Assembling tower crane

Tower crane ሲገጣጠም ተመልከቱ

@etconp
👉Helmet Color Code @COTMp
.
➡በኮንስትራክሽን ሳይት ላይ የሰራተኛ ደህንነት(safety) ቅድሚያ የሚወሰድጉዳይ ነው።
ደህንነት መጠበቂያ አንዱ እና ዋነኛው በራስ ላይ የሚደረግ ቆብ
(Helmet) ይገኝበታል።
⏩የደህንነት መከላከያ ቆብ (Helmet) እንደየ የስራ ድርሻ እና
ሀላፊነታችን በቀለም ይከፋፈላል።
እያንዳነዱን ሰው በስራ ሀላፊነት ለመለየት ይጠቅማል።👇
***
⏩Helmet Color Code
*
▶White: Managers, Engineers, Supervisors and
Foremen
*
▶Blue: Electricians, Carpenters and other technical operators apart from civil workers
*
▶Green: Safety Officers
*
▶Red: Fire Fighters
*
▶Yellow: Laborers
*
▶ Brown: Welders and workers with high heat
application
*
▶Grey: Site Visitors
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
❤1
👉What is Liquidated damage? @COTMp
.
➡ስራ ተቌራጩ ለወሰደው ውል በግዜ ላለመጨረሱ ለባለቤት
ወይም ለውል ሰጪው አካል የሚከፍለው የካሳ ክፍያ ሲሆን∷
የጠቅላላ ኮንስትራክሽን ውል ይህ ሳይሆን ሲቀር ከዚህ በታች
በተጠቀሰው ቅጣት መሰረት ስራ ተቌራጩ መቅጣት እነደሚቻል
ይጠቅሳል።
1. ቅጣቱ 0.1 ፐርሰንት ወይም የጠቅላላ ፕሮጀክቱን አንድ አንድ
ሺኛ (1/1000) ላልፈፀመው ስራ ቀናት በየቀኑ ሊቀጣ ይገባል።
2. ነገር ግን ስራ ተቌራጩ በጠቅላላው ሊቀጣ የሚችለው
የፕሮጀክቱን አስር 10% (አስር ፐርሰንት). ሊበልጥ አይገባም።

⏩"Liquidated damages" means the compensation
stated in the contract as being payable by Contractor to the Public Body for failure to perform
the contract or part thereof within the periods under
the contract, or as payable by Contractor to the Public Body for any specific breach identified in the contract;
(a) A penalty of 0.1% or 1/1000 of the value of
undelivered Service for each day of delay until
actual delivery or performance,
(b) The cumulative penalty to be paid by the Contractor shall not exceed 10% of the contract price.
.
🚩ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
❤1
👉ስለ ክርስቲ @COTMp
.
👆ይህ ከላይ በምስሉ ላይ የሚታየው ክርስቲ ይባላል - ቢሙ ካስት ሲደረግ በዋነኝነት የቢሙን ሎድ የሚሸከም በአራት አጠናዎች የተዋቀረ ነው፡፡
‹ ዋ › ፊደልን ይመስላል፡፡
.
ቢም ካስት ከማድረጋችን በፊት የምንከተላቸውን እስቴፖች
ቀጥለን እንመለከታለን፡፡
.
1. በመጀመሪያ ጎማ ውሃ ልክ አዙረን ቢሙ የሚያርፍበትን ቦታ
already ካስት የተደረጉ ኮለኖች ላይ ምልክት እናደርጋለን፡፡
.
2. በኮለኖች መሃል ምልክት የተደረገባቸውን ቦታዎች በሲባጎ
እናገናኛለን - ሲባጎው የሚያርፍበት ቦታ የቢሙ ስር ወይም ቂጥ ነው
.
3. በሁለት ኮለኖች መሃል - ኮለኖቹ ጥግ ላይ ሁለት ክርስቲ
አቁመን ወገባቸውን እናሲዛለን
.
4. በሁለት ኮለኖች መሃል የሚያስፈልገውን ያህል ክርስቲ
እንደረድርና በዳርኞቹ ክርስቲዎች ውስጥ ሁለት ማገሮች እናስገባለን፡፡ በመቀጠልም መሃል ላይ ያሉትን ወይም ወገባቸውን
ያልያዙትን ክርስቲዎች ከማገሩ ውጪ በማድረግ ወገባቸውን
በሚስማር እናሲዛለን
.
5. ክርስቲዎቹ አናት ላይ በሁለቱም በኩል ማገር እንመታለን
.
6. ሌላ ትይዩ ቢም ካለ ከእስቴፕ 1-5 ያለውን እንሰራለትና
ከዚኛው የክርስቲ ግሩፖች ጋር በማገር እናያይዛቸዋለን
.
7. በተወሰነ ርቀት ላይ ስላቡ የሚያርፍበትን ቋሚዎች እናቆማለን
.
8. ለውሃ ልክ የዘረጋነው ሲባጎና የክርስቲው አናት ልክ ከመጣልን
እንደዛው እንተወዋለን - ልክ ካልመጣ ግን ‹ ኩኞ › በክርስቲውና
በሲባጎው (ፎንዶው ስር) መሃል እናስገባለን
.
9. ፎንዶውን የቢሙን alignment ጠብቀን እናስቀምጣለን
.
10. ስፖንዳ እንመታለን - እስፖንዳውን በአጠና እንደግፈዋለን
.
11. የቢሙን reinforcement አስገብተን ቢሙን ካስት
እናደርጋለን
.
--ኩኞ -ቁርጥራጭ አጠና
-ፎንዶ - ቀጥታ ከቢሙ ስር የሚያርፍ ተሸካሚ ፎርም ዎርክ
-እስፖንዳ - ቢሙን ከጎን የሚይዝልን ፎርም ዎርክ
.
Join for more updates via the link below;
t.me/COTMp
Structural Analysis
Is the process of identitying the structural member performance( like shear force, bending moment, torsional moment, deflection....) under the applied load. Structural analysis carried out by idealizing the members geometric and behaviours of the structural system. Idealization of behaviour of structure can be classified based on EBCS as
1. Linearly elastic analysis
2. Linearly elastic with moment redistribution
3. Plastic analysis
4. Non linear analysis
.
Ye aratunm detail information bemiketlew enakerblachihualen eskeza le lehulum endiders le guadegnochachihu share adrgulin.
👇👇👇👇👇👇👇👇👇
t.me/COTMp
☝☝☝☝☝☝☝☝☝☝
let's Safe & Develop the construction Industry!
.
t.me/etconp

https://www.facebook.com/etconp/
Ethio Construction Engineering
Structural Analysis Is the process of identitying the structural member performance( like shear force, bending moment, torsional moment, deflection....) under the applied load. Structural analysis carried out by idealizing the members geometric and behaviours…
.....con't
1. Linearly plastic analysis is based on Robert Hooks law which states zat zer is a linear relationship between stress and strain of a material. Modules of elasticity is equal to stress divided by strain.
2. Linear elastic analysis with moment redistribution states zat X-section can't yield simply by implying z maximum moment but zey distribute z moment beyond z first yield or after first plastic hinge formation towards less loaded x-sections.
3. Plastic analysis is based on z plastic stage of moment or it is similar with zat of linear elastic analysis but zis is after a formation of plastic hinge. In indeterminate structures zer will be more zan two plastic hinge zat can form collapse mechanism.
4. Non linear analysis can be categorized as geometric non linearity and material non linearity.
4.1 geometric non linearity is a property which is related to deformation of material with load. E.g
p - delta effect or second order effect
4.2 material non linearity is due to non uniform or non linear relationship of stress and strain of material
.
What is Plastic hing?

Ans.. Plastic hinge is a yielded zone which is yielded by an application of higher stress beyond its elastic limit( after first yielding)
.
.
Join us
👇👇👇👇👇👇👇👇👇
t.me/COTMp
☝☝☝☝☝☝☝☝☝☝

https://www.facebook.com/etconp/
Check out our digital library link below

Digital library’ኣችንን ለመጎብኘት እታች ያለውን link ይጫኑ

@ETCONpDigitalLibrary_Bot
👉ADMIXTURES @COTMp
~~~~~~~~~~~~~~~~~
➡Admixtures are the special ingredients added during concrete mixing to enhance the properties and performance of fresh concrete. Various types of
admixtures are available in the market which is
used in construction work.
▶FUNCTION OF ADMIXTURES:
1. To accelerate or retard the setting time of fresh
concrete.
2. To improve the workability or flow ability of concrete.
3. To increase the strength and durability of concrete.
4. To reduce the heat of hydration.
5. To reduce the segregation and bleeding.
6. To decrease the permeability.
7. To achieve other desired properties.
▶TYPES OF ADMIXTURES:
1. ACCELERATING ADMIXTURES:
This admixture is added in concrete or mortar for
increasing the rate of hydration of hydraulic cement and for shortening the setting time. Calcium
chloride (CaCl2) is the most widely used
accelerating admixture.
2. RETARDING ADMIXTURES:
Retarding admixtures delay the initial rate of
hydration of cement and extend the setting time of
cement paste. This admixture can be used in high temperature and where the concrete has to be transported to a long distance. It is also suitable for using in grouting oil wells.
3. AIR-ENTRAINING ADMIXTURES:
Air entraining admixtures help to produce a certain
amount of air bubbles in the concrete mixture. The
main goal of this admixture is to increase the resistance against freeze-thaw degradation and cohesion. It also improves the workability of fresh concrete without changing the setting or the rate of hardening.
4. WATER REDUCING ADMIXTURES:
As the name suggest, water reducers are added to a concrete mixture, mortar or grout to increase the flow ability without increasing the water content.
Advantages Of Water Reducing Admixtures:
1. The rate of concrete placement is faster.
2. Strength, durability, density etc. are significantly improved.
3. Segregation, permeability, and cracking are reduced.
SPECIAL ADMIXTURES:
1. Super plasticizing admixtures.
2. Corrosion-inhibiting admixtures.
3. Grouting admixtures.
4. Coloring admixtures etc.
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
Forwarded from Wede sera ወደ ሥራ የሬድዮ ፕሮግራም
በታሪክ በመጀመሪያነቱ የሚታወቀው የመጀመሪያው ህጋዊ ቢዝነስ የትኛው ነው?
Anonymous Quiz
17%
የሆቴል ቢዝነስ
4%
የሬስቶራንት ቢዝነስ
28%
የወይን ጠጅ ምርት
24%
የእንጨት ውጤቶች ምርት
28%
የኮንስትራክሽን ስራዎች
👉ስለ ሐመር ቴስት @COTMp
➡ሐመር ቴስት/Hammer test/ አፍራሽ ያልሆነ (Non destructive) የአርማታ ጥንካሬ ደረጃ ማወቂያ ፍተሻ ሲሆን ትክክለኛ እና ፈጣን መመርመሪያ ዘዴ ነው።
.
▶ሐመር ቴስት የሚከናወንበት መንገድ ስፕሪንግ መቆጣጠርያ
ያለውን ክብደት መለኪያ መሳርያ ከላይ በምስል እንደሚታየው
የአርማታውን ገፅ ተጭኖ በመያዝ መልሶ የሚመታበትን አሀዝ
ልኬት መዝግቦ በመያዝ ይሆናል።
.
▶የሐመር ቴስት አላማውም ከዚህ በታች የተዘረዘሩትን ያካትታል፤
1. የአርማታ የመታመቅ አቅም/compressive strength/
ለማወቅ።
2. የአርማታውን አንድ አይነትነት ወይም ወጥነት ለመገምገም።
3. የአርማታውን ክብደት የመሸከም አቅምን ከተወሰነለት ዲዛይን አንፃር ትክክል መሆኑን ለማረጋገጥ።
.
▶የሐመር ቴስት ከማሰራት በፊት ሊደረግ የሚገባ ቅድመ
ሁኔታዎች፤
1) የአርማተዉ ገፅ የለሰለሰ፣ንፁህ እና ደረቅ መሆን ይጠበቅበታል
2) ናሙና የሚወሰደው ቦታ ቢያንስ 20ሚሊ ሜትር ከጠርዝ ሊርቅ ይገበዋል።
3) ስድሰት (6) ንባብ ከእያንዳንዱ የአርማታ አካል ይወሰዳል፤
አማካይ ስሌት ተሰርቶ ጥንካሬ መለኪያ ይደረጋል።
4) አርባ አምስት(45) ቀን የሞለው አርማታ መሆን ይጠበቅበታል።
❤1
COLUMN
column is a vertical compression member zar used to transfer z loads from intermediate floors and roofs towards z foundation.
TYPES OF COLUMN
A. Based on shape of cross section
1.L shaped
2.square
3.circular
B.based on lateral load resisting system ( bracing)
1.braced column:.able to carry horizontal or lateral loading like earth quick and wind load. Zer r different bracing like K bracing, X bracing, diagonal bracing....
2.unbraced column
C.based on sensitivity of P delta effect (second order effect)
1.sway column:. Is a column which shows a significant horizontal displacement. Mostly zis type of column has no bracing system
2. Non sway column:. Is a column having a lateral load resisting system and shows no lateral displacement
D. Based on load on z column
1.axially loaded column:. Carry pure axial load. Zey r columns with out eccentricity.
2.uniaxially loaded column:. Carry an axial load having eccentricity only in one axis (either along x or y)
3.biaxially loaded column:. Carry axial load having eccentricity in both direction.
E. Based on lateral support of bar
1.tied column:are column with longitudinal or main reinforcement supported by a ties having a particular spacing.
2. Spiral column:.a column with longitudinal or main reinforcement bar supported in a manner of helical spring
F. Based on length (slenderness)
1.short column:. a column with small or less slenderness ration. E.g pedestal column
2.long or slender column:. a column with hign slenderness ration.
G. based on material composition
1. Composit column:.a column cross sections in which composed of concrete and steel. In zis case steel is incased by concrete.
2. Infilled column:.a column type when concrete is poured in steel.
.
.
.le hulum endiders le guadegnochachihu share adirgulin and join us on
👇👇👇👇👇👇👇👇👇
t.me/COTMp
☝☝☝☝☝☝☝☝☝
❤1👍1
The minimum cover to the ties or spirals should not be less than ____________?
Anonymous Quiz
35%
15 mm
29%
20 mm
31%
25 mm
6%
50 mm
Master Schedule vs Milestone Schedule

Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.

Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.

In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.

In this article, we will discuss important time management concepts and their key differences.

For better understanding, let’s take a glance at the definitions.

Master Schedule, Milestone Schedule, Project Schedule

Before to start, let’s discuss the basic terms used in time management.

Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”

∴Milestones have a fixed date but no duration.

Below are some examples of milestones in a project

‌Project Start and End
‌Start and Completion of each phase and/or discipline
‌Kick of Meeting
‌Site Handover
‌Sign of Contract


Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.

A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.

Schedules are typically created at the beginning of a project and updated and reported regularly.

Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;

‌Creating and developing the Work Breakdown Structure (WBS) of the project
‌Defining work packages and major project deliverables
‌Defining the tasks
‌Defining relationships
‌Defining and assigning resources
‌Analyzing the critical path of the project

Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.

Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.

Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.

Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.

The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.

1. Milestone Schedule

A Milestone Schedule is a summary level schedule, which identifies the major project milestones.

Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.

Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.

2. Master Schedule & Why is a Master Schedule Important?

A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.



Master Schedule is a summary level project schedule which includes the major p
roject deliverables, work breakdown structure components, and key project milestones.

A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.

Simply put, a master schedule is prepared for tracking the project at a summary level.

3. Project Schedule

A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.

The project schedule should be updated regularly in order to monitor the project’s performance.

Master Schedule vs Milestone Schedule

The detail level of a milestone schedule is lower than the detail level of a master schedule.

A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.

Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.

In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management.
@henokbirhanu

http://t.me/COTMp
👉ADMIXTURES @COTMp
~~~~~~~~~~~~~~~~~
➡Admixtures are the special ingredients added during concrete mixing to enhance the properties and performance of fresh concrete. Various types of
admixtures are available in the market which is
used in construction work.
▶FUNCTION OF ADMIXTURES:
1. To accelerate or retard the setting time of fresh
concrete.
2. To improve the workability or flow ability of concrete.
3. To increase the strength and durability of concrete.
4. To reduce the heat of hydration.
5. To reduce the segregation and bleeding.
6. To decrease the permeability.
7. To achieve other desired properties.
▶TYPES OF ADMIXTURES:
1. ACCELERATING ADMIXTURES:
This admixture is added in concrete or mortar for
increasing the rate of hydration of hydraulic cement and for shortening the setting time. Calcium
chloride (CaCl2) is the most widely used
accelerating admixture.
2. RETARDING ADMIXTURES:
Retarding admixtures delay the initial rate of
hydration of cement and extend the setting time of
cement paste. This admixture can be used in high temperature and where the concrete has to be transported to a long distance. It is also suitable for using in grouting oil wells.
3. AIR-ENTRAINING ADMIXTURES:
Air entraining admixtures help to produce a certain
amount of air bubbles in the concrete mixture. The
main goal of this admixture is to increase the resistance against freeze-thaw degradation and cohesion. It also improves the workability of fresh concrete without changing the setting or the rate of hardening.
4. WATER REDUCING ADMIXTURES:
As the name suggest, water reducers are added to a concrete mixture, mortar or grout to increase the flow ability without increasing the water content.
Advantages Of Water Reducing Admixtures:
1. The rate of concrete placement is faster.
2. Strength, durability, density etc. are significantly improved.
3. Segregation, permeability, and cracking are reduced.
SPECIAL ADMIXTURES:
1. Super plasticizing admixtures.
2. Corrosion-inhibiting admixtures.
3. Grouting admixtures.
4. Coloring admixtures etc.
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
*Stress* vs *strain*
Stress is the ratio of applied force F to a cross section area - defined as "force per unit area".
tensile stress - stress that tends to stretch or lengthen the material - acts normal to the stressed area
compressive stress - stress that tends to compress or shorten the material - acts normal to the stressed area

shearing stress - stress that tends to shear the material - acts in plane to the stressed area at right-angles to
compressive or tensile stress

Tensile or Compressive Stress - Normal Stress

Tensile or compressive stress normal to the plane is usually denoted "normal stress " or "direct stress " and can be
expressed as
σ = F n / A (1)
where
σ = normal stress (Pa (N/m 2 ), psi (lb f /in 2 ))
F n = normal force acting perpendicular to the area (N, lb f)
A = area (m 2 , in 2 )
a kip is an imperial unit of force - it equals 1000 lb f (pounds-force)
1 kip = 4448.2216 Newtons (N) = 4.4482216 kilo Newtons (kN)

A normal force acts perpendicular to area and is developed whenever external loads tends to push or pull the two segments of a body.

Example - Tensile Force acting on a Rod A force of 10 kN is acting on a circular rod with diameter 10 mm . The stress in the rod can be calculated as

σ = (10 10 3 N) / (π ((10 10 -3 m) / 2) 2 )
= 127388535 (N/m 2 )
= 127 (MPa)

Example - Force acting on a Douglas Fir Square Post A compressive load of 30000 lb is acting on short square 6 x 6 in post of Douglas fir. The dressed size of the post is 5.5 x 5.5 in and the compressive stress can be calculated as

σ = (30000 lb) / ((5.5 in) (5.5 in))
= 991 (lb/in 2 , psi)

Shear Stress
Stress parallel to a plane is usually denoted as "shear stress "and can be expressed as

τ = F p / A (2)
where
τ = shear stress (Pa (N/m 2 ), psi (lb f /in 2 ))
F p = shear force in the plane of the area (N, lb f)
A = area (m 2 , in 2 )
A shear force lies in the plane of an area and is developed when external loads tend to cause the two segments of a body to slide over one another.
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉Advance Security and
Performance Security @COTMp 👆👆👆
.
1. Advance security
*ስራ ተቋራጩ ለሚወስደው የቅድም ክፍያ ገንዘብ በሚከፈለው የገንዘብ መጠን ልክ የሚያሲዘው የባንክ ዋስትና
ቦንድ ነው።
እውነተኛነቱ በተረጋገጠ ቼክ፣ ያልተገደበ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ማስያዝ ይኖርበታል።
ስራ ተቋራጩ የወሰደውን ቅድመ ክፍያ ከፍሎ እስኪጨርስ ያስያዘው ዋስትና ግዜው ማለቅ(Expire) አይችልም።
ከአንድ ወር ቀደም ብሎ የዋስትና ቀነ ገደቡ ከማለፉ በፊት ከአማካሪ በሚፃፍለት ደብዳቤ መሰረት ሊታደስ ይገባል።
ነገር ግን ስራ ተቋራጩ ያስያዘውን ዋስትና ቀነ ገደቡ አልፎ ሳያሳድስ ቢቀር ቀሪ ያልተከፈለ ቅድመ ክፍያ ሙሉ ለሙሉ ከሚቀጥለው ክፍያ ቅፅ ላይ ተቀናሽ ይደረጋል።
ስራ ተቋራጩ ያስያዘውን ዋስትና ቅድመ ክፍያ ገንዘብ ከፍሎ እንደጨረሰ ተመላሽ ይደረግለታል።
የተለየ የቅድመ ክፍያ እና የዋስትና አከፋፈል አካሔድ ለፕሮጀክቱ የተዘጋጀው ውል/special condition of contract/ ይችላል።
2. Performance Security
*ስራ ተቋራጩ ውል ተቀብሎ ተፈፃሚ ማድረግ የሚችልበትን ለብቃት ማረጋገጫ የሚያሲዘው ዋስትና ነው።
ውል በተፈራረመ በአስራ አምስት ቀናት ውስጥ (15) ውሉ የሚያዘውን መጠን ዋስትና ያቀርባል ።
ዋስትናው ስራ ተቋራጩ በተገቢው መንገድ ውሉን ተፈፃሚ ሳያደርግ ቢቀር ለውል ሰጪ (ባለቤት) እንደ ካሳ ክፍያ ይሆናል።
እውነተኛነቱ በተረጋገጠ ቼክ፣ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ውሉ ላይ
በተቀመጠው ፎርማት መሰረት ማስያዝ ይኖርበታል።
ይህ ዋስትና ሳይቀርብ ምንም አይነት ክፍይ ተፈፃሚ ሊደረግ
አይገባም።
ስራው ተጠናቆ እስኪያልቅ ይህ ዋስተና ተገቢ እና ቀነ ገደቡ ሳያልቅ መታደስ ይጠበቅበታል። ስራው ተጠናቆ ርክክብ እንደተፈፀመ በ ሀያ ስምንት(28) ቀናት ውስጥ ለስራ ተቋራጩ ሊመለስለት ይገባል።
.