Ethio Construction Engineering
32.3K subscribers
6.28K photos
359 videos
1.99K files
3.35K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
👉የምህንድስና ሙያን ወደ ከፍታው እንመልስ!! @ETCONp
👉የምህንድስና ሙያን ወደ ከፍታው እንመልስ!! @ETCONp
👉የምህንድስና ሙያን ወደ ከፍታው እንመልስ!! @ETCONp
👉የምህንድስና ሙያን ወደ ከፍታው እንመልስ!! @ETCONp
👆👆👆👆👆👆👆👆👆👆
.
👉ይቺ ናት ኢትዮጵያ ይቺ ናት ሀገሬ @ETCONp
:
▶️ኢትዮጵያ ሀገራችንን በበጎ ስራ እናገልግል የምህንድስና ሙያን ወደ ከፍታው እንመልስ!!
፡
🙏"ፈጣሪ ኢትዮጵያ እና ህዝቦቿን አብዝቶ ይባርክ!!"🙏
👉8 CAUSES OF CRACKS IN CONCRETE YOU SHOULD KNOW
:
▶️Cracking is one of the most common problems in concrete and it should be avoided seriously.
*Different causes of cracks in concrete are described below:
.
1. SHRINKAGE:
*Shrinkage is one of the major causes of cracking in hardened concrete.
*In drying shrinkage, the volume of concrete is gradually decreased and if the component is restrained against free movement, tensile stresses are developed which causes cracks.
.
2. TEMPERATURE CHANGES:
The temperature variation in concrete results in the differential volume change.
*When the tensile strain capacity of concrete exceeds due to the differential volume change, it will crack.
.
3. CHEMICAL REACTION:
Due to the alkaline nature of cement, it reacts with the carbon dioxide (CO2) present in the atmosphere resulting in an appreciable increase in the volume of the materials which
finally leads to cracking.
.
4. POOR CONSTRUCTION PRACTICES:
Poor construction practices such as adding excessive water to the mix, lack of curing, poor compaction, using low-grade materials, unreasonable placements of construction joints etc. are also responsible for cracking in concrete.
.
5. ERRORS IN DESIGN & DETAILING:
Errors in design and detailing such as an inadequate amount of reinforcement, improper design of foundation, precast members and slabs, improper selection of materials, lack of sufficient contraction joints etc may result in excessive cracking.
.
6. CONSTRUCTION OVERLOADS & EARLY
FORMWORK REMOVAL:
The load induced in the structure during construction can also lead to cracking especially at the younger stage when the
formwork is removed earlier.
.
7. ELASTIC DEFORMATION AND CREEP:
The different components of the building such as wall, column, beam. slab etc undergo elastic deformation when loaded.
*The deformation of concrete depends on the type of building materials used in the constructio such as bricks, cement concrete blocks etc.
*This unusual deformation of concrete results
in cracking.
.
8. CORROSION OF CONCRETE:
The corrosion of steel develops a huge amount of iron oxides and hydroxide that have a much greater volume than the volume of metallic iron. Hence the volume is increased
:
https://t.me/COTMp
1. A
2.B
3. C
4. D
Forwarded from Deleted Account
Tanzania_Field Testing Manual (2003).pdf
8.1 MB
Forwarded from Deleted Account
Tanzania_Laboratory Testing Manual (2000).pdf
8.2 MB
👉Types of failure @ETCONp
.
▶️Structural failure can occur from many types of problems, most of which are unique to different industries and structural types. However, most can be traced to one of five main causes.
.
▶️The first is that the structure is not strong and tough enough to support the load, due to either its size, shape, or choice of material. If the structure or component is not strong enough, catastrophic failure can occur when the structure is stressed beyond its critical stress level.
.
▶️The second type of failure is from fatigue or corrosion, caused by instability in the structure’s geometry, design or material properties.
*These failures usually begin when cracks form at stress points, such as squared corners or bolt holes too close to the material's edge.
*These cracks grow as the material is repeatedly stressed and unloaded (cyclic loading), eventually reaching a critical length and causing the structure to suddenly fail under normal loading conditions.
.
▶️The third type of failure is caused by manufacturing errors, including improper selection of materials, incorrect sizing, improper heat treating , failing to adhere to the design, or shoddy workmanship.
*This type of failure can occur at any time and is usually
unpredictable.
:
▶️The fourth type of failure is from the use of defective materials.
*This type of failure is also unpredictable, since the material may have been improperly manufactured or damaged from prior use.
:
▶️The fifth cause of failure is from lack of consideration of unexpected problems.
*This type of failure can be caused by events such as vandalism, sabotage, or natural disasters. It can also occur if those who use and maintain the construction are not properly trained and overstress the structure.

👉Reasons Structures Fail @ETCONp
▶️Defective construction that causes failure may be due to
numerous reasons that may not be easy to predict before or
during the construction. The major causes of structural
failure are defective designs that have not determined the
actual loading conditions on the structural elements. Inferior
construction materials may also be the cause since the
loads are calculated for materials of specific characteristics.
Structure may fail even if the design is satisfactory, but the
materials are not able to withstand the loads. Employment of
unskilled labor on construction work is another reason for
structural failures. Therefore, it is important that the owners,
designers, and builders are fully conscious of the reasons of
failure, and undertake all preventive measures
.
. https://t.me/COTMp
👍1
Jakarta Indonesia 🇮🇩

ውብ ምሽት ተመኘን
كنا نتمنى أمسية جميلة
我們希望有一個美麗的夜晚
हमने एक खूबसूरत शाम की कामना की
We wished a beautiful evening
Мы пожелали прекрасного вечера

@ETCONp
👉HOW TO CHECK QUALITY OF CEMENT AT SITE? @ETCONp
:
▶️Cement is one of the most important materials used in construction.
*The strength of a structure depends upon several factors, cement quality is one of them. To achieve the desired strength of concrete and to increase the longevity of structure good quality cement should always be used.
*So it is important to check the quality of cement before using. In our previous article, we have already discussed the different types of cement and their uses in construction.
▶️Today we will discuss how to check the quality of cement at site. To check the quality of cement we need to pass some easy tests which are described below.
:
1. DATE OF PACKING:
The strength of cement decreases with time. First of all, check the manufacturing date in the bag before using Generally, cement should be used before 90 days from the
manufacturing date. The percentage of strength loss of cement is given in the below table.
.
▶️Age of cement. %reduction of strength
"""""""""""""""". """"""""""""""""""""""""
3 months. 20-30
6 months. 30-40
12 months. 40-50
.
2. CEMENT COLOR:
The cement should be uniform in color. Good quality cement should have gray color with greenish shade.
.
3. CHECK FOR LUMPS:
No lumps should be present in the cement. Lumps are formed due to absorption of moisture from the climate.
.
4. RUBBING TEST:
Cement should feel smooth while rubbing in between fingers. If it gives a rough feeling that means cement is mixed with sand.
.
5 TEMPERATURE TEST:
Simply insert your hand into the cement bag, it should give cool feeling if its quality is good. Otherwise, you may feel warm because of hydration reaction.
.
6. FLOAT TEST:
Take some amount of cement and throw it in water.
The cement should float for sometimes before it sinks in the water.
.
7. SETTING TEST:
Make a thick cement paste with water and immerse it in water for 24 hours. It should be set and should not develop cracks.
.
8. STRENGTH TEST:
Prepare a cement block of 25 mm x 25 mm and 200 mm in length. Now submerge it in water for 7 days. Now place it on supports 15 cm apart and load it with 34 kg weight. Block made from good cement will not show any
.
https://t.me/COTMp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
This media is not supported in your browser
VIEW IN TELEGRAM
Solider piles and lagging walls in an earth retention technique used primarily for temporary excavation support. These shoring walls are typically constructed by installing steel beams vertically ( solider piles) which are either driven or drilled at regular intervals around the excavation prior to excavation beginning.
👉A beam is a structural element that primarily resists loads applied laterally to the beam's axis. Its mode of deflection is primarily by bending .
▶️The loads applied to the beam result in reaction forces at the beam's support points.
*The total effect of all the forces acting on the beam is to produce shear forces and bending moments within the beam, that in turn induce internal stresses, strains and deflections of the beam.
*Beams are characterized by their manner of support, profile (shape of cross-section), length, and their material. Beams are traditionally descriptions of building or civil engineering structural elements, but any structures such as automotive automobile frames, aircraft components, machine frames, and other mechanical or structural systems contain beam structures that are designed to carry lateral loads are analyzed in a similar fashion. @ETCONp
👉የ ህዳሴ ግድብ እውነታዎች @ETCONp
.
▶️የዋናው ግድብ ቁመት ከባህር ወለል በላይ 145 ሜትር ከፍታ ሲኖረው፤ ወደ
ጎን ደግሞ 1 ሺህ 780 ሜትር ርዝመት አለው።
*ስለዚህ በዚህ የግድቡ ከፍታ ላይ ለመድረስ 10 ነጥብ 1 ሚሊዮን ኪዩቢክ ሜትር የአርማታ ሙሌት የስፈልጋል፡፡
▶️በፕሮጀክቱ ግንባታ እየተሳተፈ ያለው የሰው ኃይል ቁጥር ከ 13
ሺህ በላይ ነው፡፡
▶️የ’ሳድል ዳም’ ግድብ 5 ነጥብ 2 ኪሎ ሜትር ርዝመትና 50 ሜትር ቁመት
ያለው ሲሆን፤ ይህን 50 ሜትር ቁመት ከፍታ ለመሙላት 16 ነጥብ 5 ሚሊዮን
ኪዩቢክ ሜትር የድንጋይ ሙሌት ያስፈልገዋል ማለት ነው።
፡
🏗ይቀጥላል...
❤1
Forwarded from Leul Y.
REBAR final draft Holistic cost analysis .pdf
90.9 KB
Forwarded from Deleted Account
BOQ.pdf
69.1 KB
Forwarded from Deleted Account
TAKE OFF.pdf
166.2 KB
Forwarded from Deleted Account
2G+ G+ M+ 12HOTEL BUILDING.mpp
3 MB
Forwarded from Deleted Account
ALL COST ANALYSIS.xls
1.1 MB