The maximum reach of this CAT 385 long reach excavator ? 1️⃣. 32 to 40 meters depending on the work application 2️⃣. 21.5 to 32 meters depending on the work application 3️⃣. 17.5 to 21.5 meter depending on the application…
The maximum reach of this CAT 385 long reach excavator ?
Anonymous Quiz
22%
1️⃣. 32 to 40 meters depending on the work application
34%
2️⃣. 21.5 to 32 meters depending on the work application
28%
3️⃣. 17.5 to 21.5 meter depending on the application
16%
4️⃣. 17.5 meters with a three cubic
What’s the reason for this crack in concrete?
Write your answer on @cotmp
@etconp
Facebook:- https://www.facebook.com/etconp/
Write your answer on @cotmp
@etconp
Facebook:- https://www.facebook.com/etconp/
Is there any book you want us to post regarding engineering Or architecture or construction DM to @ETCONp_Bot this bot
እንዲለቀቅ የምትፈልጉት መፅሀፍ አለ ስለ ስነ ምህንድስና ወይም ስነ@ETCONp_Bot በዚህ bot ፃፉልን
@etconp
Digital library:- https://t.me/ETCONpDigitalLibrary_Bot
Facebook:- https://www.facebook.com/etconp/
እንዲለቀቅ የምትፈልጉት መፅሀፍ አለ ስለ ስነ ምህንድስና ወይም ስነ@ETCONp_Bot በዚህ bot ፃፉልን
@etconp
Digital library:- https://t.me/ETCONpDigitalLibrary_Bot
Facebook:- https://www.facebook.com/etconp/
Telegram
ETCONp Digital Library
ማሻሸያ እና አስተያየት ፃፋልን @Philemona7
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
Ethio Construction Engineering
Is there any book you want us to post regarding engineering Or architecture or construction DM to @ETCONp_Bot this bot እንዲለቀቅ የምትፈልጉት መፅሀፍ አለ ስለ ስነ ምህንድስና ወይም ስነ@ETCONp_Bot በዚህ bot ፃፉልን @etconp Digital library:- https://t.me/ETCONpDigitalLibrary_Bot…
Most of you haven’t checked the digital library we wanted you to ask books not lecture note
Our digital library:- https://t.me/ETCONpDigitalLibrary_Bot
አብዛኞቻችሁ digital libraryውን አላያችሁትም እኛ መፅሀፍ እንድትጠይቁን ነው የፈለግነው እንጂ lecture note አይደለም።
ዲጂታል ቤተመፃህፍት ከዚህ link / መስፈንጠሪያ ያግኙ እዛ ላይ ያጣችሁትን ጠይቁን
https://t.me/ETCONpDigitalLibrary_Bot
@etconp
Our digital library:- https://t.me/ETCONpDigitalLibrary_Bot
አብዛኞቻችሁ digital libraryውን አላያችሁትም እኛ መፅሀፍ እንድትጠይቁን ነው የፈለግነው እንጂ lecture note አይደለም።
ዲጂታል ቤተመፃህፍት ከዚህ link / መስፈንጠሪያ ያግኙ እዛ ላይ ያጣችሁትን ጠይቁን
https://t.me/ETCONpDigitalLibrary_Bot
@etconp
Telegram
ETCONp Digital Library
ማሻሸያ እና አስተያየት ፃፋልን @Philemona7
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
Books that are going to be posted
- Planning and Evaluation of Irrigation Projects
Authors: Raveendra Rai Vijay Singh Alka Upadhyay
- An book about phantom programming
- About Cost Analysis books
@etconp
- Planning and Evaluation of Irrigation Projects
Authors: Raveendra Rai Vijay Singh Alka Upadhyay
- An book about phantom programming
- About Cost Analysis books
@etconp
Ethio Construction Engineering
What’s the purpose of tie beam ? @etconp
Answer
-To carry axial compression
- to transfer the load to the column
- to prevent column buckling
@etconp
Facebook:- https://www.facebook.com/etconp/
-To carry axial compression
- to transfer the load to the column
- to prevent column buckling
@etconp
Facebook:- https://www.facebook.com/etconp/
Curing days required for
Super sulphate cement ?
Ordinary Portland cement (OPC) ?
Minerals and admixture added cement ?
@etconp
Facebook:- https://www.facebook.com/etconp/
Super sulphate cement ?
Ordinary Portland cement (OPC) ?
Minerals and admixture added cement ?
@etconp
Facebook:- https://www.facebook.com/etconp/
What type of drawing is this
1️⃣. Floor plan
2️⃣. Site plan
3️⃣. Roof plan
4️⃣. Foundation layout
@etconp
Facebook:- https://www.facebook.com/etconp/
1️⃣. Floor plan
2️⃣. Site plan
3️⃣. Roof plan
4️⃣. Foundation layout
@etconp
Facebook:- https://www.facebook.com/etconp/
Forwarded from ETCONp Digital Library
@ETCONp Cost Engineering.Pdf
449.9 KB
Cost Engineering @ETCONp
Forwarded from ETCONp Digital Library
@ETCONp Financial mgmt .Pdf
3.9 MB
Financial management @ETCONp
Calculate the quantity of cement , sand and brick in one meter cubic volume
Given
- Mortar ration = 6:1 = 7
- mortar thickness = 10mm=0.01m
- density of cement = 1440 kg/m³
@etconp
Facebook:- https://www.facebook.com/etconp/
Given
- Mortar ration = 6:1 = 7
- mortar thickness = 10mm=0.01m
- density of cement = 1440 kg/m³
@etconp
Facebook:- https://www.facebook.com/etconp/
👍1
Ethio Construction Engineering
Calculate the quantity of cement , sand and brick in one meter cubic volume Given - Mortar ration = 6:1 = 7 - mortar thickness = 10mm=0.01m - density of cement = 1440 kg/m³ @etconp Facebook:- https://www.facebook.com/etconp/
Solution
🧱 brick of 1 m³
- volume of brick = length X width x
thickness ( without mortar)
- volume of brick = L x W x T
- volume of brick = 0.19 x 0.09 x 0.09
- volume of brick = 0.001539 m³
With mortar
Volume of brick add 0.01m in the three dimensions
(0.19+0.01) x (0.09+0.01) x (0.09+0.01)
= 0.2m x 0.10m x 0.10m
Now let’s compute the volume @etconp
- volume of brick = L x W x T
- volume of brick = 0.2m x 0.1m x 0.1m
- volume of brick = 0.002 m³
- Number of brick 1m³ = 1/ 0.002 =
#500 of brick 🧱
➪ Volume of mortar
= 1 - ( 500x0.001539) .... Dry VOLUME
Thus; 1 is total meter cube of volume
- 500 is total number of brick 🧱
- dry volume of brick without mortar
= 1- (500x 0.001539) = 0.2305m³
☞︎ For Wet volume of mortar we Take
40% ( 10% shrinkage & 30%
wastage )
40% = 40/10 = 0.4 ; so we multiply to dry volume with 1 + 0.4 = 1.4
Wet volume
= 0.2305m³ x 1.4 = 0.3227m³
Cement of 1m³
➪ I have given you the ratio yesterday
We assumed 6:1 so it add up 7
=6+1 = 7
-Quantity of cement = 1/7 x 0.3227m³
- Quantity of cement = 0.0461m³
- 0.0461m³ x 1440kg/m³ = 66.384kg
* Weight of cement = 66.384kg
- Number of bags = 66.38kg/ 50kg
- Number of bags = 1.32 app 2 bags
Sands for 1m³
- Quantity of sand = 6/7 x 0.3227m³
- quantity of sand = 0.2766m³
• if we want to quantify it with kilogram
- the density of sand is 1442kg/m³
Mass = density x volume
Mass= 1442kg/m³ x 0.2766m³
Mass = 398.8kg app 400kg
For 1m³ volume
➪ total number of brick = 500
➪ quantity of cement = 66.38 kg (mass)
➪ quantity of sand = 400 kg (mass)
➪ quantity of cement = 0.0461m³ (volume)
➪ quantity of sand = 0.2766m³ (volume)
@etconp
Facebook:- @etconp
Facebook:- https://www.facebook.com/etconp/
🧱 brick of 1 m³
- volume of brick = length X width x
thickness ( without mortar)
- volume of brick = L x W x T
- volume of brick = 0.19 x 0.09 x 0.09
- volume of brick = 0.001539 m³
With mortar
Volume of brick add 0.01m in the three dimensions
(0.19+0.01) x (0.09+0.01) x (0.09+0.01)
= 0.2m x 0.10m x 0.10m
Now let’s compute the volume @etconp
- volume of brick = L x W x T
- volume of brick = 0.2m x 0.1m x 0.1m
- volume of brick = 0.002 m³
- Number of brick 1m³ = 1/ 0.002 =
#500 of brick 🧱
➪ Volume of mortar
= 1 - ( 500x0.001539) .... Dry VOLUME
Thus; 1 is total meter cube of volume
- 500 is total number of brick 🧱
- dry volume of brick without mortar
= 1- (500x 0.001539) = 0.2305m³
☞︎ For Wet volume of mortar we Take
40% ( 10% shrinkage & 30%
wastage )
40% = 40/10 = 0.4 ; so we multiply to dry volume with 1 + 0.4 = 1.4
Wet volume
= 0.2305m³ x 1.4 = 0.3227m³
Cement of 1m³
➪ I have given you the ratio yesterday
We assumed 6:1 so it add up 7
=6+1 = 7
-Quantity of cement = 1/7 x 0.3227m³
- Quantity of cement = 0.0461m³
- 0.0461m³ x 1440kg/m³ = 66.384kg
* Weight of cement = 66.384kg
- Number of bags = 66.38kg/ 50kg
- Number of bags = 1.32 app 2 bags
Sands for 1m³
- Quantity of sand = 6/7 x 0.3227m³
- quantity of sand = 0.2766m³
• if we want to quantify it with kilogram
- the density of sand is 1442kg/m³
Mass = density x volume
Mass= 1442kg/m³ x 0.2766m³
Mass = 398.8kg app 400kg
For 1m³ volume
➪ total number of brick = 500
➪ quantity of cement = 66.38 kg (mass)
➪ quantity of sand = 400 kg (mass)
➪ quantity of cement = 0.0461m³ (volume)
➪ quantity of sand = 0.2766m³ (volume)
@etconp
Facebook:- @etconp
Facebook:- https://www.facebook.com/etconp/
👍3
Calculate the quantity of asphalt for a road
Given that
- Length of a road (L) = 500m
- width of a road (W) = 4 m
- Asphalt Thickness (T) = 15cm
Information
- density of asphalt = 2330kg/m³
- 1 Ton =1000kg
@etconp
Facebook:- https://www.facebook.com/etconp/
Given that
- Length of a road (L) = 500m
- width of a road (W) = 4 m
- Asphalt Thickness (T) = 15cm
Information
- density of asphalt = 2330kg/m³
- 1 Ton =1000kg
@etconp
Facebook:- https://www.facebook.com/etconp/
Ethio Construction Engineering
Calculate the quantity of asphalt for a road Given that - Length of a road (L) = 500m - width of a road (W) = 4 m - Asphalt Thickness (T) = 15cm Information - density of asphalt = 2330kg/m³ - 1 Ton =1000kg @etconp Facebook:- https://www.facebook.com/etconp/
Answer
- weight of asphalt = volume x density
of asphalt
- weight of asphalt
= 500m x 0.15m x 4m = 300m³
Weight of asphalt (WA)
WA= 300m³ x 2330kg/m³
WA= 699000kg
Weight in Ton
699000kg/1000kg = 699Ton
Cost of asphalt 1 Ton of asphalt 5600 birr (recent price በቅርብ የገዛ ስለማቅ ነው)
699 ton x 5600birr = 3,914,400 birr
@etconp
Facebook:- https://www.facebook.com/etconp/
- weight of asphalt = volume x density
of asphalt
- weight of asphalt
= 500m x 0.15m x 4m = 300m³
Weight of asphalt (WA)
WA= 300m³ x 2330kg/m³
WA= 699000kg
Weight in Ton
699000kg/1000kg = 699Ton
Cost of asphalt 1 Ton of asphalt 5600 birr (recent price በቅርብ የገዛ ስለማቅ ነው)
699 ton x 5600birr = 3,914,400 birr