This is how you repair cracked floor

@etconp
Ethio Construction Engineering
Master Schedule vs Milestone Schedule Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work…
roject deliverables, work breakdown structure components, and key project milestones.

A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.

Simply put, a master schedule is prepared for tracking the project at a summary level.

3. Project Schedule

A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.

The project schedule should be updated regularly in order to monitor the project’s performance.

Master Schedule vs Milestone Schedule

The detail level of a milestone schedule is lower than the detail level of a master schedule.

A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.

Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.

In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management.
@henokbirhanu

http://t.me/COTMp
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉ELEMENTS OF AN ASPHALT CONCRETE
PAVEMENT @COTMp
.
➡Asphalt concrete pavements also called flexible pavements are pavements built from asphalt- concrete (asphalt, coarse aggregate, filler (optional) , and fine aggregate).
They transmit loads imposed on the surface through lateral distribution of the applied loads over depth.
.
➡The elements of an asphalt concrete pavement are:👇
.
▶Surfacing: This is the uppermost layer of the
pavement. The primary function of the surfacing is
to provide a safe and comfortable riding surface for the traffic. It is also expected to protect the layers underneath from the effects of natural elements
(wind, rain, ice etc.) as well as the disintegrating
effects from vehicles skidding and braking on the roadway. In this regard, it should be impervious so
as to waterproof the underlying layers. In higher
types of roads, it may consist of two distinct sub
layers known as a wearing course and a base
course.
.
▶ Base: this is the most important and normally the thickest layer of an asphalt concrete pavement on which the surfacing rests. It is the main load
spreading layer of the pavement. It bears the burden of distributing the applied surface loads in such a manner that the bearing Capacity of the subgrade is not exceeded. It should therefore be built from high quality materials capable of withstanding the applied loads on the surface. It consist of either: crushed stone or gravel, gravelly soils, decomposed rocks, sands or sand-clays stabilized with cement, lime or bitumen.
.
▶Sub-base: The sub-base is the secondary load
spreading layer of the pavement underlying the
base. It may or may not be present in a pavement
depending on the purpose for which it is to be
used. It helps to distribute the applied loads to the
subgrade. Its stresses are less than those of the
base. Therefore its materials can be of lower quality than those of the base but must always be stronger than those of the subgrade. It is usually coarse grained or granular to act as a drainage layer for passage of any moisture which falls during
construction or after construction to the highway drainage system.
.
▶Subgrade: this is the upper layer of the natural soil over which the pavement is being built. It may be undisturbed local material exposed by excavation or soil excavated elsewhere and placed into an embankment. It is usually compacted during
construction to give added stability.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👍2
Herewith to this post is the 3D animation video of a school project under construction in the emirate of Abudhabi, UAE in which I am involved in. The project name is " Abudhabi future school program phase 8 package 5". It is a mixed gender school for KG and cycle 1 students. As per the UAE education curriculum, cycle 1 refers to grades from 1-6. It is my second project here in the UAE and I am currently working as a civil site Engineer in this school project. I will be sharing once In a while some informative journals regarding what it looks like working on a construction project. It is a 2 years project with project completion expected to be in August 2021. I hope it will be helpful and means of encouragement for all construction enthusiasts and upcoming construction professionals.👷‍♂️✌

@etconp
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉DIFFERENCE BETWEEN PERT AND CPM @COTMp
.
➡PERT and CPM are most commonly used methods
for project management. In this article, I will discuss the differences between PERT and CPM.
°°°°°°°°°°°°°°°°°°
▶WHAT IS PERT?
*PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.
The activities taking place between events are not
specified.
*In PERT network, the events fall in logical
sequence. But the logic of events may be different
for different planners. Hence PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.
*In PERT network the start circle is omitted and only
the completed event is recorded. PERT helps in
identifying critical area which threatens the
completion of the work. It provides the means to
determine how resources can be transferred from
one job to another job.
::::::::::::::::::::::::::
▶WHAT IS CPM?
CPM is also network comprising events and
activities. This network is activity based. The
activities are represented by arrowed lines and
events by circles. The activities are connected in
logical sequence. The time allotted to each activity
is related to cost.
➡DIFFERENCE BETWEEN PERT AND CPM:
1. PERT is event oriented whereas CPM is activity
oriented. In simple words, in PERT network interest
is focused upon start or completion of events and
not on activities themselves.
2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in PERT network uncertainty is considered.
3. In PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However, PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.
4. In CPM duration of activity is estimated with a
fair degree of accuracy. In PERT duration of
activities are not so accurate and definite.
5. In CPM both time and cost can be controlled
during planning. Pert is basically a tool for
planning.
6. PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Your comment

@etconp
👉ROLES OF A QUANTITY SURVEYOR @COTMp
~~~~~~~~~~~~~~~
▶Quantity surveyor calculates the cost by calculating the quantity of material required for any and every activity involved in construction.
He/She is also involved:in planning and contracting related job which is
mainly involved in the construction cost calculation.
➡The role of a quantity surveyor are listed below:👇
1. Estimating.
2. Cost planning.
3. Preparing, negotiating and analyzing costs for
tenders and contracts.
4. Procurement advice.
5. Preparing Bill of Quantities (BOQ).
6. Monitoring Budget.
7. Preparation of Payment Invoice and certification.
8. Assessment of variations
9. Dispute resolution.
10. Preparing feasibility studies.
11. Cost control.
12. Value engineering.
13. Advice on cost limits and budgets
14. Whole life cycle costing.
15. Valuation for insurance purposes.
16. Project management.
17. Advice on contractual disputes.
18. Preparation of final account.
19. Site visits, assessments, and projections for
future work.
20. Analysing completed work and arranging
payment to contractors.
21. Allocating upcoming work to contractors.
Besides these, quantity surveyors may choose to
specialize in a specific area of the construction
industry and focus on areas like costing advice,
property taxation, application to funding sources, maintenance of existing buildings, etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
❤1
What is the name of this on-site Geotechnical Investigation?
Anonymous Quiz
25%
Cone penetration test
12%
Plate load test
49%
Standard penetration test
13%
Proctor Compaction test
This is called a standard penetration test (SPT test)

Every construction works begin with a Geotechnical and geophysical investigation. SPT test is one of the Geotechnical subsurface exploration performed on site to measure the penetration resistance of soil surface. It involves correlating the blow count( N value) to the engineering property of soil. A total of 3 layers, 45 cm penetration is performed. The first 15cm is neglected during analysis assuming it is a disturbed soil. The sum of the the remaining 2 layers, 30cm which is termed as the "N value" is used for Geotechnical analysis.

A sampler tube with outside diameter of 51cm and length of 650mm is driven into the ground and is hammered with a mass of 64kg at a free fall of 75cm. Penetration marking will be in the drilling rod to check the amount of Penetration.

The SPT test together with other subsurface soil investigations helps the Geotechnical Engineer understand the condition of the site. Using this informations, the Geotechnical engineer will propose and recommend the foundation type to be used and other technical issues.

Things to know regarding SPT test are
-SPT test alone is not useful to determine the subsurface condition of a site.
-SPT test is an approximate analysis and may not necessarily implicate the site condition.
- SPT tests can be performed at any depth.

Part of The Geotechnical report below is from our project and it clearly shows the depth vs SPT N value vs Borehole name.👷‍♂️✌

@etconp
👉TYPES OF DRAWINGS USED IN BUILDING
CONSTRUCTION @COTMp
~~~~~~~~~~~~~~~~
⏩Drawings are the most important things we need to start any construction project. There are different
types of drawings for different purposes. In this
article, we will discuss different types of
construction drawings (also known as working
drawing).
*Construction drawings provide detail measurements and clear section of every building parts.
After reviewing, the drawings are justified and modified and finally approved for construction. *The different types of construction drawings are listed below.👇
.
1 ARCHITECTURAL DRAWING: This type of drawing provides complete view of a building. It demonstrates the location of building and all building parts where they will be placed.
*There are different types of architectural drawings
with different names such as plan, elevation, section
etc.
.
2 STRUCTURAL DRAWING:
As the name suggests, this type of drawing provides information about structure, like strength of
different structural elements, structural materials, grade, size and placement of reinforcement etc.
.
3 ELECTRICAL DRAWING:
This type of drawings provide the details and
location of electrical wiring, fixtures, substation
etc. The electrical load calculation is also given in
the drawing.
.
4 PLUMBING AND SANITARY DRAWINGS:
These drawings give the location of sanitary, piping
for water supply system, fixture, and the process to
connect every fixture etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Check out our digital library link below

Digital library’ኣችንን ለመጎብኘት እታች ያለውን link ይጫኑ

@ETCONpDigitalLibrary_Bot
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉ኣሁን ደሞ Unit Weight Of Building Materials እንይ @COTMp
.
*Water- 1000 Kg/ m3
*Bricks (broken) - 1420 Kg/ m3
*Bricks(common) -1600 Kg/ m3
*Cement(ordinary)- 1440 Kg/ m3
*Cement (rapid hardening)- 1250 Kg/ m3
*Cement Mortar - 2000 Kg/ m3
*Cement Concrete (Plain) - 2400 Kg/ m3
*Cement Concrete (Reinforced) -2500 Kg/ m3
*Glass - 2500 Kg/ m3
*Lime Concrete - 1900 Kg/ m3
*Cement Plaster - 2000 Kg/ m3
*Lime Plaster - 1700 Kg/ m3
*Stones (Ballast) - 1720 Kg/ m3
*Stones (Aggregates)- 1750 Kg/ m3
*Stones (Basalt)- 2850 Kg/ m3
*Stones (Granite) - 2450 Kg/ m3
*Stones (Marble)- 2650 Kg/ m3
*Timber (Oak, Sal) - 510 Kg/ m3
*Timber (Mango) - 650 Kg/ m3
*Timber (Teak)- 625 Kg/ m3
*Coal- 600 Kg/ m3 *Plastics- 1250 Kg/ m3
*Oils- 800 Kg/ m3
*Ashes- 650 Kg/ m3
*Clinker- 750 Kg/ m3
*Rubber- 1300 Kg/ m3
*Slag- 1500 Kg/ m3
*Clay Soil- 1900 Kg/ m3
*Sand (dry) - 1540 to 1600 Kg/ m3
*Sand (wet)- 1760 to 2000 Kg/ m3
*Steel- 7850 Kg/ m3
*Chalk- 2100 Kg/ m3
*Bitumen- 1040 Kg/ m3
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉Water we used for mixing Concrete @COTMp
.
◇ water is needed for two purposes:
1. Chemical Reaction with cement
2. Workability
□ water is good for preventing plastic shirnkage
cracking and workability.
.
■ Water is bad for permeability, strength, durability.
.
● Impurities in mixing water may cause:
○ Abnormal setting time
○ decreased strength
○ Volume changes
○ Efflorescence
○ Corrosion of reinforcement
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Properties of R.C.C./✔Requirement of Good R.C.C.
1. It should be capable of resisting expected tensile, compressive, bending and shear forces.
2. It should not show excessive deflection and spoil serviceability requirement.
3. There should be proper cover to the reinforcement, so that the corrossion is prevented.
4. The hair cracks developed should be within the permissible limit.
5. It is a good fire resistant material.
6. When it is fresh, it can be moulded to any desired shape and size.
7. Durability is very good.
8. R.C.C. structure can be designed to take any load.
What is the name of these test performed on a ground surface?
Anonymous Quiz
33%
Field density test
37%
Plate load test
18%
Proctor compaction test
12%
Cone penetration test