⛑️ SAFETY HELMET COLOURS IN CONSTRUCTION

🔹 White: Engineers, managers, supervisors, and visitors.

🔹 Blue: Electricians, plumbers, and technical workers.

🔹 Red: Firefighters and emergency response teams.

🔹 Green: Safety, environmental, or first-aid personnel.

🔹 Gray: Visitors and trainees.

🔹 Yellow: General construction workers and labourers.

🔹 Brown: Welders and workers performing hot work.

⚠️ Note: Helmet colour codes vary by country and construction site. Always follow site-specific safety rules.

@ETCONP
🥰4❤2
📐 CONSTRUCTION CALCULATION: HOW TO CALCULATE CONCRETE VOLUME

Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.

🔹 Formula for a Rectangular Element

Concrete Volume = Length × Width × Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (m³).

🏗️ Example: Calculate the Volume of a Slab

Given:-

Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 × 4 × 0.15

Required geometric volume = 3.00 m³

🔹 Example: Calculate the Volume of a Beam

Given:

Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 × 0.25 × 0.40

Required geometric volume = 0.60 m³

📌 Important Considerations

✅ Convert millimetres to metres before calculating.

✅ Account for openings and intersecting elements where applicable.

✅ Calculate each element separately when dimensions differ.

✅ Consider ordering allowances according to site conditions and project procedures.

@ETCONP
👏6❤3
🏗️ የ ኮንስትራክሽን ስራ ውል ደብዳቤዎች ይፈልጋሉ?

📑120+ ለስራ ዝግጁ የሆኑ ስታንዳርድ ደብዳቤዎች
✅ ለኮንትራክተሮችም ሆነ ለአማካሪዎች ተዘጋጅቶ የቀረበ
✅ ከ PPA 2025 እና FIDIC Red Book 2017 ህጎች ጋር ሙሉ በሙሉ የተጣጣመ
✅ በ Microsoft Word በቀላሉ ኤዲት የሚደረግ (Editable) ከተጨማሪ PDF ፋይሎች

🚀 የኮንትራት አስተዳደር ስራዎን ቀላልና ፕሮፌሽናል ለማድረግ ፋይሎቹ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
❤3🥰1
🏗️ CONCRETE MIX RATIO 1:2:3

🔹 Mix Proportion (by volume):

• 1 part Cement

• 2 parts Sand

• 3 parts Gravel

🔹 Approximate Materials for 1 m³ of Concrete:

• Cement: 7–7.5 bags (50 kg each)

• Sand: 0.51 m³

• Gravel: 0.77 m³

🔹 Key Quality Tips:

✅ Use clean sand, gravel, and water.

✅ Maintain the correct water-cement ratio.

✅ Compact and cure concrete properly.

✅ Use an approved mix design for structural work.

⚠️ Note: A 1:2:3 nominal mix does not automatically guarantee M20 strength. Use a verified mix design and applicable standards for structural concrete.

📌 @ETCONP
❤5🥰2
🏗️ ISOLATED FOOTING vs. RAFT FOUNDATION

Foundations transfer structural loads safely to the supporting ground. The appropriate foundation depends on soil conditions, building loads, settlement requirements, groundwater, and engineering design.

🔹 1. Isolated Footing

An isolated footing generally supports one column and spreads its load over a larger area of soil.

Common characteristics:

#Often used where soil can safely support the applied loads.

#Can be square, rectangular, or another designed shape.

#May be economical when columns are sufficiently separated and soil conditions are suitable.

🔹 2. Raft Foundation

A raft foundation is a large foundation slab that supports several columns and/or walls over a broad area.

Common characteristics:

#Distributes loads across a larger foundation area.

#May be considered where individual footings would cover a substantial portion of the building footprint.

#Can help manage differential settlement when properly designed.

Requires careful consideration of bending, punching shear, soil pressure, and groundwater conditions.

📊 Comparison

Isolated footing: Supports an individual column.

Raft foundation: Supports multiple structural elements across a larger area.

⚠️ Engineering Tip: A raft foundation is not automatically better or safer. The selection must be supported by geotechnical information and structural calculations.

@ETCONP
❤4
📊 RATE ANALYSIS IN CONSTRUCTION — A PRACTICAL GUIDE

Rate analysis is the process of determining the estimated cost of completing one unit of a construction activity.

It helps contractors prepare estimates, evaluate rates, develop tender prices, and understand where project costs come from.

🔹 Main Components of Rate Analysis

1️⃣ Materials: Cement, sand, aggregates, reinforcement, blocks, and other materials required for the work.

2️⃣ Labour: Wages and associated costs for workers involved in the activity.

3️⃣ Equipment: Machinery, tools, operation, and equipment-related costs.

4️⃣ Transportation: Delivery and handling costs where applicable.

5️⃣ Overheads: Relevant site and company operating expenses.

6️⃣ Profit and Other Allowances: Included according to the estimating method and project requirements.

🏗️ Example: Concrete Work

For a concrete activity, the estimator considers the specified concrete grade or mix, material quantities, labour productivity, equipment, transport, and applicable overheads.

The total estimated cost is then divided by the quantity of work to establish a rate per unit.

📌 Why Is Rate Analysis Important?

✅ Supports realistic cost estimates.
✅ Helps prepare competitive tenders.
✅ Identifies major cost components.
✅ Supports budget planning and cost control.
✅ Helps compare alternatives.

⚠️ Actual rates depend on location, date, specifications, productivity, supplier prices, and contract conditions.

@ETCONP
❤3🥰1
#Advertisement
📚🔥 እንግሊዝኛን በአማርኛ ይማሩ! 🇬🇧🇪🇹
💡 እንግሊዝኛ መማር ይፈልጋሉ?

እንግሊዝኛን ለመማር ተቸግረዋል? የእንግሊዝኛ ቃላትንና አረፍተ ነገሮችን በቀላሉ መረዳት ይፈልጋሉ?
🎯 መፍትሔው እዚህ አለ!
📖 ከእንግሊዝኛ ወደ አማርኛ የተዘጋጀውን ይህን ኢ-መጽሐፍ ይጠቀሙ።
✅ እንግሊዝኛን በአማርኛ ለመረዳት ይረዳዎታል።
✅ አዳዲስ የእንግሊዝኛ ቃላትን ለመማር ያግዛል።
✅ የቋንቋ እውቀትዎን ለማሳደግ ይረዳል።
✅ በስልክዎ ላይ በቀላሉ ማንበብ ይችላሉ።
🚀 ዛሬ ይጀምሩ! ነገ የተሻለ የቋንቋ እውቀት ይኑርዎት!
📩 የእርስዎን ቅጂ ለማግኘት አሁኑኑ ያግኙን👇
https://ye-buna.com/ethiowisdom?ref=product_detail&product=6a909035df904_matoro27
❤2🥰1
📐 CONSTRUCTION CALCULATION

🚥HOW TO CALCULATE CONCRETE VOLUME


Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.

🔹 Formula for a Rectangular Element

Concrete Volume = Length × Width × Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (m³).

🏗️ Example: Calculate the Volume of a Slab

Given:

Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 × 4 × 0.15

Required geometric volume = 3.00 m³

🔹 Example: Calculate the Volume of a Beam

Given:

Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 × 0.25 × 0.40

Required geometric volume = 0.60 m³

📌 Important Considerations

✅ Convert millimetres to metres before calculating.

✅ Account for openings and intersecting elements where applicable.

✅ Calculate each element separately when dimensions differ.

✅ Consider ordering allowances according to site conditions and project procedures.

@ETCONP
❤5
🏗️ አሁናዊ የኮንስትራክሽን ማቴሪያል ገበያ
📅 ቀን፦ 07/02/2019
━━━━━━━━━━━━━━━
⛓ ሰብ ስትራክቸር ማቴሪያል ዋጋ

📌 ብረት
• ባለ 8 — 900.00
• ባለ 10 — 1,406.00
• ባለ 12 — 2,025.00
• ባለ 14 — 2,758.00
• ባለ 16 — 3,600.00
• ባለ 20 — 5,633.00
• ባለ 24 — 8,105.00
🧵 የስታፋ ሽቦ (በኪሎ)
• 1.5 — 350.00
• 2.5 — 350.00
📌 ሚስማር (በኪሎ)
• ሆራይዘን አከፋፋይ — 270.00 - 360.00
• አፖሎ ቸርቻሪ — 340.00 - 400.00
• አፖሎ አከፋፋይ (3-4) — 248.80
• አፖሎ አከፋፋይ (5-15) — 228.80
🏠 ቆርቆሮ (DH Geda)
• G-28 — 2,480.00
• 30 ቁጥር — 1,980.00
• 32 ቁጥር — 1,530.00
• 35 ቁጥር — 1,170.00
━━━━━━━━━━━━━━━
🚰 ፓይፖች
🔹 PPR (Rack)
• ባለ 25 — 950.00
• 32 — 1,800.00
• 40 — 2,500.00
• 50 — 3,500.00
• 63 — 5,800.00
• 75 — 12,500.00
• 90 — —
• 110 — —
🔹 PPR (Roxi)
• ባለ 25 — 1,450.00
• 32 — 2,500.00
• 40 — 4,500.00
• 50 — 7,000.00
• 63 — 8,500.00
• 75 — 14,000.00
• 90 — 25,000.00
• 110 — 28,000.00
🔹 HDPE
• 20 — 80.00
• 25 — 160.00
• 32 — 235.00
• 40 — 385.00
• 50 — 506.00
• 63 — 740.00
• 75 — —
• 90 — —
• 110 — —
🔹 U-PVC (PN 4)
• 50ሚ.ሜ — 1,000.00
• 75ሚ.ሜ — 1,550.00
• 110ሚ.ሜ — 2,300.00
• 160ሚ.ሜ — 4,800.00
• 200ሚ.ሜ — 7,500.00
🔹 U-PVC (PN 6)
• 50ሚ.ሜ — 1,300.00
• 75ሚ.ሜ — 2,000.00
• 110ሚ.ሜ — 3,200.00
• 125ሚ.ሜ — 5,800.00
• 160ሚ.ሜ — 7,000.00
• 200ሚ.ሜ — —
• 250ሚ.ሜ — 25,000.00
🔹 U-PVC (PN 10)
• 90ሚ.ሜ — 6,700.00
• 110ሚ.ሜ — 7,000.00
• 160ሚ.ሜ — 15,000.00
• 200ሚ.ሜ — 21,000.00
• 250ሚ.ሜ — —
• 380ሚ.ሜ — 35,000.00
🔹 U-PVC (PN 16)
• 20ሚ.ሜ — 2,200.00
• 25ሚ.ሜ — 2,800.00
• 50ሚ.ሜ — 3,500.00
━━━━━━━━━━━━━━━
⚡ ኤሌክትሪክ እቃዎች
🌀 ጉሮሮ ኮንድዩት (በሜትር)
• ባለ 13 — 1,500.00
• ባለ 16 — 2,000.00
• 19 — 2,400.00
• 20 — 2,500.00
• 25 — 2,500.00
🔌 ኖርማል ኮንድዩት (በሜትር)
• ባለ 16 — 80.00
• 19 — 110.00
• 25 — 130.00
💡 ዋየር ጥቅል (Wire Rolls)
▪️ ዩሮ ኬብል
• 1.5 — 8,800.00
• 2.5 — 13,200.00
• 4.0 — 22,500.00
▪️ ዩ.ኤፍ (UF)
• 1.5 — 7,800.00
• 2.5 — 10,300.00
• 4.0 — 18,700.00
▪️ ቢሜት (Bmet)
• 1.5 — 8,600.00
• 2.5 — 13,000.00
• 4.0 — 21,900.00
▪️ Blue Nile
• 1.5 — 7,000.00
• 2.5 — 7,250.00
• 4.0 — 10,800.00
▪️ Addis Cable
• 1.5 — 7,500.00
• 2.5 — 12,000.00
• 4.0 — 19,300.00
▪️ Rhino
• 1.5 — 7,500.00
• 2.5 — 12,600.00
• 4.0 — 18,700.00
🎛 ብሬከር ቦርድ
• ባለ 4 — 600.00
• ባለ 6 — 750.00
• ባለ 8 — —
• ባለ 12 — 1,500.00
• ባለ 24 — 2,100.00
━━━━━━━━━━━━━━━
🧱 ሲሚንቶ፣ አሸዋ፣ ድንጋይ እና ጠጠር
🔹 ሲሚንቶ
• ዳንጎቴ (PPC/OPC) — —
• ናሽናል PPC — 1,740.00
• ናሽናል OPC — —
🏖 አሸዋ
• 16 ሜትር ኩብ — 120,000.00
• በሜትር ኩብ — 4,000.00 - 8,000.00
• በሳጥን — 1,000.00
⛰ ድንጋይ
• 16 ሜትር ኩብ — 36,000.00
🪨 ጠጠር
• 16 ሜትር ኩብ — 95,000.00
• በሜትር ኩብ — 5,000.00
• በሳጥን — 700.00
━━━━━━━━━━━━━━━
🧱 ብሎኬት
🔹 ብሎኬት ክላስ
• ክላስ A — 126.00 - 200.00
• ክላስ B — 109.00 - 180.00
• ክላስ C — 138.00 - 165.00
🔹 ብሎኬት ሎካል
• ባለ 20 — 89.00
• ባለ 15 — 75.00
• ባለ 10 — 63.00
━━━━━━━━━━━━━━━

👉 አዲስ ባሁን የገበያ ዋጋ የተሰራ የህንፃ Cost BreakDown Analysis እና BOQ ከፈለጉ ከታች ባለው ሊንክ ያውርዱ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
❤9👍3🥰1
🏗️ የ ኮንስትራክሽን ስራ ውል ደብዳቤዎች ይፈልጋሉ?

📑120+ ለስራ ዝግጁ የሆኑ ስታንዳርድ ደብዳቤዎች
✅ ለኮንትራክተሮችም ሆነ ለአማካሪዎች ተዘጋጅቶ የቀረበ
✅ ከ PPA 2025 እና FIDIC Red Book 2017 ህጎች ጋር ሙሉ በሙሉ የተጣጣመ
✅ በ Microsoft Word በቀላሉ ኤዲት የሚደረግ (Editable) ከተጨማሪ PDF ፋይሎች

🚀 የኮንትራት አስተዳደር ስራዎን ቀላልና ፕሮፌሽናል ለማድረግ ፋይሎቹ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
❤3👍1🥰1
📊 MICROSOFT EXCEL SKILLS EVERY ASPIRING QUANTITY SURVEYOR SHOULD LEARN

Excel is a valuable tool for quantity estimation, cost calculations, BOQs, valuations, and construction reporting.

🔹 Start With These Skills

1️⃣ Basic formulas: addition, subtraction, multiplication, and division.

2️⃣ SUM: Calculate totals.

3️⃣ Percentage calculations: Work with tax, allowances, or percentage-based values where applicable.

4️⃣ Cell references: Understand relative and absolute references.

5️⃣ IF functions: Apply simple logical conditions.

6️⃣ Sorting and filtering: Organize large datasets.

7️⃣ Lookup functions: Retrieve relevant information from tables.

8️⃣ Formatting: Make cost reports and BOQs easier to read.

🏗️ Practical Exercise

Create a small BOQ containing:
Item description.
Unit.
Quantity.
Unit rate.
Total amount.

Use a formula to calculate:

Amount = Quantity × Unit Rate
Then calculate the overall total using the SUM function.

📌 Always verify quantities, formulas, units, and rounding. A spreadsheet can calculate incorrectly if its inputs or formulas are wrong.

@ETCONpWORK
❤6🥰1
🏗️ RCC PARAPET WALL DETAIL

🔹 Dimensions • Height: 1200 mm • Thickness: 200 mm • Scale: 1:20

🔹 Material Specifications • Concrete: 21 MPa • Main Reinforcement: Ø12 mm bars • Stirrups: Ø8 mm @ 150 mm c/c • Concrete Cover: Minimum 25 mm • Haunch: 200 mm high, 1:2 cement mortar

🔹 Key Construction Notes

✅ Ensure proper bar anchorage at corners.

✅ Follow structural reinforcement details.

✅ Provide waterproofing on the top surface.

✅ Comply with applicable building codes.

⚠️ Note: Final dimensions and reinforcement must be verified by a qualified structural engineer.

@ETCONP
🥰5❤4
👉ምርጥ እና አስደናቂ ሲስተም

🌟የግንባታ ፕሮጀክትዎን BOQ፣ ወጪ፣ የሥራ አፈጻጸም፣ ክፍያ፣ Cash Flow እና Profit/Loss በአንድ ፕሮፌሽናል Excel System በቀላሉ ለማስተዳደር የሚያግዝ ሲስተም ካስፈለግዎ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aaf8ac262672_etconp
❤2🥰1👌1
🏗️ STAIRCASE REINFORCEMENT DETAILS

🔹 Typical Staircase Dimensions
• Riser Height: 150 mm
• Tread Width: 250 mm
• Stair Slab Thickness: 150 mm

🔩 Main Reinforcement: Placed along the inclined stair slab to resist bending.

🔧 Distribution Bars: Placed across the stair width to control cracking and distribute loads.

🔗 Extra Reinforcement: Provided near supports as required by structural design.

🏢 Landing Beams: Transfer staircase loads safely to supporting columns or beams.

✅ Construction Tips
• Maintain proper concrete cover and bar spacing.
• Ensure adequate anchorage and secure reinforcement.
• Compact and cure concrete properly.

⚠️ Note: Final reinforcement must be designed by a qualified structural engineer according to loading, span, and applicable codes.

@ETCONP
❤7🥰2
👉ቅናሹ ዛሬ ያበቃል

🌟ዩኒቨርስቲ ተማሪዎች ይህ እድል እንዳያመልጣቹ፥ ለዛሬ ብቻ የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏

👊Qs ለሚወስዱ የETABS ኮርሶ እንደ ቦነስ ይሰጣቹዋል😍

📩ለማነኛውም ጥያቄ እና አስተያየት @Philemona7 ይፃፉልን

🗂ኮርሱ ከታች ባለዉ ሊንክ በመንካት ይጀምሩ
👇👇👇👇

https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp

@etconp
👍3🥰1
🏗️ CONCRETE MIX RATIO 1:2:3

🔹 Mix Proportion (by volume):

• 1 part Cement

• 2 parts Sand

• 3 parts Gravel

🔹 Approximate Materials for 1 m³ of Concrete:

• Cement: 7–7.5 bags (50 kg each)

• Sand: 0.51 m³

• Gravel: 0.77 m³

🔹 Key Quality Tips:

✅ Use clean sand, gravel, and water.

✅ Maintain the correct water-cement ratio.

✅ Compact and cure concrete properly.

✅ Use an approved mix design for structural work.

⚠️ Note: A 1:2:3 nominal mix does not automatically guarantee M20 strength. Use a verified mix design and applicable standards for structural concrete.

📌 @ETCONP
👍4❤1🥰1
👉የ ህንፃ Quantity Surveying ከ Introduction ጀምሮ ችሎታዎን በተግባራዊ ምሳሌዎች የሚያሳድጉበት ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp
🙏3🥰2
🏗 የግንባታ ሳይት የጥራት ቁጥጥር፦ የቁመትና የደረጃ ልኬት (Auto Level & Site Surveying)!

በግንባታ ሳይት ላይ የሚሠራ እያንዳንዱ ሥራ በትክክለኛ ልኬት መመራት አለበት። የህንፃው ከፍታ፣ የኮንክሪት ወለል ደረጃ እና የመሠረት ቁፋሮ ጥልቀት ከዲዛይኑ ጋር ተመሳሳይ መሆናቸውን ለማረጋገጥ Auto Level (አውቶ ሌቭል) በጣም ጠቃሚ የሰርቬይንግ መሣሪያ ነው።

📌 1. Auto Level በግንባታ ሳይት ላይ ምን ይሠራል?

🔹 የከፍታና የደረጃ ቁጥጥር (Elevation & Level Control)

የኮንክሪት ወለሎች፣ የቢም ከፍታዎች እና የመሠረት ደረጃዎች በዲዛይን ስዕሉ መሠረት መሠራታቸውን ለማረጋገጥ ይረዳል።

🔹 የዝንባሌ ቁጥጥር (Slope Control)

የፍሳሽ ቱቦዎች፣ የመሬት ውሃ ማስወገጃዎች እና የሻወር ቤት ወለሎች የሚፈለገውን ዝንባሌ እንዲኖራቸው ትክክለኛ የከፍታ ልኬት ማድረግ ያስፈልጋል። Auto Level በዚህ ሥራ ውስጥ ወሳኝ ሚና ይጫወታል።

📌 2. በሳይት ላይ መፈተሽ ያለባቸው ዋና ዋና ነጥቦች (Quality Control Checkpoints)

1️⃣ Tripod Stability (የመሣሪያው ማቆሚያ ጽናት)

መሣሪያው የተገጠመበት Tripod በጠንካራ መሬት ላይ በደንብ መቆሙን እና በልኬት ጊዜ እንዳይንቀሳቀስ ማረጋገጥ አስፈላጊ ነው።

2️⃣ Bubble Level (የደረጃ ማስተካከያ)

በመሣሪያው ላይ ያለው Circular Bubble በትክክለኛው መሃል ላይ መሆኑን ማረጋገጥ አለበት። ይህም መሣሪያው በትክክል እንዲሠራ ይረዳል።

3️⃣ Staff Reading (የሌቭል ስታፍ ንባብ)

የሌቭል ስታፉን በትክክል በማቆም ንባቡን ማስተካከልና በመዝገብ ማስፈር ያስፈልጋል። የተሳሳተ ንባብ በኋላ የከፍታ ልዩነትና የሥራ ጉድለት ሊያስከትል ይችላል።

⚠️ የሳይት ኢንጂነሮች ሊያስታውሱት የሚገባ ነገር!

የከፍታ ልኬት ስህተት በቀጣይ የመሠረት፣ የቢም፣ የስላብ እና የፍሳሽ ሥራዎች ላይ ተጨማሪ ችግር ሊፈጥር ይችላል። ስለዚህ ከሥራው በፊትና በሥራው ሂደት ውስጥ ልኬቶችን ማረጋገጥ የጥራት ቁጥጥር ዋና ክፍል ነው።

💡 እርስዎ በግንባታ ሳይት ላይ የከፍታና የደረጃ ልኬት (Leveling Work) ለማድረግ የትኛውን መሣሪያ ይጠቀማሉ?

👉 Auto Level፣ Total Station ወይስ ሌላ መሣሪያ? ልምድዎን በኮሜንት ያካፍሉን!

━━━━━━━━━━━━━━
​📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት ​የፌስቡክ ገፃችን ይጎብኙ👇

https://www.facebook.com/profile.php?id=61592085774934

@etconp
❤5🥰2🙏1
🏗️ አዲስ ፕሪሚየም eBook አዘጋጀንላቹ❤️

📘The Master Construction Estimation Handbook

🏛የBuilding Cost Estimation እና Unit Rate Analysis ሙሉ መመሪያ።

🌟በውስጡ፦
✅ የConstruction Material Formula
✅ Labor & Equipment Cost Analysis
✅ Unit Rate Analysis (URA)
✅ BOQ እና Cost Estimation ጠቃሚ ፎርሙላዎች
👷 ለCivil Engineers፣ Contractors፣ Architects፣ Quantity Surveyors እና ተማሪዎች ተስማሚ።

"ትክክለኛ ግምት፣ የተሳካ ፕሮጀክት መሠረት ነው!"

🤌ለማውረድ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a71b78edc006_etconp
👌4🥰2
Q4. Following the fundamental principles of surveying, the minimum number of control points required for establishing a new station is
Anonymous Quiz
19%
4
15%
1
38%
2
27%
3
👍6