Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
πŸ”¨ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

πŸ“¨ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
ADVERTISMENT

α‰³αˆαˆ«α‰΅ α•αˆŒα‰΅ αŠ₯αŠ“ αŒ„ α‰¦αˆα‰΅ αŠ α‰…αˆ«α‰’

βœ…α‹¨αˆαŠ•αˆ°αŒ£α‰Έα‹ αŠ αŒˆαˆαŒαˆŽα‰Άα‰½

πŸ”… α•αˆŒα‰΅ any Size & thickness
πŸ”… αŒ„ α‰¦αˆα‰΅ (αŒ₯ርሡ αˆ›α‹‰αŒ£α‰΅αŠ“ αˆ›αŒ α)

πŸ”… α‹¨α‰°αˆˆα‹«α‹©  [modefic] αˆ΅αˆ«α‹Žα‰½αŠ• αŠ₯αŠ•αˆ°αˆ«αˆˆαŠ•α’

♦️ αˆ›αŠ•αŠ›α‹‰αŠ•αˆ α‰₯αˆ¨α‰³ α‰₯αˆ¨α‰΅ αŠ₯αŠ•αŒˆα‹›αˆˆαŠ•α’

☎️ሡልክ 0904040477 α‹ˆα‹­αˆ 0911016833 α‹°α‹αˆˆα‹ α‹«αŒαŠ™αŠ•
πŸ“±α‰΄αˆŒαŒαˆ«αˆ αˆ‹α‹­ ፦https://t.me/heavenic1

αŠ α‹΅αˆ«αˆ»α¦  ቁ 1.αˆ˜αˆ­αŠ«α‰Ά
                ቁ.2 αŠ α‹¨αˆ­ αŒ€αŠ“  αŠͺα‹³αŠ αˆαˆ…αˆ¨α‰΅

αŒ₯αˆ«α‰΅αŠ“ α‰³αˆ›αŠαŠα‰΅ αˆ˜αˆˆα‹«α‰½αŠ• αŠα‹α’
α‰³αˆαˆ«α‰΅ α•αˆŒα‰΅ αŠ₯αŠ“ αŒ„ α‰¦αˆα‰΅ αŠ α‰…αˆ«α‰’
πŸ‘‰CONCRETE CRACK

🚧1. Shrinkage Cracks (plaster, concrete, mortar)

β€’ Proper curing during and after construction.
β€’ Apply crack filler putty or polymer modified mortar.
β€’ For hairline cracks, use wall putty repainting.

🚧2 . Thermal Cracks (due to expansion/contraction)

β€’ Provide expansion joints in long walls/slabs.
β€’ Use materials with low thermal movement.
β€’ Fill cracks with elastomeric sealants (flexible materials that expand/contract).

🚧3 . Crazing Cracks (fine hairline, network pattern)

β€’ Usually surface-level, no structural danger.
β€’ Improve curing methods to avoid rapid drying.
β€’ Apply a thin coat of plaster or skim coat paint.

🚧4. Map Cracking (surface cracks in plaster/concrete)

β€’ Remove loose plaster and re-plaster with proper mix.
β€’ Ensure correct water-cement ratio.
β€’ Use sulfate-resistant cement in areas prone to chemical attack.

🚧5. Settlement Cracks (minor, not structural)

β€’ Fill with epoxy putty, crack filler, or cement mortar.
β€’ If soil settlement is minor, monitor for further movement before repair.

🚧6 . Moisture/Leakage-Induced Cracks

β€’ Seal cracks with waterproofing compounds.
β€’ Apply polymer-modified mortar or PU injection for waterproofing.
β€’ Ensure proper drainage and damp-proofing to prevent recurrence.

🚧7. General Hairline Cracks (paint-level cracks)

β€’ Fill with acrylic crack filler or wall putty.
β€’ Sand smooth, then repaint with flexible paint.

@etconp
❀10πŸ‘5
πŸ‘‰Effective Depth (d) Requirements

πŸ’«The Effective Depth (d) is a calculated value, not a minimum requirement, and is used directly in all strength equations.

🚧1. Calculation of Effective Depth

⏺The effective depth is calculated based on the overall geometry of the section:

❇️d = D - Effective cover

🎲Where D = overall depth of the member

πŸ”°Effective Cover = Clear Cover + Stirrup/Link Diameter + (Main bar Diameter) /2

πŸ“To prevent noticeable deflection, the calculated L/d ratio must be less than the modified basic ratio.

⏺For example, for a simply supported beam with a 5m span, the minimum effective depth required for deflection control would be:

🌟d min =span/20 = 5000mm/20 =250 mm

@etconp
❀10πŸ‘2
Qorannoo_Gabaa_galteewwan_ijaarsaa_Marsaa_2ffa_Bara_201822222.pdf
18.9 MB
πŸ‘‰α‹¨2018 α‹“.ም 2αŠ› ሩα‰₯ α‹“αˆ˜α‰΅ α‹¨αŒαŠ•α‰£α‰³ αˆ₯αˆ«α‹Žα‰½ የቀαŒ₯α‰°αŠ› α‹‹αŒ‹ (Direct Cost) αŒ₯αŠ“α‰΅ αˆ°αŠα‹΅

πŸ’«Oromia Construction Authority (OCA)

https://t.me/ETCONp

@ETCONpWORK
πŸ™11❀4πŸ‘2πŸ‘1
πŸ‘‰Addendum vs Amendment β€” What’s the Difference?

πŸ’«Quantity Surveyors, we often deal with contract documents, tender clarifications, and revisions.

🚧Two common terms we see are Addendum and Amendment, and although they sound similar, they serve different purposes.

⭐️Addendum

➀ Issued before the contract is signed.
➀ Used to add, clarify, or modify tender documents (like drawings, BOQ items, or specifications).
➀ Example: β€œAddendum 02 – Revised ceiling layout and updated quantities.”

⭐️Amendment

➀ Issued after the contract is signed.
➀ Used to change the terms, price, or scope of an existing contract.
➀ Example: β€œContract Amendment No.1 – Addition of new partition works.”

⏺Addendum:-Before contract
⏺Amendment:-After contract

πŸ“Understanding this helps in proper documentation, variation handling, and clear communication with clients and consultants.

@etconp
πŸ‘19❀9
πŸ‘‰Here’s a detailed explanation of a Site Engineer’s responsibilities during staircase construction β€” from preparation to finishing work:

🧱 1. Planning and Preparation
Study the drawings: Review architectural and structural drawings to understand the staircase dimensions, type (dog-legged, open-well, spiral, etc.), reinforcement details, rise and tread measurements, and finishes.

⏺Check levels: Verify the floor-to-floor height and coordinate with the formwork and reinforcement plans.
⏺Material preparation: Ensure all materialsβ€”cement, sand, aggregate, steel bars, formwork boards, and binding wireβ€”are available on site before work starts.

πŸ“ 2. Layout and Marking
Set out staircase dimensions: Mark the staircase position on the site using a tape, level, and plumb bob according to the approved drawings.

⏺Verify rise and tread: Confirm that each step’s rise (height) and tread (depth) are consistent and meet the design or building code requirements.
⏺Mark landing positions: Ensure correct landing levels and alignment with beams or slab edges.

🧰 3. Formwork Supervision
Check shuttering quality: Ensure formwork is strong, well-supported, and properly aligned to achieve accurate step dimensions.

⏺Prevent leakage: Seal joints to prevent cement slurry leakage during concreting.
⏺Safety checks: Confirm all supports and props are stable, especially at higher elevations.

πŸ”© 4. Reinforcement Work
Inspect reinforcement placement: Ensure main bars, distribution bars, and landing reinforcement are fixed according to the drawing.

⏺Maintain cover: Verify concrete cover blocks are in place (usually 20–25 mm for stairs).
⏺Check bar bends and laps: Confirm correct bending of bars at landings and overlaps at junctions with slabs or beams.

🧱 5. Concreting Supervision
Monitor concrete mix: Check mix proportion (as per design or site mix) and ensure workability for proper compaction in steps.

⏺Vibration: Ensure adequate vibration without disturbing the formwork or causing honeycombing.
⏺Finish: Smooth the step surface immediately after concreting, maintaining rise and tread accuracy.

🧊 6. Curing and Formwork Removal

⏺Curing: Ensure the staircase is properly cured (minimum 7 days for normal cement) to prevent cracks.
⏺Formwork removal: Supervise careful removal of formwork after sufficient strength gain, starting from steps and then landings.

🎨 7. Finishing Work
Plastering or tile laying: Check line, level, and alignment during plastering or installation of stair tiles, granite, or terrazzo.
Railing installation: Ensure railing is fixed firmly, maintaining required height and aesthetics.
⏺Final inspection: Verify overall finish, safety, and dimensions before handing over.

πŸ“‹ 8. Documentation and Coordination

⏺Maintain daily progress reports and quality checklists.
Coordinate with architects, structural engineers, and contractors for any design clarifications or site modifications.

⏺Ensure safety compliance for workers during construction at heights.

@etconp
❀13πŸ‘Œ4
πŸ‘‰αˆ°αˆ‹αˆ ውዡ α‰€α‰°αˆ°α‰¦α‰»α‰½αŠ•

πŸ’«α‰₯α‹™ αˆ°α‹Žα‰½ የ Thesis αŠ₯αŠ“ Internship αˆ³αˆα•αˆŽα‰½ αˆ‹αŠ©αˆαŠ• α‰₯αˆ‹α‰Ήα‹‹αˆ

πŸš§αˆ΅αˆˆα‹šαˆ… α‹›αˆ¬ የ Thesis αˆ³αˆα•αˆ αŠ₯αŠ•αˆˆα‰…αˆ‹α‰Ήα‹‹αˆˆαŠ• ነገ α‹°αˆž Internship αˆ³αˆα•αˆ αŠ₯αŠ•αˆαŠ­αˆ‹α‰Ήα‹‹αˆαŠ•πŸ™ πŸ‘‡

@etconp
πŸ™5❀2
THESIS_ON_BUILDING_DESIGN,_EXCEL.pdf
10.2 MB
FOR THOSE OF YOU DOING YOUR THESIS (SENIOR ESSEY) IN STRUCTURAL DESIGN THIS FILE IS HELPFUL. IT ENCOMPASSES:

1. SOLID, RIBBED, FLAT AND WAFFLE SLAB DESIGN AND COST COMPARISON

2. DOG LEGGED, OPEN NEWEL & FREE STANDING STAIR ANALYSIS AND DESIGN

3. EXCEL TEMPLATE PREPARATION FOR 11 TYPES OF STAIRS

4. EXCEL TEMPLATE PREPARATION FOR NON-RECTANGULAR SLABS SUCH AS TRAPIZOIDAL SLAB AND SUCH.

5. MOMENT COEFFICIENT PREPARATION FOR TRAPIZOIDAL SLAB

6. ANALYSIS AND DESIGN OF 2B+G+M+15 OFFICE BUILDING

PART OF IT WAS PUBLISHED IN THE JOURNAL OF ETHIOPIAN CIVIL ENGINEERING ASSOCIATION

I HOPE IT IS HELPS!

https://t.me/ETCONpWORK

@etconp
❀9πŸ‘5
Abubeker Jemal.pdf
689 KB
▢️Thesis samples on Telegram @COTMp

https://t.me/ETCONpWORK

@etconp
❀1