#soilmechanics #soil
Given 1870g (gram) of wet compacted soil into mold with volume of 1000cm³. The soil is put into oven and dried to a constant weight of 1667 gram. The specific gravity of the soil is assumed to be 2.56.
Calculate
A. Water content (Ww)
B. Dry unit weight (γdry)
C. Porosity of the soil (n)
D. Degree of saturation (S)
E. Saturated unit weight of the soil (γsaturated)
@etconp
Facebook:- https://www.Facebook.com/etconp/
Given 1870g (gram) of wet compacted soil into mold with volume of 1000cm³. The soil is put into oven and dried to a constant weight of 1667 gram. The specific gravity of the soil is assumed to be 2.56.
Calculate
A. Water content (Ww)
B. Dry unit weight (γdry)
C. Porosity of the soil (n)
D. Degree of saturation (S)
E. Saturated unit weight of the soil (γsaturated)
@etconp
Facebook:- https://www.Facebook.com/etconp/
#soil mechanics #soil
The moist unit weight of a soil is 16.5KN/m³. Given water content of soil is 15% and specific gravity (Gs) = 2.7 based on the given information find
A. Dry unit weight( γdry)
B. The porosity (n)
C. The degree of saturation (S), and
D. The mass of water in kg/m³ that must
be reach full saturation
@etconp
Facebook:- https://www.Facebook.com/etconp/
The moist unit weight of a soil is 16.5KN/m³. Given water content of soil is 15% and specific gravity (Gs) = 2.7 based on the given information find
A. Dry unit weight( γdry)
B. The porosity (n)
C. The degree of saturation (S), and
D. The mass of water in kg/m³ that must
be reach full saturation
@etconp
Facebook:- https://www.Facebook.com/etconp/
What’s the weight 16mm diameter and 12m long bar ?
@etconp
Facebook:- https://www.Facebook.com/etconp/
@etconp
Facebook:- https://www.Facebook.com/etconp/
Ethio Construction Engineering
#soil mechanics #soil The moist unit weight of a soil is 16.5KN/m³. Given water content of soil is 15% and specific gravity (Gs) = 2.7 based on the given information find A. Dry unit weight( γdry) B. The porosity (n) C. The degree of saturation (S), and…
#soilmechanics
Question and answer
Soil mechanics
@etconp
Facebook:- https://www.Facebook.com/etconp/
Question and answer
Soil mechanics
@etconp
Facebook:- https://www.Facebook.com/etconp/
The most stable cement for under water construction 🚧
Anonymous Quiz
30%
Rapid hardening cement
20%
OPC
18%
PPC
32%
Quick setting cement
Ethio Construction Engineering
The most stable cement for under water construction 🚧
What’s the difference between rapid setting cement and quick setting cement?
@etconp
Facebook:- https://www.Facebook.com/etconp/
@etconp
Facebook:- https://www.Facebook.com/etconp/
👍1
Ethio Construction Engineering
What’s the difference between rapid setting cement and quick setting cement? @etconp Facebook:- https://www.Facebook.com/etconp/
Answer
The difference between the quick setting cement and rapid hardening cement is that quick–setting cement sets earlier. At the same time, the rate of gain of strength is similar to Ordinary Portland Cement, while quick hardening cement gains strength quickly. Formworks in both cases can be removed earlier. The construction which is done by using Ordinary Portland cement generally takes 24 hours to set and hardened completely and it requires consistent curing. The OPC cement shuttering removal time is about 14 days.
In some special cases, it is not possible to keep shuttering for 14 days. Some construction required to be completed very fast. For example, Construction of roads and underwater construction, in this case Extra Rapid Hardening cement is used which will set and hardened quickly.
@etconp
Facebook:- https://www.Facebook.com/etconp/
The difference between the quick setting cement and rapid hardening cement is that quick–setting cement sets earlier. At the same time, the rate of gain of strength is similar to Ordinary Portland Cement, while quick hardening cement gains strength quickly. Formworks in both cases can be removed earlier. The construction which is done by using Ordinary Portland cement generally takes 24 hours to set and hardened completely and it requires consistent curing. The OPC cement shuttering removal time is about 14 days.
In some special cases, it is not possible to keep shuttering for 14 days. Some construction required to be completed very fast. For example, Construction of roads and underwater construction, in this case Extra Rapid Hardening cement is used which will set and hardened quickly.
@etconp
Facebook:- https://www.Facebook.com/etconp/
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Surface tension is due to
Anonymous Quiz
52%
Cohesion and adhesion
32%
Cohesion only
13%
Adhesion only
2%
None
What’s the difference between OPC and OPC ?
የ ፒፒሲ እና የ ኦፒሲ ልዩነት ምንድነው ?
@etconp
Discussion group :- @cotmp
Telegram:- https://t.me/ETCONp
Facebook:- https://www.Facebook.com/etconp/
የ ፒፒሲ እና የ ኦፒሲ ልዩነት ምንድነው ?
@etconp
Discussion group :- @cotmp
Telegram:- https://t.me/ETCONp
Facebook:- https://www.Facebook.com/etconp/
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
PLAIN‐FOOTING VOLUME OF CONCRETE | AREA OF SHUTTERING | AREA OF BITUMEN PAINT | CALCULATIONS
1. Plain‐Footing Volume Of Concrete Calculation
2. Plain‐Footing Area Of Shuttering Calculation
3. Plain‐Footing Area Of Bitumen Paint Calculation
If you try we will post the answer at lest 10 members
@etconp
Facebook:- https://www.Facebook.com/etconp/
1. Plain‐Footing Volume Of Concrete Calculation
2. Plain‐Footing Area Of Shuttering Calculation
3. Plain‐Footing Area Of Bitumen Paint Calculation
If you try we will post the answer at lest 10 members
@etconp
Facebook:- https://www.Facebook.com/etconp/
Ethio Construction Engineering
What’s the difference between OPC and OPC ? የ ፒፒሲ እና የ ኦፒሲ ልዩነት ምንድነው ? @etconp Discussion group :- @cotmp Telegram:- https://t.me/ETCONp Facebook:- https://www.Facebook.com/etconp/
Answer for the difference between OPC and PPC written in Amharic
@etconp
Facebook:- https://www.Facebook.com/etconp/
@etconp
Facebook:- https://www.Facebook.com/etconp/
Ethio Construction Engineering
What’s the difference between OPC and OPC ? የ ፒፒሲ እና የ ኦፒሲ ልዩነት ምንድነው ? @etconp Discussion group :- @cotmp Telegram:- https://t.me/ETCONp Facebook:- https://www.Facebook.com/etconp/
Answer for the difference between OPC and PPC English version
@etconp
Facebook:- https://www.Facebook.com/etconp/
@etconp
Facebook:- https://www.Facebook.com/etconp/
Why did they color the reinforcement bar frem color ?
@etconp
Discuss at :- https://t.me/COTMp
Facebook:- https://www.Facebook.com/etconp/
@etconp
Discuss at :- https://t.me/COTMp
Facebook:- https://www.Facebook.com/etconp/
👍1
Beams
* transfer loads perpendicularly to its
length
Types of beams
- simple beam
- continuous beam
- cantilever beam
- lintel (በር እና መስኮት ላይ ለopening)
- girder (የ ድልድይ )
- joist (የ ጣውላ)
- Truss and purlin ( ለጣሪያ ስራ elements of roof)
@etconp
Facebook:- https://www.Facebook.com/etconp/
* transfer loads perpendicularly to its
length
Types of beams
- simple beam
- continuous beam
- cantilever beam
- lintel (በር እና መስኮት ላይ ለopening)
- girder (የ ድልድይ )
- joist (የ ጣውላ)
- Truss and purlin ( ለጣሪያ ስራ elements of roof)
@etconp
Facebook:- https://www.Facebook.com/etconp/
Forwarded from Ethio Construction Engineering (Mustefa A. (St.lng.))
This media is not supported in your browser
VIEW IN TELEGRAM
👉Building Resonance
➡️Structural stability during earthquake
➡️Why do some buildings fall in earthquakes?
🚧All buildings have a natural period, or resonance, which is the number of seconds it takes for the building to naturally vibrate back and forth.
🚧The ground also has a specific resonant frequency.
🚧Hard bedrock has higher frequencies softer sediments If the period of ground motion matches the natural resonance of a building, it will undergo the largest oscillations possible and suffer the greatest damage.
🚧A sample demonstration follows the animated portion of this video clip.
@etconp
➡️Structural stability during earthquake
➡️Why do some buildings fall in earthquakes?
🚧All buildings have a natural period, or resonance, which is the number of seconds it takes for the building to naturally vibrate back and forth.
🚧The ground also has a specific resonant frequency.
🚧Hard bedrock has higher frequencies softer sediments If the period of ground motion matches the natural resonance of a building, it will undergo the largest oscillations possible and suffer the greatest damage.
🚧A sample demonstration follows the animated portion of this video clip.
@etconp
GEOTECHNICAL ENGINEERING
what’s the minimum water content at which the soil begins to crumble when it’s rolled into 3mm diameter threads ?
1️⃣. Plastic limit
2️⃣. Liquid limit
3️⃣. Shrinkage limit
4️⃣. Plastic limit
@etconp
Instagram :- https://instagram.com/etconp?igshid=h82z1u7h3leg
Facebook :- https://www.facebook.com/115479406977628/posts/120058029853099/?d=n
Please update your telegram
what’s the minimum water content at which the soil begins to crumble when it’s rolled into 3mm diameter threads ?
1️⃣. Plastic limit
2️⃣. Liquid limit
3️⃣. Shrinkage limit
4️⃣. Plastic limit
@etconp
Instagram :- https://instagram.com/etconp?igshid=h82z1u7h3leg
Facebook :- https://www.facebook.com/115479406977628/posts/120058029853099/?d=n
Please update your telegram
Facebook
Log in or sign up to view
See posts, photos and more on Facebook.
❤1
Case study
A client wanted to build residential building and you are consultant list out the holistic process to build a residential house (paper works)
አንድ ባለሀብት መኖሪያ ቤት ለመገንባት ፈለገ አንተ አማካሪ ነህ ..... ቤት ለመገንባት የ ሚያስፈልጉ ሁሉንአቀፍ ሂደቶችን ዘርዝር (የወረቀት ስራ)
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/120058029853099/?d=n
A client wanted to build residential building and you are consultant list out the holistic process to build a residential house (paper works)
አንድ ባለሀብት መኖሪያ ቤት ለመገንባት ፈለገ አንተ አማካሪ ነህ ..... ቤት ለመገንባት የ ሚያስፈልጉ ሁሉንአቀፍ ሂደቶችን ዘርዝር (የወረቀት ስራ)
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/120058029853099/?d=n
Facebook
Log in or sign up to view
See posts, photos and more on Facebook.