concrete mix design question
design the concrete for an unreinforced, air-entrained pavement, in a very cold climate where there is no statistical data available for the proposed mix design; 25 cm thick; specified 28-day concrete flexural strength of 4.7 MPa; the coarse aggregates have a bulk specific gravity of 2.70; a rodded density of 1650 kg/m3 at the saturated surface dry (SSD) condition and a moisture content of 1.5% above the SSD condition; the fine aggregates have a bulk specific gravity of 2.65 with a fineness modulus of 2.75 and a moisture of 5% above the (SSD) condition. The apparent specific gravity of the Portland cement = 3.15.
If more than 30 members participate we will post the solution ….. we don’t need intensive participation at least show us you are with us
ከ 30 በላይ አባላት ተሳትፏቸውን ካሳዩን ጥያቄውን ለመስራት ዝግጁ ነን ቢያንስ ትንሽ ሞክራችሁ አብሮነታችሁን አሳዩን
@etconp
Facebook:- https://www.facebook.com/etconp/
design the concrete for an unreinforced, air-entrained pavement, in a very cold climate where there is no statistical data available for the proposed mix design; 25 cm thick; specified 28-day concrete flexural strength of 4.7 MPa; the coarse aggregates have a bulk specific gravity of 2.70; a rodded density of 1650 kg/m3 at the saturated surface dry (SSD) condition and a moisture content of 1.5% above the SSD condition; the fine aggregates have a bulk specific gravity of 2.65 with a fineness modulus of 2.75 and a moisture of 5% above the (SSD) condition. The apparent specific gravity of the Portland cement = 3.15.
If more than 30 members participate we will post the solution ….. we don’t need intensive participation at least show us you are with us
ከ 30 በላይ አባላት ተሳትፏቸውን ካሳዩን ጥያቄውን ለመስራት ዝግጁ ነን ቢያንስ ትንሽ ሞክራችሁ አብሮነታችሁን አሳዩን
@etconp
Facebook:- https://www.facebook.com/etconp/
👍43🥰1
This media is not supported in your browser
VIEW IN TELEGRAM
Roof work in Ethiopia both in Amharic and English
What are the steps we should follow when we take over roof work in local Ethiopian methodology?
In Ethiopian there are two methodologies for local roof work
1. Placing the assembled truss (ካንች) and tying it on the top tie beam - this method is preferable when there is working space on the site because carpenters need wood bed (አልጋ) to assemble the roof truss in other case if it’s steel roof truss we don’t need a space it will be arranged in the workshop
The next step is nailing the purlin on the truss (ካንች) then the roof cover it might be CIS (corrugated iron sheet) or decra or galvanized EGA sheet
* in this methodology carpenters should be very careful about dimension because it should fit our supporting top tie beams …. So measurement is very crucial
Part 1
@etconp
Facebook:- https://www.facebook.com/etconp/
What are the steps we should follow when we take over roof work in local Ethiopian methodology?
In Ethiopian there are two methodologies for local roof work
1. Placing the assembled truss (ካንች) and tying it on the top tie beam - this method is preferable when there is working space on the site because carpenters need wood bed (አልጋ) to assemble the roof truss in other case if it’s steel roof truss we don’t need a space it will be arranged in the workshop
The next step is nailing the purlin on the truss (ካንች) then the roof cover it might be CIS (corrugated iron sheet) or decra or galvanized EGA sheet
* in this methodology carpenters should be very careful about dimension because it should fit our supporting top tie beams …. So measurement is very crucial
Part 1
@etconp
Facebook:- https://www.facebook.com/etconp/
👍15🔥1😁1🖕1
Ethio Construction Engineering
Roof work in Ethiopia both in Amharic and English What are the steps we should follow when we take over roof work in local Ethiopian methodology? In Ethiopian there are two methodologies for local roof work 1. Placing the assembled truss (ካንች) and tying…
- PART 2 -
* in this methodology logistic shall be under consideration because we should transport and carry the assembled truss and placing it aligned is another difficult work
2. Assembling it on the top tie beam - in this method we lay rafter wood on the top tie beam and tie it with Φ6 stirrup bar(ስታፋ) which is extended before we cast our top tie beam then we provide queen and king posts then we provide truss then we tie queen posts and king posts on rafter using “BONDA” (iron sheet) then we nail the purlin on the inclined rafter then the roof cover
የጣራ ስራ ላይ በተለምዶ እንዴት ይሰራል
በመጀመሪያ በሀገራችን ሁለት መንገዶች አሉ ጣራ ለመስራት
፩. ተሰርቶ ተገጣጥሞ ያለቀለትን ካንች አጓጉዞ ቶፕ ታይ ቢሙ ላይ ማሰር - የዚህኛው መንገድ ስንጠቀም ሳይታችን በቂ ቦታ ሊኖረው ይገባል ምክንያቱም የ እንጨት አልጋ ተዘጋጅቶ ስለሚገጣጠም የ rafter’ኣችን ርዝመት + working space ያስፈልጋል ለመገጣጠም በሌላ በኩል ደግሞ ካንቻችን የብረት ከሆነ እዛው workshop ስለሆነ ችግር የለም spaceን በተመለከተ። የተሰራውን ካንች እላይ አውጥተን ሰቅለን በ ስታፋ እናስረዋለን በመቀጠል ሞራሌ (purlin) እንመታለን ከዛም የጣራ ሽፋናችንን እንመታለን ወይ ዴክራ ወይም normal gauge ቆርቆሮ ወይም galvanized EGA
፪. እዛው ጣሪያ ላይ መገጣጠም
@etconp
Facebook:- https://www.facebook.com/etconp/
* in this methodology logistic shall be under consideration because we should transport and carry the assembled truss and placing it aligned is another difficult work
2. Assembling it on the top tie beam - in this method we lay rafter wood on the top tie beam and tie it with Φ6 stirrup bar(ስታፋ) which is extended before we cast our top tie beam then we provide queen and king posts then we provide truss then we tie queen posts and king posts on rafter using “BONDA” (iron sheet) then we nail the purlin on the inclined rafter then the roof cover
• this method is time taking compared to the previous የጣራ ስራ ላይ በተለምዶ እንዴት ይሰራል
በመጀመሪያ በሀገራችን ሁለት መንገዶች አሉ ጣራ ለመስራት
፩. ተሰርቶ ተገጣጥሞ ያለቀለትን ካንች አጓጉዞ ቶፕ ታይ ቢሙ ላይ ማሰር - የዚህኛው መንገድ ስንጠቀም ሳይታችን በቂ ቦታ ሊኖረው ይገባል ምክንያቱም የ እንጨት አልጋ ተዘጋጅቶ ስለሚገጣጠም የ rafter’ኣችን ርዝመት + working space ያስፈልጋል ለመገጣጠም በሌላ በኩል ደግሞ ካንቻችን የብረት ከሆነ እዛው workshop ስለሆነ ችግር የለም spaceን በተመለከተ። የተሰራውን ካንች እላይ አውጥተን ሰቅለን በ ስታፋ እናስረዋለን በመቀጠል ሞራሌ (purlin) እንመታለን ከዛም የጣራ ሽፋናችንን እንመታለን ወይ ዴክራ ወይም normal gauge ቆርቆሮ ወይም galvanized EGA
• በዚህኛው መንገድ ጥንቃቄ ይሻል አናፂዎች ልኬት በደንምብ መውሰድ አለባቸው ምክንያቱም እላይ ወጥቶ አልገጥም ሊል ስለምችል በ ትክክል ካልተለካ • Transport መታሰብ አለበት ነገር ነው ከፍታ ላይ ማውጣት መሸከም የመሳሰሉት ነገሮች መታሰብ አለባቸው፪. እዛው ጣሪያ ላይ መገጣጠም
@etconp
Facebook:- https://www.facebook.com/etconp/
👍13👎1
👍10❤1🔥1😁1
The small circular pattern in the plan represents
1️⃣. hole
2️⃣. beam
3️⃣. column
4️⃣. design
@etconp
Facebook:- https://www.facebook.com/etconp/
1️⃣. hole
2️⃣. beam
3️⃣. column
4️⃣. design
@etconp
Facebook:- https://www.facebook.com/etconp/
👍20😁4
Ethio Construction Engineering via @like
The small circular pattern in the plan represents 1️⃣. hole 2️⃣. beam 3️⃣. column 4️⃣. design @etconp Facebook:- https://www.facebook.com/etconp/
The answer is 3️⃣
Explanation
Circular structure is drawn with a polygon with as many sides as you need to keep the distance between columns safe for the materials you are using. Stronger material will require less columns
@etconp
Facebook:- https://www.facebook.com/etconp/
Explanation
Circular structure is drawn with a polygon with as many sides as you need to keep the distance between columns safe for the materials you are using. Stronger material will require less columns
@etconp
Facebook:- https://www.facebook.com/etconp/
👍9
Ethio Construction Engineering
Circular plan offer better seismic resistance.
Explanation
Considering a rectangular plan, and assuming the lateral load in one direction, its clear that only the two walls in the direction of the force would more or less contribute to the stiffness and thus the seismic resistance. However, in a circular plan, every part of the wall would have some component in the direction of the seismic load. Also, instead of the regular X-shaped cracks (on account of in-plane shear in load bearing walls), a circular plan would experience a parabolic failure pattern, and that could possibly also be a reason for the increased seismic resilience.
@etconp
Facebook:-https://www.facebook.com/etconp/
Considering a rectangular plan, and assuming the lateral load in one direction, its clear that only the two walls in the direction of the force would more or less contribute to the stiffness and thus the seismic resistance. However, in a circular plan, every part of the wall would have some component in the direction of the seismic load. Also, instead of the regular X-shaped cracks (on account of in-plane shear in load bearing walls), a circular plan would experience a parabolic failure pattern, and that could possibly also be a reason for the increased seismic resilience.
@etconp
Facebook:-https://www.facebook.com/etconp/
❤2👍1
Ethio Construction Engineering
@etconp Facebook:- https://www.facebook.com/etconp/
Strip foundation construction process
To be continued…….
@etconp
Facebook:- https://www.facebook.com/etconp/
To be continued…….
@etconp
Facebook:- https://www.facebook.com/etconp/
👍5
Ethio Construction Engineering
Strip foundation construction process To be continued……. @etconp Facebook:- https://www.facebook.com/etconp/
PAD foundation construction process
I’ll soon post illustrative pictures stay tuned
@etconp
Facebook:- https://www.facebook.com/etconp/
I’ll soon post illustrative pictures stay tuned
@etconp
Facebook:- https://www.facebook.com/etconp/
👍3
Ethio Construction Engineering
PAD foundation construction process I’ll soon post illustrative pictures stay tuned @etconp Facebook:- https://www.facebook.com/etconp/
Illustrative pictures regarding construction of pad foundation
@etconp
Facebook:- https://www.facebook.com/etconp/
@etconp
Facebook:- https://www.facebook.com/etconp/
👍1
Ethio Construction Engineering
PAD foundation construction process I’ll soon post illustrative pictures stay tuned @etconp Facebook:- https://www.facebook.com/etconp/
Illustrative pictures regarding That it’s singly reinforced only at the bottom there is the main bar and distribution bar
@etconp
Facebook:- https://www.facebook.com/etconp/
@etconp
Facebook:- https://www.facebook.com/etconp/
👍8
ይህ የሂሳባዊ ጂኦሜትሪ ፅንሰ ሀሳብ "issoseles triangle inscribed in a circle"
ስንቶቻችን ነን በኮንስትራክሽን ሳይት ውስጥ ወሳኝ ሚና እንደሚጫወት የምናውቀው?
ይህ የምትመለከቱት ሂሳባዊ ጂኦሜትሪ በተለየ መልኩ በኮንስትራክሽን ሳይት በበሮች፣በመስኮቶችና በበረንዳ ኮለኖች መካከል የምንሰራቸው( ከግማሽ) ሰርክል ውጪ የሆኑ በሌላ አገላለፅ የአርኩ ዲያሜትር ከላይ ከጠቀስኳቸው ከበሮች፣ከመስኮቶችና ከኮለኖች ውጪ ሲሆን አርኮችን ለመስራት የምንጠቀምበት ጂኦሜትሪ ነው።
እንዴት አድርገን ሳይት ውስጥ እንደምንጠቀምበት በሚቀጥለው ጊዜ አቀርብላችኋለሁ።
@etconp
Facebook:- https://www.facebook.com/etconp/
ስንቶቻችን ነን በኮንስትራክሽን ሳይት ውስጥ ወሳኝ ሚና እንደሚጫወት የምናውቀው?
ይህ የምትመለከቱት ሂሳባዊ ጂኦሜትሪ በተለየ መልኩ በኮንስትራክሽን ሳይት በበሮች፣በመስኮቶችና በበረንዳ ኮለኖች መካከል የምንሰራቸው( ከግማሽ) ሰርክል ውጪ የሆኑ በሌላ አገላለፅ የአርኩ ዲያሜትር ከላይ ከጠቀስኳቸው ከበሮች፣ከመስኮቶችና ከኮለኖች ውጪ ሲሆን አርኮችን ለመስራት የምንጠቀምበት ጂኦሜትሪ ነው።
እንዴት አድርገን ሳይት ውስጥ እንደምንጠቀምበት በሚቀጥለው ጊዜ አቀርብላችኋለሁ።
@etconp
Facebook:- https://www.facebook.com/etconp/
👍23
Answer for the previous Q.
Info.
Floor to floor height= 310cm
Slab thickness =15cm
Verticall RC wall drop down from Rc slab=10cm
CD=70cm 👉see the previous image
Spacing of veranda column =300cm 👉it's face to face length.
እኛ ሳይት መሀንዲስ ሆነን ተመድበን ሳይት ውስጥ ነን እንዴት አድርገን እንስራው ነው?
ሀሳቡ ግልፅ እንዲሆንላችሁ ራዲየስ እንዴት እናግኝ ነው።
በተለምዶ የምንሰራው አርክ Radis=width/2 አድርገን ነው እንደዛ ብንሰራው አንችልም ወይ? ትሉ ይሆናል ነገር ግን Width/2 የሚሰራው በጣም ለተቀራረቡ ኮለኖች በሮችና መስኮቶች ነው።
የኮለኖች፣ የበሮችና የመስኮቶች width በጨመረ ቁጥር width/2=radius አድርገን ብንሰራ የአርክ መነሻ point ወደታች እየወረደ ስለሚመጣ እንደዛ ብንሰራ እጅግ የሚያስጠላ ዲዛይን ይሆናል።
ይሄንንም በኋላ በቁጥር አስደግፌ አቀርባለሁ።
ወደ ሀሳቡ እንመለስና
Let say
FTH) 👉floor to floor height =310cm
(FCH)👉 floor to ceiling height=295cm
FCH ማለት FTH-slab thickness ነው።
310cm-15cm=295cm
አርክ ቶፕ ከማድረጋችን በፊት 10 cm hanging vertically Rc wall አለን
አርኩ central top ድሮፕ የሚያደርገው ከslab bottom 10cm ወርዶ ነው
Arch starting point =295cm-10cm-70cm=215cm
የአርክ ጫማ የሚነሳው ከመሬት በላይ 215cm ላይ ነው ማለት ነው image ከላይ አስደግፌያለሁ።
Info.
Floor to floor height= 310cm
Slab thickness =15cm
Verticall RC wall drop down from Rc slab=10cm
CD=70cm 👉see the previous image
Spacing of veranda column =300cm 👉it's face to face length.
እኛ ሳይት መሀንዲስ ሆነን ተመድበን ሳይት ውስጥ ነን እንዴት አድርገን እንስራው ነው?
ሀሳቡ ግልፅ እንዲሆንላችሁ ራዲየስ እንዴት እናግኝ ነው።
በተለምዶ የምንሰራው አርክ Radis=width/2 አድርገን ነው እንደዛ ብንሰራው አንችልም ወይ? ትሉ ይሆናል ነገር ግን Width/2 የሚሰራው በጣም ለተቀራረቡ ኮለኖች በሮችና መስኮቶች ነው።
የኮለኖች፣ የበሮችና የመስኮቶች width በጨመረ ቁጥር width/2=radius አድርገን ብንሰራ የአርክ መነሻ point ወደታች እየወረደ ስለሚመጣ እንደዛ ብንሰራ እጅግ የሚያስጠላ ዲዛይን ይሆናል።
ይሄንንም በኋላ በቁጥር አስደግፌ አቀርባለሁ።
ወደ ሀሳቡ እንመለስና
Let say
FTH) 👉floor to floor height =310cm
(FCH)👉 floor to ceiling height=295cm
FCH ማለት FTH-slab thickness ነው።
310cm-15cm=295cm
አርክ ቶፕ ከማድረጋችን በፊት 10 cm hanging vertically Rc wall አለን
አርኩ central top ድሮፕ የሚያደርገው ከslab bottom 10cm ወርዶ ነው
Arch starting point =295cm-10cm-70cm=215cm
የአርክ ጫማ የሚነሳው ከመሬት በላይ 215cm ላይ ነው ማለት ነው image ከላይ አስደግፌያለሁ።
👍7
ከዚህ በመቀጠል ግን ይህንን የምትመለከቱት figure በመያዝ የተወሰነ የgeometric calculation ሰርተን እንዴት ሬዲየስ እናገኛለን እንየው።
እንደምትመለከቱት isosles triangle ይታያል በዚህ መሠረት
AB=300cm
AD=AB/2=150cm
CD=70cm
AC=?
Phytagorian formula በመጠቀም AC እናግኝ
AC=√(AD²+CD²)=√(150²+70²)=165.53
AC=165.53cm
Find <DAC=DbBC?
tan‐¹(70÷150)=25°
Using sine low
👉165.52/sinA=300/sinC=165.52/sinB
=2R
2R=165.5/sin25°=2R=391.43cm
R=391.43cm/2=195.72cm✅
አሁን ይሄንን 195.72cm ራዲየስ ከሁለቱ ኮለኖች መሀል ባለው አናት ስላብ ወደ ታች ለክቶ በምስሉ እንደሚታየው ወርዶ በሚስማር ማርክ አድርጎ በሲባጎ አርኩን አርኩን ማርክ መመድረግና formwork ማሰራት ነው።
እንደምትመለከቱት isosles triangle ይታያል በዚህ መሠረት
AB=300cm
AD=AB/2=150cm
CD=70cm
AC=?
Phytagorian formula በመጠቀም AC እናግኝ
AC=√(AD²+CD²)=√(150²+70²)=165.53
AC=165.53cm
Find <DAC=DbBC?
tan‐¹(70÷150)=25°
Using sine low
👉165.52/sinA=300/sinC=165.52/sinB
=2R
2R=165.5/sin25°=2R=391.43cm
R=391.43cm/2=195.72cm✅
አሁን ይሄንን 195.72cm ራዲየስ ከሁለቱ ኮለኖች መሀል ባለው አናት ስላብ ወደ ታች ለክቶ በምስሉ እንደሚታየው ወርዶ በሚስማር ማርክ አድርጎ በሲባጎ አርኩን አርኩን ማርክ መመድረግና formwork ማሰራት ነው።
👍12
ይህ መጨረሻ ላይ ብረት ሰርተን ኮንክሪት ሞልተን formwork ስናነሳ የምናገኘው structural member ነው።
እንግዲህ ለማንኛውም ከhalf አርክ ውጪ የሆነ የarch structure ለመስራት ያገለግላል ማለት ነው።
ከበሮች ከመስኮቶችና ከኮለኖች መሀል ላይ ከሚገኙ አርኮች በተጨማሪ የስላብ ጠርዞች የexternal structures design በሙሉ ለመሥራት መጠቀም ይቻላል🙏
@etconp
እንግዲህ ለማንኛውም ከhalf አርክ ውጪ የሆነ የarch structure ለመስራት ያገለግላል ማለት ነው።
ከበሮች ከመስኮቶችና ከኮለኖች መሀል ላይ ከሚገኙ አርኮች በተጨማሪ የስላብ ጠርዞች የexternal structures design በሙሉ ለመሥራት መጠቀም ይቻላል🙏
@etconp
👍8❤1