🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
#ADVERTISEMENT

ጎጆ Shine የጽዳት አገልግሎት - የንፅህና አጋርዎ!
/ Your trusted cleaning partner./

*ለ መኖሪያ ቤቶች
*ለ ሆቴሎች
*ለ ሬስቶራንቶች
*ለ ካፌዎች
*ለ Guest house
*ለ ሱፐር ማርኬቶች
*ለ ቢሮዎች
*ለ ትምህርት ቤቶች
*ለ ሆስፒታሎች
*ለ construction ሳይቶች
*ለ GYM ቤቶች
*ለ event አዳራሾች ሙሉ የ ቤት ጽዳት አገልግሎት እንሰጣለን።


ቤትዎ ወይም የመስሪያ ቦታዎ ንጹህ፣ ማራኪ እና ምቹ እንዲሆን ይፈልጋሉ? ጎጆ Shine ዘመናዊ በሆኑ ማሽኖች እና በሰለጠኑ ባለሙያዎች ጥራት ያለው የጽዳት አገልግሎት ይሰጥዎታል።

□ የምንሰጣቸው አገልግሎቶች፦
🛋️ የሶፋ እና የ ፍራሽ እጥበት
🧹 የምንጣፍ እጥበት እና የአረቢያን መጅሊስ እጥበት
🏢 የቤት እና የቢሮ ጽዳት
✨ ጥልቅ ጽዳት (Deep Cleaning)
🏗️ ከግንባታ በኋላ ጽዳት
🪟 የመስኮትና መስታወት ጽዳት
🚗 የመኪና እጥበት (Car Wash)

ያሉበት ድረስ መጥተን በታማኝነትና በጥራት እናገለግላለን!

📞 አሁኑኑ ይደውሉልን፦
📱 0986416457
📱 0965635149
📱 0704982721

🔻Website:- http://gojoshine.vercel.app

#የጽዳትአገልግሎት #GojoShine #CleaningService #AddisAbaba #Ethiopia
❤3🥰3
🌍 WHY IS SOIL INVESTIGATION IMPORTANT?
A building doesn't only depend on what you see above the ground.
Soil investigation helps engineers understand:
🔹 Soil layers

🔹 Bearing capacity

🔹 Groundwater conditions

🔹 Settlement potential

🔹 Foundation requirements

🔹 Problematic soil conditions
🏗️ Good construction starts with understanding the ground beneath the structure.


@ETCONP
👍7❤4
👉ምርጥ የ ኢንተርየር ዲዛይን አማርኛ መፅሃፍ ከፈለጉ ከታች ባለው ሊንክ አውርደዉ ይጠቀሙበት👇

https://ye-buna.com/ethiowisdom?ref=product_detail&product=6abe09836d352_ethiowisdom
🥰3
👉ስለ (Isolated / Pad Footing) ግንባታ ሙሉ እና ዝርዝር መረጃ!

🌟Isolated Footing / Pad Footing በህንፃ ግንባታ ላይ በጣም የተለመደና በስፋት ጥቅም ላይ የሚውል የጥልቀት ዝቅተኛ መሰረት (Shallow Foundation) አይነት ነው።

☄ዋና ዓላማውም የእያንዳንዱን ዓምድ (Column) ጭነት ለብቻው ወደ ታችኛው አፈር ማስተላለፍ ነው።

📌 1. Isolated መሰረት መቼ ጥቅም ላይ ይውላል?

🔹 ጥሩ የአፈር የመሸከም አቅም ሲኖር፦
የመሬቱ አፈር የመሸከም አቅም (Safe Bearing Capacity of Soil) ከፍተኛ ወይም አጥጋቢ በሚሆንበት ጊዜ።

🔹 የአዕማድ እርቀት ሰፊ ሲሆን፦
በአዕማድ መካከል ያለው ርቀት ሰፊ ሆኖ የመሰረት ብረቶች እርስ በእርስ የማይደራረቡ ከሆነ።

🔹 ዝቅተኛ እና መካከለኛ ህንፃዎች ላይ፦
ለቪላዎች፣ ለመኖሪያ ቤቶች (G+0, G+1, G+2) እና ዝቅተኛ ጭነት ላላቸው ህንፃዎች በጣም ኢኮኖሚያዊ የመሰረት አማራጭ ሊሆን ይችላል።

📌 2. በሳይት ላይ Isolated Footing የሚሰራበት ቅደም ተከተል (Step-by-Step Construction Process)

1️⃣ Excavation – የመሰረት ቁፋሮ

• በዲዛይኑ መሰረት የመሰረቱ ስፋትና ጥልቀት ተለክቶ ይቆፈራል።
• ቁፋሮው ከተጠናቀቀ በኋላ የአፈሩ የታችኛው ክፍል በደንብ ይደቀደቃል (Compacted Bottom)።

2️⃣ Lean Concrete / Blinding Concrete – የብላይንዲንግ ኮንክሪት

• የብረት አፅሙ ከቆሻሻና ከአፈር ጋር እንዳይገናኝ ከ 5–10 cm ውፍረት ያለው ዝቅተኛ የኮንክሪት ጥንካሬ ያለው (C-15/C-20) ቀጭን ኮንክሪት ይፈሳል።

3️⃣ Reinforcement Placement – የብረት ዝርጋታ

• በዲዛይኑ መሰረት የታችኛው የብረት መረብ (Bottom Rebar Mat) ይዘጋጃል።
• ብረቱ ከአፈር ወይም ከብላይንዲንግ ጋር እንዳይነካካ በቂ የኮንክሪት ከቨር (Concrete Cover ≈ 50 mm) በብሎኬት/Spacer ማሰሪያዎች ይዘጋጃል።

4️⃣ Column Starter Bars Setup – የዓምድ መያዣ ብረቶች

• የዓምዱ ብረቶች ከመሰረቱ ጋር ተያይዘው በ 90° L-hook ታጥፈው ከመሰረቱ ብረት ጋር በቅርበት ይታሰራሉ።
• የዓምዱ መሃል መስመር (Centerline/Gridline) እንዳይዛነፍ በቴዎዶላይት ወይም በሹሩብ ይረጋገጣል።

5️⃣ Formwork Installation – የፎርምወርክ/ሳጥን ስራ

• የመሰረቱ የጎን ፎርምወርክ፣ የእንጨት ወይም የብረት ሳጥን፣ በዲዛይኑ ልክ ተሰርቶ በጎን በኩል በጥንቃቄ ይደገፋል።

6️⃣ Concrete Pouring & Compaction – ኮንክሪት ማፍሰስና ማደቅደቅ

• የተዘጋጀው ስትራክቸራል ኮንክሪት (C-25 / C-30) ይፈሳል።
• በኮንክሪቱ ውስጥ አየርና ባዶ ቦታ (Honeycombing/Cavities) እንዳይቀር በቪብሬተር (Vibrator) በትክክል ይደቀደቃል።

⚠️ 3. ለጥራት ቁጥጥር (Quality Control) የሚረዱ ዋና ዋና የሳይት ቲፖች

🔹 Curing – ውሃ ማጠጣት፦
ኮንክሪት ከተፈሰሰ በኋላ በቂ የCuring ሂደት ማድረግ የኮንክሪቱን ጥንካሬና ጥራት ለማረጋገጥ ወሳኝ ነው።

🔹 Starter Bar Lapping፦
ወደ ላይ የሚወጡት የዓምድ መያዣ ብረቶች በቂ የመቀጠያ እርዝመት (Lap Length ≈ 40d–50d) ማሟላታቸውን ማረጋገጥ።

🔹 Backfilling – የአፈር ድቅደቃ፦
መሰረቱ በቂ ጥንካሬ ካገኘ በኋላ በዙሪያው የሚሞላው አፈር በጥሩ Selected Material በየ 15–20 cm ንብርብር እየተደቀደቀ (Compacted in Layers) መሞላት አለበት።

🏗️ በመጨረሻ፦ Isolated / Pad Footing ቀላል የሚመስል ቢሆንም፣ የመሰረቱ ስፋት፣ ጥልቀት፣ የብረት ዝርጋታ፣ Concrete Cover፣ Column Starter Bars እና Concrete Quality በዲዛይኑና በሳይት መመሪያው መሰረት በጥንቃቄ መፈተሽ አለባቸው።

👉የ Isolated Footing ዲዛይን ለማረግ የሚረዳ  እንዲሁም ስራቹ  የሚያቀልላቹ ምርጥ Excel ፋይል ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ👇

https://ye-buna.com/etconp?ref=product_detail&product=6a5f6b3b1c816_etconp
❤6🙏4🥰1
👉 የኢሬቻ ሆራ ፊንፊኔ በዓልን ምክንያት በማድረግ የተወሰኑ መንገዶች ለተሽከርካሪዎች ዝግ ይደረጋሉ፡፡

የአዲስ አበባ ፖሊስ ዋና ጠቅላይ መምሪያ መስከረም 23 ቀን 2019 ዓ/ም በአዲስ አበባ ከተማ በሚከበረውን የኢሬቻ ሆራ ፊንፊኔ በዓል ምክንያት የተወሰኑ መንገዶች ለተሽከርካሪዎች ዝግ እንደሚሆኑ አስታወቀ፡፡

ነገ መስከረም 22 ቀን 2019 ዓ/ም ከረፋዱ 4፡00 ሠዓት ጀምሮ እስከ መርሀ ግብሩ ፍፃሜ ድረስ፡-

👉ከመገናኛ ወደ መስቀል አደባባይ (22 ወይም ጎላጎል አደባባይ ላይ እና ታች)

👉ከአድዋ ድልድይ ወደ ዘሪሁን ህንፃ እና ወደ ቅዱስ ዑራኤል አደባባይ (ዘሪሁን ህንፃ መስቀለኛ)

👉ከአትላስ መብራት ወደ ቅዱስ ዑራኤል አደባባይ (ፒኮክ መብራት)

👉ከቦሌ ሩዋንዳ ድልድይ ወደ መስቀል አደባባይ (ወሎ ሠፈር አደባባይ ላይ እና ታች)

👉ከጋዜቦ አደባባይ በደንበል ህንፃ ጀርባ ወደ ፊላሚንጎ እንዲሁም ከጋዜቦ አደባባይ በአዲሱ መንገድ ወደ ለገሃር መብራት (ጋዜቦ አደባባይ)

👉ከቅዱስ ቂርቆስ ታቦት ማደሪያ ወደ ለገሃር መብራት (ቅዱስ ቂርቆስ ታቦት ማደሪያ መብራት)

👉ከቀድሞው ብርሃን ኢትዮጵያ መስቀለኛ በአዲሱ መንገድ ወደ ቅዱስ ቂርቆስ ቤ/ክርስቲያን (ብርሃን ኢትዮጵያ መስቀለኛ)

👉ከአፍሪካ ህብረት ቅዱስ ሚካኤል መስቀለኛ ወደ ሜክሲኮ አደባባይ (አፍሪካ ህብረት ቅዱስ ሚካኤል መስቀለኛ)

👉ከአፍሪካ ህብረት መብራት ወደ ሜክሲኮ አደባባይ (አፍሪካ ህብረት መብራት)

👉ከከፍተኛ ፍ/ቤት አደባባይ ወደ ሜክሲኮ አደባባይ (ከፍተኛ ፍ/ቤት አደባባይ)

👉ከሜክሲኮ አረቁ ፋብሪካ ወደ ሜክሲኮ አደባባይ (አረቄ ፋብሪካ መስቀለኛ)

👉ከሰንጋ ተራ 40/60 ቤቶች መገንጠያ ወደ ሠንጋ ተራ መብራት (ሠንጋ ተራ 40/60 መገንጠያ)

👉ከጎማ ቁጠባ መብራት ወደ  ብሔራዊ ቴአትር (ጎማ ቁጠባ መብራት)

👉ከሜትሮሎጂ መታጠፊያ  ወደ ፖስታ ቤት መብራት (ሜትዮሮሎጂ መታጠፊያ)

👉ከጥቁር አንበሳ ሼል ወደ ኤሚግሬሽን መብራት ( ጥቁር አንበሳ መስቀለኛ)

👉ከጎላ ቅዱስ ሚካኤል መስቀለኛ ወደ ኤሚግሬሽን መብራት (ጎላ ቅዱስ ሚካኤል መስቀለኛ)

👉ከቴዎድሮስ አደባባይ ወደ ኤሚግሬሽን መብራት (ቴዎድሮስ አደባባይ)

👉ከንግድ ማተሚያ መታጠፊያ ወደ ፍል ውሃ መስቀለኛ (ንግድ መታጠፊያ)

👉ከፓርላማ መብራት ወደ ውጭ ጉዳይ (ፓርላማ መብራት ላይ)

👉ከሴቶች አደባባይ ወደ ካዛንቺስ (ሴቶች አደባባይ)

ከረፋዱ 4:00 ሠዓት ጀምሮ የሚዘጋ ሲሆን አሽከርካሪዎች አስቀድመው አማራጭ መንገዶችን እንዲጠቀሙ የአዲስ አበባ ፖሊስ ዋና ጠቅላይ መምሪያ እያሳሰበ ከንጋቱ 12:00 ሠዓት ጀምሮ በተጠቀሱት መንገዶች ለአጭርም ሆነ ለረጅም ጊዜ ተሽከርካሪ ማቆም የተከለከለ መሆኑን አሳስቧል።

ህብረተሰቡ የፖሊስን አገልግሎት ለማግኘትም ሆነ ጥቆማ ለመስጠት  በ01-11-11-01-11 እና በ990 ነፃ የስልክ መስመር መጠቀም እንደሚቻል ፖሊስ  መልዕክቱን አስተላልፏል፡፡

Addis Ababa Police

@ETCONP
❤12
🏗️ SLAB CASTING INSPECTION CHECKLIST — DON’T POUR CONCRETE BEFORE CHECKING THESE

A slab may look ready for casting, but a few missed details can create structural, durability, quality, and cost problems later.

Before concrete placement, inspect the following:

🔍 1. STRUCTURAL CHECKS

☑️ Slab thickness matches the approved drawing
☑️ Main reinforcement diameter and spacing
☑️ Distribution reinforcement
☑️ Top reinforcement over supports
☑️ Beam reinforcement and anchorage
☑️ Additional reinforcement around openings
☑️ Reinforcement laps and development lengths

📏 2. COVER & REINFORCEMENT

☑️ Correct concrete cover
☑️ Proper chairs/spacers provided
☑️ Bars are securely tied
☑️ Reinforcement is not displaced or excessively sagging
☑️ No excessive rust, mud, oil, or contamination

⚡ 3. MEP COORDINATION

☑️ Electrical conduits installed correctly
☑️ Plumbing sleeves/openings confirmed
☑️ Floor drains and service penetrations positioned
☑️ No unauthorized cutting or displacement of structural reinforcement

🏗️ 4. FORMWORK & TEMPORARY SUPPORT

☑️ Formwork level and dimensions verified
☑️ Beam and slab soffit levels checked
☑️ Props and supports adequately installed
☑️ Formwork joints properly closed
☑️ Formwork is clean and free from debris
☑️ Adequate access for concrete placement and vibration

🧪 5. BEFORE CONCRETE ARRIVES

☑️ Approved concrete mix/design confirmed
☑️ Concrete grade verified
☑️ Concrete delivery arrangement confirmed
☑️ Vibrator and other equipment available
☑️ Adequate manpower available
☑️ Concrete curing materials prepared
☑️ Inspection and approval completed

🚨 IMPORTANT SITE RULE:

Do not start slab casting simply because the formwork is complete.

The slab should be checked as an integrated structural + architectural + MEP system before concrete placement.

📌 Remember:

Inspect → Verify → Approve → Cast → Cure

A 30-minute inspection before casting can prevent days of demolition, repair, delay, additional cost, and disputes.

🏗️ For site engineers, consultants, contractors and public-project professionals:
Make the pre-pour inspection a mandatory quality-control gate—not just a formality.

What would you add to this checklist?

👉ሙሉ የኮንስትራክሽን ስራዎች ላይ ቼክ ሊስት ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ

⬇️Construction Work Permit Cheaklist Package

✅ Excavation & Earthwork Checklists
✅ Foundation & Substructure Checklists
✅ Reinforced Concrete (RC) Work Checklists
✅ Formwork & Reinforcement Checklists
✅ Concrete Casting Checklists
✅ Masonry & Block Work Checklists
✅ Structural Steel Checklists
✅ Roofing Checklists እና ሌሎች👇

https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
❤8🥰2
👉በኮንስትራክሽን ውል የስራ ለውጥ!

በኮንስትራክሽን ውል የስራ ለውጥ(variation) የሚባለው በዋናነት የግንባታ ስራ ጥራትን፣መጠን፣ዲዛይን፣የግንባታ ቁሳቁስ፣የስራ ጊዜ፣የግንባታ ማከናወኛ ቦታ መጠን የመሳሰሉትን የማሻሻል፣የመጨመር ወይም የመቀነስን የሚመለከት የኮንስትራክሽን ውል መሰረታዊ ነጥብ ነው፡፡
*ስለዚህ ቫሬሽን የዋናውን የኮንስትራክሽን ውል ይዘት/object of the contract/ በመጠኑ የመለወጥ ባህሪ ይኖረዋል ማለት ነው፡፡
*PPA 2011 ክሎስ 15.1 ይሄንኑ አረዳድ በሚያጠናክር ሁኔታ ለቫሬሽን ትርጉም ይሰጠዋል፡፡

ቫሬሽን ኦርደር/variation order/ የሚባለውስ ምንድን ነው? ማነው ኦርደር ሰጭው? በቃል ኦርደር መስጠት ይቻላል? በምን አይነት መልኩ ነው ትእዛዝ የሚሰጥ? በዚህ ረገድ ህጉ ምን ይላል?

*ቫሬሽን ኦርደር ከመሀንዲሱ ለተቋራጩ በጽሁፍ የሚሰጥ የስራ ለውጥ ትእዛዝ ነው፡፡
*አማካሪ መሀንዲሱ ለግንባታ ስራው መልካም አፈጻጸም ሲባል የስራ ለውጥ ትእዛዝ አስፈላጊ ነው ብሎ ካመነ ትእዛዝ መስጠት ይችላል፡፡
*በመጀመሪያ ግን በአማካሪ መሀንዲሱ አማካይነት ለተቋራጩ ስለለውጥ ስራው ባህሪና ምንነት ማሳወቂያ/ኖቲስ/ እንዲደርሰው ይደረጋል፡፡ኖቲስ እንደደረሰው ተቋራጩ የለውጥ ስራውን አስመልክቶ ትሮፖዛል ያቀርባል፡፡ፕሮፖዛሉም የጊዜ ማራዘሚያ/ስኬጁል፣የዋጋ ሁኔታን የሚያካትት ይሆናል፡፡(PPA 15.3)
*የስራ ለውጥ ትእዛዝ በጽሁፍ ነው መደረግ እንዳለበት PPA 2011 ክሎስ 15.2 ያስቀምጣል፡፡አንዳንዴ ግን አማካሪ መሀንዲሱ በቃል የቫሬሽን ትእዛዝ መስጠት እንደሚችል PPA 2011 ክሎስ 15.2(a) ላይ ፈቃጅ ሆኖ ተቀምጧል፡፡ ነገር ግን በቶሎ የለውጥ ስራ ትእዛዙ ወደ ጽሁፍ መቀየር ይኖርበታል፡፡
እዚህ ጋር አብሮ የሚታየው ነገር የአስተዳደር መስሪያ ቤት ጋር የሚደረጉ ውሎች በጽሁፍ መደረግ ይኖርባቸዋል፡፡ይሄውም ስለውሎች በጠቅላላው በሚመለከተው የውል ህግ አንቀጽ 1724 ላይ በግልጽ ተቀምጧል፡፡
*አንድ ውል የሚሻሻለው ደግሞ ከመጀመሪያው ውል ጋር ተመሳሳይ በሆነ ፎርም ነው፡፡በዚህ ረገድ የፍትሀብሄር ህግ አንቀጽ 1722 ላይ "ዋናውን ውል የመለወጥ ጉዳይ ለዚሁ ውል በተደነገገው አጻጻፍ(ፎርም) መሰራት አለበት፡፡" በሚል የተደነገገው የሚያስገነዝበውም ቫሬሽን ዋናውን ውል በከፊል የመለወጥ ሁኔታ ስለሚኖረው ከዋናው የኮንስትራክሽን ውል ጋር በተመሳሳይ የአጻጻፍ ፎርም በጽሁፍ መደረግ ይኖርበታል ማለት ነው፡፡ለዚህ ነው በመርህ ደረጃ ቫሬሽን በጽሁፍ መደረግ አለበት የሚባለው፡፡

የስራ ለውጥ ውል/change agreement/ ምን ማለት ነው? ከህግ አንጻር በዚህ ረገድ ምን ነጥቦች ሊነሱ ይችላሉ?

*PPA 2011 ክሎስ 15.9 ላይ እንደተቀመጠው በየስራ ለውጥ ውል የሚባለው ከቫሬሽን ኦርደር በኋላ አሰሪው/ተወካይ መሀንዲሱ እና ተቋራጩ በጽሁፍ የሚስማሙበት የማሻሻያ ውል ነው፡፡ ሆኖም በዚህ የፒፒኤ ትርጉም ጸሀፊው አይስማማም::
ምክንያቱም አማካሪው ስራ ለመቆጣጠር እንጅ ውል ለመዋዋል በአማካሪነት ውሉ ላይ ብዙ ጊዜ ስልጣን አይኖረውም፡፡በተቋራጭና አሰሪ መካከል የተደረገ የኮንስትራክሽን ውል በአሰሪና ተቋራጭ በሚደረግ ስምምነት/ውል ሊሻሻል ከሚችል በስተቀር አማካሪ መሀንዲሱን ውል እንዲዋዋል እስከመፍቀድ የሚደርስ ትርጓሜ መሰጠቱ ተገቢነት የለውም፡፡
*የስራ ለውጥ ውሎች ቀን፣ቁጥርና ቅደምተከተል ይሰጣቸዋል፡፡(ፒፒኤ15.10)
━━━━━━━━━━━━━
‎👉የኢትዮጵያ የኮንስትራክሽን ሕግ እና አተገባበሩ | የተግባር መመሪያ መፅሐፍ ይፈልጋሉ?
‎
‎📚 ይህ መፅሐፍ በኮንስትራክሽን ሥራ ውስጥ የሚመለከቱ የሕግ ጉዳዮችን በቀላልና ተግባራዊ መልኩ ለመረዳት ይረዳል።
‎
⏺‎የኮንስትራክሽን ሕግ መሠረታዊ ግንዛቤ
⏺‎የግንባታ ፕሮጀክት ሕጋዊ አተገባበር
⏺‎የተዋዋይ ወገኖች መብትና ግዴታ
⏺‎የኮንትራት እና የስምምነት ጉዳዮች
⏺‎የግንባታ ሥራ ኃላፊነትና ተጠያቂነት
⏺‎በግንባታ ሥራ ላይ የሚፈጠሩ የሕግ ጉዳዮች እና ሌሎች ተካተዋል👇
‎
‎https://ye-buna.com/etconp?ref=product_detail&product=6a83e1c10064f_etconp
❤3🙏3🥰1👏1
🏗️✨ SITE ENGINEER'S CHALLENGE! ┃ የሳይት መሐንዲስ ፈተና! ✨🏗️

📐 Footing 1.5 m × 1.5 m × 0.45 m with 12 mm Ø @ 150 mm c/c both ways ┃ 1.5 ሜ × 1.5 ሜ × 0.45 ሜ መሠረት፣ በሁለቱም አቅጣጫ 12 ሚሜ ብረት በ150 ሚሜ ልዩነት 🔩

📌 Cover: 50 mm ┃ ሽፋን፡ 50 ሚሜ

📌 Bend-up: 300 mm ┃ የታጠፈ ክፍል፡ 300 ሚሜ

📌 Concrete: M20 ┃ ኮንክሪት፡ M20

🧮 Can you calculate? ┃ ማስላት ትችላላችሁ?

1️⃣ 🧱 Volume of concrete ┃ የኮንክሪት መጠን

2️⃣ 🔢 Number of bars each way ┃ በእያንዳንዱ አቅጣጫ የብረት ብዛት

3️⃣ 📏 Cutting length of one bar ┃ የአንድ ብረት የመቁረጫ ርዝመት

4️⃣ ⚖️ Total weight of steel ┃ የጠቅላላ ብረት ክብደት

⬅️ Drop your answers below 👇 ┃ መልሳችሁን ከታች ጻፉ 👇

✅ Solution coming soon! ┃ መፍትሄው በቅርብ ይመጣል!
🔔 Follow for more civil engineering problems ┃ ለተጨማሪ የሲቪል ምህንድስና ጥያቄዎች ይከተሉን
👷‍♂️📚 Learn • Calculate • Build ┃ ተማር • አስላ • ገንባ 🧱

@ETCONP
❤13
🧱 HOW SHOULD CEMENT BE STORED ON SITE?
Poor storage can damage cement before it is used.
✅ Store cement in a dry, covered area.

✅ Keep bags off the ground.

✅ Protect them from moisture and rain.

✅ Avoid contact with walls where moisture may enter.

✅ Follow proper stock rotation.
❌ Never treat cement storage as an unimportant activity.
📌 Material quality starts with proper storage.


@ETCONP
❤7🥰2
👉የ ህንፃ Quantity Surveying ከ Introduction ጀምሮ ችሎታዎን በተግባራዊ ምሳሌዎች የሚያሳድጉበት ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp
🥰3👌1
እንኳን ለሆራ ፊንፊኔ የኢሬቻ በዓል በሰላም አደረሳችሁ!

የከተማችን ነዋሪዎች የኢሬቻ በዓልን ለመታደም ከተለያዩ አቅጣጫ ወደ ከተማችን እየገቡ ያሉ ክቡራን እንግዶቻችንን በተለያዩ የመግቢያ በሮች በእውነተኛ የወንድማማችነትና የእህትማማችነት ስሜት እየተቀበሉና እያስተናገዱ እንዲሁም በጥልቅ የአብሮነት ስሜት ፍቅራቸውን እየገለፁ ይገኛሉ።
ኢትዮጵያ በልጆቿ ትብብርና ህብረብሔራዊ አንድነት ትፀናለች!!
መልካም የኢሬቻ በዓል!
❤9🥰1
💧 WHY IS CONCRETE CURING IMPORTANT?
Curing provides suitable moisture and temperature conditions for cement hydration to continue.
Proper curing helps support:
✅ Strength development

✅ Durability

✅ Surface quality

✅ Crack control
🏗️ Concrete work doesn't end when casting is finished.
The curing period is also an important part of quality construction.

@ETCONp
👍4❤3🎉1
👉ምርጥ የ ኢንተርየር ዲዛይን አማርኛ መፅሃፍ ከፈለጉ ከታች ባለው ሊንክ አውርደዉ ይጠቀሙበት👇

https://ye-buna.com/ethiowisdom?ref=product_detail&product=6abe09836d352_ethiowisdom
❤4🥰1
🏢 BEAM vs COLUMN — WHAT'S THE DIFFERENCE?
🔹 BEAM: A structural member that primarily carries loads and transfers them to supports.
🔹 COLUMN: A structural member that primarily carries axial loads and transfers them toward the foundation.
Both are important parts of a building's structural system.
📐 Understanding how structural elements work together is essential for every construction professional.

@ETCONp