Ethio Construction Engineering
32.3K subscribers
6.28K photos
359 videos
1.99K files
3.35K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
What 3D programs are using Architects for designing and rendering nowadays?

One of the main goals of all Architects is to creat good projects, with both proper construction and nice visualization.

The second one is the final destination of project, and the quality of render (3D visualisation) depends on many constituents.

Time is the important thing. When the calculations is done, and design is made. And the world is ready to see it, we need to show it in the best way.

The LUMION is the one of the best programs, which allows us to show our creativity and imagination in simple way.

Here are examples of young Architecture firm called "DoArch"

https://www.instagram.com/doarchdo/
https://www.facebook.com/DoArchDo

@etconp
👉EFFECT OF COMPACTION ON ENGINEERING PROPERTIES OF SOIL

📌THEORY OF SOIL COMPACTION

➡️During compaction the reduction in volume is mainly due to expulsion of pore air and rearrangement of particles resulting in their closer packing. Compaction of a soil mass results in increase in dry density. The dry density attained depends on water content, amount and type of compaction. The amount and type of compaction determine the compactive effect. For a specific amount of compactive energy applied on soil, the mass attains maximum dry density at particular water content. This water content is referred to as optimum water content.

📌EFFECT OF COMPACTION ON PROPERTIES OF SOIL

➡️When a soil is compacted, it changes its engineering properties and thereby behaves differently.
▶️Some of the engineering properties which changes on application of compactive effort is briefly described below.

🚧1. PERMEABILITY

⏺The effect of compaction is to decrease the permeability.
⏺In the case of fine grained soils it has been found that for the same dry density soil compacted wet of optimum will be less permeable than that of compacted dry of optimum.

🚧2. COMPRESSIBILITY

⏺In case of soil samples initially saturated and having same void ratio, it has been found that in low pressure range a wet side compacted soil is more compressible than a dry side compacted soil and vice versa in high pressure range.

🚧3. PORE PRESSURE

⏺In undrained shear test conducted on saturated samples of clay it has been found that lower pore pressures develop at low strains when the sample is compacted dry of optimum, compared to the case when the sample is compacted wet of optimum But at high strains in both types of samples the development of pore pressure is same for same density and water content.

🚧4. STRESS-STRAIN RELATION

⏺Samples compacted dry of optimum produce much steeper stress-starin curves with peaks at low strains, whereas samples compacted wet of optimum, having the same density, produce much flatter stress-strain curves with increase in stress even at high strains.

🚧5. SHRINKAGE AND SWELLING

⏺At same density a soil compacted dry of optimum shrinks appreciably less than that of compacted wet of optimum Also the soil compacted dry of optimum exhibits greater swelling characteristics than samples of the same density compacted wet of optimum.

#GeotechnicalEngineering

@etconp
❤1
👉Shelter for the Homeless Henok Molla

🚧This project tackles the crisis of housing by strategically considering a scale where the previous attempts had never considered and by assuming a virtually neglected target group of homeless citizens.

🚧ለ ጎዳና ተዳዳሪዎች እና አቅመ ደካሞች የሚሆን አሪፍ የቤት ዲዛይን።

🚩ሊደነቅ እና ሊበረታታ የሚገባ ስራ ነው።

@etconp
👉the largest suspension bridge in the world

➡️Akashi-Kaikyo Bridge is the longest span bridge in the world, located in Akashi Strait between Kobe and Awaji Island in Hyogo Pref.

🚧The total and central span lengths are 3,911m and 1991m respectively.

🚧The suspension bridge connects the city of Kobe (mainland of Honshu) to Iwaya (Awaji Island) in Japan.

🚧The spectacular view of the bridge in the night resulted in the name, Pearl Bridge.

🚧The bridge was opened to traffic on 5 April 1998.

🚧It has six lanes of roadway, three in each direction.

🚧It consists of three spans The length of the central span is 1,991m, currently the longest span for a suspension bridge The end spans are 960m long each.

🚧The bridge is located at a height of 280m from the sea level.

🚧Construction of the bridge began in May 1988 and took nearly ten years to complete.

🚧The foundation depth of the bridge is equivalent to that of a 20-storey apartment.

🚧The total cost incurred for the bridge completion was $4.3bn

@etconp
👉Different methods of road construction in Construction engineering

🚩1) Concrete: 

🚧It is a common option for road construction purposes as they are a solid material and can be used for building walls and local roads.

🚧This method is considerably less prone to wear and tear defects like rutting, cracking, stripping loss of texture, and potholes.

🚧This is the main reason for its wide usage.

🚩2) Asphalt: 

🚧This method of construction replacing concrete method in these days.

🚧They are very durable, water-resistant and can go more longer then the concrete.

🚧The major advantage of asphalt over concrete is its price Concrete is very expensive as compared to asphalt.

🚧Moreover, asphalt includes low noise during pavement and it is easy to handle it for repairing and maintenance That is why it is widely accepted and used by the people for the purpose of pavement surfacing.

🚩3) Composite: 

🚧This method is widely used for the maintenance, recycling, and rehabilitation of the roads.

🚧The composite material is the combination of both asphalt and concrete material.

🚩4) Bituminous: 

🚧The solvent from the bituminous material will evaporate and the bitumen will bind the aggregate.

🚧It is used in road construction because it is easy to produce, reusable, non-toxic, and a strong binder.

🚩5) Recycling: 

🚧Recycling or repairing of a damaged road surface consists of three different types of construction methods:

⏺(a)Full depth replacement

⏺(b)Hot or cold prepared road recycling

⏺(c)Rubberizing

🚩👆These are the different types of road construction.

#TransportationEngineering

@etconp
🚧በኮንስትራክሽን ውሎች አፈጻጸም COVID 19 ከአቅም በላይ የሆነ ምክንያት/Force Majeure/ ተደርጐ ሊወሰድ ይችላልን?ውጤቱስ ምንድን ነው?✍በ ጉባዔ አሰፋ
.
👉እንደሚታወቀው COVID 19 የተባለ በሽታ የአለማቀፉን ማህበረሰብ ውስብስብ ችግር ውስጥ አስገብቷል፡፡
*በሀገራችንም በሽታው መከሰቱ ከታወቀ ጊዜ ጀምሮ እንዳይስፋፋ ለማድረግ ሰፊ ስራዎች እየተሰሩ ይገኛል፡፡
➡️በዚህ ጽሁፍም በሽታው ያስከተለው ወቅታዊ ሁኔታ ከኮንስትራክሽን ውሎች አንጻር እንዴት ይታያል የሚለውን ለመቃኘት ተሞክሯል፡፡
➡️ከአቅም በላይ የሆነ ምክንያ ተከስቷል ማለት ይቻላልን?
*የበሽታውን ስርጭት ለመግታት በቤት መቀመጥ/stay at home/ የሚለው የበሽታ መከላከል ስትራቴጅ በአንድንድ አካባቢዎች በተለይ በጥብቅ እየተተገበረ ነው፡፡
*በሽታው አስቀድሞ ሊታሰብ የማይችል ድንገተኛ ነገር መሆኑ ግልጽ ነው በኮንትራክተሮች ላይ የኮንስትራክሽን ውሎችን አፈጻጸምም የሚያከብድ መሆኑም አያጠያይቅም፡፡
*ምክንያቱም የኮንስትራክሽን ሰራተኛ ማግኘት አይቻልም እንዲሁም የኮንስትራክሽን እቃዎችን ለማግኘት አይቻልም፡፡
*በእርግጥ በመንግስት በኩል እስካሁን በመርህ ደረጃ ለኮንስትራክሽን ውሎች አፈጻጸም ጉዳይ ከአቅም በላይ የሆነ ሁኔታ ተከስቷል የሚል ግልጽ አቋም አልተወሰደም፡፡
*ይሄውም ምናልባት የኮንስትራክሽን ውሎችን ለማሻሻልም እንደማንኛውም ውል የተዋዋዮችን ነጻነትና ፈቃድ የሚጠይቅ በመሆኑ በየራሳቸው እንደተጨባጭ ሁኔታው መፍትሄ እያስቀመጡ እንዲሄዱ ነጻነታቸውን ለመጠበቅ ሊሆን ይችላል፡፡
*በፍትሀብሄር ህግ አንቀጽ 1792(1) ላይ "ከአቅም በላይ የሆነ ሊመልሱት የማይቻል ሀይል ደርሷል የሚባለው አንድ ባለእዳ(ለዚህ ጽሁፍ ተቋራጭ) ባላሰበው ነገር ድንገት ደራሽ ሆኖበት ግዴታውን እንዳይፈጽም ፍጹም መሰናክል በሆነ አይነት የሚያግደው ነገር ባጋጠመው ጊዜ ነው፡፡"
*እንግዲህ ከዚህ ህግ አንጻር አሁን ላይ ሁኔታው ተቋራጮችን እንደፈለጉ ተንቀሳቅሰው የውል ግዴታቸውን እንዳይፈጽሙ የሚያስቆም/የሚያግድ ሁኔታ በመኖሩ ከአቅም በላይ የሆነ ምክንያት ተከስቷል ማለት ይቻላል፡፡
*ከአቅም በላይ የሆኑ ምክንያቶች ዝርዝር ስለውሎች በጠቅላላው ክፍል ውስጥ በአንቀጽ 1793 ላይ ተቀምጧል፡፡
*ከነዚህም ውስጥ ተዋዋዩ ሀላፊ የማይሆንበት ያልታሰቡና በሌላ ሰው ላይ የሚመጡ ድንገተኛ ደራሽ ነገሮች፣ውሉ እንዳይፈጸም በመንግስት የሚደረግ ክልከላ፣እንደመሬት መናወጥና መብረቅ ያለ ፍጥረታዊ መቅሰፍት ሊጠቀስ ይችላል፡፡
*ይሄው ከአቅም በላይ የሆኑ ምክንያቶች ዝርዝር በተመሳሳይ በጀኔራል ኮንዲሽኖች ለምሳሌ በፒፒኤ 2011 ክሎስ 18.1 ላይ ተቀምጧል፡፡
*የእቃ መወደድ እና የውሉን አፈጻጸም ወጭ የሚያከብድ አዲስ ህግ መውጣት ከአቅም በላይ የሆነ ምክንያት ተደርጐ እንደማይቆጠር በፍትሀብሄር ህግ አንቀጽ 1794 ላይ ተደንግጓል፡፡በፒፒኤ 2011 ክሎስ 18.2 ላይም በተመሳሳይ ከአቅም በላይ የማይባሉ ምክንያቶች ዝርዝር ተቀምጧል፡፡
*በተጨማሪም በፍትሀብሄር ህግ አንቀጽ 1791(2) ላይ በተቋራጩ ላይ የውሉ አፈጻጸም ከባድ ወጭ የሚያስከትል መሆኑ ብቻ ከአቅም በላይ የሆነ ምክንያት ተደርጐ እንደማይወሰድ ተደንግጓል፡፡
➡️ከአቅም በላይ የሆነ ምክንያት መከሰቱን የማሳወቅ ሀላፊነት የማን ነው?
▶️ተቋራጩ፡-የፍትሀብሄር ህግ አንቀጽ 1797 ተቋራጩ የማሳወቅ ግዴታ እንዳለበት የሚያስገነዝብ ነው፡፡
*በተጨማሪም በፒፒኤ 2001 ጀኔራል ኮንዲሽን በተጠቀሙ ውሎች ክሎስ 18.5 ላይ ተቋራጩ በ14 ቀናት ውስጥ ለአሰሪው የተከሰተውን ከአቅም በላይ የሆነ ነገር ማሳወቅ እንዳለበት ይደነግጋል፡፡
*የተከሰተውን ነገር ባህሪ እና መነሻ ምክንያቱን ጠቅሶ ማለት ነው፡፡
*ችግሩ ሲፈታም ተቋራጩ የማሳወቅ ግዴታ ተጥሎበታል፡፡
▶️መሀንዲሱ፡-የፕሮጀክቱ መሀንዲስ ስራ ለተወሰነ ጊዜ እንዲቆም/suspension/ ተቋራጩን ለማዘዝ እንደሚችል ፒፒኤ 2011 ክሎስ 20.1 ላይ ተቀምጧል፡፡
➡️ከአቅም በላይ የሆነ ምክንያት መከሰቱን የማስረዳት ሸክሙ የማን ነው?
*በፍትሀብሄር ህግ አንቀጽ 1791(2) ላይ እንደተደነገገው ተቋራጩ እንደውሉ ያልፈጸመበትን በቂ ምክንያት የማስረዳት ግዴታ አለበት፡፡
*ካለበለዚያ ተቋራጩ የጉዳት ኪሳራ የመክፈል ሀላፊነት ይኖርበታል በተቋራጩ የሚቀርበውም ምክንያት ከአቅም በላይ የሆነ ምክንያ መሆኑ ሊረጋገጥለት ይገባል፡፡
*ስለዚህ የማስረዳት ሸክሙ የተቋራጩ ይሆናል ማለት ነው፡፡
➡️ሌላው ተቋራጩ ከአቅም በላይ የሆነው ነገር የሚያስከትለውን ጉዳት የመቀነስ ግዴታ አለበት እንዲሁም ተቋራጩ በውስን መዘግየት/minimum delay/ ግዴታውን መወጣት ይኖርበታል በዚህ ረገድ ፒፒኤ 2011 ክሎስ 18.4 ግልጽ ግዴታ አስቀምጧል፡፡
➡️ከአቅም በላይ የሆነ ምክንያት ተከስቷል ከተባለ ምን ውጤት ይኖረዋል?
*የውል መሻሻል፡-እንግዲህ በፍትሀብሄር ህግ አንቀጽ 3286 ላይ በተለይ ተቋራጩ በውሉ አግባብ በሚፈጽምበት ጊዜ ታይቶ የማይታወቅ እክል ያጋጠመው እንደሆነ እና ይሄውም ውሉ ሲደረግም ያልታሰበ ነገር የሆነ እንደሆነ ውሉ እንዲሻሻል ለመጠየቅ እንደሚችል ይደነግጋል፡፡
*የፍትሀብሄር ህግ አንቀጽ 3189(3) ላይም ከአቅም በላይ የሆነው ምክንያት በቀረ ጊዜ ውሉ በስምምነት ሊሻሻል እንደሚችል እና ስምምነት ላይ መድረስ ካልተቻለ ግን ውሉ በፍርድ ቤት ሊፈርስ እንደሚችል ተደንግጓል፡፡
*የውል መሰረዝ፡-የፍትሀብሄር ህግ አንቀጽ 3286(2) ውል ሊሰረዝ እንደሚችል ይደነግጋል፡፡
*ወጭ/ኪሳራ፡-አሰሪው/የግንባታው ባለቤት ከአቅም በላይ የሆነው ምክንያት ያስከተለውን ተጨማሪ ወጭ በከፊል እንደሚችል የፍትሀብሄር ህግ አንቀጽ 3286(2) እና 3132 ይደነግጋል፡፡
*ምክንያቱም ከአቅም በላይ የሆነው ምክንያት የውሉን ሚዛናዊነት ሊያናውጠው ስለሚችል ነው፡፡
*ሆኖም ተቋራጩ ትርፍ በመቀነሱ/በማጣቱ ብቻ ኪሳራ መጠየቅ እንደማይችል በፍትሀብሄር ህግ አንቀጽ 3187 ላይ በግልጽ ተቀምጧል፡፡
*በዚህ ረገድ በገኔራል ኮንዲሽኖች ላይ ልዩ ቅድመ ሁኔታ ሊኖር ይችላል ለምሳሌ በፒፒኤ 2011 ክሎስ 20.3 ላይ ተቋራጩ የስራ ማቆም ትእዛዝ/suspension order/ በደረሰው በ30(ሰላሳ) ቀናት ውስጥ በዚሁ ምክንያት የሚደርስበትን ጉዳት/ተጨማሪ ወጭ የመጠየቅ ሀሳብ እንዳለው ካላሳወቀ ለመጠየቅ እንደማይችል ይገልጻል::
*እዚህ ላይ እንደየ ውሉ ስለሚለያይ ስፔሻል ኮንዲሽኖችንም ጭምር አብሮ ማየት ያስፈልጋል፡፡
**የጊዜ ማራዘሚያ/Time extension/:-በፒፒኤ 2011 ጀኔራል ኮንዲሽን ክሎስ 18.6 ላይ ተቋራጩ ከአቅም በላይ በሆነው ምክንያት የግንባታ ስራ ማከናወን ያልቻለበትን ያህል የጊዜ ማራዘሚያ ሊደረግበት እንደሚገባ ተቀምጧል፡፡
➡️በአጠቃላይ የኮንስትራክሽን ኢንዱስትሪው ሰፊ የሰው ሀይል የሚይዝ እንደመሆኑ እና ከፍተኛ ገንዘብ የሚንቀሳቀስበት እንደመሆኑ ሁኔታው ውስብስብ ጫና እንደሚኖረው አጠያያቂ አይሆንም፡፡ስለዚህ የኮንስትራክሽን ውሎችን፣ጀኔራል እና ስፔሻል ኮንዲሽኖችን በጥንቃቄ በመመርመር፣የህግ ድንጋጌዎችን በመፈተሽ እና ተጨባጭ ሁኔታውን በመረዳት በኮንስትራክሽን ውሎች ተሳታፊ የሆኑ አካላት ተቋራጭ፣አሰሪ እና አማካሪዎች በመመካከር ችግሩ የሚያመጣውን ጉዳት መቀነስ እና በጋራ በስምምነት ችግሩን ተግባብተው ማሳለፋቸው የተሻለ ነው፡፡
*የኮንስትራክሽን ሚኒስቴር መስሪያቤት እና የክልል ኮንስትራክሽን ቢሮዎችም አጋዥ ሆነው መንቀሳቀስ ይኖርባቸዋል።

@etconp
The structural frame is designed to continuously the vertical gravitational loads (self -weight , masonry walls, floor coverings, cars , furniture, people etc) and , not in a continuous but in a periodical basis , the wind and snow actions. Moreover it must always bear the “self- induced” loadings caused by temperature changes etc ....

A part from the usual loads , in earthquake prone regions, the structural frame must have enough strength surplus distributed in such a way so that in the critical moment of earthquake, to be able to respond successfully, retaining the building intact .

Telegram:- @etconp

Instagram:- https://instagram.com/etconp?igshid=1lyiqt063f32f
👉የደጃች አምዴ አበራ ካሣ ታሪካዊ መኖሪያ ቤት የእድሳት አፈጻጸም 70% ደርሷል!

🚧ከዓመት በፊት የፌደራል ቤቶች ኮርፖሬሽን የደጃች አምዴ አበራ ካሣ ታሪካዊ መኖሪያ ቤት 'በቅርስነት ስለመመዝገቡ ምንም ዓይነት መረጃ የለኝም' በሚል በከፊል በማፍረሱ ቅርሱ ላይ ጉዳት ደርሶበት የነበረ ሲሆን አሁን ላይ ጥገና እየተደረገለት እንደሚገኝ ተገልጿል፡፡

🚧አሁን ላይ የእድሳት ደረጃው 70 በመቶ መጠናቀቁም ተገልጿል፡፡

🚧የደጃዝማች አምዴ አበራ ካሳ መኖሪያ ቤት በቅርስነት መዝገብ ዝርዝር ውስጥ የተመዘገበና በየካ ክ/ከተማ ውስጥ በቅርስነት ከተያዙ 51 ቅርሶች መካከል አንዱ ነው፡፡

🚧ከ90 ዓመታት በላይ ያስቆጠረዉ መኖሪያ ቤቱ በቅርስነት የተመዘገበውም በ2003 እና በ2008 ዓ.ም መሆኑን ከክ/ከተማው ኮሚውኒኬሽን ቢሮ የተገኘው መረጃ ያሳያል፡፡

@etconp
Highway engineering II

MARSHAL STABILITY DETERMINES __________?
Anonymous Quiz
21%
Ductility
30%
Flexibility
9%
Utility
40%
Grade of Bitumen
👉"የሸራተን አካባቢ ፓርክ  በተለያዩ ሀገራት ከሚገኙ መዝናኛ ስፍራዎች ጋር መወዳደር በሚያስችል ዲዛይን እና ጥራት በመገንባቱ በርካታ ጎብኚ መሳብ ይችላል" - አርክቴክት ዢዬ ዢኣዎይንግ የፓርኩ ዋና ዲዛይነር

🚧ሸገርን የማስዋብ ፕሮጀክት አንድ አካል የሆነውና በሸራተን አካባቢ የተገነባው ዘመናዊ ፓርክ ሊጎበኙ ከሚገባቸው ምርጥ ስፍራዎች መካከል አንዱ መሆኑን የፓርኩ ዋና ዲዛይነር አርክቴክት ዢዬ ዢኣዎይንግ ገለጹ።

🚧የሸራተን አካባቢ ፓርክ ዋና ዲዛይነርና ቻይናዊቷ አርክቴክት ሚስ ዢዬ ለኢትዮጵያ ፕሬስ ድርጅት እንደገለጹት፤ ፓርኩ በተለያዩ ሀገራት ከሚገኙ መዝናኛ ስፍራዎች ጋር መወዳደር በሚያስችል ዲዛይን እና ጥራት በመገንባቱ በርካታ ጎብኚ መሳብ ይችላል።

🚧የመዝናኛ ስፍራው የውሃ አካላት ትርኢት እና የአበቦች ህብረ ቀለማዊ ውህድ ላይ መሰረቱን መጣሉ ደግሞ በዓለም አቀፍ ደረጃ ሊጎበኙ ከሚገባቸው ድንቅ ቦታዎች አንዱ ያደርገዋል።

🚧ፓርኩ በውስጡ የያዘው እያንዳንዷ ተፈጥሯዊ እና ሰው ሰራሽ መዝናኛዎች በጥንቃቄ እንደታነጹ የገለጹት አርክቴክት ዢዬ፤ ሰው ሰራሽ ሐይቁ ላይ የተሰሩ መድረኮች፣ በጥሩንቤ አበባ ቅርጽ የተሰራው ሰገነት እና የሙዚቃ ምትን ተከተሎ ትርኢት የሚያሳየው ውሃ የስፍራው ዋነኛ መስህቦች መሆናቸውን ተናግረዋል።

🚧የፓርኩ የወንዝ ዳር ሰው ሰራሽ ጉም እና የዘንባባ ተክል መዝናኛ ስፍራዎችም ከየትኛውም ዓለም ሊመጣ የሚችል ጎብኚን የማዝናናት አቅም እንዳላቸው ተናግረዋል።

🚧እንደ አርክቴክል ዢዬ፤ ገለጻ፤ ደረጃቸውን በጠበቁ ዲዛይን እና ጥራት የተገነቡ ፓርኮች ለነዋሪዎች የጋራ መዝናኛ ቦታን በማመቻቸት ሰዎች ህብረትን እንዲፈጥሩ ያግዛሉ።

🚧የሸገር አካባቢ ፓርክም በዚህ ረገድ ኢትዮጵያውያን ብቻ ሳይሆኑ ዓለም አቀፍ ሰዎችም ተሰባስበው አንድነታቸውን የሚያሳዩበት ቦታ እንደሚሆን ይጠበቃል።

🚧የፓርኩ ግንባታ ጽንሰ ሃሳብ መነሻ ለዜጎች ምቹ የሆነ አካባቢን መፈጠር መሆኑን የገለጹት አርክቴክል ዢዬ፤ አዲስ አበባን እንደ ስሟ አበባ ለማስመሰል የተያዘውን የኢትዮጵያ መንግስት እቅድ በሚገባ የተሳካበት ፕሮጀክት መሆኑን ተናግረዋል።

🚧ፓርኩ ከመዝናኛነት ባለፈ የዓለም አቀፍ ጎብኚዎችን በመሳብ ስለኢትዮጵያ ያላቸውን ግንዛቤ እንዲያሳድጉ የሚረዳ አገልግሎት ሊሰጥበት እንደሚገባም ገልጸዋ በተለይ ኢትዮጵያውያን የሚታወቁበት የጥዑም ቡና ምርትና አፈላል ስርዓት በዘመናዊው ፓርክ ውስጥ በሚዘጋጁ ቦታዎች በማስተዋወቅ ሰፊ የገጽታ ግንባታ ስራ ሊከናወን እንደሚገባ መልዕክት አስተላልፈዋል።

🚧የፓርኩ አጠቃላይ ገጽታ የዘመናዊ ከተሞች ህይወት ማሳያ መሆኑን የገለጹት አርክቴክት ዢዬ፤ በስፍራው ተግባራዊ የተደረጉ የቴክኖሎጂ ስራዎች እና የመናፈሻ ስነጥበብ ክንውኖች በቀጣይ በኢትዮጵያ ለሚከናወኑ ተመሳሳይ ስራዎች ልምድ ለማስተላለፍ ከፍተኛ አስተዋጽኦ እንዳላቸው አስረድተዋል።

🚧የፓርኩ ግንባታ ሙሉ በሙሉ ሲጠናቀቅ በቻይና እንደሚገኙ መናፈሻ ስፍራዎች በርካቶች የሚጎርፉበት እንደሚሆንም እምነታቸው መሆኑን ገልጸዋል።

🚧እንደ ዋና ዲዛይነሯ ገለጻ፤ የሸራተን አካባቢ ፓርክ ግንባታ በመሃል ሰንጥቆት በሚያልፈው ባንትይከቱ ወንዝ አካባቢ ተከናውኗል በአሁኑ ወቅት ከተለያዩ ተቋማት ለሚመጡ ጎብኚዎች ክፍት የሆነው ሰፊውን ቦታ የያዘው እና ከወንዙ ወዲህ ያለው ግንባታ ሲሆን፤ ወንዙን ተሻግሮ ያለው አካባቢ ደግሞ የሰርግ ስነ-ስርዓት ለማከናወን የሚያስችሉ የመናፈሻ ስራዎች እየተገቡበት ይገኛል።

🚧በዲዛይኑ መሰረት የሰርግ መናፈሻ ስፍራው 400 ሜትር የሚደርስ የዘንባባ ዛፎች የአትክልት መንገድ የሚዘረጋለት ሲሆን፤ ለዚሁ ታስበው የተዘጋጁ ዛፎችም በሳይንሳዊ መንገድ እንክብካቤ እየተደረገላቸው ይገኛል።

🚩አዲስ ዘመን ነሐሴ 26/2012
ጌትነት ተስፋማርያም

@etconp
👉ከ 2.4 ቢሊዮን ብር በላይ ወጪ የተገነባው የዲቾቶ - በልሆ መንገድ ግንባታ ፕሮጀክት ተጠናቀቀ!

🚧በኢትዮጵያ መንግስት በአፋር ክልል ከ2.4 ቢሊዮን ብር በላይ ወጪ የተገነባው 78 ኪሎ ሜትር የዲቾቶ - በልሆ መንገድ ግንባታ ፕሮጀክት መጠናቀቁን የኢትዮጵያ መንገደኞች ባለስልጣን አስታወቀ፡፡

🚧በሲሚንቶ ኮንክሪት ደረጃ የተሰራው መንገድ፤ አዲሱን የታጁራ ወደብ ለመጠቀም ከማስቻሉም በላይ በነባሩ ጅቡቲ ወደብ ይፈጠር የነበረውን የትራንስፖርት ጫና ይቀንሳል ተብሏል፡፡

🚧የሲሚንቶ ኮንክሪት መንገድ በአነስተኛ ጥገና እስከ 40 አመት አገልግሎት መስጠት የሚችል በመሆኑ ለጥገና የሚወጣውን ወጪ በእጅጉ እንደሚቀንስ ከሚኒስቴሩ የተገኘው መረጃ ያመለክታል፡፡

Via ERA

@etconp
The ideal distance between tv and couch 🛋 ( sofa )

የቴሌቭዥናችን size እና የsofa’ችን ሊኖረው የሚገባው ርቀት።

@etconp


Instagram:- https://instagram.com/etconp?igshid=g6ld2vknloea
👉'ሀይሌ ሪዞርት አዳማ' ዛሬ ተመረቀ!

🚧የሀይሌ ሆቴሎችና ሪዞርቶች ድርጅት በ500 ሚሊየን ብር በአዳማ ከተማ ያስገነባው 7ኛው የሀይሌ ሪዞርት ዛሬ መመረቁን ኤፍ ቢ ሲ ዘግቧል።

🚧ዛሬ የተመረቀው ሪዞርት ሰፋፊና ምቹ የመመገቢያና የስብሰባ አዳራሾች ጨምሮ 106 የእንግዳ ማረፊያ ክፍሎች፣ የስፖርት ማዘወትሪያ ስፍራዎች፣ የመዋኛ ገንዳዎች እና ሌሎችንም መሰረተ ልማቶችን ያካተተ መሆኑ ተገልጿል።

🚧በአዳማ የተገነባው ሰባተኛው ሪዞርት በ 500 ሚሊየን ወይም በግማሽ ቢሊየን ብር ወጪ ተገነባ መሆኑን ሀይሌ በመግለጫው ገልጿል።

🚧ሪዞርቱ በግንባታም ሆነ በአገልግሎቱ ከሌሎች ሪዞርቶች ለየት ባለ መልኩ መቅረቡን የተናገረው ሻለቃ ሀይሌ÷ ከባለ 4 እና 5 ኮኮብ ደረጃን የሚያሟሉ አገልግሎቶችን እንደሚሠጥ ገልጿል።

🚧ግንባታውን ለማጠናቀቅ ሁለት ዓመታትን የፈጀ ሲሆን በአዲሱ ዓመት እየተገነቡ ያሉ ሶስት (3) ሪዞርቶችእንደሚጠናቀቁ ከኤፍቢሲ የተገኘው መረጃ ያሳያል።

Via FBC

@etconp
👉3 MOST COMMON TYPES OF LATERAL EARTH PRESSURE

➡️On earth retaining structures such as retaining wall, sheet piles, etc

➡️the back fill retained mass of soil,exerts lateral pressure known as earth pressure.

➡️If the positions of the back fill lies above a horizontal plane at the elevation of the top of the structure, it is called surcharge.

➡️The inclination of the surcharge to the horizontal is called surcharge angle.

➡️The magnitude of the lateral earth pressure depends upon the movement of the retaining wall relative to the back fill and also upon the type of the soil.

🚧TYPES OF EARTH PRESSURE

➡️Lateral earth pressure may be one of the following 3 types.

⏺Active earth pressure
⏺Passive earth pressure
⏺Earth pressure at rest

🚩1. ACTIVE EARTH PRESSURE

▶️Due to excessive pressure of the retained soil, the retaining wall tends to move away from the back fill.

▶️Consequently a certain portion of the back fill located immediately behind the retaining wall, gets separated from the rest of the soil mass and hence the earth pressure on the retaining wall decreases.

▶️The wedged shaped portion of the back fill tending to move with the wall, is called the failure wedge.

▶️The retaining wall is kept in equilibrium by resisting force developed due to shear strength of the soil along the plane of the failure wedge in a direction away from the retaining wall.

▶️There is a limit within which the retaining wall may move from the back fill, thereby limiting the pressure.

▶️The minimum pressure exerted by the soil on the retaining wall, is called Active Earth Pressure.

🚩2. PASSIVE EARTH PRESSURE

▶️Whenever the retaining wall moves towards the back fill due to any natural cause, the earth pressure increases because the retaining soil gets compressed and the resulting shearing strength develops along the plane of the failure wedge in direction towards the retaining wall.

▶️The pressure reaches a maximum limit when the shearing resistance of the soil has been fully mobilized.

▶️The maximum earth pressure due to maximum shear stress on the retaining wall is called Passive Earth Pressure.

🚩3. EARTH PRESSURE AT REST

▶️We know that active earth pressure is accompanied by the movement of the retaining wall away from the back fill and passive earth pressure is accompanied by the movement of the retaining wall towards the back fill.

▶️Thus, there occurs an intermediate situation when the retaining wall does not move due to earth pressure but remains perfectly stationary.

▶️The pressure which develops due to back fill at zero movement is called Earth Pressure at Rest.

▶️Its value is higher than limiting active pressure but less than the passive pressure.

#GeotechnicalEngineering

@etconp
❤1
Ethio Construction Engineering
Pick up the correct statement from the following :
Pick up the correct statement from the following:

1️⃣. The bent up bars at the support
resist negative bending moment
2️⃣. The bent up bars at a support
resists the shearing force
3️⃣. The bending of bars near supports
is generally at 45⁰
4️⃣. All of the above

Telegram:- @etconp

Instagram:- https://instagram.com/etconp?igshid=1c84yk0vnhmbk
👉WHAT IS FLAT SLAB

➡️Slab directly supported on columns( without beams or beams only at the perimeter of the building) are called Flat slabs or flat plates.

🚧What is the Difference between flat slab and flat plate?

➡️Flat slab is one with either drop panel or column capital (or both at the same time) that helps reduce shear stress on the column slab junction.

➡️On the other hand flat plates are slabs systems with the slab connected to the column directly.

➡️Flat slabs can bridge larger spans when compared to flat plates Due to shear demand and deflection requirement the span flat plates can bridge is very small According to MacGregor and whites book mechanics and design of reinforced concrete Structures, flat plates are most economical for spans from 4.5 to 6 m and flat slabs are used for spans of 6 to 9 m.

➡️Flat slab or plates can be analyzed using several methods of structural analysis Some of these methods are:

⏺DDM(direct design method)

⏺EFM(equivalent frame method)

⏺FEM(finite element method)

⏺Grillage method

⏺Yeild line method

⏺Strip method of analysis.

#Slab

@etconp
👉የ ኢትዮጵያ አየር መንገድ አዲሱ የመንገደኞች ማስተናገጃ ተርሚናል የተጠቃሚውን ደህንነትና ምቾት በጠበቀ እና ዘመናዊ በሆነ ቴክኖሎጂ ግንባታው ተጠናቆ አገልግሎት ለመስጠት ዝግጁ ሆኗል።

@etconp
👍1
👉ከ300 ሚሊዮን ኩንታል በላይ የሲሚንቶ ምርት ከውጭ ሊገባ ነው!

🚧በኢትዮጵያ የተከሰተውን የሲሚንቶ እጥረት ችግር ለመፍታት 320 ሚሊዮን ኩንታል የሲሚንቶ ምርት ከውጭ ሊያስገባ መሆኑን የንድግና ኢንዱስትሪ ሚኒስቴር አስታውቋል።

🚧በዘርፉ የህገ-ወጥ ነጋዴዎችና ደላሎች መበራከት ለሲሚንቶ ምርት እጥረት አንዱ ምክንያት መሆኑን የገለጹት የንግድና ኢንዱስትሪ ሚኒስቴር የኮሙንኬሽን ዳይሬክተር አቶ ወንድሙ ፍላቴ ችግሩን በዘላቂነት ለመፍታትም "የሲሚንቶ አቅርቦት ግብይትና ስርጭት መመሪያ " ተዘጋጅቶ ወደ ስራ መገባቱን አስታውቀዋል፡፡

🚧የተዘጋጀው መመሪያ የሲሚንቶ ፋብሪካ አምራቾች አሁን እያመረቱ ካሉት ከአቅማቸው ከ50 በመቶ በታች ወደ 85 በመቶ ከፍ እንዲያደረጉ የሚያስገድድ ነው።

🚧በመመሪያው መሰረት ከውጭ የሚገባው የሲሚንቶ ምርት መጠን ከ3 ሺህ ቶን በላይ መሆን ያለበት ሲሆን ከተመረተም 3 ወራት ያልበለጠው መሆን ይኖርበታል ተብሏል።

Via Fidel Post

@etconp
👉Specific Gravity of Fine Aggregate Test

➡️Fine aggregate is used in many fields in sites for many purposes.

⏺So the determination of specific gravity of fine aggregate is very essential.

➡️Specific gravity of fine aggregate can be defined as the ratio of the weight of given volume of coarse aggregate to the weight of given volume of distilled water.

🚧Apparatus for determination of specific gravity of fine aggregate

📌Pycnometer Balance weight

🚧Procedure for the determination of specific gravity of fine aggregate

▶️Clean the pycnometer, dry it, Find the weight of the pycnometer.

▶️Take about 200gm of coarse aggregate sample in the pycnometer.

▶️Weight the pycnometer, Note the weight W2Fill the remaining part of pycnometer with distilled water and weight W3 Empty the pycnometer and clean it and fill it with distilled water.
Note the weight W4

➡️Calculations

▶️Empty weight of pycnometer =   W1 Weight of pcynometer + sample= W2 Weight of pycnomete+ sample+water = W3 Weight of pycnometer + water =   W4

⏹The specific gravity of fine aggregate (G) = W2-W1 / (W2-W1) – (W3-W4)

#ConcreteTechnology

#TestsonAggregates

@etconp