Ethio Construction Engineering
Photo
Gate tower building is 16 floor office building in Fukushima-ku , Osaka Japan. It’s notable for the highway offramp at umeda exist that pass through the building.
The building has a double core construction, with a circular cross section. The umeda exist of ikea route of the hanshin expressway system (when existing the highway form the direction of ikeda) passes between the fifth through seventh floor of this pass through this building . The highway is the tenant of this floors . The elevator by floor 8. The elevator pass through the floors without stopping , floor 4 being followed elevator stairways and machinery. The highway 🛣 does not make contact with the building. It passes through as a bridge , held up by supporters next to the building. The highway is surrounded by structure to protect the building from noise and vibration. The roof has a helipad
Official name .......Gate tower building
Other names........Beehive
Structure type .......building
Status.................completed
Country ........... Japan 🇯🇵
City ............ Osaka
Building function......office
Structural material....... composite
Completion.............1992
Height architectural..........71.9meter
Height:helipad..................71.9 meter
Floors above ground .......16
Floors below the ground ......2
Tower GFA............7,956m2
https://t.me/ETCONp
The building has a double core construction, with a circular cross section. The umeda exist of ikea route of the hanshin expressway system (when existing the highway form the direction of ikeda) passes between the fifth through seventh floor of this pass through this building . The highway is the tenant of this floors . The elevator by floor 8. The elevator pass through the floors without stopping , floor 4 being followed elevator stairways and machinery. The highway 🛣 does not make contact with the building. It passes through as a bridge , held up by supporters next to the building. The highway is surrounded by structure to protect the building from noise and vibration. The roof has a helipad
Official name .......Gate tower building
Other names........Beehive
Structure type .......building
Status.................completed
Country ........... Japan 🇯🇵
City ............ Osaka
Building function......office
Structural material....... composite
Completion.............1992
Height architectural..........71.9meter
Height:helipad..................71.9 meter
Floors above ground .......16
Floors below the ground ......2
Tower GFA............7,956m2
https://t.me/ETCONp
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Ethio Construction Engineering
Name this type of footing ?
Stepped footing
Ethio Construction Engineering
Why is the bending?
This is called a joggle in technical term.
The bent is provided to overlap the column reinforcement and to keep in alignment in its dimension (column size )..... if we don’t bend the reinforcement at overlapping then the size of the column will increase when we go up.
So the point is TO MINIMIZE LOAD IN THE TOP AND TO REDUCE THE SIZE OF COLUMN ON THE WAY
The bent is provided to overlap the column reinforcement and to keep in alignment in its dimension (column size )..... if we don’t bend the reinforcement at overlapping then the size of the column will increase when we go up.
So the point is TO MINIMIZE LOAD IN THE TOP AND TO REDUCE THE SIZE OF COLUMN ON THE WAY
This media is not supported in your browser
VIEW IN TELEGRAM
House with moving part
Ethio Construction Engineering
Why is curing important?
Curing helps in the following ways:
- reduces the loss of water
-required for cement hydration process, thus will help in gaining the required strength for the concrete
-improves durability of concrete by reducing permeability and porosity
- improves microstructure of concrete
- reduces the loss of water
-required for cement hydration process, thus will help in gaining the required strength for the concrete
-improves durability of concrete by reducing permeability and porosity
- improves microstructure of concrete
What is lintel ?
Ethio Construction Engineering
What is lintel ?
Lintel is horizontal structure member placed across the opening and can be found on the top of window or the door