Ethio Construction Engineering
Photo
๐Ÿ‘‰10 key terms of Project management and schedule
you should know. @COTMp ๐Ÿ‘†
.
1. WBS (Work Breakdown Structure): Is hierarchical that breaks down the work into manageable clods so that each level of WBS could be easily understood by the project team.
.
2. Milestone:
These are the significant points in time or an event
that mark important moments during the project.
These are mainly used for
โ— Starting phase
โ— Ending phase
โ— Fixed dates on plan
.
3. Baseline:
Is used to measure the performance of the project.
There are three baselines in project management.
These are โ€“
โ— Schedule baseline
โ— Cost baseline
โ— Scope baseline
4. Gantt Chart:
Is a bar chart that displays the scheduled
.
information graphically.
5. Critical Path Method (CPM) Critical Path Method (CPM) is a step by step approach in which one can analyze critical and non- critical tasks.
6. Dummy Activity:
dummy activity is a simulated activity of sorts, one that is of a zero duration.
.
7. Float:
Float, also called slack, is the amount of time a
task can slip before it bumps into another task.
8. Chart Dependencies:
.
the predecessor is the first task; it controls the start
or end date for all related successor tasks. The
successor, by contrast, is the task whose start or
end date is controlled by the predecessor.
.
9. Types of relationship:
โ–  Finish to Start: Predecessor must finish before Successor can start.
โ–  Start to Start:Predecessor must start before Successor can start.
โ–  Finish to Finish: Predecessor must finish before Successor can finish.
โ–  Start to Finish: Predecessor must start before Successor can finish.
.
10. Lead time and Lag time: Lead time causes the successor task to begin
before its predecessor task concludes.
Lag time causes the successor task to begin some time after its predecessor task concludes.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
Structural_Analysis_by_R_C_Hibbeler.pdf
30.1 MB
Reinforced_Concrete_Design_by_S.pdf
14.4 MB
๐Ÿ‘‰Today Book Tip @COTMp ๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
.
๐ŸšฉSHARE SHARE SHARE
๐Ÿ˜ญ1
๐Ÿ‘‰Important points for a Construction Site Engineer @COTMp
.
โ–ถA site engineer has to perform a lot of activities on the site. His/her role involves a lot of responsibility which includes giving sufficient advice and supervision when there are any technical issues, or for proper management and for the preparation of day to day reports of the construction works.
*There are some works which are recurring and hence a few tips might be useful for a civil engineer if
they are remembered. They help in faster
*calculations as well as to address problems at
the site.
โฉPoints to Remember for Civil Site Engineer ๐Ÿ‘‡
:
โ–ถ36mm is the maximum diameter of the bars used for lapping.
*Bars having more than this diameter are not allowed.
โ–ถMaximum chair spacing is 1m and the minimum diameter used for these bars is 12mm.
โ–ถMinimum diameter used for dowels bars is
12mm.
โ–ถLongitudinal reinforcement should not be less than 0.8% of gross area of cross section
and not be more than 6% of the same.
โ–ถMinimum number of bars used for square
columns is 4 and that of a circle is 6.
โ–ถThe main bars used in the slabs should not
be less than 8mm when HYSD bars are used
and 10mm when plain bars are used.
โ–ถThe distribution bars in slabs should not less
than 8mm and not more than 1/8 of slab
thickness.
โ–ถMinimum thickness of slab is 125mm.
โ–ถMaximum free fall of concrete is allowed to
1.50m.
โ–ถLap slices not be employed for bars greater
than 36 mm.
โ–ถPH value of the water should not be less
than 6.
โ–ถCompressive strength of Bricks is 3.5 N/
mm
โ–ถWater absorption of bricks should not be
more than 15 %.
โ–ถ Binding wire required in steel reinforcement
is 8 kg per MT.
.

๐Ÿ‘‰ Density of Materials
*Bricks : 1600-1920kg/m
*Concrete block:1920kg/m
*Reinforced concrete :2310-2700kg/m
โฉDe shuttering time of different RCC Members
*For columns : 16-24 hrs.
*Soffit formwork to slabs : 3days
*Soffit to beams props : 7days
*Beams spanning upto 4.5m : 7days
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•แข
๐Ÿ‘2
๐Ÿ‘‰แ‹แ‰ขแ‰ตแ‹‹ แ‰ฃแˆ…แˆญแ‹ณแˆญโค
.
๐ŸšฉแˆธแŒ‹ แˆแˆฝแ‰ต แˆˆแŠ“แŠ•แ‰ฐ แ‹ญแˆแŠ•แข @COTMp
Sketch...แ‰ตแŒ แˆ‹แˆˆแˆ…
๐Ÿ‘‰TYPES OF CONSTRUCTION CONTRACT @COTMp
.
โฉIn Construction Industry, the following eight contract types are so far practiced:๐Ÿ‘‡
1. Lump Sum Contract,
2. Bill of Quantities or Unit Rate Contract,
3. Cost Plus Fixed Fee Contract,
4. Cost Plus Percentage of Cost Contract,
5. Item Rate or Schedule of Rates Contract,
6. Labor Contract,
7. Hybrid Contract, and
Special Contract
.
โ–ถLump Sum Contract: When the Project or Tender price is determined and quoted as a total sum of money without individual ratings to execute the whole of the works and / or
services according to the drawings and specifications, it is called a Lump Sum Contract. In such contracts: It is difficult to administer changes and amendments but experiences of similar
projects are used as a basis to this effect, Works or services are checked based on the specifications, the conditions of contract or
terms of reference and drawings if any for
acceptance and closing of accounts, and Payments are agreed at different stages of works or services.
*A Lump Sum Contract is more suitable for works of smaller in size and where the contracting parties have prior experience of
similar projects. But it is not advisable for projects with considerable uncertainties such as; difficult sub surface situation, unusual projects, maintenance projects, etc. *A Lump Sum Contract mainly includes Contract
Agreement, Conditions of Contract, Drawings and Technical Specifications.
.
โ–ถBill of Quantities Contract: When the Project
or Tender price is determined and quoted
from unit rates assigned to detailed bill of quantities, it is called a Bill of Quantity
Contract.
*The Bill of Quantity includes short description of specifications, unit of
measurement, quantities and columns for pricing the unit rate and its total amounts. In such contracts: It is relatively easy to administer changes and amendments because actual and assigned quantities can be compared, Works or services are checked based on the specifications, the conditions of contract or terms of reference, drawings if any and the
priced bill of quantities for acceptance and closing of accounts, and*Payments are made based on measurements of
executed works and material on site provided
on site.
.
โ–ถCost Plus Fixed Fee Contract: When projects
are fast โ€“ track and required to be completed expeditiously and where it is difficult to estimate the project cost before, the project expenses called costs will be recorded and a fixed amount which is agreed upon by the
contracting parties will be added as payment
to the contractor.
A contract that stipulates to reimburse cost together with an additional
fixed fee, it is called a cost plus fixed fee contract. Such a contract is desirable when the scope and nature of the work can at least be broadly defined and for important structures such as monumental buildings which are Time and Quality driven than Cost driven.
*In such contracts: The work is executed in the best interest of the
owner with regard to the project quality and
time, There is no way that the contractor can loose,
Changes and Amendments can be accommodated amicably, The amount of the fixed fee is determined as a lump sum from a consideration of the scope
of the work, its approximate cost, nature of work, estimated time of construction, manpower and equipment requirements, and The owner could not easily anticipate the final
project price and can cause budgetary
problems.
.
โ–ถCost Plus Percentage of Cost Contract: This type of contract is similar to the Cost plus fixed fee contract but its fixed fee is made variable using a percentage of the cost which is meant to cover the overhead and profit
costs of the contractor. Contract Administration becomes intense in such type of contract in order to protect the interest of the
owner. This is because the payment is made by
determining the actual cost of the work plus a certain percentage.
*The disadvantage of such
kind of contract is the tendency to increase
the cost of the work to earn more profit by
way of percentage of enhanced actual cost.
Item Rate or Schedules of Rates Contract:
...๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
*A different form of fixed contract but priced
based on the unit rate approach for individual
or groups of activities, not the whole project.
When accurate specifications and quantities of work or services could not be determined before executions, provisional quantities together with acceptable specifications can be included to determine Provisional sums using unit rates. This type of contract is Item Rate or Schedules of Rates Contract.
.
โ–ถLabor Contract: When the Project owner is responsible for the provision of major resources such as materials and Equipments other than labor, small tools and equipments and their management, it is called a labor contract.
.
โ–ถHybrid Contract: A contract that combines two or more contract types is called Hybrid
Contract.
*This type of contract is designed to meet the special requirement of certain classes of works to suit their particular needs.
.
โ–ถSpecial Contract: As the name implies, in certain circumstances such as use of specializations, urgency, supplementary nature and continuity of services or works; remoteness and smallness of projects, etc requires special arrangements. These include:
*Packaged Contract
Continuing / *Supplementary Contract
*Running Contract, and
*Sub Contract
.
โฉPackaged Contract: In remote areas where
there is a need to develop physical infrastructures and their smallness and cost are too low that contractors are discouraged to participate, projects are grouped to
combine two or more individual contracts so
as to arose interests by increasing their costs.
A single contract formed from a combination
of two or more separate contract to suit
special need of a project owner or financier or
regulator is called a packaged contract.
This type of contract becomes feasible in order to promote privatization and discourage Force
Account forms of delivery system.
โฉContinuing/Supplementary Contract: When a project incurs additional works or services which is within 10 โ€“ 15 % of the total contract
price but should not be > 25 % can be allowed
to supplement to the existing contractor in the
form of Continuing or Supplementary Contract.
Such contract is advisable when the project
owner is able to save cost and time due to tendering and mobilization.
โฉRunning Contract: This type of contract is becoming popular after projects started to use
Alliance and Outsourcing Delivery System. Such
contracts provide goods, services and works at
specified intervals or as and when required by
the Project Owner for a certain period of time.
The Contract price is often per unit rate of
goods, services or works where the payment is
based on actual goods delivered and / or
services rendered and / or works executed.
Contract Prices can in some instances be fixed
specifically for services.
Sub Contract: This type of contract is made
when specialized works are involved in the
project package or if the Project Owner
envisaged other tangible as well as intangible
benefits by using such a contract type.
Competitive and Comparative advantages can be sought using such a contract type and they
are forms of outsourcing and alliances delivery
systems.
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•แข
๐Ÿ‘1
๐Ÿ‘‰ CURING OF CONCRETE @COTMp
.
โ–ถCuring may be defined as the process of maintaining satisfactory moisture and temperature conditions for freshly placed concrete for some specified time for proper hardening of concrete. Curing in the early ages of concrete is more important.
๐Ÿ‘‰Curing for 14 days is very important. Better to continue it for 7 to 14 days more.
๐Ÿ‘‰ If curing is not done properly, the strength of concrete reduces. Cracks develop due shrinkage.
The durability of concrete structure reduces.
.
โฉThe following curing methods are employed ๐Ÿ‘‡
.
โ–ถSpraying of water
โ–ถCovering the surface with wet gunny bags, straw etc.
โ–ถSteam curing and
Application of curing compounds.
โ–ถSpraying of water: Walls, columns, plastered surfaces are cured by sprinkling water.
โ–ถWet covering the surface: Columns and other vertical surfaces may be cured by covering the surfaces with wet gunny bags or straw.
โ–ถPonding: The horizontal surfaces like slab and floors are cured by stagnating the water to a height of 25 to 50 mm by providing temporary small hounds with mortar.
โ–ถ Steam curing: In the manufacture of pre-fabricated concrete units steam is passed over the
units kept in closed chambers. It accelerates curing process, resulting into the reduction of curing period.
๐Ÿ‘‰ Application of curing compounds: Compounds like calcium chloride may be applied on the curing surface. The compound shows affinity to the moisture and retains it on the surface. It keeps the concrete surface wet for a long time.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
This media is not supported in your browser
VIEW IN TELEGRAM
๐Ÿ‘‰Slump Test @COTMp
.
๐ŸšฉSHARE SHARE SHARE
๐Ÿ‘‰New Vacancy @COTMp
.
๐ŸšฉFor Civil and architects.
.
โฉSHARE SHARE SHARE
๐Ÿ‘‰Picture Of The Day @COTMp
.
๐Ÿšฉ5โ˜† Sky light Hotel A.A Ethiopia Air lines๐Ÿ˜
.
๐Ÿ‘‰@ design_ETH source and @HilenaT took the picture.
๐Ÿ‘‰What is WORKABILITY OF CONCRETE? @COTMp
.
โžกWorkability can be defined as the property of fresh concrete which describes the ease and homogeneity of the concrete to be mixed, fully compacted and finished.
*A workable concrete
should possess following two requirements:๐Ÿ‘‡
1. The concrete should be compacted with minimum efforts.
2. The concrete should not form bleeding and segregation.
*Workability of concrete mainly depends on the mix
proportion and the properties of concreting materials (water, cement,
aggregates).
*The shape, size, and grades of aggregates also
play a great role in the variation of workability. For
better workability fine and coarse aggregates should be well graded. It
has been found that concrete made of round grain sand is more
workable than the concrete of crushed sand. If air
entraining admixture is used in the mix, it will also increase the workability
and decrease segregation and bleeding.
โฉFACTORS AFFECTING WORKABILITY OF CONCRETE:
*The factors affecting workability are as following:
1. Amount Of Water In The Mix:
2. Proportion Of Coarse And Fine Aggregates:
Workability can be
increased by decreasing the amount of coarse
aggregates in the
mix. Fine aggregates produce more wore workable concrete.
3. Shape Of aggregates: Round shaped aggregates
give better workability than angular shaped aggregates.
4. By expanding the cement content in the mix.
5. By including admixtures in the mix. Apparently, the necessity of workability differs as per the nature of the job and blockage in the full stream of concrete due to the spacing and nature of the reinforcement. The
workability of concrete is generally measured by one of the following three
tests.๐Ÿ‘‡
1. Slump Test.
2. Compaction Factor Test.
3. Vee-Bee Test.
โค1๐Ÿ‘1
๐Ÿ‘‰what is Honeycombs @COTMp
.
โฉHoneycombs are hollow spaces and cavities left in
concrete mass on surface or inside the concrete mass where concrete could not reach. These look like honey bees nest.
.
โฉHoneycombs which are on sides are visible to naked eyes and can be detected easily as soon shuttering is removed. Honey combs which are inside mass of concrete can only be detected by advanced techniques which we will discuss another time.
.
โฉThere are many reasons for Honeycombs the main reasons are:๐Ÿ‘‡
1) Improper vibration during concrete.
2) Less cover to reinforcement bars.
3) Use of very stiff concrete (this can be avoided by controlling water as per slump test).
4) Places like junction of beam to beam to column
and to one or more beams are the typical spots where honey combs are observed.
*This is due to jumbling of reinforcement of beams and column rods at one place; special attention is required at such place during concreting and vibrating.
5) Presence of more percentage of bigger size of aggregate in concrete also prevents concrete to fill narrow spaces between the reinforcement rods.
.
โฉHoneycombs as a
defect not only reduces the load bearing capacity
but water finds an easy way to reinforcement rods
and rusting and corrosion starts. Corrosion is a process which continues through reinforcement rods even in good concrete, this result in loosing grip between rods and concrete, which is very dangerous to safety and life of concrete structures.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
Diamond tower spiral structure
๐Ÿ‘1
Anatomy of tower crane