👉STAIRCASE DESIGN & DIMENSIONS — KEY CIVIL ENGINEERING DETAILS

🌟A well-designed staircase must be safe, comfortable, structurally adequate, and compliant with the applicable building code.

📐 Important Dimensions Shown

1. Minimum headroom: 2.10 m
2. Handrail height: 0.90 m
3. Landing: At floor level and where required
4. Riser: 0.15 m (150 mm)
5. Tread: 0.25 m (250 mm)
6. Total rise: 3.00 m
7. Typical riser range: 0.15–0.20 m
8. Stair width: 1.20 m
9. Horizontal run shown: 4.50 m

🧮 Staircase Formula — Blondel’s Rule

2 × Riser + Tread ≈ 0.60–0.65 m

For the dimensions shown:

2 × 0.15 + 0.25 = 0.55 m

⚠️ Important: 0.55 m is below the commonly used 0.60–0.65 m comfort range, so the “safe & comfortable” check shown in the graphic should not be interpreted as a universal code-compliance approval.

Stair dimensions should be finalized according to the applicable local building code and actual floor-to-floor height.

🏗️ RCC Staircase Reinforcement Shown

- Main reinforcement: Ø12 mm @ 150 mm c/c along the slope
- Distribution reinforcement: Ø10 mm @ 200 mm c/c
- Clear cover: 20 mm

These reinforcement sizes are illustrative only.
Actual reinforcement must be designed based on span, loading, support conditions, concrete/steel grades, thickness, seismic requirements, and the governing structural code.

🔨 Construction Points

✔ Keep riser heights uniform throughout the flight.
✔ Maintain uniform tread dimensions.
✔ Provide a suitable non-slip finish.
✔ Ensure adequate landing and headroom.
✔ Provide properly anchored handrails/guardrails.
✔ Use proper concrete compaction and curing.
✔ Check the complete staircase design before construction.

Remember: Staircase dimensions and reinforcement should be verified by a qualified structural engineer and the applicable local building regulations before construction.

@etconp
❤12🔥1👏1
👉የ RC ዲዛይን ላይ ሙሉ ቴምፕሌቶች ከፈለጉ ማለትም

⏺Calculation of Design Coefficients
⏺‎Design of Slabs
⏺‎Design of Flat Slabs
⏺‎Design of Beams
⏺‎Design of Sections Under M & N
⏺‎Shear Design & Checks
⏺‎Design for Torsion
⏺‎Design of Rectangular Columns
⏺‎Design of Circular Columns
⏺‎Design of Isolated Footings
‎Isolated Footings Under Moment እና ሌሎች👇

https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
👍4❤3
👉How to be treated-Forgotten Items in Previouse Interim Payments?

🌟A contractor can be paid for a forgotten item of work in the final payment, but it depends on contract terms and proper documentation.

1. Contractual Basis

If the item is part of the original scope of work (included in BOQ, drawings, or specifications) but was mistakenly omitted in earlier interim payments, it can be included in the final account.

If it is an extra or variation, a formal variation order or instruction should be approved before payment.

2. Verification

The Resident Engineer (RE) or Consultant must verify that:

The work has been executed to the required standard.

It was not previously paid for.

It is not a duplication of another item.

3. Payment Procedure

Include the forgotten item in the Final Payment Certificate.

Provide a measurement sheet or payment summary showing the work done and its valuation.

Obtain approval from the Engineer/Consultant and Client before release of payment.

4. Contract Clauses

Refer to the contract clauses on Final Account, Variations, and Payment Certificates (FIDIC, PPA, or local standard contract conditions).

4.1.FIDIC (1999 Red Book)

Clause 14.6 – Issue of Interim Payment Certificates

“The Engineer may in any payment certificate make any correction or modification that should properly be made to any previous payment certificate.”

This means if an item was forgotten in the first payment, it can be included in later interim payments, provided it was part of the contract works.

4.2.Ethiopian Public Procurement Agency (PPA) Conditions of Contract

Clause 43.1 – Interim Payment Certificates

“The Engineer may in any payment certificate make any correction or modification that should properly be made to any previous certificate.”

Clause 47 – Final Statement and Payment also confirms that any remaining adjustments or omissions shall be included in the final payment

Once the final certificate is signed, no additional claims are normally accepted unless there is a formal dispute.

5. Practices

According to the Ethiopian Standard Conditions of Contract (MoWE or ERA):

Clause on Interim Payment Certificates allows correction of previous omissions or errors in subsequent certificates.

Payment is cumulative – meaning any forgotten item can be added later as long as it is justified.

6. Time Limitation

Some contracts state that claims not raised within a certain time (e.g., 28 days after discovery) may be invalid. Check the contract for such provisions.

☄Key References

-PPA 2011

-Ethiopian Roads Authority (ERA) General Conditions of Contract

-FIDIC Conditions of Contract (1999 Edition)

@etconp
❤17🙏2
🧱የብሎኬት ግንብ (Block Work) ሲገነባ መረሳት የሌለባቸው ወሳኝ የሳይት ህጎች!

​ግንብ በሚገነባበት ወቅት ጥራቱን እና ቀጥታነቱን ለመጠበቅ በምስሉ ላይ እንደሚታየው የክር መመሪያ (Alignment Line/String) እና የሞርታር (Mortar) ውፍረት ትልቅ ሚና አላቸው።
​በሳይት ላይ የብሎኬት ስራን ስንቆጣጠር ትኩረት ልንሰጣቸው የሚገቡ ዋና ዋና ነጥቦች፦

​1️⃣ የክር መመሪያ (Alignment & Plumb Line): ብሎኬቱ ወደ ጎን እንዳይዛነፍ እና ወደ ላይ ቀጥ ብሎ እንዲወጣ በክር እና በስፒሪት ሌቭል (Spirit Level) ዘወትር ማረጋገጥ።

​2️⃣ የሞርታር ውፍረት (Mortar Joint Thickness): በብሎኬቶች መካከል ያለው የሲሚንቶ ውህድ ውፍረት ከ10-15 ሚ.ሜ (1.0 - 1.5 cm) መብለጥ ወይም ማነስ የለበትም።

​3️⃣ ብሎኬቱን ማርከስ (Wetting Blocks): ብሎኬቶች ደረቅ ከሆኑ የሞርታሩን እርጥበት ስለሚመጡት ከመደርደራቸው በፊት በቂ ውሃ ማግኘት አለባቸው።

​4️⃣ የማሰሪያ ብረት (Wall Ties/Stiffeners): ግንቡ ከኮለም (Column) ጋር የሚገናኝበት ቦታ ላይ በጥንካሬ እንዲያያዝ የማሰሪያ ብረቶችን ወይም ዶወል (Dowels) መጠቀም።

​5️⃣ የቀን ግንባታ ከፍታ (Maximum Lift Height): በአንድ ቀን ከ1.2 እስከ 1.5 ሜትር በላይ አለመገንባት—ከስር ያለው ሞርታር ሳይደርቅ በክብደት እንዳይዛነፍ።

​በእናንተ ሳይት ላይ ለብሎኬት ግንብ ጥራት ከሁሉ በላይ ትኩረት የምትሰጡት ለየትኛው ነው?

​💡 ተመሳሳይ የሳይት ኢንጂነሪንግ መረጃዎችን ለማግኘት የፌስቡክ ገፃችን Follow ያድርጉ👇

https://www.facebook.com/profile.php?id=61592085774934

@​etconp
❤5👍4🥰2🔥1
‎👉የኢትዮጵያ የኮንስትራክሽን ሕግ እና አተገባበሩ | የተግባር መመሪያ መፅሐፍ ይፈልጋሉ?
‎
‎📚 ይህ መፅሐፍ በኮንስትራክሽን ሥራ ውስጥ የሚመለከቱ የሕግ ጉዳዮችን በቀላልና ተግባራዊ መልኩ ለመረዳት ይረዳል።
‎
⏺‎የኮንስትራክሽን ሕግ መሠረታዊ ግንዛቤ
⏺‎የግንባታ ፕሮጀክት ሕጋዊ አተገባበር
⏺‎የተዋዋይ ወገኖች መብትና ግዴታ
⏺‎የኮንትራት እና የስምምነት ጉዳዮች
⏺‎የግንባታ ሥራ ኃላፊነትና ተጠያቂነት
⏺‎በግንባታ ሥራ ላይ የሚፈጠሩ የሕግ ጉዳዮች እና ሌሎች ተካተዋል👇
‎
‎https://ye-buna.com/etconp?ref=product_detail&product=6a83e1c10064f_etconp
👏1
Ethio Construction Engineering
ገዳ ባንክ አዲስ የሚያስገነባውን የህንፃ ዲዛይን ይፋ አደረገ፡፡ ባንኩ አስገነባዋለሁ ያለው ዋና መስሪያ ቤት ሜክሲኮ አካባቢ በ6 ሺህ 579 ካሬ ሜትር ላይ እንደሚያርፍም ተናግሯል፡፡ ገዳ ባንኩ ይፋ ያደረገው የህንፃው ዲዛይን የኪነ-ሕንፃ ጥበብን ከዘመናዊ ቴክኖሎጂ ጋር ያቀናጀ መሆኑን የተናገሩት የባንኩ ዋና ስራ አስፈፃሚ አቶ ወልዴ ቡልቶ የዋና መሥሪያ ቤት ግንባታ ለማካሄድ የዲዛይን ውድድር ሲያካሂድ…
🏗️ ገዳ ባንክ በፋይናንስ ተቋማት ማዕከል ላይ ለሚያስገነባው ዋና መስሪያ ቤት የዲዛይን ምርጫ አጠናቀቀ!

በቅርቡ ወደ ሥራ ከገቡት አዳዲስ ባንኮች መካከል አንዱ የሆነው ገዳ ባንክ፣ በአዲስ አበባ እንብርት በሆነው የሜክሲኮ አካባቢ ባገኘው 6,579 ካሬ ሜትር የመሬት ቦታ ላይ ለሚያስገነባው ሰማይ ጠቀስ ዋና መስሪያ ቤት የዲዛይን ውድድር ሲያካሂድ ቆይቷል።

🏆 ባንኩ ዛሬ ባወጣው የምርጫ ውጤት፣ ከመጨረሻዎቹ 18 ተሳታፊዎች መካከል ከ1ኛ እስከ 5ኛ ደረጃ ላገኙት ተወዳዳሪዎች የገንዘብ ሽልማት መስጠቱን አስታውቋል።

🏙️ ይህ ፕሮጀክት በአዲስ አበባ የፋይናንስ ተቋማት ማዕከል እየተገነባ ካለው የከተማ ልማት ጋር ተያይዞ ትልቅ የአርክቴክቸርና የኢንጂነሪንግ ፕሮጀክት እንደሚሆን ይጠበቃል።

@etconp
❤5🙏1😭1
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች

🗂ለዛሬ ብቻ የሚቆይ Full ኳንቲቲ ሰርቨይንግ Online Course ለምትወስዱ የ ETABS ኮርስ በነፃ ይመረቅላቹዋል❤️

🚀 ዛሬውኑ ይመዝገቡ እና የ Quantity Surveying ክህሎትዎን ወደ ሌላ ደረጃ ያሳድጉ!

⭐️ኮርሱ ለመጀመር👇

https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
❤4
📐 BEARINGS IN SURVEYING

Bearing is the horizontal angle measured in a horizontal plane from a reference meridian to a survey line.

It is an essential concept in surveying for determining the direction of lines accurately.

🔹 1. Whole Circle Bearing (W.C.B.)

• Bearing is measured clockwise from North.
• Values range from 0° to 360°.
• It does not use quadrant letters such as N, S, E or W.
• Example: A line may have a W.C.B. of θ°.

🔹 2. Quadrantal Bearing (Q.B.)

• Bearing is measured from the nearer North or South meridian toward East or West.
• The angle ranges from 0° to 90°.
• It is written with quadrant letters: NE, SE, SW and NW.
• Examples: N θ E, S θ E, S θ W and N θ W.

📌 Key Difference

W.C.B.: 0°–360°, measured clockwise from North.
Q.B.: 0°–90°, measured from North or South toward East or West.

Understanding bearings is fundamental for land surveying, traverse calculations, road alignment, construction layout and mapping. 🏗️📏

#CivilEngineering #Surveying #LandSurveying #Bearings #WholeCircleBearing #QuadrantalBearing #WCBBearing #QBBearing #SurveyingEngineering #CivilEngineer #EngineeringStudents #Construction #SiteSurveying #Surveyor #EngineeringEducation

@etconp
❤4🙏2
Forwarded from Kelemat Ads
የኤቲኤም (ATM)፣ የመታወቂያ እና የሌሎች ካርዶችዎ ብዛት ኪስዎን እያጨናነቀው ተቸግረዋል?

💳 ካርዶችዎን በቀላሉ አውጥተው ለመጠቀም
🔓 ኤቲኤምዎን ከዲጂታል ስርቆት (RFID) ለመጠበቅ
💯 ለማንኛውም ኪስዎ ተስማሚና ቀጭን ሆኖ የተሰራ
💪 ከጠንካራ አልሙኒየም የተመረተ
🎁 ለወዳጅዎ ስጦታ አድርገው ቢሰጡት የሚያኩራዎ

ዘመናዊ፣ ቀጭን እና ደህንነቱ የተጠበቀ — ለዕለታዊ አጠቃቀም የተሰራ ፕሪሚየም ዋሌት

💰 ዋጋ: 1,499 ብር

📩 ለትዕዛዝ እና ለተጨማሪ መረጃ:

📞 ስልክ: +251939593929
📲 ቴሌግራም: @Jaysonder

"አዳዲስ ዎሌቶች ሲገቡ ቶሎ እንዲደርስዎት በቴሌግራም ቤተሰብ ይሁኑ"

ይቀላቀሉን: @foldandcarry
❤4
👉ኳንቲቲ ሰርቨይንግ በቀላሉ ለመረዳት እና ቴክ ኦፍ እንዲሁም Cost Breakdown ለማዘጋጀት የሚጠቅም እጅግ በጣም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a71b78edc006_etconp
❤6🙏2
👉TESTS IN CONCRETE 🏗️ | Essential On-Site & Laboratory Tests

Concrete quality is checked through different tests to evaluate workability, uniformity, and compressive strength.

🔹 1. Rebound Hammer Test
A non-destructive test used on hardened concrete to estimate surface hardness and assess the uniformity of concrete.

Take multiple readings and use the appropriate correlation chart for strength estimation.

🔹 2. Slump Test
Used to determine the workability and consistency of fresh concrete.

The slump is measured after filling the slump cone in layers and compacting each layer with a tamping rod.

🔹 3. Compression Test
The compressive strength of hardened concrete is determined using a Compression Testing Machine (CTM).

Standard specimens such as 150 mm × 300 mm cylinders or 150 mm cubes may be tested depending on the applicable standard.

📐 Compressive Strength Formula:
f′c = P / A
Where:
• P = Ultimate load
• A = Cross-sectional area

📌 Important Points

• Use representative samples.
• Keep testing equipment properly calibrated.
• Follow the applicable local standards and testing procedures.
• Do not add water during slump testing.
• For rebound hammer testing, use a clean, suitable surface and avoid honeycombed or damaged areas.
• Test results should be interpreted by qualified personnel; rebound hammer results are estimates and should not replace proper strength testing when acceptance decisions are required.

🏗️ Key Takeaway

Rebound Hammer → Hardened concrete surface assessment
Slump Test → Fresh concrete

workability
Compression Test → Concrete compressive strength

@etconp
❤6👍6
👉ለ ኳንቲቲ ሰርቨይንግ እጅግ ጠቃሚ በተለይ Rate Analysis ስትሰሩ የሚያግዛቹ ስታንዳርዶች የያዘ መፅሃፍ ይፈልጋሉ?

🔆ስለ labour እና equipment UF(Utilization Factor) ከዚህ በተጨማሪ የ labour,Equipment እና machinery composition standard ወይ norms ጨምሮ Material consumption rate standard ያካተተ መፅሀፍ ከፈለጉ ከታች ባለው ሊንክ ያውርዱ👇

https://ye-buna.com/etconp?ref=product_detail&product=6a7ab12995479_etconp
❤1
👉በኘሮጀክት ማኔጅመንት ፕሮፌሽናል ላይ ያተኮረ ስልጠና መስጠት ተጀመረ
 
🌟የኮንስትራክሽን ማኔጅመንት ኢንስቲትዩት ከሚድሮክ ኢትዮጵያ ኃላፊነቱ የተወሰነ የግል ማህበር ጋር በመተባበር  በኮንስትራክሽን ዘርፍ ላይ ለተሰማሩ አመራሮችና ባለሙያዎች  ስልጠና መስጠት ተጀመረ።

በስልጠናው ማስጀመሪያ ኘሮግራም ላይ የተገኙት የሚድሮክ ኢትዮጵያዊ  አመራሮች የሆኑት ዶ/ር ልዑል አስራቴ  (የሚድሮክ ኮንሰልት አርክቴክቼር & ኢንጅነረስ ጀነራል ማኔጀር)  እና ኢ/ር ወልደ በርኼ( በሚድሮክ ኢትዮጵያ  ኃ.የተ. ኩባንያ ጀኔራል ማኔጀር) ሲሆኑ በመልዕክታቸውም የኘሮጀክት አመራር ዘይቤ ቀድሞ ከነበረው  በብዙ የተለወጠ በመሆኑ በቀድሞው መንገድ በመምራት ተወዳዳሪ፣ ውጤታማና ደንበኛን ማርካት አያስችልም ብለዋል።

ስለሆነም ዘመናዊውን የኘሮጀክት አመራር ዘይቤን መከተል አስፈላጊና ግዴታ እንደሆነ አስገንዝበዋል።

ለዚህ ደግሞ የኘሮጀክት ማኔጅመንት ኘሮፈሽናል ስልጠና በመውሰድ እና በዓለም አቀፍ ደረጃ ሰርትፋይድ መሆን ስቻል  እንደሆነ አስገንዝበዋል።

የስልጠናው ተሳታፊዎችም ይህንን አውቆ ስልጠናውን በተገቢው ሁኔታ በመከታተል ስለጉዳዩ እውቀትና ክዕሎታቸውን በማሳደግ በዓለም ዓቀፍ ደረጃ የምስክር ወረቀት መያዝ እንዳለባቸው አበክረው መልዕክታቸውን አስተላልፈዋል።

በኢንስቲትዩቱ በኩልም የዘርፉን ተወዳዳሪነት ለማሻሻል  የዘርፉ ተዋናይ ለሆኑት አመራሮችና ባለሙያዎች የተለያዩ የሀገራችን ነባራዊ ሁኔታን መሠረት ያደረጉ የአቅም ግንባታ ስልጠናዎችን እንድሁም ዓለም አቀፍ የሆኑ ስልጠናዎችንም በመስጠት ላይ እንደሚገኝ ጠቅሰው፣ ከዓለም አቀፍ ስልጠናዎች ውስጥ አንደኛው ኘሮጀክት ማኔጅመንት ኘሮፈሽናል(PMP) አንዱ ነው ብለዋል።

ይህም ስልጠና ኘሮጀክቶቻችን ውጤታማና ተወዳዳሪ  እንድሆኑ ከማድረግ አንጻር ሚናው የላቀ ነው በማለት ተናግሯል።

በዚህ ስልጠና ላይ ከሚድሮክ ኢትዮጵያ  የተውጣጡ 25 አመራሮችና ባለሙያዎች  እየተሳተፉ የሚገኙ ሲሆን ስልጠናውም ለ6 ተከታታይ ቀናት በተለያዩ አሰልጠኞች የሚሰጥ መሆኑን ከወጣው መርሐ-ግብር መገንዘብ ተችሏል።

@etconp
❤9🙏3
Ethio Construction Engineering pinned «👉ኳንቲቲ ሰርቨይንግ በቀላሉ ለመረዳት እና ቴክ ኦፍ እንዲሁም Cost Breakdown ለማዘጋጀት የሚጠቅም እጅግ በጣም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇 https://ye-buna.com/etconp?ref=product_detail&product=6a71b78edc006_etconp»
🏗️ Bid & Contract Document Package

🌟ለኢትዮጵያ የግንባታ Bid, Tender & Contract ዝግጅት የሚያግዝ ፕሮፌሽናል ፓኬጅ።

📦 4 Editable MS Word Documents
📁 One ZIP File

🇪🇹 ለኢትዮጵያ ግንባታ ፕሮጀክቶች

🏛ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a7fed4a173ec_etconp
👌3
👉Types of Construction Machinery by Function

Construction machinery plays a vital role in modern civil engineering by improving productivity, reducing manual effort, and making heavy construction activities safer and faster.

🚜 1. Earthmoving & Excavation Equipment

• Excavator – Used for digging, earthmoving, trenching, and loading soil.
• Demolition Excavator – Equipped with hydraulic breakers and attachments for breaking and removing concrete and structures.
• Wheel Loader – Used for loading soil, aggregates, rock, and debris into trucks.

🚛 2. Hauling & Transport Equipment

• Articulated Dump Truck – Transports excavated soil, rock, and construction materials.
• Compactor/Roller – Compacts soil, gravel, and asphalt to achieve the required density.
• Motor Grader – Used for grading, leveling, slope formation, and road preparation.

🏗️ 3. Concrete & Material Handling Equipment

• Mobile Crane – Used for lifting and placing heavy construction materials.
• Piling Rig – Creates deep foundations by installing piles into the ground.
• Asphalt/Pavement Finisher – Spreads and finishes asphalt or paving materials to form smooth road surfaces.

📌 Key Point

Selecting the correct machine depends on the type of work, site conditions, required capacity, project duration, and material being handled.

Proper equipment selection can significantly improve construction efficiency and quality.

📚 Save this post for quick civil engineering reference!

@etconp
❤6🙏3
👉በነገራችን ላይ ለዛሬ ብቻ የሚቆይ Full ኳንቲቲ ሰርቨይንግ Online Course ለምትወስዱ የ ETABS ኮርስ በነፃ ይመረቅላቹዋል❤️

🚀 ዛሬውኑ ይመዝገቡ እና የ Quantity Surveying ክህሎትዎን ወደ ሌላ ደረጃ ያሳድጉ!

⭐️ኮርሱ ለመጀመር👇

https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
👌2
👉ኮንስትራክሽን ሳይት ላይ የሚጠቅሙ Template Format ዶክመንቶች ከታች ባለው ሊንክ ያውርዱ👇

🌟ከ ፎርማቶቹ Site Diary,Site Book እና ሌሎች ተካቶባቹዋል

https://ye-buna.com/etconp?ref=product_detail&product=6a740ccd63237_etconp
❤6👌1