๐Ÿ‘‰DIFFERENCE BETWEEN PERT AND CPM @COTMp
.
โžกPERT and CPM are most commonly used methods
for project management. In this article, I will discuss the differences between PERT and CPM.
ยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐยฐ
โ–ถWHAT IS PERT?
*PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.
The activities taking place between events are not
specified.
*In PERT network, the events fall in logical
sequence. But the logic of events may be different
for different planners. Hence PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.
*In PERT network the start circle is omitted and only
the completed event is recorded. PERT helps in
identifying critical area which threatens the
completion of the work. It provides the means to
determine how resources can be transferred from
one job to another job.
::::::::::::::::::::::::::
โ–ถWHAT IS CPM?
CPM is also network comprising events and
activities. This network is activity based. The
activities are represented by arrowed lines and
events by circles. The activities are connected in
logical sequence. The time allotted to each activity
is related to cost.
โžกDIFFERENCE BETWEEN PERT AND CPM:
1. PERT is event oriented whereas CPM is activity
oriented. In simple words, in PERT network interest
is focused upon start or completion of events and
not on activities themselves.
2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in PERT network uncertainty is considered.
3. In PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However, PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.
4. In CPM duration of activity is estimated with a
fair degree of accuracy. In PERT duration of
activities are not so accurate and definite.
5. In CPM both time and cost can be controlled
during planning. Pert is basically a tool for
planning.
6. PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
แŠฅแŠ•แŠณแŠ• แˆˆ แŠขแˆฌแ‰ป แ‰ แ‹“แˆ แŠ แ‹ฐแˆจแˆณแ‰ฝแˆ
Bega Geessan
๐Ÿ‘‰The major steps involved in the process of
concreting are as follows:๐Ÿ‘‡
1. Batching
2. Mixing
3. Transporting and placing of concrete
4. Compacting.
.
โ–ถBatching: The process of measurement of the
different materials for the making of concrete is
known as batching. batching is usually done in two ways: volume batching and weight batching. In case of volume batching the measurement is done in the form of volume whereas in the case of weight batching it is done by the weight.
.
โ–ถMixing: In order to create good concrete the
mixing of the materials should be first done in dry
condition and after it wet condition. The two general
methods of mixing are: hand mixing and machine
mixing.
.
โ–ถTransportation and placing of concrete: Once the concrete mixture is created it must be transported to its final location. The concrete is placed on form works and should always be dropped on its final location as closely as possible.
.
โ–ถCompaction of concrete: When concrete is placed
it can have air bubbles entrapped in it which can
lead to the reduction of the strength by 30%. In
order to reduce the air bubbles the process of
compaction is performed. Compaction is generally
performed in two ways: by hand or by the use of
vibration.
๐Ÿ‘‰MIXING OF CONCRETE @COTMp
.
โ–ถHAND MIXING AND
MACHINE MIXING MIXING OF CONCRETE:
.
*After proportioning all concrete ingredients their
mixing is done. The mixing process should ensure
homogeneous mass uniform color. Segregation
should not take place during the mixing operation. Mixing is done by two following methods:
1. Hand Mixing
2. Machine Mixing
.
1. HAND MIXING:
This method is adopted where the quantity of
concrete is very small or where mixing machine is
not available. Cement and sand are first of all mixed dry on a clean hard impermeable platform. Dry mixing is continued until the mixture attains uniform color.
*Now, this mix is spread on the measured stock of
coarse aggregate in required amount and these are mixed again to have uniform color. Shovels are
used for this mixing purpose.
*Make hollow in the middle of the mixed pile and add 75% of the required amount of water. Mixing is done and the remaining quantity of water is added to acquire the uniform workability. In this method of mixing, about 10% more cement is used to make good the cement lost due to possible water flowing
out of the mix and also to make good strength
characteristic to inferior result of hand mixing.
.
2. MACHINE MIXING:
On large works where concreting work is quite
large, machine mixing of concrete proves economical. Concrete produced by machine mixing is more homogeneous and can be prepared with comparatively less w/c ratio.
*The concrete mixers may either be batch type or
continuous type. Batch mixers mix and discharge
each load of materials separately, whereas
continuous mixers produce steady stream of
concrete so long as it is in operation. Latter type
mixers are not in common use. Batch type mixers
are mostly adopted. These may be rotary o non-
tiling type or tilting type.
A) ROTARY OR NON-TILTING TYPE MIXER:
This mixer has a cylindrical drum fitted with a number of inclined blades in it. It revolves about horizontal axis and has two openings. Charge is admitted in the drum through one opening and
mixed charge is discharged through the second one. This mixer is available in following capacities. (Concrete produced in a batch in liters) 140 NT, 200 NT, 280 NT, 400 NT and 800NT. (NT
indicates Non-tilting).
B) TILTING TYPE MIXER:
This mixer has conical-shaped drum which revolves about inclined axis.
*The drum is tiltable in different positions of charging, mixing, and discharging. Blades are fitted inside the drum to affect through mixing of materials. The materials are charged into the drum by loading skip. These are available in the following capacities:
100 T, 140 T, and 200 T.
In capacity figures 100, 140 200 etc. indicate
capacity in liters of one batch. The most common
size of mixer is 200 T. It is a convenient size and
permits a full bag batch of concrete of 1:2:4 ratio.
Speed of revolution/minute of mixers is 15 to 35.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
๐Ÿ‘‰แŠจแ‰ฐแˆ› แ‹“แ‹ฒ แŒแˆซแ‰ต๐Ÿ˜
.
โ–ถแ‹จแŠ“แŠ•แ‰ฐ แŠจแ‰ฐแˆ›แˆ แˆ‹แŠฉแˆแŠ•
.
๐Ÿšฉแˆแ‹‹แˆ แˆแˆธแ‰ต แ‰ฐแˆ˜แŠ’แŠ“ @COTMp
๐Ÿ‘‰ROLES OF A QUANTITY SURVEYOR @COTMp
~~~~~~~~~~~~~~~
โ–ถQuantity surveyor calculates the cost by calculating the quantity of material required for any and every activity involved in construction.
He/She is also involved:in planning and contracting related job which is
mainly involved in the construction cost calculation.
โžกThe role of a quantity surveyor are listed below:๐Ÿ‘‡
1. Estimating.
2. Cost planning.
3. Preparing, negotiating and analyzing costs for
tenders and contracts.
4. Procurement advice.
5. Preparing Bill of Quantities (BOQ).
6. Monitoring Budget.
7. Preparation of Payment Invoice and certification.
8. Assessment of variations
9. Dispute resolution.
10. Preparing feasibility studies.
11. Cost control.
12. Value engineering.
13. Advice on cost limits and budgets
14. Whole life cycle costing.
15. Valuation for insurance purposes.
16. Project management.
17. Advice on contractual disputes.
18. Preparation of final account.
19. Site visits, assessments, and projections for
future work.
20. Analysing completed work and arranging
payment to contractors.
21. Allocating upcoming work to contractors.
Besides these, quantity surveyors may choose to
specialize in a specific area of the construction
industry and focus on areas like costing advice,
property taxation, application to funding sources, maintenance of existing buildings, etc.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
๐Ÿ‘1
๐Ÿ‘‰CONSTRUCTION DELIVERY METHODS @COTMp
.
โ˜žForce Account
When the Project Owners engage themselves to
undertake the project, it is called a force account
delivery system. Often such a system is promoted if
the Project Owners believe that there is a
comparative advantage in Cost, Time and Quality
issues. Besides, when there is a lack of capacity
from the private sector to undertake very large and
technologically new projects, public companies do
undertake such projects using Force account
delivery systems.
These days this type of delivery system is often
used when projects are small and places are
remote such that reaching them is difficult and in
general they are not attractive enough to call the
attention of Bidders. Besides when projects are
spatially scattered and maintenance are to be done
for schools, colleges, health centres etc., such
cases can be applied.
โ˜žDesign Bid Build (DBB)
This is the most practiced type of delivery system
in the Construction Industry of Ethiopia since the
1987. After project owners did prepare the Basic
Planning that identifies construction project
programs, they call upon the participation of Design
and / or Supervision Consultants either by tender or
by negotiated contracts. This consultant will carry
out the design together with the necessary tender
documents which will be the bases for tendering to
select contractors. These process is called Design -
Bid - Build and hence the name for such delivery
system.
In this type of delivery system, projects are divided
into different packages interfacing to each other.
Though the design and supervision consultant will
be the prime professional on behalf of the owner
and largely the administrator of the construction
contract; the employer takes the responsibility of
coordinating the various project packages and their
respecting interfaces.
Besides, designers have not been required to
guarantee results but rather methods. That is, they
are held accountable on the basis of their superior
knowledge and sufficient competency and ability to
design with a reasonable degree of technical skills.
As a result, contracts and courts focused on
professional duty of care, not results or project
goals. Contractors are also responsible to construct
works with due care and diligence and complete
them in accordance with the contract, but they are
not held responsible for design deficiencies.
Since the 1980s, this traditional approach becomes
less popular due to the following factors:
Severe Adversarial relations between the design and
contract administration consultant and the
contractor
Fragmented contract for the project owner
Project owner responsibility for risks associated
with the design and contract administration
Non - Impartiality of the Design and Contract
Administration services
The inability of design and contract administration
consultants to cope up with new construction
technologies and constructability issues of their
designs
Severe adversarial relationships between Urban
Planners and Architects on the one hand; and
Architects and Engineers on the other hand on
building projects
The indirect contractual obligation assigned for the
Design and Contract Administration consultants
The incompatibility of consultancy fee to the
desired activities they are required to provide, etc.
The following standard forms of DBB Conditions of
Contract are known for use for such delivery
system:
FIDIC White Book for Consultancy Services (Design
and Supervision) and Red Book for Construction
Works
Standard Conditions of Contract for Construction of
Civil Works, 1994; MWUD
โ˜žDesign Build (DB) / Turnkey
Design Build or Turnkey Delivery system is a
response to problems associated to the last two
types of delivery systems. These were promoting
privatization and its business like approach to
enhance the Force Account System and reducing
fragmentation, adversarial relations and Project
Ownersโ€™ risk which are recurrent manifestations in
the DBB delivery system.
Design Build or Turnkey by principle reduces
numbers....๐Ÿ‘‡๐Ÿ‘‡
๐Ÿ‘4
of procurement processes engaged in the
fragmented process and employ only one
procurement process and a single contractor to
provide the entire Construction Implementation
Process (Design and Construction Implementations)
. In the 1970s, large firms began to offer both
design and construction services in order to provide
project owners with a single source for project
delivery. At the beginning, this delivery system was
limited to complex projects such as industrial, big
plants and big infrastructural constructions.
DB delivery system is common worldwide
specifically for Private projects. This led lead
contracting firms to form a team or consortium of
designers and specialty contractors who work
together to meet the entire demand. Such services
are initiated after the Project Owner built the project
concept during the basic planning phase and
brought to the DB Contracting Firms. The project
concept should clearly define the performance
criteria such as output, input, waste and any other
performances the employer may desire. This makes
an additional responsibility to the contractor which
is ยจfitness to purposeยจ according to the Orange
Book of Fidic. Fitness to purpose is beyond the
professional duty of care and places liability on the
contractor for any failure of the design to perform
the standards required.
Typical advantages of this system include:
reducing fragmentation and adversarial relations
between designers and constructors;
minimizing Project ownersโ€™ risk transferable due to
Designersโ€™ faults;
accountability and entire responsibility for both
design and construction which entitle the employer
to receive completed project is onto a single
contractor;
employersโ€™ responsibility to co-ordinate interfaces
between different project elements is avoided;
single point responsibility minimizes the opportunity
to claims by the contractor due to design related
issues;
coordination between design and construction
processes will also be enhanced (both in
communication for constructability as well as in
fast tracking); and
the client budget or financial requirement is defined
early enough in the development process.
For this type of delivery systems, either joint
ventures or firms with large design and construction
capabilities were able to participate.
The disadvantage of this delivery system is loss of
control, cost of tender and cost of risks.
Since limited supervisory role by the employer
representative is practiced; which is relatively
flexible and makes the employer distanced from the
whole process, the employer has little chance to
understand what is developed and entertain
variations in requirements implying loss of control.
Contractors in order to provide reasonable offer,
their tender cost is higher than in the case for DBB
delivery system. This is because they need to
carryout acceptable design for project cost offers.
Though it was not practiced often, employers who
shared costs related to tendering are informed to
get seriously considered offers. World Bank
suggested a Two staged procurement method
based first on technical merit and followed by
financial competition and not for more than six
bidders.
The increase in risk transferred onto the contractor
will be counterbalanced by the increase in contract
prices which can be taken to include these costs of
risks.
Projects carried out using DB delivery system are
often called Turnkey Projects because a single
contractor is responsible to hand over the
completed facility and let the Project owner to turn
the key and gets in. Often Turnkey projects use
Lump-Sum contract type which will be discussed in
section 4.4. The following standard forms of DB
Conditions of contract are known for use for such
delivery systems:
FIDIC Orange Book
ENAA Model Form International Contract
ICE Design & Construct Conditions of Contract
EIC Contract
AIA Contract Form A191
โ˜žFinance / Build Operate Transfer (BOT)
Build - Operate - Transfer is a form of procurement
and contract delivery system that promotes Public
Private Partnership (PPP) in which a private
company is contracted to financ
e, design, construct,
and operate for a certain period (usually 10 years)
and transfer. BOT contractors look to project
financiers for the realization of projects through
equity contributions or credits. Such provisions are
different from budgetized finances such that they
involve no or limited re โ€“ course which means the
project owner is not responsible for any liability
other than force majeure and agreed upon claim
adjustments. This obliges that projects should first
be viable for revenue generation in order to payback
its depts.
The Typical BOT contract is the process whereby a
government grants a concession to a project
development company to develop and operate what
would normally be a public sector project, for a
given period of time known as the concession
period. BOT project involves a potentially complex
contractual structure. The Operation period between
completion and transfer gives the contractor an
opportunity to verify the quality of the output of the
services and works, and train the employer
personnel on how to manage the facility afterwards.
In some BOT contracts, defect liability period will
be included in order to ensure the quality of the
facility during transfer. This is because, operators in
an attempt to save costs, may decrease operating
and maintenance expenditures towards the end of
the concession period.
This delivery system is advantageous because of
three major factors:
it minimizes ownersโ€™ scarcity of financial resources;
It devoid of considerable risks from the project
owners and lesson regulatory activities; and
the facility is well operated and transferred with free
of charge or minimum compensations to project
owners.
Such delivery system requires appropriate packaging
of projects and their definition clearly. It is
advisable to start with small projects and tries to
develop experience and expertise to make such
delivery system successful. Most BOT projects
failed because of their built up and engagement in
very large projects which is an extremely risky
business for contractors. Consortium of contractors
is used to carry out such projects. The increasing
popularity of the BOT project is largely due to a
shortage of public funding and the opinion that the
facility will be more efficiently managed by a
private entity.
The following standard forms of BOT Conditions of
Contract are known for use for such delivery
systems:
FIDIC Yellow Book
Construction / Facility Management Consultancy
Construction Management Consultancy Delivery
System is a response to problems associated with
DB and BOT where the Project Owner was not well
represented for its benefit and the problem of
fragmentation between Planning and
Implementation. As a result, construction
management consultancy firm is used to coordinate
all activities from concept inception through
acceptance of the facility. Facility management
consultancy adds operation of facility during
operation to Construction Management Consultancy.
Construction Management service in such delivery
system include the management activities related to
a construction program carried out during the Basic
Planning, Design & Construction Implementation and
its completion process that contributes for the
successful completion of projects. The main
difference of this delivery system is that, while all
the others involve only during the implementation
phase after major decisions was made during the
Basic planning phase of the construction process, it
is involved in the whole construction processes.
Construction Management Consultancy service are
particularly attractive to organizations that involve in
construction physical infrastructures such as MoE,
MoH, Real Estate Organizations, MoWRs, MoT&C,
etc. Construction Management Consultants then
represents Project Owners to carry out the following
services: Feasibility studies of Construction related services
Plan and Monitor the Triple Constraints of Project
Performances
Lead and Organize regulatory systems of the
Construction Industry.๐Ÿ‘‡๐Ÿ‘‡
๐Ÿ‘† Valuation, Quantity Surveying and Procurement and
Contract Management Services Partnering, Alliances, Outsourcing and CE & JIT (Running and Specialized Delivery System) The need for constructing quicker, cheaper and to a
higher quality of physical infrastructure by clients
and at the same time with very minimized or no
dispute questioned fragmentation of packaging,
costs related to wastes and overheads, single
staged procurement systems, involving in less
competitive and comparative advantage for services
and works and existing stakeholders relationships.
As a result,
running delivery system using Partnering and
Alliances,
specialized delivery system using Outsourcing,
fast tracking, parallel and coordinated
implementations using Concurrent Engineering and
Just in Time principles
which focuses most on management of
relationships and value adding to ensure quicker,
cheaper and quality services and products with less
disputes are recent developments. These systems
require to overcome cultural and behavioral barriers
among interest groups and control motivated
performance based management. These types of
delivery systems are often the bases behind DB,
BOT, FM\CM consultancy delivery systems but their
at most and recent developments.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
๐Ÿ‘‰TYPES OF DRAWINGS USED IN BUILDING
CONSTRUCTION @COTMp
~~~~~~~~~~~~~~~~
โฉDrawings are the most important things we need to start any construction project. There are different
types of drawings for different purposes. In this
article, we will discuss different types of
construction drawings (also known as working
drawing).
*Construction drawings provide detail measurements and clear section of every building parts.
After reviewing, the drawings are justified and modified and finally approved for construction. *The different types of construction drawings are listed below.๐Ÿ‘‡
.
1 ARCHITECTURAL DRAWING: This type of drawing provides complete view of a building. It demonstrates the location of building and all building parts where they will be placed.
*There are different types of architectural drawings
with different names such as plan, elevation, section
etc.
.
2 STRUCTURAL DRAWING:
As the name suggests, this type of drawing provides information about structure, like strength of
different structural elements, structural materials, grade, size and placement of reinforcement etc.
.
3 ELECTRICAL DRAWING:
This type of drawings provide the details and
location of electrical wiring, fixtures, substation
etc. The electrical load calculation is also given in
the drawing.
.
4 PLUMBING AND SANITARY DRAWINGS:
These drawings give the location of sanitary, piping
for water supply system, fixture, and the process to
connect every fixture etc.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
๐Ÿ‘2
๐Ÿ‘‰แ‹แ‰ขแ‰ตแ‹‹ แ‹ตแˆฌแ‹ฐแ‹‹๐Ÿ˜
.
โœŒแ‹จแŠ“แŠ•แ‰ฐ แŠจแ‰ฐแˆ›แˆ แˆ‹แŠฉแˆแŠ•
.
๐ŸšฉแˆธแŒ‹ แˆแˆฝแ‰ต แˆˆแŠ“แŠ•แ‰ฐ แ‹ญแˆแŠ• @COTMp
แˆตแˆˆแАแ‹šแˆ… แˆ•แŠ•แƒแ‹Žแ‰ฝ แˆแŠ• แ‰ตแˆ‹แˆ‹แ‰ฝแˆ?
แˆ˜แ‰ณแ‹จแ‰ต แ‹ซแˆˆแ‰ฃแ‰ธแ‹ แŠ แˆชแ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆพแ‹Žแ‰ฝ
1. Megastructures
2. Impossible builds
3.Building Giants
4. Living big in tiny house

YouTube แˆ‹แ‹ญ แ‰ณแŒˆแŠ™แ‰ณแˆ‹แ‰ฝแˆ
๐Ÿ‘1
แ‹ญแˆ… แ‹จแˆแ‰ตแˆ˜แˆˆแŠจแ‰ฑแ‰ต Dubai mall แ‹ญแ‰ฃแˆ‹แˆ แ‹จแŠ แˆˆแˆ›แ‰ฝแŠ• แˆฐแŠแ‹‰ แŠฅแŠ“ แ‰ตแˆŒแ‰ แˆ…แŠ•แƒ แАแ‹‰แข
Structural failures due to shear,buckling,and compression
https://www.ethiotelecom.et/ev-civil-works/....