๐Deep segregation in concrete, especially in vertical elements (columns, walls, etc.), is a serious defect that compromises the strength, durability, and sometimes even the stability of the structure, particularly in harsh climates.
๐ทHere are the most commonly used repair methods that comply with DTU (Unified Technical Document) requirements:
๐ง1. Mortar repair (manual) using monotop products, generally used for localized and accessible surface segregation.
๐Application steps
โ Demolition of the defective concrete down to sound concrete.
โ Cleaning and passivation of the reinforcing steel.
โ Application of a bonding agent.
โ Reshaping with a thixotropic repair mortar (monotop).
โ Wet curing for 48 to 72 hours to prevent cracking.
โบAdvantages: Simple, quick, ideal for small areas.
๐ง2. Repair by grouting or grout injection (non-shrinking fluid mortar): This method is recommended for deep segregation with significant voids around the reinforcing steel.
๐Application steps
โ Watertight formwork around the area.
โ Cleaning and dampening the substrate.
โ Pouring or injecting high-strength fluid grout.
โ Checking the filling and wet curing.
โ Advantages: Excellent penetration, high strength, fills cavities.
โบProduct application requires proper formwork and technical expertise.
๐ง3. Structural repair (shotcrete or lining): In cases of widespread segregation or significant loss of cross-section.
๐Application steps
โ Complete demolition of the damaged area.
โ Cleaning, passivation of the reinforcing steel, and possibly the addition of reinforcement.
โ Application of shotcrete or reinforced concrete/composite (FRP) lining.
โ Finishing and curing.
๐Advantages: Restores or increases structural strength.
๐However, the method is expensive and requires rigorous engineering and control.
๐To avoid any form of segregation, it is essential to.
๐ป Before proceeding with the application, it is important to check the workability of the concrete.
๐ป Maintain vibration of the concrete throughout the pouring process.
๐ป Verify the conformity of the concrete, the maximum aggregate density (Dmax) specified in the mix design, and adhere to it.
@etconp
๐ทHere are the most commonly used repair methods that comply with DTU (Unified Technical Document) requirements:
๐ง1. Mortar repair (manual) using monotop products, generally used for localized and accessible surface segregation.
๐Application steps
โ Demolition of the defective concrete down to sound concrete.
โ Cleaning and passivation of the reinforcing steel.
โ Application of a bonding agent.
โ Reshaping with a thixotropic repair mortar (monotop).
โ Wet curing for 48 to 72 hours to prevent cracking.
โบAdvantages: Simple, quick, ideal for small areas.
๐ง2. Repair by grouting or grout injection (non-shrinking fluid mortar): This method is recommended for deep segregation with significant voids around the reinforcing steel.
๐Application steps
โ Watertight formwork around the area.
โ Cleaning and dampening the substrate.
โ Pouring or injecting high-strength fluid grout.
โ Checking the filling and wet curing.
โ Advantages: Excellent penetration, high strength, fills cavities.
โบProduct application requires proper formwork and technical expertise.
๐ง3. Structural repair (shotcrete or lining): In cases of widespread segregation or significant loss of cross-section.
๐Application steps
โ Complete demolition of the damaged area.
โ Cleaning, passivation of the reinforcing steel, and possibly the addition of reinforcement.
โ Application of shotcrete or reinforced concrete/composite (FRP) lining.
โ Finishing and curing.
๐Advantages: Restores or increases structural strength.
๐However, the method is expensive and requires rigorous engineering and control.
๐To avoid any form of segregation, it is essential to.
๐ป Before proceeding with the application, it is important to check the workability of the concrete.
๐ป Maintain vibration of the concrete throughout the pouring process.
๐ป Verify the conformity of the concrete, the maximum aggregate density (Dmax) specified in the mix design, and adhere to it.
@etconp
โค6๐2
๐Follow these simple tips for successful project scheduling and keep your construction projects on track.
โญ๏ธSIMPLE TIPS FOR SUCCESSFULPROJECT SCHEDULING
๐Plan the work clearly.
๐Break the project into small tasks.
๐Set realistic time for each task.
๐ldentify the critical path.
๐Arrange labour, material &
equipment on time.
๐Add buffer for delays.
๐Update the schedule regularly.
๐Monitor planned vs. actual
progres.
๐Communicate schedule with
the whole team.
๐Control changes and risks.
๐ซPlan smart, build better!
@etconp
โญ๏ธSIMPLE TIPS FOR SUCCESSFULPROJECT SCHEDULING
๐Plan the work clearly.
๐Break the project into small tasks.
๐Set realistic time for each task.
๐ldentify the critical path.
๐Arrange labour, material &
equipment on time.
๐Add buffer for delays.
๐Update the schedule regularly.
๐Monitor planned vs. actual
progres.
๐Communicate schedule with
the whole team.
๐Control changes and risks.
๐ซPlan smart, build better!
@etconp
โค11
๐Curing is the key to strong, crack-free, and durable concrete! Keep it moist, protected, and properly timed.
๐ซCONCRETE CURING
MANAGEMENT CHECKLIST
๐Start curing immediately after final setting.
๐Keep surface moist continuously for at least 7 days (OPC).
๐ For PPC or blended cement - cure for 10-14 days.
๐Use ponding, wet gunny bags, or sprinkling method.
๐Protect from direct sunlight and wind.
๐Ensure proper drainage to avoid water stagnation.
๐Cover vertical surfaces with wet hessian cloth.
๐Continue curing even in cold or hot weather.
๐Apply curing compound where water curing is not possible.
๐Record curing duration and method daily.
@etconp
๐ซCONCRETE CURING
MANAGEMENT CHECKLIST
๐Start curing immediately after final setting.
๐Keep surface moist continuously for at least 7 days (OPC).
๐ For PPC or blended cement - cure for 10-14 days.
๐Use ponding, wet gunny bags, or sprinkling method.
๐Protect from direct sunlight and wind.
๐Ensure proper drainage to avoid water stagnation.
๐Cover vertical surfaces with wet hessian cloth.
๐Continue curing even in cold or hot weather.
๐Apply curing compound where water curing is not possible.
๐Record curing duration and method daily.
@etconp
โค9๐ฅ1
๐ROLE OF A PLANNING
ENGINEER
โญ๏ธA Planning Engineer ensures every activity is scheduled, monitored, and executed on time.
โบFrom planning resources to tracking progress, they keep the project on the right timeline.
๐Prepare project schedule using tools like MS Project / Primavera
๐Plan resources - manpower, materials, machinery
๐ Track daily, weekly, monthly progress
๐ Compare planned vs actual progress
๐ldentify delays and suggest corrective actions
๐Coordinate with site engineers,
Contractors, and management
๐Prepare progress reports, charts, and dashboards
๐Support billing team with quantity tracking
๐ Monitor cost, time, and productivity
@etconp
ENGINEER
โญ๏ธA Planning Engineer ensures every activity is scheduled, monitored, and executed on time.
โบFrom planning resources to tracking progress, they keep the project on the right timeline.
๐Prepare project schedule using tools like MS Project / Primavera
๐Plan resources - manpower, materials, machinery
๐ Track daily, weekly, monthly progress
๐ Compare planned vs actual progress
๐ldentify delays and suggest corrective actions
๐Coordinate with site engineers,
Contractors, and management
๐Prepare progress reports, charts, and dashboards
๐Support billing team with quantity tracking
๐ Monitor cost, time, and productivity
@etconp
โค11
๐In highway construction, every layer plays a crucial role in ensuring strength, stability, and longevity of the pavement.
โญ๏ธBelow is the standard layer composition for a flexible pavement structure, designed for performance and durabilityแก
@etconp ๐
โญ๏ธBelow is the standard layer composition for a flexible pavement structure, designed for performance and durabilityแก
@etconp ๐
โค2๐2๐1
Seal Coat & Tack Coatแก
Applied to provide a smooth surface finish and ensure proper bonding between bituminous layers.
Bituminous Concrete (40 mm)
The wearing course that resists traffic load and provides a durable riding surface.
Dense Bituminous Macadam (80 mm)
Acts as a binder course distributing load to lower layers.
Wet Mix Macadam (250 mm)
Provides structural stability and acts as a strong base layer.
Granular Sub-Base (250 mm)
Ensures adequate drainage and prevents capillary rise of water.
Sub Gravel (200 mm)
Adds additional load-bearing capacity to the substructure.
Embankment (200 mm)
Elevates the road level and provides a stable foundation.
Cleaning and Graveling (200 mm)
The initial preparation ensuring uniformity and compaction at ground level.
@etconp
โค11๐2
๐Phases Of Construction Work
1. Site Clearance
Removing unwanted materials such as bushes, trees, debris, topsoil, and obstacles to prepare the land for construction.
2. Excavation
Digging soil for foundations, footings, septic tanks, basements, etc., using manual tools or excavators.
3. Foundation
Constructing the base of the building (like isolated footing, raft, or pile) that safely transfers load to the soil.
4. Plinth Beam
A reinforced concrete beam constructed at the plinth level to tie the foundation walls and prevent differential settlement.
5. Super Structure
All construction above the plinth levelโcolumns, beams, floors, walls, and roof.
6. Brick Works
Building walls using bricks or blocks with mortar to form rooms, partitions, and structural walls.
7. Lintel Work
Casting RCC beams above doors and windows to carry the load of the wall above openings.
8. Slab Construction
Constructing RCC slabs (roof/floor) using shuttering, reinforcement, and concrete.
9. Electric & Plumbing
Installing electrical wiring, switches, DB panels, water supply pipes, sanitary lines, and drainage systems.
10. Interior & Exterior
Internal and external finishing works such as plaster, false ceiling, faรงade work, wall putty, etc.
11. Flooring
Laying tiles, marble, granite, wooden flooring, or other finishes.
12. Painting
Applying primer, putty, and paint to both interior and exterior surfaces for final appearance and protection.
@etconp
1. Site Clearance
Removing unwanted materials such as bushes, trees, debris, topsoil, and obstacles to prepare the land for construction.
2. Excavation
Digging soil for foundations, footings, septic tanks, basements, etc., using manual tools or excavators.
3. Foundation
Constructing the base of the building (like isolated footing, raft, or pile) that safely transfers load to the soil.
4. Plinth Beam
A reinforced concrete beam constructed at the plinth level to tie the foundation walls and prevent differential settlement.
5. Super Structure
All construction above the plinth levelโcolumns, beams, floors, walls, and roof.
6. Brick Works
Building walls using bricks or blocks with mortar to form rooms, partitions, and structural walls.
7. Lintel Work
Casting RCC beams above doors and windows to carry the load of the wall above openings.
8. Slab Construction
Constructing RCC slabs (roof/floor) using shuttering, reinforcement, and concrete.
9. Electric & Plumbing
Installing electrical wiring, switches, DB panels, water supply pipes, sanitary lines, and drainage systems.
10. Interior & Exterior
Internal and external finishing works such as plaster, false ceiling, faรงade work, wall putty, etc.
11. Flooring
Laying tiles, marble, granite, wooden flooring, or other finishes.
12. Painting
Applying primer, putty, and paint to both interior and exterior surfaces for final appearance and protection.
@etconp
โค17๐3
๐SITE MATERIAL CONSUMPTION TRACKING
๐Tracking how much material (cement, steel, sand, bricks, etc.) is received, used, and remaining at site.
โบEfficient material tracking ensures cost control and smooth project progress.
๐WHY ITS IMPORTANT
-Control wastage
-Save cost
- Plan material in advance
- Keep project records clear
๐TIPS
- Record daily
- Check stock weekly
- Use issue slips for every material
- Compare with estimated quantity
๐ซStay organized, stay accurate!
@etconp
๐Tracking how much material (cement, steel, sand, bricks, etc.) is received, used, and remaining at site.
โบEfficient material tracking ensures cost control and smooth project progress.
๐WHY ITS IMPORTANT
-Control wastage
-Save cost
- Plan material in advance
- Keep project records clear
๐TIPS
- Record daily
- Check stock weekly
- Use issue slips for every material
- Compare with estimated quantity
๐ซStay organized, stay accurate!
@etconp
2โค12๐2
๐Small reinforcement mistakes can lead to big structural problems.
๐ซAlways check spacing, cover, laps, bar placement, and tying quality to ensure a safe and durable structure.
๐Common Reinforcement Mistakes
๐ท1. Insufficient concrete cover
๐problem
๐steel too close to surface.
๐rusts easily.
๐ท2. Short lap length
๐problem
๐overlapping not enough.
๐weak joints.
๐ท3. Rusty or dirty steel
๐problem
๐reduces bond with concrete.
๐ท4. Missing stirrups or ties
๐problem
๐less resistance to shear.
๐ท5. Wrong bar spacing
๐problem
๐reduces anchorage bars too close or too far.
๐weak structure.
๐ท6. Loose binding wires
๐problem
๐bars shift during concreting.
๐ท7. Wrong bar size
๐problem
๐affects structural strength.
๐ท8. No chairs or spacers
๐problem
๐bars touch shutter.
๐poor cover.
๐ท9. Removing hooks Reinforcement/bends
๐problem
๐Reduce anchorage.
๐ท10.Reinforcement congestion
๐problems
๐hard to compact Concrete
๐honeycombing
@etconp
๐ซAlways check spacing, cover, laps, bar placement, and tying quality to ensure a safe and durable structure.
๐Common Reinforcement Mistakes
๐ท1. Insufficient concrete cover
๐problem
๐steel too close to surface.
๐rusts easily.
๐ท2. Short lap length
๐problem
๐overlapping not enough.
๐weak joints.
๐ท3. Rusty or dirty steel
๐problem
๐reduces bond with concrete.
๐ท4. Missing stirrups or ties
๐problem
๐less resistance to shear.
๐ท5. Wrong bar spacing
๐problem
๐reduces anchorage bars too close or too far.
๐weak structure.
๐ท6. Loose binding wires
๐problem
๐bars shift during concreting.
๐ท7. Wrong bar size
๐problem
๐affects structural strength.
๐ท8. No chairs or spacers
๐problem
๐bars touch shutter.
๐poor cover.
๐ท9. Removing hooks Reinforcement/bends
๐problem
๐Reduce anchorage.
๐ท10.Reinforcement congestion
๐problems
๐hard to compact Concrete
๐honeycombing
@etconp
โค21๐ฅ3
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
2โค4
๐Reversal of Stresses in Earthquake Load
๐ซIn earthquake-resistant design, understanding how stresses reverse due to seismic loads is crucial.
๐ทBuildings are not only subjected to vertical gravity loads but also to dynamic lateral forces during an earthquake. Here's what happens:
๐ 1. Bidirectional Seismic Load
๐Earthquake forces act in both directions (left and right).
๐This leads to alternating tension and compression zones in the columns and beams.
๐Reinforcement detailing must accommodate this reversal.
๐ 2. Tension Shift
๐As seismic waves hit from either side, tension zones shift, especially in columns.
๐Ductile detailing becomes essential to absorb this energy without brittle failure.
โ๏ธ 3. Gravity Load vs Seismic Load
๐Under gravity load, beams are mostly in tension at the bottom.
๐However, during earthquakes, the tension may appear on top or on the sides.
๐Designs must allow for this reversal of stress zones, especially in critical connections.
๐ Engineers must ensure both columns and beams can withstand reversed tension and compression cycles to prevent collapse.
@etconp
๐ซIn earthquake-resistant design, understanding how stresses reverse due to seismic loads is crucial.
๐ทBuildings are not only subjected to vertical gravity loads but also to dynamic lateral forces during an earthquake. Here's what happens:
๐ 1. Bidirectional Seismic Load
๐Earthquake forces act in both directions (left and right).
๐This leads to alternating tension and compression zones in the columns and beams.
๐Reinforcement detailing must accommodate this reversal.
๐ 2. Tension Shift
๐As seismic waves hit from either side, tension zones shift, especially in columns.
๐Ductile detailing becomes essential to absorb this energy without brittle failure.
โ๏ธ 3. Gravity Load vs Seismic Load
๐Under gravity load, beams are mostly in tension at the bottom.
๐However, during earthquakes, the tension may appear on top or on the sides.
๐Designs must allow for this reversal of stress zones, especially in critical connections.
๐ Engineers must ensure both columns and beams can withstand reversed tension and compression cycles to prevent collapse.
@etconp
โค6๐2
๐Road Super Elevation
๐ซSuper elevation is the tilting of the road surface at a curve so that the outer edge of the pavement is raised above the inner edge.
โบIt helps counteract the effect of centrifugal force on vehicles moving along curved paths.
โญ๏ธPurpose of Super Elevation
โ๏ธTo reduce the tendency of vehicles to overturn or skid outward.
โ๏ธTo provide comfort and safety to drivers.
โ๏ธTo allow vehicles to negotiate curves at higher speeds smoothly.
โ๏ธ Formula
๐ฐe + f = V2/127R
๐ฒWhere:
โบe = rate of super elevation (m/m)
โบf = lateral friction factor (usually 0.15)
โบv = speed of vehicle (km/hr)
โบR = radius of curve (m)
๐ Design Steps
1. Calculate required super elevation using the above formula.
2. Limit the maximum super elevation (generally 1 in 15 to 1 in 20, or 7% for highways).
3. Provide transition length for smooth rise.
๐ฃ๏ธ Methods of Providing Super Elevation
โนBy rotating the pavement about the inner edge.
โนBy raising the outer edge with respect to the center.
โนBy rotating about the center line (commonly used method).
โ ๏ธ Limitations
โก๏ธNot suitable for urban roads with slow-moving traffic.
โก๏ธExcessive super elevation can cause problems for slow or parked vehicles.
๐Advantages
โบIncreases vehicle stability.
โบReduces side friction demand.
โบEnhances comfort and safety at curves.
@etconp
๐ซSuper elevation is the tilting of the road surface at a curve so that the outer edge of the pavement is raised above the inner edge.
โบIt helps counteract the effect of centrifugal force on vehicles moving along curved paths.
โญ๏ธPurpose of Super Elevation
โ๏ธTo reduce the tendency of vehicles to overturn or skid outward.
โ๏ธTo provide comfort and safety to drivers.
โ๏ธTo allow vehicles to negotiate curves at higher speeds smoothly.
โ๏ธ Formula
๐ฐe + f = V2/127R
๐ฒWhere:
โบe = rate of super elevation (m/m)
โบf = lateral friction factor (usually 0.15)
โบv = speed of vehicle (km/hr)
โบR = radius of curve (m)
๐ Design Steps
1. Calculate required super elevation using the above formula.
2. Limit the maximum super elevation (generally 1 in 15 to 1 in 20, or 7% for highways).
3. Provide transition length for smooth rise.
๐ฃ๏ธ Methods of Providing Super Elevation
โนBy rotating the pavement about the inner edge.
โนBy raising the outer edge with respect to the center.
โนBy rotating about the center line (commonly used method).
โ ๏ธ Limitations
โก๏ธNot suitable for urban roads with slow-moving traffic.
โก๏ธExcessive super elevation can cause problems for slow or parked vehicles.
๐Advantages
โบIncreases vehicle stability.
โบReduces side friction demand.
โบEnhances comfort and safety at curves.
@etconp
โค10๐4
#ADVERTISEMENT
๐แแแแฃแณแ แแ แต แฅแแ แตแ แแแตแแแแ แจแแแฃแณ แ แแ แแฐ แฅแ แญแฐแแแข
๐ซAR Building Finishing & Water Proofing Works แแ แแแแฝ แแ แต แแฃแชแแฝ แแ
๐งแ แแฉ แฅแซแต แจแแแฝแแ แตแซแแ แ แ แแแ แคแตแ แแ แต แ แแแ แแ แฅแแตแจแญแฅแแณแแแข
๐แจแแแชแซ แคแต แฅแตแจ แตแแแ แ แแแแฝ แ แปแซแฝแแ แ แณแญแแแแข
โถ๏ธContextra
โถ๏ธFine quartez
โถ๏ธ Water Proofing Chemicals
โถ๏ธ Membranes แ แฅแซแต แฅแแฐแซแแแข
๐ฒแ แฐแจแแช แจ Sales แตแซแแฝ แฅแแฐแซแแ
๐แ แตแซแป:โแกแซแคแ แแญแแแ แ แแ
แตแแญ 0977 67 67 90
0912 23 04 71
๐ซAR Building Finishing & Water Proofing Works
๐แดแแแซแ๐
https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
๐แแแแฃแณแ แแ แต แฅแแ แตแ แแแตแแแแ แจแแแฃแณ แ แแ แแฐ แฅแ แญแฐแแแข
๐ซAR Building Finishing & Water Proofing Works แแ แแแแฝ แแ แต แแฃแชแแฝ แแ
๐งแ แแฉ แฅแซแต แจแแแฝแแ แตแซแแ แ แ แแแ แคแตแ แแ แต แ แแแ แแ แฅแแตแจแญแฅแแณแแแข
๐แจแแแชแซ แคแต แฅแตแจ แตแแแ แ แแแแฝ แ แปแซแฝแแ แ แณแญแแแแข
โถ๏ธContextra
โถ๏ธFine quartez
โถ๏ธ Water Proofing Chemicals
โถ๏ธ Membranes แ แฅแซแต แฅแแฐแซแแแข
๐ฒแ แฐแจแแช แจ Sales แตแซแแฝ แฅแแฐแซแแ
๐แ แตแซแป:โแกแซแคแ แแญแแแ แ แแ
แตแแญ 0977 67 67 90
0912 23 04 71
๐ซAR Building Finishing & Water Proofing Works
๐แดแแแซแ๐
https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
โค4๐1
๐Steps for Implementing a Potable Water Supply Project:
๐ซ1. Feasibility Study
- Evaluation of potable water needs
- Identification of available water sources
๐ซ2. Project Design
- Design of the water supply network
- Calculation of flow rates and pressures
๐ซ3. Environmental Impact Assessment
- Evaluation of potential environmental impacts
- Development of mitigation measures
๐ซ4. Land Acquisition
- Acquisition of land required for the project
- Compensation of landowners
๐ซ5. Tendering and Contracting
- Preparation of tender documents
- Selection of contractors and award of contracts
๐ซ6. Construction
- Site preparation and excavation
- Installation of pipes and equipment
- Connection to existing network
๐ซ7. Commissioning and Testing
- Verification of water quality
@etconp
๐ซ1. Feasibility Study
- Evaluation of potable water needs
- Identification of available water sources
๐ซ2. Project Design
- Design of the water supply network
- Calculation of flow rates and pressures
๐ซ3. Environmental Impact Assessment
- Evaluation of potential environmental impacts
- Development of mitigation measures
๐ซ4. Land Acquisition
- Acquisition of land required for the project
- Compensation of landowners
๐ซ5. Tendering and Contracting
- Preparation of tender documents
- Selection of contractors and award of contracts
๐ซ6. Construction
- Site preparation and excavation
- Installation of pipes and equipment
- Connection to existing network
๐ซ7. Commissioning and Testing
- Verification of water quality
@etconp
โค6๐6
๐Objectives of Soil Investigation
๐ซ1. To determine the type and stratification (layers) of soil beneath the site.
๐ซ2. To find out the bearing capacity of the soil how much load it can safely support.
๐ซ3. To determine the depth of the water table (groundwater level).
๐ซ4. To detect any weak or problematic soils (e.g., expansive clay, peat).
๐ซ5. To recommend the most suitable type of foundation (e.g., raft, pad, pile).
๐ซ6. To estimate settlement and stability under loading.
@etconp
๐ซ1. To determine the type and stratification (layers) of soil beneath the site.
๐ซ2. To find out the bearing capacity of the soil how much load it can safely support.
๐ซ3. To determine the depth of the water table (groundwater level).
๐ซ4. To detect any weak or problematic soils (e.g., expansive clay, peat).
๐ซ5. To recommend the most suitable type of foundation (e.g., raft, pad, pile).
๐ซ6. To estimate settlement and stability under loading.
@etconp
โค13๐2
The capillary porosity of a cement paste depends on:
Anonymous Quiz
14%
the cement content and the curing
68%
the water/cement ratio and the curing
4%
only the curing
14%
the water content and the curing
๐7โค3
๐ฉโ๐ซ What are the main raw materials used in the manufacture of portland cement?
Anonymous Quiz
20%
limestone and quartz
8%
clay and gypsum
36%
limestone and clay
37%
limestone and gypsum
โค9๐1