Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
▶️Flexural Strength vs Tensile Strength
.
👉Flexural Strength is the capacity of the concrete
(usually beams) to resist deformation under
bending moment. It is sometimes called Bending
Strength.
.
👉Tensile Strength is the capacity of concrete to resist
tension/stretched tight.
The similarity is that, by definition - They are both
concrete’s capacity in resisting deformation under
loads. But the loads to which they are resisting
are different.
Multi-modal bridge Design

For this example of multimodal bridge highway traffic travels on the upper level , while the lower level features high speed rail and light rail transit along with pedestrian and bike lanes

What do you think ?

እንዲህ አይነት ድልድይ ጠቀሜታው ብዙ ነው ከላይ የተሽከርካሪ ፍሰት ያለው ከስር ለ እግረኛ እና ለቀላል ባቡር መተላለፊያ ይሆናል

ምን ታስባላችሁ ?

@etconp

Facebook:-https://www.facebook.com/etconp/
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉ስለ የ joint ዓይነቶች አብረን እንይ
፡
▶️An expansion joint or movement joint is an
assembly designed to safely absorb the heat-
induced expansion and contraction of construction
materials, to absorb vibration, to hold parts
together, or to allow movement due to ground
settlement or earthquakes. They are commonly
found between sections of buildings, bridges ,
sidewalks, railway tracks, piping systems, ships,
and other structures.
Building faces, concrete slabs, and pipelines
expand and contract due to warming and cooling
from seasonal variation, or due to other heat
sources. Before expansion joint gaps were built into
these structures, they would crack under the stress
induced.
.
▶️Control joints, or contraction joints, are sometimes
confused with expansion joints, but are completely
different in purpose and function. Control joints are
cut into pavement at regular intervals to control
cracking. Concrete and asphalt have relatively
weak tensile strength, and typically form cracks as
they age, shrink, and are exposed to environmental
stresses (including stresses of thermal expansion
and contraction). Without the control joint, cracking
can occur in a random fashion, and compromise
the surface of the structure. This is primarily an
aesthetic issue. Control joints attenuate the
cracking in a more controlled fashion. The cracks
will tend to form along the cut planes that makes
up the control joints.
.
▶️A construction joint occurs when there are multiple
concrete placements. It can occur between different
days of concrete placements as shown below.
There is a construction joint between the placement
of a footing and the placement of the column.

@etconp

Facebook:- https://www.facebook.com/etconp/
👍1
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉ስለ STAIRS ትንሽ ጠቃሚ ሃሳብ እንማማር 👇
.
▶️Calculations for the construction of stairs, ramps and guards are set out in various national building regulations. The guidelines here are based on German standards.
.
▶️Dwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio. Stairs governed by building regulations must have a width of 1.00m and a ratio of 17/28. In high rise flats they must be 1.25 m wide . The length of stair runs from 23 steps up to,,; 18 steps --> @. Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m). Doors opening into the stairwell must not restrict the effective width.

▶️The time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent. A staircase at a side entrance or emergency stairs should make a rapid descent easy.
.
▶️The experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps. Climbing stairs takes on average seven times as much energy as walking on the flat. From the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30° and a ratio of rise of: rise of step/going of step; r/g= 17/29.
.
▶️The angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied:
2r+ g= 63cm (1 stride)
.
▶️In the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
.
▶️Not only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable. However, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly. Every main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.

Source: Neufert,Architect's data

@etconp
❤1👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
What is the reason for this give valid reason? Use discussion group

@etconp
Forwarded from Ethio Construction Engineering (Haroun Maju)
ASTU research guide.docx
19.2 KB
▶️ሪሰርች ስትሰሩ ኣጋዥ ነው ተጠቀሙበት፡፡

@etconp
❤1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 ARCHITECTURAL@ETCONP.dwg
13.2 MB
Architectural drawing for holistic project you can see the pervious drawing(original one) and modified one

Prepared by:- AUTOCAD 2007

@etconp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Structural design etabs@etconp.EDB
110.2 KB
Structural design for holistic project . This design file is automated

Prepared by :- ETABS 2017

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 STRUCTURAL @ETCONP.dwg
4.5 MB
Structural drawings for holistic project

Prepared by :- 2007 autocad

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
3D

Prepared by sketch up 2016

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
3D

Prepared by sketch up 2016

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
boq final draft Holistic cost analysis .pdf
368.3 KB
Final BOQ draft for holistic project

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
BOQ for holistic .xlsx
610.1 KB
BOQ for holistic project

Prepared by excel 2019

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Cost BOQ.xlsx
610.1 KB
Cost break down analysis

Prepared by MS excel 2019

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
holistic@etconp .mpp
928 KB
Project scheduling

Prepared by:- ms project 2019

@etconp