Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ) via @like
ጥያቄ
The maximum diameter of a bar used in ribbed slab is _____?
1. 12 mm
2. 16 mm
3. 20 mm
4. 22 mm
#rebar # ribbed #slab
@etconp
The maximum diameter of a bar used in ribbed slab is _____?
1. 12 mm
2. 16 mm
3. 20 mm
4. 22 mm
#rebar # ribbed #slab
@etconp
👍2
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Combined Strap Footing@etconp.xls
2 MB
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Strap-Footing@etconp.pdf
155.3 KB
Design of Strap footing
#foundation #strap #footing
#design
ይህን ፋይል ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን እናመሰግናለን 🙏
@etconp
#foundation #strap #footing
#design
ይህን ፋይል ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን እናመሰግናለን 🙏
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12 @ETCONP.dwg
1.7 MB
-2G +G +12
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12 ARCHITECTURAL @ETCONP.dwg
2 MB
-2G +G +12 architectural drawing
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
❤1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12-@ETCONP.dwg
2.8 MB
-2G +G +12
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12@ETCONP.dwg
1.8 MB
-2G +G +12 structural drawing (beams)
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
PROJECT -2G+G+12 @ETCONP.dwg
2.4 MB
-2G +G +12
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።
የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12 SHEAR WALL RETAING WALL@ETCONP.xlsx
342.9 KB
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
SAMPLE HCB FLOOR @ETCONP.xlsx
35 KB
-2G+G+12 project
HCB and formwork for the ground floor
የዚህ xls. ፋይል format ትክክል አይደለም።
ካልኩሌሽኑ ግን ትክክለኛ ነው።
@etconp
HCB and formwork for the ground floor
የዚህ xls. ፋይል format ትክክል አይደለም።
ካልኩሌሽኑ ግን ትክክለኛ ነው።
@etconp
Forwarded from Ethio Construction Engineering (Yonathan)
Track structures
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 ARCHITECTURAL@ETCONP.dwg
13.2 MB
Architectural drawing for holistic project you can see the pervious drawing(original one) and modified one
Prepared by:- AUTOCAD 2007
@etconp
Prepared by:- AUTOCAD 2007
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Structural design etabs@etconp.EDB
110.2 KB
Structural design for holistic project . This design file is automated
Prepared by :- ETABS 2017
@etconp
Prepared by :- ETABS 2017
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 STRUCTURAL @ETCONP.dwg
4.5 MB
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)