แแช แแณแฅ แจแแซแแฐแ แแตแจแฉแฅ แจแฎแแตแตแซแญแฝแ แแญแ แจแแแแ แต แแฃแซแ แแแณ (แฐแจแ)แฃ แจแแญแ แแแ แแฐแแแฝ แฅแแฒแแ แแฃแญ แ แ แฃแซแแฝแ แ แฐแแแจแฐ แตแฉแจแฑแ แ แตแญแแแข
แจแจแฐแ แแแต แฅแ แฎแแตแตแซแญแฝแ แแแตแดแญ แฃแฐแแณแ แ แแ แแตแจแญ แแญ แจแแฐแ แจแแแแตแต แแแแแฝแฃ แจแฅแซ แฐแแซแฎแฝแฃ แ แแซแช แแแแฒแถแฝ แฅแแฒแแ แแแฝ แจแแญแ แฐแแแซแ แญแณแฐแแ แณแแข
Via ERA
@etconp
แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแช แจแฃแแตแญแป แ แซแแต แจแแญแญแญ แแตแจแญ แแแฒ แ แแแแ แจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แจแแแแต แแญแแญ แแแจแ แฅแจแฐแซแแฐ แญแแแแข
แจแฎแแตแตแซแญแฝแ แฅแแญแณ แแแแญ แแแฃแณ แ แแ แแช แแณแฅ แจแแซแแฐแ แแตแจแฉแฅ แจแฎแแตแตแซแญแฝแ แแญแ แจแแแแ แต แแฃแซแ แแแณ (แฐแจแ)แฃ แจแแญแ แแแ แแฐแแแฝ แฅแแฒแแ แแฃแญ แ แ แฃแซแแฝแ แ แฐแแแจแฐ แตแฉแจแฑแ แ แตแญแแแข
แจแจแฐแ แแแต แฅแ แฎแแตแตแซแญแฝแ แแแตแดแญ แฃแฐแแณแ แ แแ แแตแจแญ แแญ แจแแฐแ แจแแแแตแต แแแแแฝแฃ แจแฅแซ แฐแแซแฎแฝแฃ แ แแซแช แแแแฒแถแฝ แฅแแฒแแ แแแฝ แจแแญแ แฐแแแซแ แญแณแฐแแ แณแแข
Via ERA
@etconp
๐7
Media is too big
VIEW IN TELEGRAM
๐แ แฒแต แ แ แฃ " แตแฎแ แแแตแฎ"
๐งแจแฆแ - แแแแ แจแฎแชแฐแญ แแแต แฅแแแณแแฝ
โข แแแแฑ แจ68 แแตแญ แตแแต แซแแ แฐแ แแแแต แแ
โข แ แแแฑแ แ แ แฃแซ แ แ แแด 10 แแชแแฝแ แแตแฐแแแต แญแฝแแ
โข 5 แแตแญ แจแแแ แ แฎแแญแชแต แจแฐแ แซ แจแฅแแจแ แแแแต แ แซแทแ
โข 3 แแตแญ แตแแต แซแแ แจแฅแตแญแแต แแแแต แ แแแฑแ แ แ แฃแซ แญแแ
โข แแแแแฑ แแฅแต แจแแจแแญ แฃแปแแญ แ แดแญแแแ แจแฐแฐแแ แซแแซแฃ แตแญแชแแฝแ แฅแ แจแแชแ แปแญแ แซแแ แแ
โข แ450 แแแแ แแแฝ แจแฅแซ แแตแ แแแ แญ แฝแแ
โข แ แ แแแญ แแฎแแญแฑ 4 แแฅแฅ 3 แชแแแตแญ แญแจแแแ
@etconp
๐งแจแฆแ - แแแแ แจแฎแชแฐแญ แแแต แฅแแแณแแฝ
โข แแแแฑ แจ68 แแตแญ แตแแต แซแแ แฐแ แแแแต แแ
โข แ แแแฑแ แ แ แฃแซ แ แ แแด 10 แแชแแฝแ แแตแฐแแแต แญแฝแแ
โข 5 แแตแญ แจแแแ แ แฎแแญแชแต แจแฐแ แซ แจแฅแแจแ แแแแต แ แซแทแ
โข 3 แแตแญ แตแแต แซแแ แจแฅแตแญแแต แแแแต แ แแแฑแ แ แ แฃแซ แญแแ
โข แแแแแฑ แแฅแต แจแแจแแญ แฃแปแแญ แ แดแญแแแ แจแฐแฐแแ แซแแซแฃ แตแญแชแแฝแ แฅแ แจแแชแ แปแญแ แซแแ แแ
โข แ450 แแแแ แแแฝ แจแฅแซ แแตแ แแแ แญ แฝแแ
โข แ แ แแแญ แแฎแแญแฑ 4 แแฅแฅ 3 แชแแแตแญ แญแจแแแ
@etconp
โค6๐3๐1
๐Who is the planning engineer, scheduling engineer and cost control engineer?
๐ทThe division will be based on the roles, responsibilities and management to which it belongs?
๐ซ1. Planning Engineer
โบRoles and Responsibilities:
๐ฐDevelopment of the master project plan (Project Master Plan) to determine the scope of the project, and this differs from the Project management plan may be part of it, but the Project Master Plan is a brief document with details about the project, its vision, objectives, scope of work and outline of the time range for each network, and I am one of the people who were wrong in this title when we present something like this abbreviated is the Master Plan I call it the Project management plan
Create a workflow structure (WBS) to break down the project into manageable parts.
Identify the activities necessary to complete the project with the identification and sequencing of their relationships.
โบEstimate the time required for each activity and establish a logical chronology.
โบPrepare a time plan based on resource and potential constraints.
โบCoordination with different departments such as design, implementation, and procurement to ensure the compatibility of the plan.
๐ทTools used:
Planning programs such as: Primavera P6, Microsoft Project: for planning and project management, Excel .....
โบSubsidiary Management:
Planning Department, Project Management or Technical Department
๐ซ3. Scheduling Engineer
โบRole and Responsibilities:
Create a schedule: Create a detailed schedule of activities and tasks, and identify the relationships between them and the chronology of their implementation.
โบUpdate schedule: Update the schedule regularly to reflect changes that occur in the project.
โบCritical Path Analysis: Identify critical paths in the schedule that must be focused on to ensure that the project is completed on time.
โบPerformance Appraisal: Evaluate the actual performance of the project against the planned schedule.
๐ซ3. Cost Engineer
โบRoles and Responsibilities:
Prepare detailed cost estimates for the project based on the planned activities.
โบDeveloping the overall budget of the project and monitoring compliance with it.
โบTrack actual costs and identify differences between them and budget.
โบCost variance management due to risks or changes in the scope of the project.
โบPrepare monthly cost reports that include: Current spending,Estimated cost at completion (EAC) and Overall financial performance.
๐งTools used:
โบCost management tools such as:
โบExcel: Analyze data and reports.
โบSAP or Oracle ERP: To track costs and manage budgets.
@etconp
๐ทThe division will be based on the roles, responsibilities and management to which it belongs?
๐ซ1. Planning Engineer
โบRoles and Responsibilities:
๐ฐDevelopment of the master project plan (Project Master Plan) to determine the scope of the project, and this differs from the Project management plan may be part of it, but the Project Master Plan is a brief document with details about the project, its vision, objectives, scope of work and outline of the time range for each network, and I am one of the people who were wrong in this title when we present something like this abbreviated is the Master Plan I call it the Project management plan
Create a workflow structure (WBS) to break down the project into manageable parts.
Identify the activities necessary to complete the project with the identification and sequencing of their relationships.
โบEstimate the time required for each activity and establish a logical chronology.
โบPrepare a time plan based on resource and potential constraints.
โบCoordination with different departments such as design, implementation, and procurement to ensure the compatibility of the plan.
๐ทTools used:
Planning programs such as: Primavera P6, Microsoft Project: for planning and project management, Excel .....
โบSubsidiary Management:
Planning Department, Project Management or Technical Department
๐ซ3. Scheduling Engineer
โบRole and Responsibilities:
Create a schedule: Create a detailed schedule of activities and tasks, and identify the relationships between them and the chronology of their implementation.
โบUpdate schedule: Update the schedule regularly to reflect changes that occur in the project.
โบCritical Path Analysis: Identify critical paths in the schedule that must be focused on to ensure that the project is completed on time.
โบPerformance Appraisal: Evaluate the actual performance of the project against the planned schedule.
๐ซ3. Cost Engineer
โบRoles and Responsibilities:
Prepare detailed cost estimates for the project based on the planned activities.
โบDeveloping the overall budget of the project and monitoring compliance with it.
โบTrack actual costs and identify differences between them and budget.
โบCost variance management due to risks or changes in the scope of the project.
โบPrepare monthly cost reports that include: Current spending,Estimated cost at completion (EAC) and Overall financial performance.
๐งTools used:
โบCost management tools such as:
โบExcel: Analyze data and reports.
โบSAP or Oracle ERP: To track costs and manage budgets.
@etconp
๐14โค2๐1
form all construction permit(Word).pdf
1.6 MB
๐แจแแแ แจแแแฃแณ แแแต แ
แฝ/แแแแจแป(form all construction permit) word- in Addis Ababa
@etconp
@etconp
๐9โค2๐2
๐แจแฅแแซแ แตแณแฒแจแ แแแฃแณ แ แ แแฃแ แฅแแฒแ แแแ
แ แ
แฃแซ แฐแฐแ
แจแฅแแซแ แตแณแฒแจแ แแแฃแณ แจแฐแซแแแต แแ แ แแต แฅแแฒแ แแแ แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แ แตแณแแแข
แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แแแแ แจแซแขแ แแณแฎแฝ แแแตแตแญ แแแแแแญ แณแแแตแฃ แจแฃแ แแ แตแแญแต แแแตแตแญ แธแแต แปแแซแฃ แจแฃแ แแ แตแแญแต แแแตแตแญ แดแคแณ แแชแฉ แแแแตแ แจแแแฃแณแ แฐแแซแญ แจแฅแซ แแแแแฝ แ แฐแแแ แต แจแฅแแซแ แตแณแฒแฎแ แจแแแฃแณ แแฐแต แ แแแแ แชแแญแต แแแแ แแฌ แฐแซแแทแแข
แ แแแแแ แ แ แแแญ แจแแฎแแญแฑ แ แแปแธแ แชแแญแต แแญแฆ แแญแญแต แจแฐแฐแจแแ แต แฒแแ แ แตแณแฒแจแแ แ แแแ แแแฃแณ แแแณแ แแแจแณ แฐแฐแญแแแข
แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แแแแ แจแซแขแ แแณแฎแฝ แแแตแตแญ แแแแแแญ แณแแแต แฅแแซแ แตแณแฒแจแ แจแฐแซแแแต แแ แ แแต แแ แแแ แฅแแณแแ แต แ แ แฃแซ แฐแฅแฐแแแข
แฐแแซแฉ แ แ แฉแ แแตแณแฒแจแ แแช แฅแซแแฝ แจแแแ แแฅแแถแฝแ แ แแตแแฃแต แแญ แฅแแฐแแ แแแพแฃ แจแแฎแแญแฑ แ แแปแธแ แแแแ แ แฅแแฐแแ แซ แแแแนแ แจแฐแแแ แแจแ แซแแแญแณแแข
@etconp
แจแฅแแซแ แตแณแฒแจแ แแแฃแณ แจแฐแซแแแต แแ แ แแต แฅแแฒแ แแแ แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แ แตแณแแแข
แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แแแแ แจแซแขแ แแณแฎแฝ แแแตแตแญ แแแแแแญ แณแแแตแฃ แจแฃแ แแ แตแแญแต แแแตแตแญ แธแแต แปแแซแฃ แจแฃแ แแ แตแแญแต แแแตแตแญ แดแคแณ แแชแฉ แแแแตแ แจแแแฃแณแ แฐแแซแญ แจแฅแซ แแแแแฝ แ แฐแแแ แต แจแฅแแซแ แตแณแฒแฎแ แจแแแฃแณ แแฐแต แ แแแแ แชแแญแต แแแแ แแฌ แฐแซแแทแแข
แ แแแแแ แ แ แแแญ แจแแฎแแญแฑ แ แแปแธแ แชแแญแต แแญแฆ แแญแญแต แจแฐแฐแจแแ แต แฒแแ แ แตแณแฒแจแแ แ แแแ แแแฃแณ แแแณแ แแแจแณ แฐแฐแญแแแข
แจแ แ แแญ แแแตแตแญ แฝแแแต แคแต แแแแ แจแซแขแ แแณแฎแฝ แแแตแตแญ แแแแแแญ แณแแแต แฅแแซแ แตแณแฒแจแ แจแฐแซแแแต แแ แ แแต แแ แแแ แฅแแณแแ แต แ แ แฃแซ แฐแฅแฐแแแข
แฐแแซแฉ แ แ แฉแ แแตแณแฒแจแ แแช แฅแซแแฝ แจแแแ แแฅแแถแฝแ แ แแตแแฃแต แแญ แฅแแฐแแ แแแพแฃ แจแแฎแแญแฑ แ แแปแธแ แแแแ แ แฅแแฐแแ แซ แแแแนแ แจแฐแแแ แแจแ แซแแแญแณแแข
@etconp
๐8โค3๐ฅฐ1
แจแขแตแฎแตแซ แจแ
แแป แ แแ
.pdf
2.4 MB
๐แจแขแตแฎแตแซ แจแ
แแป แ แแ
๐ทแ แตแซ แแญ ~ แฐแแญ แแ ๐ค
https://t.me/ETCONp
แปแแแ แ แแฉ
@etconp
๐ทแ แตแซ แแญ ~ แฐแแญ แแ ๐ค
https://t.me/ETCONp
แปแแแ แ แแฉ
@etconp
๐13