The equation τ = C + σ tan φ is given by.
Anonymous Quiz
32%
Rankine
27%
Coulomb
5%
Culaman
36%
Mohr
❤1
Effective stress
[σ' = Total stress (σ) - Pore water pressure(u)] is
[σ' = Total stress (σ) - Pore water pressure(u)] is
Anonymous Quiz
14%
the stress at particles contact
10%
a physical parameter that can be measured
18%
important because it is a function of engineering properties of soil
58%
all of the above
👍4
The consistency index of a soil is defined as the ratio of.
Anonymous Quiz
20%
liquid limit plus the natural water content to the plasticity index of the soil
38%
liquid limit minus the natural water content to the plasticity index of the soil
24%
natural water content of a soil minus plastic limit to the plasticity index of the soil
18%
natural water content of a soil plus its plastic limit to the plasticity index of the soil.
👍4🍌2
The moment distribution method in structural analysis can be treated as
Anonymous Quiz
31%
Force method
37%
Displacement method
23%
Flexibility method
9%
None of these
👍7😁2
If ‘H’ is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is
Anonymous Quiz
39%
0.3 H
21%
0.4 H
23%
0.5 H
17%
0.7 H
👍8
In a pre-stressed member it is advisable to use
Anonymous Quiz
6%
Low strength concrete only
16%
High strength concrete only
31%
Low strength concrete but high tensile steel
47%
High strength concrete and high tensile steel
👍14
Distribution of shear intensity over a rectangular section of a beam, follows:
Anonymous Quiz
9%
A circular curve
45%
A straight line
38%
A parabolic curve
8%
An elliptical curve
👍12
In a simply supported slab, alternate bars are curtailed at
Anonymous Quiz
72%
1/4th of the span
9%
1/5th of the span
12%
1/6th of the span
8%
1/7th of the span
👍20
Ethio Construction Engineering
In a simply supported slab, alternate bars are curtailed at
Expiation
Curtailment is a way of reducing the area of tensile reinforcement at points/areas (either on a beam/slab) where bending moment is minimum or zero for the purpose of achieving an economic design.
Condition of curtailment - At least 50% of the total main reinforcement shall be carried through at the bottom on to the bearing and anchored in accordance
let us find out the BM in simply supported slab at 1/7th of span or 0.15L from the face of the support. (Considering unit strip)
BM =w. l/2 x 0.15 l - 0.15 w. l x 0.15 l/2 =0.06375 wl²
Which is almost equal to 1/16 wl² or in other words it is 50 %of maximum. Moment at mid span (for udl) wl²/8
Thus we can curtail 50 % of bars or alternate bars depending upon moment requirement at app. 1/7th of the span from face of the support, subject to the provision of minimum reinforcement.
Ethiopian Construction Work Professionals - ETCONp
Telegram:- https://www.facebook.com/etconp/
Curtailment is a way of reducing the area of tensile reinforcement at points/areas (either on a beam/slab) where bending moment is minimum or zero for the purpose of achieving an economic design.
Condition of curtailment - At least 50% of the total main reinforcement shall be carried through at the bottom on to the bearing and anchored in accordance
let us find out the BM in simply supported slab at 1/7th of span or 0.15L from the face of the support. (Considering unit strip)
BM =w. l/2 x 0.15 l - 0.15 w. l x 0.15 l/2 =0.06375 wl²
Which is almost equal to 1/16 wl² or in other words it is 50 %of maximum. Moment at mid span (for udl) wl²/8
Thus we can curtail 50 % of bars or alternate bars depending upon moment requirement at app. 1/7th of the span from face of the support, subject to the provision of minimum reinforcement.
Ethiopian Construction Work Professionals - ETCONp
Telegram:- https://www.facebook.com/etconp/
👍12
Network of Sanitary pipeline
📍 leghar Addis Ababa In front of
Awash bank head office
@etconp
Facebook:- https://www.facebook.com/etconp/
📍 leghar Addis Ababa In front of
Awash bank head office
@etconp
Facebook:- https://www.facebook.com/etconp/
👍8
Bar Bending Schedule
Just like any other schedules, bar bending schedule is most important part of any project.
It helps in doing reconciliation of steel and controlling the wastage at site.
If bar bending schedule (BBS) is not prepared at site, then contractor and its workmen tend to cut and and bend bars without quantifying it and leads to more wastage due to over doing it.
Engineer who going to use this sheet for doing BBS should aware of following;
- Should be able to read the structural and architectural drawings.
Should know where the lapping of bar is to be done.
- Should know how to calculate number of bar as per spacing in any given member.
- Basic knowledge of using excel sheet.
@etconp
Facebook:- https://www.facebook.com/etconp/
Just like any other schedules, bar bending schedule is most important part of any project.
It helps in doing reconciliation of steel and controlling the wastage at site.
If bar bending schedule (BBS) is not prepared at site, then contractor and its workmen tend to cut and and bend bars without quantifying it and leads to more wastage due to over doing it.
Engineer who going to use this sheet for doing BBS should aware of following;
- Should be able to read the structural and architectural drawings.
Should know where the lapping of bar is to be done.
- Should know how to calculate number of bar as per spacing in any given member.
- Basic knowledge of using excel sheet.
@etconp
Facebook:- https://www.facebook.com/etconp/
👍15👏2
concrete mix design question
design the concrete for an unreinforced, air-entrained pavement, in a very cold climate where there is no statistical data available for the proposed mix design; 25 cm thick; specified 28-day concrete flexural strength of 4.7 MPa; the coarse aggregates have a bulk specific gravity of 2.70; a rodded density of 1650 kg/m3 at the saturated surface dry (SSD) condition and a moisture content of 1.5% above the SSD condition; the fine aggregates have a bulk specific gravity of 2.65 with a fineness modulus of 2.75 and a moisture of 5% above the (SSD) condition. The apparent specific gravity of the Portland cement = 3.15.
If more than 30 members participate we will post the solution ….. we don’t need intensive participation at least show us you are with us
ከ 30 በላይ አባላት ተሳትፏቸውን ካሳዩን ጥያቄውን ለመስራት ዝግጁ ነን ቢያንስ ትንሽ ሞክራችሁ አብሮነታችሁን አሳዩን
@etconp
Facebook:- https://www.facebook.com/etconp/
design the concrete for an unreinforced, air-entrained pavement, in a very cold climate where there is no statistical data available for the proposed mix design; 25 cm thick; specified 28-day concrete flexural strength of 4.7 MPa; the coarse aggregates have a bulk specific gravity of 2.70; a rodded density of 1650 kg/m3 at the saturated surface dry (SSD) condition and a moisture content of 1.5% above the SSD condition; the fine aggregates have a bulk specific gravity of 2.65 with a fineness modulus of 2.75 and a moisture of 5% above the (SSD) condition. The apparent specific gravity of the Portland cement = 3.15.
If more than 30 members participate we will post the solution ….. we don’t need intensive participation at least show us you are with us
ከ 30 በላይ አባላት ተሳትፏቸውን ካሳዩን ጥያቄውን ለመስራት ዝግጁ ነን ቢያንስ ትንሽ ሞክራችሁ አብሮነታችሁን አሳዩን
@etconp
Facebook:- https://www.facebook.com/etconp/
👍43🥰1
This media is not supported in your browser
VIEW IN TELEGRAM
Roof work in Ethiopia both in Amharic and English
What are the steps we should follow when we take over roof work in local Ethiopian methodology?
In Ethiopian there are two methodologies for local roof work
1. Placing the assembled truss (ካንች) and tying it on the top tie beam - this method is preferable when there is working space on the site because carpenters need wood bed (አልጋ) to assemble the roof truss in other case if it’s steel roof truss we don’t need a space it will be arranged in the workshop
The next step is nailing the purlin on the truss (ካንች) then the roof cover it might be CIS (corrugated iron sheet) or decra or galvanized EGA sheet
* in this methodology carpenters should be very careful about dimension because it should fit our supporting top tie beams …. So measurement is very crucial
Part 1
@etconp
Facebook:- https://www.facebook.com/etconp/
What are the steps we should follow when we take over roof work in local Ethiopian methodology?
In Ethiopian there are two methodologies for local roof work
1. Placing the assembled truss (ካንች) and tying it on the top tie beam - this method is preferable when there is working space on the site because carpenters need wood bed (አልጋ) to assemble the roof truss in other case if it’s steel roof truss we don’t need a space it will be arranged in the workshop
The next step is nailing the purlin on the truss (ካንች) then the roof cover it might be CIS (corrugated iron sheet) or decra or galvanized EGA sheet
* in this methodology carpenters should be very careful about dimension because it should fit our supporting top tie beams …. So measurement is very crucial
Part 1
@etconp
Facebook:- https://www.facebook.com/etconp/
👍15🔥1😁1🖕1
Ethio Construction Engineering
Roof work in Ethiopia both in Amharic and English What are the steps we should follow when we take over roof work in local Ethiopian methodology? In Ethiopian there are two methodologies for local roof work 1. Placing the assembled truss (ካንች) and tying…
- PART 2 -
* in this methodology logistic shall be under consideration because we should transport and carry the assembled truss and placing it aligned is another difficult work
2. Assembling it on the top tie beam - in this method we lay rafter wood on the top tie beam and tie it with Φ6 stirrup bar(ስታፋ) which is extended before we cast our top tie beam then we provide queen and king posts then we provide truss then we tie queen posts and king posts on rafter using “BONDA” (iron sheet) then we nail the purlin on the inclined rafter then the roof cover
የጣራ ስራ ላይ በተለምዶ እንዴት ይሰራል
በመጀመሪያ በሀገራችን ሁለት መንገዶች አሉ ጣራ ለመስራት
፩. ተሰርቶ ተገጣጥሞ ያለቀለትን ካንች አጓጉዞ ቶፕ ታይ ቢሙ ላይ ማሰር - የዚህኛው መንገድ ስንጠቀም ሳይታችን በቂ ቦታ ሊኖረው ይገባል ምክንያቱም የ እንጨት አልጋ ተዘጋጅቶ ስለሚገጣጠም የ rafter’ኣችን ርዝመት + working space ያስፈልጋል ለመገጣጠም በሌላ በኩል ደግሞ ካንቻችን የብረት ከሆነ እዛው workshop ስለሆነ ችግር የለም spaceን በተመለከተ። የተሰራውን ካንች እላይ አውጥተን ሰቅለን በ ስታፋ እናስረዋለን በመቀጠል ሞራሌ (purlin) እንመታለን ከዛም የጣራ ሽፋናችንን እንመታለን ወይ ዴክራ ወይም normal gauge ቆርቆሮ ወይም galvanized EGA
፪. እዛው ጣሪያ ላይ መገጣጠም
@etconp
Facebook:- https://www.facebook.com/etconp/
* in this methodology logistic shall be under consideration because we should transport and carry the assembled truss and placing it aligned is another difficult work
2. Assembling it on the top tie beam - in this method we lay rafter wood on the top tie beam and tie it with Φ6 stirrup bar(ስታፋ) which is extended before we cast our top tie beam then we provide queen and king posts then we provide truss then we tie queen posts and king posts on rafter using “BONDA” (iron sheet) then we nail the purlin on the inclined rafter then the roof cover
• this method is time taking compared to the previous የጣራ ስራ ላይ በተለምዶ እንዴት ይሰራል
በመጀመሪያ በሀገራችን ሁለት መንገዶች አሉ ጣራ ለመስራት
፩. ተሰርቶ ተገጣጥሞ ያለቀለትን ካንች አጓጉዞ ቶፕ ታይ ቢሙ ላይ ማሰር - የዚህኛው መንገድ ስንጠቀም ሳይታችን በቂ ቦታ ሊኖረው ይገባል ምክንያቱም የ እንጨት አልጋ ተዘጋጅቶ ስለሚገጣጠም የ rafter’ኣችን ርዝመት + working space ያስፈልጋል ለመገጣጠም በሌላ በኩል ደግሞ ካንቻችን የብረት ከሆነ እዛው workshop ስለሆነ ችግር የለም spaceን በተመለከተ። የተሰራውን ካንች እላይ አውጥተን ሰቅለን በ ስታፋ እናስረዋለን በመቀጠል ሞራሌ (purlin) እንመታለን ከዛም የጣራ ሽፋናችንን እንመታለን ወይ ዴክራ ወይም normal gauge ቆርቆሮ ወይም galvanized EGA
• በዚህኛው መንገድ ጥንቃቄ ይሻል አናፂዎች ልኬት በደንምብ መውሰድ አለባቸው ምክንያቱም እላይ ወጥቶ አልገጥም ሊል ስለምችል በ ትክክል ካልተለካ • Transport መታሰብ አለበት ነገር ነው ከፍታ ላይ ማውጣት መሸከም የመሳሰሉት ነገሮች መታሰብ አለባቸው፪. እዛው ጣሪያ ላይ መገጣጠም
@etconp
Facebook:- https://www.facebook.com/etconp/
👍13👎1
👍10❤1🔥1😁1
The small circular pattern in the plan represents
1️⃣. hole
2️⃣. beam
3️⃣. column
4️⃣. design
@etconp
Facebook:- https://www.facebook.com/etconp/
1️⃣. hole
2️⃣. beam
3️⃣. column
4️⃣. design
@etconp
Facebook:- https://www.facebook.com/etconp/
👍20😁4
Ethio Construction Engineering via @like
The small circular pattern in the plan represents 1️⃣. hole 2️⃣. beam 3️⃣. column 4️⃣. design @etconp Facebook:- https://www.facebook.com/etconp/
The answer is 3️⃣
Explanation
Circular structure is drawn with a polygon with as many sides as you need to keep the distance between columns safe for the materials you are using. Stronger material will require less columns
@etconp
Facebook:- https://www.facebook.com/etconp/
Explanation
Circular structure is drawn with a polygon with as many sides as you need to keep the distance between columns safe for the materials you are using. Stronger material will require less columns
@etconp
Facebook:- https://www.facebook.com/etconp/
👍9
Ethio Construction Engineering
Circular plan offer better seismic resistance.
Explanation
Considering a rectangular plan, and assuming the lateral load in one direction, its clear that only the two walls in the direction of the force would more or less contribute to the stiffness and thus the seismic resistance. However, in a circular plan, every part of the wall would have some component in the direction of the seismic load. Also, instead of the regular X-shaped cracks (on account of in-plane shear in load bearing walls), a circular plan would experience a parabolic failure pattern, and that could possibly also be a reason for the increased seismic resilience.
@etconp
Facebook:-https://www.facebook.com/etconp/
Considering a rectangular plan, and assuming the lateral load in one direction, its clear that only the two walls in the direction of the force would more or less contribute to the stiffness and thus the seismic resistance. However, in a circular plan, every part of the wall would have some component in the direction of the seismic load. Also, instead of the regular X-shaped cracks (on account of in-plane shear in load bearing walls), a circular plan would experience a parabolic failure pattern, and that could possibly also be a reason for the increased seismic resilience.
@etconp
Facebook:-https://www.facebook.com/etconp/
❤2👍1
Ethio Construction Engineering
@etconp Facebook:- https://www.facebook.com/etconp/
Strip foundation construction process
To be continued…….
@etconp
Facebook:- https://www.facebook.com/etconp/
To be continued…….
@etconp
Facebook:- https://www.facebook.com/etconp/
👍5