The bearing capacity of soil is primarily dependent on:
Anonymous Quiz
39%
A) Soil type and moisture content
7%
B) Depth of foundation and soil type
53%
C) Soil type, depth of foundation, and groundwater level
2%
D) Only the size of the foundation
โค16๐11
๐Flexural strength and compressive strength Of Concrete
๐ทThey are two key mechanical properties of concrete, each describing how the material behaves under different types of stress.
โญ๏ธ1. Compressive Strength:
- Definition: Compressive strength is the ability of concrete to withstand loads that reduce the size of the concrete, i.e., loads that push or compress the material.
- Measurement: It is measured by applying a compressive load to a concrete cylinder or cube until it fails. The maximum load applied divided by the cross-sectional area of the specimen gives the compressive strength, typically expressed in megapascals (MPa) or pounds per square inch (psi).
- Typical Values: Concrete generally has a high compressive strength, ranging from about 20 MPa (2900 psi) for residential construction to over 40 MPa (5800 psi) for commercial structures, and even higher for specialized applications.
โญ๏ธ2. Flexural Strength:
- Definition: Flexural strength, also known as modulus of rupture, is the ability of concrete to resist deformation under bending. It reflects the tensile strength of concrete in bending.
- Measurement: It is determined by loading a concrete beam until it fails in bending. The flexural strength is calculated based on the load at failure, the dimensions of the beam, and the span length. It is also expressed in MPa or psi.
- Typical Values: Flexural strength is typically much lower than compressive strength, often about 10% to 20% of the compressive strength, depending on the mix design and the presence of reinforcing materials.
๐Key Differences:
- Type of Stress: Compressive strength involves compression (pushing forces), while flexural strength involves tension due to bending (pulling forces).
- Magnitude: Concrete's compressive strength is significantly higher than its flexural strength.
- Application: Compressive strength is crucial for columns, foundations, and other elements primarily subjected to compressive loads. Flexural strength is important for beams, slabs, and other elements subjected to bending moments.
๐ฐUnderstanding both properties is essential for designing concrete structures that are safe and durable under the expected loading conditions.
@etconp
๐ทThey are two key mechanical properties of concrete, each describing how the material behaves under different types of stress.
โญ๏ธ1. Compressive Strength:
- Definition: Compressive strength is the ability of concrete to withstand loads that reduce the size of the concrete, i.e., loads that push or compress the material.
- Measurement: It is measured by applying a compressive load to a concrete cylinder or cube until it fails. The maximum load applied divided by the cross-sectional area of the specimen gives the compressive strength, typically expressed in megapascals (MPa) or pounds per square inch (psi).
- Typical Values: Concrete generally has a high compressive strength, ranging from about 20 MPa (2900 psi) for residential construction to over 40 MPa (5800 psi) for commercial structures, and even higher for specialized applications.
โญ๏ธ2. Flexural Strength:
- Definition: Flexural strength, also known as modulus of rupture, is the ability of concrete to resist deformation under bending. It reflects the tensile strength of concrete in bending.
- Measurement: It is determined by loading a concrete beam until it fails in bending. The flexural strength is calculated based on the load at failure, the dimensions of the beam, and the span length. It is also expressed in MPa or psi.
- Typical Values: Flexural strength is typically much lower than compressive strength, often about 10% to 20% of the compressive strength, depending on the mix design and the presence of reinforcing materials.
๐Key Differences:
- Type of Stress: Compressive strength involves compression (pushing forces), while flexural strength involves tension due to bending (pulling forces).
- Magnitude: Concrete's compressive strength is significantly higher than its flexural strength.
- Application: Compressive strength is crucial for columns, foundations, and other elements primarily subjected to compressive loads. Flexural strength is important for beams, slabs, and other elements subjected to bending moments.
๐ฐUnderstanding both properties is essential for designing concrete structures that are safe and durable under the expected loading conditions.
@etconp
๐23โค2
๐TYPES OF SOIL
๐ซSoil is a crucial component in construction, road building, and other engineering projects.
๐งDifferent types of soil have varying properties that make them suitable or unsuitable for specific applications.
โบBelow is a description of the types of soil commonly used in construction, road building, and other structures:
โญ๏ธ1. Gravel
- Description: Gravel consists of coarse particles, typically larger than 2 mm in diameter. It is a mixture of small rocks and pebbles.
- Properties:
- High load-bearing capacity.
- Excellent drainage properties.
- Resistant to compaction.
- Uses:
- Base material for roads and foundations.
- Used in concrete production.
- Ideal for drainage systems.
โญ๏ธ2. Sand
- Description: Sand is composed of fine granular particles, ranging from 0.075 mm to 4.75 mm in diameter.
- Properties:
- Good drainage and low cohesion.
- Easy to compact.
- Poor plasticity.
- Uses:
- Sub-base material for roads and pavements.
- Used in mortar and concrete mixtures.
- Suitable for backfilling trenches.
โญ๏ธ3. Silt
- Description: Silt consists of fine particles, smaller than sand but larger than clay (0.002 mm to 0.075 mm).
- Properties:
- Smooth texture.
- Moderate drainage and fertility.
- Low strength when wet.
- Uses:
- Not ideal for construction due to low strength.
- Can be stabilized with additives for use in road subgrades.
โญ๏ธ4. Clay
- Description: Clay is made up of extremely fine particles (less than 0.002 mm in diameter) and has high plasticity.
- Properties:
- High cohesion and plasticity.
- Expands when wet and shrinks when dry.
- Poor drainage.
- Uses:
- Used in making bricks, tiles, and ceramics.
- Stabilized clay can be used in road construction.
- Not suitable for foundations due to swelling and shrinkage.
โญ๏ธ5. Loam
- Description: Loam is a mixture of sand, silt, and clay in roughly equal proportions.
- Properties:
- Balanced drainage and fertility.
- Moderate strength and compaction.
- Uses:
- Used in landscaping and agriculture.
- Not typically used in heavy construction but can be stabilized for light structures.
โญ๏ธ 6. Peat
- Description: Peat is an organic soil composed of decomposed plant material.
- Properties:
- High organic content.
- Poor load-bearing capacity.
- High compressibility.
- Uses:
- Not suitable for construction or road building.
- Often removed and replaced with stronger soils in construction projects.
โญ๏ธ7. Rock (Bedrock)
- Description: Rock refers to solid, unweathered geological formations.
- Properties:
- Extremely high strength and stability.
- Excellent load-bearing capacity.
- Uses:
- Foundation for large buildings and bridges.
- Used as aggregate in concrete and asphalt.
โญ๏ธ8. Laterite
- Description: Laterite is a reddish, iron-rich soil formed in tropical regions.
- Properties:
- Hardens when exposed to air.
- Moderate strength.
- Uses:
- Used in road construction in tropical regions.
- Can be cut into bricks for building.
โญ๏ธ9. Bentonite
- Description: Bentonite is a type of clay formed from volcanic ash.
- Properties:
- High swelling capacity when wet.
- Low permeability.
- Uses:
- Used as a sealing material in foundations and landfills.
- Used in drilling fluids for construction.
โญ๏ธ10. Fill Dirt
- Description: Fill dirt is a mixture of soil, sand, and rock used to fill depressions or raise ground levels.
- Properties:
- Low organic content.
- Compactable and stable.
- Uses:
- Used in landscaping and construction to create level surfaces.
- Not suitable for structural support.
@etconp ๐
๐ซSoil is a crucial component in construction, road building, and other engineering projects.
๐งDifferent types of soil have varying properties that make them suitable or unsuitable for specific applications.
โบBelow is a description of the types of soil commonly used in construction, road building, and other structures:
โญ๏ธ1. Gravel
- Description: Gravel consists of coarse particles, typically larger than 2 mm in diameter. It is a mixture of small rocks and pebbles.
- Properties:
- High load-bearing capacity.
- Excellent drainage properties.
- Resistant to compaction.
- Uses:
- Base material for roads and foundations.
- Used in concrete production.
- Ideal for drainage systems.
โญ๏ธ2. Sand
- Description: Sand is composed of fine granular particles, ranging from 0.075 mm to 4.75 mm in diameter.
- Properties:
- Good drainage and low cohesion.
- Easy to compact.
- Poor plasticity.
- Uses:
- Sub-base material for roads and pavements.
- Used in mortar and concrete mixtures.
- Suitable for backfilling trenches.
โญ๏ธ3. Silt
- Description: Silt consists of fine particles, smaller than sand but larger than clay (0.002 mm to 0.075 mm).
- Properties:
- Smooth texture.
- Moderate drainage and fertility.
- Low strength when wet.
- Uses:
- Not ideal for construction due to low strength.
- Can be stabilized with additives for use in road subgrades.
โญ๏ธ4. Clay
- Description: Clay is made up of extremely fine particles (less than 0.002 mm in diameter) and has high plasticity.
- Properties:
- High cohesion and plasticity.
- Expands when wet and shrinks when dry.
- Poor drainage.
- Uses:
- Used in making bricks, tiles, and ceramics.
- Stabilized clay can be used in road construction.
- Not suitable for foundations due to swelling and shrinkage.
โญ๏ธ5. Loam
- Description: Loam is a mixture of sand, silt, and clay in roughly equal proportions.
- Properties:
- Balanced drainage and fertility.
- Moderate strength and compaction.
- Uses:
- Used in landscaping and agriculture.
- Not typically used in heavy construction but can be stabilized for light structures.
โญ๏ธ 6. Peat
- Description: Peat is an organic soil composed of decomposed plant material.
- Properties:
- High organic content.
- Poor load-bearing capacity.
- High compressibility.
- Uses:
- Not suitable for construction or road building.
- Often removed and replaced with stronger soils in construction projects.
โญ๏ธ7. Rock (Bedrock)
- Description: Rock refers to solid, unweathered geological formations.
- Properties:
- Extremely high strength and stability.
- Excellent load-bearing capacity.
- Uses:
- Foundation for large buildings and bridges.
- Used as aggregate in concrete and asphalt.
โญ๏ธ8. Laterite
- Description: Laterite is a reddish, iron-rich soil formed in tropical regions.
- Properties:
- Hardens when exposed to air.
- Moderate strength.
- Uses:
- Used in road construction in tropical regions.
- Can be cut into bricks for building.
โญ๏ธ9. Bentonite
- Description: Bentonite is a type of clay formed from volcanic ash.
- Properties:
- High swelling capacity when wet.
- Low permeability.
- Uses:
- Used as a sealing material in foundations and landfills.
- Used in drilling fluids for construction.
โญ๏ธ10. Fill Dirt
- Description: Fill dirt is a mixture of soil, sand, and rock used to fill depressions or raise ground levels.
- Properties:
- Low organic content.
- Compactable and stable.
- Uses:
- Used in landscaping and construction to create level surfaces.
- Not suitable for structural support.
@etconp ๐
๐19โค4๐1
๐Key Considerations for Soil in Construction and Road Building**:
1. Load-Bearing Capacity: Soils like gravel and sand are preferred for their high strength.
2. Drainage: Well-draining soils (e.g., gravel, sand) are ideal for road construction.
3. Stability: Clay and silt may require stabilization to prevent swelling or shrinkage.
4. Compaction: Proper compaction is essential to ensure soil stability and prevent settlement.
๐By understanding the properties of different soils, engineers can select the appropriate type for construction, road building, and other projects.
@etconp
1. Load-Bearing Capacity: Soils like gravel and sand are preferred for their high strength.
2. Drainage: Well-draining soils (e.g., gravel, sand) are ideal for road construction.
3. Stability: Clay and silt may require stabilization to prevent swelling or shrinkage.
4. Compaction: Proper compaction is essential to ensure soil stability and prevent settlement.
๐By understanding the properties of different soils, engineers can select the appropriate type for construction, road building, and other projects.
@etconp
๐20โค4
Intercon Construction Chemicals
๐ Authorized agent of MC, SIMENTEK, Sika, Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grouting
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0944774267
Address: Signal, around signal mall
๐ Authorized agent of MC, SIMENTEK, Sika, Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grouting
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0944774267
Address: Signal, around signal mall
โค2๐2
#ADVERTISEMENT
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
แแแแฝแ
แ1แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2 แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3 แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ
แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ 4 แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญ
0912492727
0913061530
0923764834
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
แแแแฝแ
แ1แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2 แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3 แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ
แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ 4 แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญ
0912492727
0913061530
0923764834
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐1
๐แแแแต- แฑแแณแแ!
๐ซ6,000 แจแ แญแถ แ แฐแญ แคแฐแฐแฆแฝ แจแแแฉแ แต แแแฐแญ!
-----------------------------------
Suลoszowa โ the Polish village where 6,000 people share the same road
In the heart of Poland, a few kilometers from Krakow, there is a village that looks like it came out of a rural painting: Suลoszowa. Here, all of its approximately 6,000 inhabitants live along a single main road, a detail that makes this locality unique and fascinating. Seen from above, the village offers an extraordinary spectacle: a long, perfectly linear central artery, flanked by neatly arranged houses, like pearls strung on a single thread.
@etconp
๐ซ6,000 แจแ แญแถ แ แฐแญ แคแฐแฐแฆแฝ แจแแแฉแ แต แแแฐแญ!
-----------------------------------
Suลoszowa โ the Polish village where 6,000 people share the same road
In the heart of Poland, a few kilometers from Krakow, there is a village that looks like it came out of a rural painting: Suลoszowa. Here, all of its approximately 6,000 inhabitants live along a single main road, a detail that makes this locality unique and fascinating. Seen from above, the village offers an extraordinary spectacle: a long, perfectly linear central artery, flanked by neatly arranged houses, like pearls strung on a single thread.
@etconp
โค12๐4๐1
๐What is the Earned Value Management in Construction Project Management โ
๐ทEarned Value Management (EVM) is a project management technique widely used in construction projects to measure and monitor project performance and progress. It integrates three critical components: scope, schedule, and cost, providing a comprehensive picture of how a project is performing compared to its baseline.
โญ๏ธ Key Components of EVM
๐ Planned Value (PV): Also known as Budgeted Cost of Work Scheduled (BCWS). This represents the budgeted cost of the work planned to be completed at a specific point in time.
๐ต Earned Value (EV): Also known as Budgeted Cost of Work Performed (BCWP). This represents the budgeted cost of the work that has actually been completed at a specific point in time.
๐ชฌ Actual Cost (AC): Also known as Actual Cost of Work Performed (ACWP). This is the actual cost incurred for the work completed at a specific point in time.
โญ๏ธ EVM Metrics
EVM generates key metrics to analyze project performance:
๐ฅ Schedule Variance (SV)
Formula: SV=EVโPV
Indicates whether the project is ahead of or behind schedule.
Positive SV: Ahead of schedule
Negative SV: Behind schedule
๐ฅ Cost Variance (CV)
Formula: CV=EVโAC
Indicates whether the project is under or over budget.
Positive CV: Under budget
Negative CV: Over budget
๐ฅ Schedule Performance Index (SPI)
Formula: SPI=EV/PV
Measures schedule efficiency (progress vs. plan).
SPI > 1: Ahead of schedule
SPI < 1: Behind schedule
๐ฅ Cost Performance Index (CPI)
Formula: CPI=EV/AC
Measures cost efficiency (value earned for money spent).
CPI > 1: Under budget
CPI < 1: Over budget
โญ๏ธ Benefits of EVM in Construction
1. Proactive Decision-Making: Identifies variances early, allowing corrective actions to keep the project on track.
2. Integrated Performance Tracking: Combines cost, schedule, and scope into a single framework.
3. Forecasting Capability: Predicts future project performance and costs based on current trends.
4. Improved Communication: Provides a clear, quantitative view of project progress for stakeholders.
@etconp
๐ทEarned Value Management (EVM) is a project management technique widely used in construction projects to measure and monitor project performance and progress. It integrates three critical components: scope, schedule, and cost, providing a comprehensive picture of how a project is performing compared to its baseline.
โญ๏ธ Key Components of EVM
๐ Planned Value (PV): Also known as Budgeted Cost of Work Scheduled (BCWS). This represents the budgeted cost of the work planned to be completed at a specific point in time.
๐ต Earned Value (EV): Also known as Budgeted Cost of Work Performed (BCWP). This represents the budgeted cost of the work that has actually been completed at a specific point in time.
๐ชฌ Actual Cost (AC): Also known as Actual Cost of Work Performed (ACWP). This is the actual cost incurred for the work completed at a specific point in time.
โญ๏ธ EVM Metrics
EVM generates key metrics to analyze project performance:
๐ฅ Schedule Variance (SV)
Formula: SV=EVโPV
Indicates whether the project is ahead of or behind schedule.
Positive SV: Ahead of schedule
Negative SV: Behind schedule
๐ฅ Cost Variance (CV)
Formula: CV=EVโAC
Indicates whether the project is under or over budget.
Positive CV: Under budget
Negative CV: Over budget
๐ฅ Schedule Performance Index (SPI)
Formula: SPI=EV/PV
Measures schedule efficiency (progress vs. plan).
SPI > 1: Ahead of schedule
SPI < 1: Behind schedule
๐ฅ Cost Performance Index (CPI)
Formula: CPI=EV/AC
Measures cost efficiency (value earned for money spent).
CPI > 1: Under budget
CPI < 1: Over budget
โญ๏ธ Benefits of EVM in Construction
1. Proactive Decision-Making: Identifies variances early, allowing corrective actions to keep the project on track.
2. Integrated Performance Tracking: Combines cost, schedule, and scope into a single framework.
3. Forecasting Capability: Predicts future project performance and costs based on current trends.
4. Improved Communication: Provides a clear, quantitative view of project progress for stakeholders.
@etconp
๐21
๐Design Concepts Of Road
๐งDesigning the thickness of each layer for a Double Bituminous Surface Treatment (DBST) road involves several steps.
โบThe design typically depends on factors like traffic load, subgrade soil conditions, climate, and expected lifespan. Here's a general guideline:
โญ๏ธ1. Traffic Analysis
Determine the types and volumes of vehicles expected.
Calculate the equivalent single axle loads (ESALs) for design life.
โญ๏ธ2. Subgrade Evaluation
Conduct soil tests (CBR, Plate Load Test, etc.) to determine subgrade strength.
Subgrade preparation: Ensure proper compaction and drainage.
โญ๏ธ3. Layer Design
Subgrade (Natural Soil)
Ensure a minimum CBR of 8-10% for light traffic and higher for heavy traffic.
Sub-base Layer
Material: Granular material or crushed stone.
Thickness: Typically 150-250 mm, depending on subgrade strength and traffic load.
Base Layer
Material: Crushed stone or stabilized material.
Thickness: 100-200 mm, depending on traffic requirements.
DBST Layer
First coat: Apply bitumen (1-1.5 liters/mยฒ) + 10 mm aggregate.
Second coat: Apply bitumen (0.8-1.2 liters/mยฒ) + 6-10 mm aggregate.
Total thickness: Typically 20-30 mm.
โญ๏ธ4. Drainage Considerations
Provide adequate surface and sub-surface drainage.
Use side drains and culverts as needed.
โญ๏ธ5. Design Example
For a DBST road with moderate traffic:
Sub-base: 200 mm
Base: 150 mm
DBST Surface: 25 mm
โญ๏ธ6. Final Design
The final design should comply with local standards and guidelines, such as those from the Ministry of Public Works and Transport in The country or AASHTO standards.
@etconp
๐งDesigning the thickness of each layer for a Double Bituminous Surface Treatment (DBST) road involves several steps.
โบThe design typically depends on factors like traffic load, subgrade soil conditions, climate, and expected lifespan. Here's a general guideline:
โญ๏ธ1. Traffic Analysis
Determine the types and volumes of vehicles expected.
Calculate the equivalent single axle loads (ESALs) for design life.
โญ๏ธ2. Subgrade Evaluation
Conduct soil tests (CBR, Plate Load Test, etc.) to determine subgrade strength.
Subgrade preparation: Ensure proper compaction and drainage.
โญ๏ธ3. Layer Design
Subgrade (Natural Soil)
Ensure a minimum CBR of 8-10% for light traffic and higher for heavy traffic.
Sub-base Layer
Material: Granular material or crushed stone.
Thickness: Typically 150-250 mm, depending on subgrade strength and traffic load.
Base Layer
Material: Crushed stone or stabilized material.
Thickness: 100-200 mm, depending on traffic requirements.
DBST Layer
First coat: Apply bitumen (1-1.5 liters/mยฒ) + 10 mm aggregate.
Second coat: Apply bitumen (0.8-1.2 liters/mยฒ) + 6-10 mm aggregate.
Total thickness: Typically 20-30 mm.
โญ๏ธ4. Drainage Considerations
Provide adequate surface and sub-surface drainage.
Use side drains and culverts as needed.
โญ๏ธ5. Design Example
For a DBST road with moderate traffic:
Sub-base: 200 mm
Base: 150 mm
DBST Surface: 25 mm
โญ๏ธ6. Final Design
The final design should comply with local standards and guidelines, such as those from the Ministry of Public Works and Transport in The country or AASHTO standards.
@etconp
๐10โค1
๐แแตแฎแญ แ แแแณ 2.6 แขแแฎแ แฅแญ แแช 'แแญ แแญแแต แฃแญ แธแซแฐแ แแแณโ แชแแญแฑ แแแแฃ แแ
๐ซแแตแฎแญ แขแแจแตแตแแแต แแฉแ แ แแแณ แแชแแญแต แแแฃแณ แจแแ แจแต แตแแแญ แ แตแแแงแแข
๐ทโแแญ แแญแแต แฃแญ แธแซแฐแ แแแณโ แจแแ แตแซแ แซแแ แชแแญแฑ แ 21 แบแ แซแฌ แแตแญ แแฌแต แแญ แจแแซแญแ แฒแแแค แฅแตแจ 2.6 แขแแฎแ แฅแญ แแช แฅแแฐแแฐแจแแ แต แณแแแแข
โบแจแฐแแซแฉ แฐแจแแธแแ แจแ แ แ แ แแแแแถแฝแ แจแแซแแญแ แแ แชแแญแต แ แ แแแญ แจแแแฃแณ แฅแซ แ 2 แแแต แแ แแฐแฅ แแแ แแแ แณแ แทแแข
โบแ แแก แจแแแ แชแแญแฑ แตแแแ แแแซแ แฅแ แแแ แ แแแ แแแถแฝแ แ แฅแแต แจแแตแฐแแต แ แ แ แแฎแต แจแแแแฃ แฒแแแค แแแดแ แฅแ แฑแชแแ แขแแฑแตแตแชแ แฐแจแแช แ แ แ แฅแแฐแแแ แฐแแแฟแแข
โบแชแแญแฑ แ แแแฃแณ แแฐแต แ500 แฐแแฝ แฅแแฒแแ แฐแ แแ แแฐแตแซ แฒแแฃ แจ350 แ แแญ แแแแ แแแฝ แแ แจแฅแซ แแตแ แญแแฅแซแ แฐแฅแ แญแ แ แแแข
@etconp
๐ซแแตแฎแญ แขแแจแตแตแแแต แแฉแ แ แแแณ แแชแแญแต แแแฃแณ แจแแ แจแต แตแแแญ แ แตแแแงแแข
๐ทโแแญ แแญแแต แฃแญ แธแซแฐแ แแแณโ แจแแ แตแซแ แซแแ แชแแญแฑ แ 21 แบแ แซแฌ แแตแญ แแฌแต แแญ แจแแซแญแ แฒแแแค แฅแตแจ 2.6 แขแแฎแ แฅแญ แแช แฅแแฐแแฐแจแแ แต แณแแแแข
โบแจแฐแแซแฉ แฐแจแแธแแ แจแ แ แ แ แแแแแถแฝแ แจแแซแแญแ แแ แชแแญแต แ แ แแแญ แจแแแฃแณ แฅแซ แ 2 แแแต แแ แแฐแฅ แแแ แแแ แณแ แทแแข
โบแ แแก แจแแแ แชแแญแฑ แตแแแ แแแซแ แฅแ แแแ แ แแแ แแแถแฝแ แ แฅแแต แจแแตแฐแแต แ แ แ แแฎแต แจแแแแฃ แฒแแแค แแแดแ แฅแ แฑแชแแ แขแแฑแตแตแชแ แฐแจแแช แ แ แ แฅแแฐแแแ แฐแแแฟแแข
โบแชแแญแฑ แ แแแฃแณ แแฐแต แ500 แฐแแฝ แฅแแฒแแ แฐแ แแ แแฐแตแซ แฒแแฃ แจ350 แ แแญ แแแแ แแแฝ แแ แจแฅแซ แแตแ แญแแฅแซแ แฐแฅแ แญแ แ แแแข
@etconp
๐13โค1
๐แ แตแฌแณแ แจแฐแ 8.54 แชแ แแตแญ แจแแธแแ แจแฎแชแฐแญ แแแต แแฎแแญแต แ แ แแตแต แจแฐแแซแฉ แฆแณแแฝ แ แแซแแต แแญ แญแแแแข
โบแฅแแแ แฆแณแแฝ แจแแณแฝ แแตแแแ แฅแซแแฝแแฃ แจแฅแแจแ แแแแถแฝแ แแแฃแณแฃ แจแฅแตแญแแต แแฅแแฎแฝแแฃ แจแ แจแแแด แแแต แแฎแแญแถแฝแแฃ แจแแชแ แแแแซ แฆแณแแฝแ แฅแ แจแตแแญแต แ แซแณแ แแแฃแณแ แซแซแตแณแแข
โญ๏ธA corridor development project spanning 8.54 km is currently underway in Dire Dawa, divided into five different lots. These lots include drainage works, walkway construction, cycle lanes, greenery projects, parking areas, and the construction of a sports academy.
Via PMO Ethiopia
@etconp
โบแฅแแแ แฆแณแแฝ แจแแณแฝ แแตแแแ แฅแซแแฝแแฃ แจแฅแแจแ แแแแถแฝแ แแแฃแณแฃ แจแฅแตแญแแต แแฅแแฎแฝแแฃ แจแ แจแแแด แแแต แแฎแแญแถแฝแแฃ แจแแชแ แแแแซ แฆแณแแฝแ แฅแ แจแตแแญแต แ แซแณแ แแแฃแณแ แซแซแตแณแแข
โญ๏ธA corridor development project spanning 8.54 km is currently underway in Dire Dawa, divided into five different lots. These lots include drainage works, walkway construction, cycle lanes, greenery projects, parking areas, and the construction of a sports academy.
Via PMO Ethiopia
@etconp
๐12
#ExitExamResult
โก" แจแแฐแแ แแคแต แฐแแ แแแแ แฉแแจแญแฒแฒแแฝ แฐแแณแ " - แจแตแแ แญแต แแแตแดแญ แ แแซแญ
๐ด" แจแแฐแ แแคแต แแแ แฉแแจแญแฒแฒแแฝ แแญ แแฅแทแ " - แจแขแตแฎแตแซ แฐแแชแแฝ แ แฅแจแต
แจแแแญ แ แแ แแแซ แแฐแ แแคแต แแฉแแจแญแฒแฒแแฝ แแแฉแ แจแตแแ แญแต แแแตแดแญ แแฒแญแซแ แขแตแฎแตแซ แแแฟแแข
แจแตแแ แญแต แแแตแดแญ แจแแฐแ แ แแซแญ แแฒแญแซแ แขแตแฎแตแซ แ แฐแกแต แ แญแญ แแ แฅ " แแฐแแ แฐแแ แแฉแแจแญแฒแฒแแฝ แฐแแณแ " แฅแแแแข
" แ แแแซแฝแ แแญ แแฉแแจแญแฒแฒแแฝ แแ แจแแแจแ แแแฉแ แญแแญแแธแแแข แแคแต แแแ แฉแแจแญแฒแฒ แแญ แฐแญแทแ " แฒแ แแแธแแแข
แแ แซแญแ แฐแแช แ แแ ? แแแแ แจแฒแญแซแ แขแตแฎแตแซ แฅแซแ " แแคแฑ แ แแ แตแแฐแแแแ แแฐแแแต แตแแฐแแจ แ แ แแแญ แณแณแแ แจแแแจแ แแ แแ " แฅแแแแข
แจแขแตแฎแตแซ แฐแแชแแฝ แ แฅแจแต แกแฉแแฃ " แแคแฑ แฐแแแแข แจแแแ แฉแแจแญแฒแฒ แแฅแทแ " แฒแ แแฒแญแซแ แขแตแฎแตแซ แแแฟแแข
แแคแต แแแแจแป แแแฉ แฐแญแทแฝแแ ? แตแแ แแแจแฅแแแต แฅแซแ แ แฐแ แ แแแฝ แฐแแแฃ " แแ แฅแ แแคแฑ แแ แจแแฃแ " แจแแ แ แญแญ แแแฝ แฐแฅแทแแข
แแคแฑ แแจแฉแแจแญแฒแฒแแฝ แฌแ แตแตแซแญ แแแฉแ แจแแแธแ แ แฅแจแฑ แฐแแณแแฝ แแคแณแธแแ แ แจแฉแแจแญแฒแฒแซแธแ / แซแแแณแธแ #แจแแ แแแฎ แแจแต แฅแแฐแแฝแ แแแฟแแข
@etconp
โก" แจแแฐแแ แแคแต แฐแแ แแแแ แฉแแจแญแฒแฒแแฝ แฐแแณแ " - แจแตแแ แญแต แแแตแดแญ แ แแซแญ
๐ด" แจแแฐแ แแคแต แแแ แฉแแจแญแฒแฒแแฝ แแญ แแฅแทแ " - แจแขแตแฎแตแซ แฐแแชแแฝ แ แฅแจแต
แจแแแญ แ แแ แแแซ แแฐแ แแคแต แแฉแแจแญแฒแฒแแฝ แแแฉแ แจแตแแ แญแต แแแตแดแญ แแฒแญแซแ แขแตแฎแตแซ แแแฟแแข
แจแตแแ แญแต แแแตแดแญ แจแแฐแ แ แแซแญ แแฒแญแซแ แขแตแฎแตแซ แ แฐแกแต แ แญแญ แแ แฅ " แแฐแแ แฐแแ แแฉแแจแญแฒแฒแแฝ แฐแแณแ " แฅแแแแข
" แ แแแซแฝแ แแญ แแฉแแจแญแฒแฒแแฝ แแ แจแแแจแ แแแฉแ แญแแญแแธแแแข แแคแต แแแ แฉแแจแญแฒแฒ แแญ แฐแญแทแ " แฒแ แแแธแแแข
แแ แซแญแ แฐแแช แ แแ ? แแแแ แจแฒแญแซแ แขแตแฎแตแซ แฅแซแ " แแคแฑ แ แแ แตแแฐแแแแ แแฐแแแต แตแแฐแแจ แ แ แแแญ แณแณแแ แจแแแจแ แแ แแ " แฅแแแแข
แจแขแตแฎแตแซ แฐแแชแแฝ แ แฅแจแต แกแฉแแฃ " แแคแฑ แฐแแแแข แจแแแ แฉแแจแญแฒแฒ แแฅแทแ " แฒแ แแฒแญแซแ แขแตแฎแตแซ แแแฟแแข
แแคแต แแแแจแป แแแฉ แฐแญแทแฝแแ ? แตแแ แแแจแฅแแแต แฅแซแ แ แฐแ แ แแแฝ แฐแแแฃ " แแ แฅแ แแคแฑ แแ แจแแฃแ " แจแแ แ แญแญ แแแฝ แฐแฅแทแแข
แแคแฑ แแจแฉแแจแญแฒแฒแแฝ แฌแ แตแตแซแญ แแแฉแ แจแแแธแ แ แฅแจแฑ แฐแแณแแฝ แแคแณแธแแ แ แจแฉแแจแญแฒแฒแซแธแ / แซแแแณแธแ #แจแแ แแแฎ แแจแต แฅแแฐแแฝแ แแแฟแแข
@etconp
๐11โค1
#ADVERTISEMENT
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
แแแแฝแ
แ1แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2 แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3 แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ
แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ 4 แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญ
0912492727
0913061530
0923764834
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
แแแแฝแ
แ1แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2 แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3 แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ
แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ 4 แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญ
0912492727
0913061530
0923764834
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐2โค1
๐Challenging Liquidated Damages
๐ซContractors and subcontractors may attempt to challenge the amount of damages to be levied closer to the time they are deducted rather than when signing the contract.
โบTo overcome this challenge, the employer must prove that the damages included in the contract were a genuine pre-estimate of the loss at the time the damages were calculated.
*Key Principles*
- *Genuine Pre-Estimate*: The employer must demonstrate that the damages were a genuine pre-estimate of the loss.
- *Irrelevance of Actual Cost*: The actual cost of damages incurred by the employer is irrelevant.
- *Exclusive Remedy*: Liquidated damages are an exclusive remedy, and the employer cannot revisit and increase the level of damages deducted if the actual loss suffered is greater.
*Challenging Damages During Tender Negotiations*
โบIf the contractor does not consider the level of damages to be reasonable, it can be challenged during tender negotiations rather than after the contract has been signed.
*Early Possession or Take-Over*
Challenges may arise where there is early possession or take-over of a part of the work by the employer. Contracts generally allow for this proportion of the value of works to be considered so that full damages are not deducted.
*Practical Completion and Damages*
At the end of a project, the date of completion or practical completion is often subject to some debate. In practice, the date of achieving practical completion is sometimes agreed and formalised some time after the actual event occurred.
*Unliquidated Damages*
If the relevant section of the contract is left blank, unliquidated damages will apply. Therefore, it will be for the employer and their representatives to collate records and prove actual loss.
*Inserting 'Nil' in the Contract*
If 'nil' is inserted in the relevant section of the contract, the employer will not be entitled to either liquidated or unliquidated damages. This should be advised against as it significantly reduces the contractor's incentive to complete the works by the completion date and prevents the employer from recovering losses.
*Recovery of Liquidated Damages*
Under JCT contracts, recovery of liquidated damages is separate from the interim payment procedures, and therefore would normally be dealt with by the issue of a 'pay-less notice' by the employer, rather than being included in an interim valuation.
*Mechanism for Amending Completion Date*
Where there is no mechanism in the contract to award an extension to the completion date, the employer cannot benefit if they are responsible for the delay through items such as delayed possession or changes to the scope of work, for example.
*Payment by Contractor to Employer*
At the end of a project, the level of damages to be deducted may exceed payments outstanding to the contractor. In this instance, the contractor would have to make a payment to the employer. The relevant provisions in the contract should be reviewed in this instance, as they may well cover contractor payment to the employer.
@etconp
๐ซContractors and subcontractors may attempt to challenge the amount of damages to be levied closer to the time they are deducted rather than when signing the contract.
โบTo overcome this challenge, the employer must prove that the damages included in the contract were a genuine pre-estimate of the loss at the time the damages were calculated.
*Key Principles*
- *Genuine Pre-Estimate*: The employer must demonstrate that the damages were a genuine pre-estimate of the loss.
- *Irrelevance of Actual Cost*: The actual cost of damages incurred by the employer is irrelevant.
- *Exclusive Remedy*: Liquidated damages are an exclusive remedy, and the employer cannot revisit and increase the level of damages deducted if the actual loss suffered is greater.
*Challenging Damages During Tender Negotiations*
โบIf the contractor does not consider the level of damages to be reasonable, it can be challenged during tender negotiations rather than after the contract has been signed.
*Early Possession or Take-Over*
Challenges may arise where there is early possession or take-over of a part of the work by the employer. Contracts generally allow for this proportion of the value of works to be considered so that full damages are not deducted.
*Practical Completion and Damages*
At the end of a project, the date of completion or practical completion is often subject to some debate. In practice, the date of achieving practical completion is sometimes agreed and formalised some time after the actual event occurred.
*Unliquidated Damages*
If the relevant section of the contract is left blank, unliquidated damages will apply. Therefore, it will be for the employer and their representatives to collate records and prove actual loss.
*Inserting 'Nil' in the Contract*
If 'nil' is inserted in the relevant section of the contract, the employer will not be entitled to either liquidated or unliquidated damages. This should be advised against as it significantly reduces the contractor's incentive to complete the works by the completion date and prevents the employer from recovering losses.
*Recovery of Liquidated Damages*
Under JCT contracts, recovery of liquidated damages is separate from the interim payment procedures, and therefore would normally be dealt with by the issue of a 'pay-less notice' by the employer, rather than being included in an interim valuation.
*Mechanism for Amending Completion Date*
Where there is no mechanism in the contract to award an extension to the completion date, the employer cannot benefit if they are responsible for the delay through items such as delayed possession or changes to the scope of work, for example.
*Payment by Contractor to Employer*
At the end of a project, the level of damages to be deducted may exceed payments outstanding to the contractor. In this instance, the contractor would have to make a payment to the employer. The relevant provisions in the contract should be reviewed in this instance, as they may well cover contractor payment to the employer.
@etconp
โค5๐4