Stairs are important building elements that are used to provide vertical circulation and access across different floor levels in a building. It is also recommended that when an access height exceeds 600mm, a staircase should be provided. For stairs in a building, the recommended slope for comfort is 27°, but for practical purposes, this can sometimes be extended to 35°.
Types of staircase
straight flight staircase, circular staircase, helical staircase, spiral staircase, or a combination of the above mentioned types.
@etconp
Types of staircase
straight flight staircase, circular staircase, helical staircase, spiral staircase, or a combination of the above mentioned types.
@etconp
👍7👏1🏆1
Functional parts of a staircase
Flight: A series of steps extending from floor to floor, or from a floor to an intermediate landing or platform.
Guard: Protective vertical barrier along edges of stairways, balconies, and floor openings.
Landings (platforms): Used where turns are necessary or to break up long climbs. Landings should be level, as wide as the stairs, and at least 1000mm long in the direction of travel.
Step: Combination of a riser and the tread immediately above.
Rise: Distance from floor to floor.
Run: Total length of stairs in a horizontal plane, including landings.
Riser: Vertical face of a step. Its height is generally taken as the vertical distance between treads.
Tread: Horizontal face of a step. Its width is usually taken as the horizontal distance between risers.
Nosing: Projection of a tread beyond the riser below.
Soffit: Underside of a stair.
Railing: Framework or enclosure supporting a handrail and serving as a safety barrier.
Baluster: Vertical member supporting the handrail in a railing.
Balustrade: A railing composed of balusters capped by a handrail.
Handrail: Protective bar placed at a convenient distance above the stairs for a handhold.
Ideas on the selection of staircase dimensions
Headroom
Ample headroom should be provided not only to prevent tall people from injuring their heads but to give a feeling of spaciousness. The minimum vertical distance from the nosing of a tread to overhead construction should preferably never be less than 2100 mm.
Stairway Width
The width of a stairway depends on its purpose and the number of persons to be accommodated in peak hours or emergencies. Also, there are building codes that regulate the geometric design of stairways. The following can be used as guidelines;
For residential flats between two to four storeys, use a minimum width of 900 mm, for flats more than 4 storeys, use a width of 1000 mm. For public buildings of under 200 persons per floor, use a width of 1000 mm, for buildings between 200 – 400 persons per floor, use a width of 1500 mm. For over 400 persons, use a width between 1500 – 3000 mm. However, when the width of a stairway exceeds 1800 mm, it is necessary to divide it using handrails.
Step Sizes
Risers and treads generally are proportioned for comfort and to meet accessibility standards for the handicapped. Treads should be at least 250 mm, exclusive of nosing. The most comfortable height of riser is 175 mm. Risers less than 100 mm and more than 200 mm high should not be used. The steeper the slope of the stairs, the greater the ratio of the riser to tread. In the design of stairs, account should be taken of the fact that there is always one less tread than riser per flight of stairs. No flight of stairs should contain less than three risers.
@etconp
Flight: A series of steps extending from floor to floor, or from a floor to an intermediate landing or platform.
Guard: Protective vertical barrier along edges of stairways, balconies, and floor openings.
Landings (platforms): Used where turns are necessary or to break up long climbs. Landings should be level, as wide as the stairs, and at least 1000mm long in the direction of travel.
Step: Combination of a riser and the tread immediately above.
Rise: Distance from floor to floor.
Run: Total length of stairs in a horizontal plane, including landings.
Riser: Vertical face of a step. Its height is generally taken as the vertical distance between treads.
Tread: Horizontal face of a step. Its width is usually taken as the horizontal distance between risers.
Nosing: Projection of a tread beyond the riser below.
Soffit: Underside of a stair.
Railing: Framework or enclosure supporting a handrail and serving as a safety barrier.
Baluster: Vertical member supporting the handrail in a railing.
Balustrade: A railing composed of balusters capped by a handrail.
Handrail: Protective bar placed at a convenient distance above the stairs for a handhold.
Ideas on the selection of staircase dimensions
Headroom
Ample headroom should be provided not only to prevent tall people from injuring their heads but to give a feeling of spaciousness. The minimum vertical distance from the nosing of a tread to overhead construction should preferably never be less than 2100 mm.
Stairway Width
The width of a stairway depends on its purpose and the number of persons to be accommodated in peak hours or emergencies. Also, there are building codes that regulate the geometric design of stairways. The following can be used as guidelines;
For residential flats between two to four storeys, use a minimum width of 900 mm, for flats more than 4 storeys, use a width of 1000 mm. For public buildings of under 200 persons per floor, use a width of 1000 mm, for buildings between 200 – 400 persons per floor, use a width of 1500 mm. For over 400 persons, use a width between 1500 – 3000 mm. However, when the width of a stairway exceeds 1800 mm, it is necessary to divide it using handrails.
Step Sizes
Risers and treads generally are proportioned for comfort and to meet accessibility standards for the handicapped. Treads should be at least 250 mm, exclusive of nosing. The most comfortable height of riser is 175 mm. Risers less than 100 mm and more than 200 mm high should not be used. The steeper the slope of the stairs, the greater the ratio of the riser to tread. In the design of stairs, account should be taken of the fact that there is always one less tread than riser per flight of stairs. No flight of stairs should contain less than three risers.
@etconp
👍11❤2
#ጥቆማ
1 ሚሊዮን ብር በሚያሸልመው የ Solve IT 2023 የፈጠራ ውድድር ይሳተፉ።
የፈጠራ ሃሳብ ያላችሁ ወጣቶች ከታች በተቀመጡት አማራጮች መመዝገብ ትችላላችሁ።
የውድድሩ ምዝገባ የተጀመረ ሲሆን 1 ሚሊዮን ብር የሥራ መነሻ (Seed Funding) ተሸላሚ ያደርጋል።
ለመመዝገብ ➭ https://solveit-et.com
ለበለጠ መረጃ ➭
Telegram Bot: @solveit_et_bot
Email: contact@solveit-et.com
Phone No.: 0991440049
@etconp
1 ሚሊዮን ብር በሚያሸልመው የ Solve IT 2023 የፈጠራ ውድድር ይሳተፉ።
የፈጠራ ሃሳብ ያላችሁ ወጣቶች ከታች በተቀመጡት አማራጮች መመዝገብ ትችላላችሁ።
የውድድሩ ምዝገባ የተጀመረ ሲሆን 1 ሚሊዮን ብር የሥራ መነሻ (Seed Funding) ተሸላሚ ያደርጋል።
ለመመዝገብ ➭ https://solveit-et.com
ለበለጠ መረጃ ➭
Telegram Bot: @solveit_et_bot
Email: contact@solveit-et.com
Phone No.: 0991440049
@etconp
👍1👏1
👉Hangzhou Bay Bridge, Zhejiang, China
🌉Believe it or not:
🔖Approximately 600 experts were involved in designing the Hangzhou Bay Bridge. It took almost a decade to design and build.
🔖Design & Engineering
🔖The bridge leverages cable stayed bridge construction techniques. The project was built using this method because the cables are able to hold up against adverse conditions, including some of the highest tidal bore forces on earth. The bridge is also located in an area that experiences earthquakes, extremely high winds, and typhoons.
🔖The Hangzhou Bay Bridge uses steel piles rather than concrete because experts proved they’d hold up better against corrosion from the tidal forces in the bay.
🔖The bridge made use of some novel construction technology and vehicles
#ConstructionTechnology
@etconp
🌉Believe it or not:
🔖Approximately 600 experts were involved in designing the Hangzhou Bay Bridge. It took almost a decade to design and build.
🔖Design & Engineering
🔖The bridge leverages cable stayed bridge construction techniques. The project was built using this method because the cables are able to hold up against adverse conditions, including some of the highest tidal bore forces on earth. The bridge is also located in an area that experiences earthquakes, extremely high winds, and typhoons.
🔖The Hangzhou Bay Bridge uses steel piles rather than concrete because experts proved they’d hold up better against corrosion from the tidal forces in the bay.
🔖The bridge made use of some novel construction technology and vehicles
#ConstructionTechnology
@etconp
👍4
👉Here are four common types of guarantees in the construction industry
1. bid bond is a financial guarantee provided by a bidder (contractor) to the project owner(client) during the bidding phase of a construction project. The purpose of a bid bond is to protect the project owner from bidders who may withdraw their bids after the bidding process or fail to provide the necessary bonds if awarded the project. It financially compensates the owner in case of such situations so they can re-tender the project or choose an alternative bidder without incurring additional costs.
The bid bond is ranging from 5-10% of the total bid amount. If the bidder is successful and signs the contract while providing the required performance and payment bonds, the bid bond becomes void. However, if the bidder fails to meet these obligations, the project owner can claim the bid bond to recover damages.
2. Performance Bond: a financial guarantee provided by a surety company or a bank, which ensures that the contractor will fulfill their contractual obligations according to the agreed terms. If the contractor fails to meet their obligations, the surety will compensate the project owner either by finding a replacement contractor or providing financial compensation. a performance bond is mostly 10% total contract amount.
2. Advance Payment Guarantee: This guarantee safeguards the project owner's interest in cases where they provide an initial payment to the contractor to cover initial expenses, such as mobilization or procurement of materials. The guarantee ensures that the contractor will properly utilize the advance payment according to the contract, and will refund any unspent amount in case of non-completion or contract breach. The advance guarantee ranges from 5-20% of the contract amount.
3. Retention Money Guarantee: an amount withheld by the project owner from the contractor's payments to ensure proper completion of the project and to cover any defects or issues that may arise during the defects liability period. The contractor can provide retention money or guarantee, allowing them to receive their full payment during the project while giving the project owner assurance that funds will be available to address any defects or issues. a retention guarantee is mostly 5% total paid amount.
@etconp
1. bid bond is a financial guarantee provided by a bidder (contractor) to the project owner(client) during the bidding phase of a construction project. The purpose of a bid bond is to protect the project owner from bidders who may withdraw their bids after the bidding process or fail to provide the necessary bonds if awarded the project. It financially compensates the owner in case of such situations so they can re-tender the project or choose an alternative bidder without incurring additional costs.
The bid bond is ranging from 5-10% of the total bid amount. If the bidder is successful and signs the contract while providing the required performance and payment bonds, the bid bond becomes void. However, if the bidder fails to meet these obligations, the project owner can claim the bid bond to recover damages.
2. Performance Bond: a financial guarantee provided by a surety company or a bank, which ensures that the contractor will fulfill their contractual obligations according to the agreed terms. If the contractor fails to meet their obligations, the surety will compensate the project owner either by finding a replacement contractor or providing financial compensation. a performance bond is mostly 10% total contract amount.
2. Advance Payment Guarantee: This guarantee safeguards the project owner's interest in cases where they provide an initial payment to the contractor to cover initial expenses, such as mobilization or procurement of materials. The guarantee ensures that the contractor will properly utilize the advance payment according to the contract, and will refund any unspent amount in case of non-completion or contract breach. The advance guarantee ranges from 5-20% of the contract amount.
3. Retention Money Guarantee: an amount withheld by the project owner from the contractor's payments to ensure proper completion of the project and to cover any defects or issues that may arise during the defects liability period. The contractor can provide retention money or guarantee, allowing them to receive their full payment during the project while giving the project owner assurance that funds will be available to address any defects or issues. a retention guarantee is mostly 5% total paid amount.
@etconp
👍7❤2👏2
👉Calculation of Lap length in Reinforced Concrete Structures
🔰Lap length in Reinforced Concrete
______
Lap length is one of the important term in the reinforcement.
This is usually confused with another important term called development length and anchorage length. In this article, the lap lengths of bars is discussed. During the placement of steel in Reinforced concrete structure, if the required length of single bar may fall short. To get the desired design length, lapping of two bars side by side is done. An alternative to this is to provide mechanical couplers.
______
Lapping can be defined as the overlapping of two bars side by side to upto the design length. Usually, the stock length of steel bars is limited to 12m. This is for easy transportation of steel bars to the construction site. For example, imagine there is a need to build a 100ft tall column. But it’s not practically available. Hence the bars are cut every second story.
______
Then the tension forces are required to be transferred from one bar to the other bar at the location of discontinuity of the bar. So the second bar is kept closely to the first bar and overlapping is done. This amount of overlapping between two bars is called “lap length”. Lapping is usually done where minimum bending stress is encountered. In general, lap length is 50d which means 50 times the bar diameter, if both bars are of same diameter.
______
🔰Lap length in tension:
The lap length including anchorage value of hooks shall be
______
For flexural tension – Ld or 30d whichever is greater is considered. For direct tension – 2Ld or 30d whichever is greater is considered.
______
The straight length of lapping of bars shall not be less than 15d or 20cm.
______
🔰Lap Length in Compression:
The lap length is equal to the development length calculated in compression but not less than 24d.
______
🔰For Different Diameter Bars:
When the bars of different diameters are to be spliced, the lap length is calculated considering the smaller diameter bar.
______
🔰Lap Splices
Lap splices should not be catered for the bars which are having diameter greater than 36 mm. In such cases, welding should be considered. But if welding is also not feasible in some conditions, then lapping may be allowed for the bars larger than 36 mm diameter. But along with lapping, additional spirals of 6 mm should be provided around the lapped bars.
______
@etconp
🔰Lap length in Reinforced Concrete
______
Lap length is one of the important term in the reinforcement.
This is usually confused with another important term called development length and anchorage length. In this article, the lap lengths of bars is discussed. During the placement of steel in Reinforced concrete structure, if the required length of single bar may fall short. To get the desired design length, lapping of two bars side by side is done. An alternative to this is to provide mechanical couplers.
______
Lapping can be defined as the overlapping of two bars side by side to upto the design length. Usually, the stock length of steel bars is limited to 12m. This is for easy transportation of steel bars to the construction site. For example, imagine there is a need to build a 100ft tall column. But it’s not practically available. Hence the bars are cut every second story.
______
Then the tension forces are required to be transferred from one bar to the other bar at the location of discontinuity of the bar. So the second bar is kept closely to the first bar and overlapping is done. This amount of overlapping between two bars is called “lap length”. Lapping is usually done where minimum bending stress is encountered. In general, lap length is 50d which means 50 times the bar diameter, if both bars are of same diameter.
______
🔰Lap length in tension:
The lap length including anchorage value of hooks shall be
______
For flexural tension – Ld or 30d whichever is greater is considered. For direct tension – 2Ld or 30d whichever is greater is considered.
______
The straight length of lapping of bars shall not be less than 15d or 20cm.
______
🔰Lap Length in Compression:
The lap length is equal to the development length calculated in compression but not less than 24d.
______
🔰For Different Diameter Bars:
When the bars of different diameters are to be spliced, the lap length is calculated considering the smaller diameter bar.
______
🔰Lap Splices
Lap splices should not be catered for the bars which are having diameter greater than 36 mm. In such cases, welding should be considered. But if welding is also not feasible in some conditions, then lapping may be allowed for the bars larger than 36 mm diameter. But along with lapping, additional spirals of 6 mm should be provided around the lapped bars.
______
@etconp
👍11❤5👏3
AUTOCAD 2022 pre-activated
You don't need to crack it, just install and run it without any cracking and key.
@etconp
You don't need to crack it, just install and run it without any cracking and key.
@etconp
❤5
To install AutoCAD 2022, follow the below steps:
1. Download part 1 and 2 rar files.
2. Copy the downloaded files to your desktop.
3. Disable any antivirus or defender to avoid interruption during installation.
4. Turn off the internet connection.
5. Extract the rar files and install the setup file of AutoCAD 2022.
@etconp
1. Download part 1 and 2 rar files.
2. Copy the downloaded files to your desktop.
3. Disable any antivirus or defender to avoid interruption during installation.
4. Turn off the internet connection.
5. Extract the rar files and install the setup file of AutoCAD 2022.
@etconp
👍17
A continuous beam is deemed to be a deep beam when the ratio of effective span to
overall depth (1/D) is less than
overall depth (1/D) is less than
Anonymous Quiz
40%
a) 1.5
27%
b) 2.0
23%
c) 2.5
10%
d) 3.0
👍8👏5🏆1
Standard Technical Specification.pdf
9.1 MB
ECPN) MUDHCo No.25/2015 standard technical specification for building works
Standard Method of Measurment.pdf
11.9 MB
(ECPN) MUDHCo No.26/2015 standard methods of measurements for building works
@etconp
@etconp
👍13🙏1
👉The list of a few combinations
Ctrl + a - select everything
Ctrl + B - Bold
Ctrl + c - copy
Ctrl + d - fill
Ctrl + f - find
Ctrl + G - fat
Ctrl + h - replace
Ctrl + I - italic
Ctrl + k - insert a hypertext link
Ctrl + n - new binder
Ctrl + o - open
Ctrl + P - Print
Ctrl + r - nothing on the right
Ctrl + s - save
Ctrl + u - underlined
Ctrl + v - paste
Ctrl w - close
Ctrl + x - cut
Ctrl + y - repeat
Ctrl + z - cancel
F1 - help
F2 - Edition
F3 - Paste the name
F4 - repeat the last action
F4 - when entering a formula, switch between the absolute / relative references
F5 - goto
F6 - Next Pane
F7 - spell check
F8 - Extension of the fashion
F9 - Recalculate all binders
F10 - Activate Menubar
F11 - new graphic
F12 - save under
Ctrl +: - insert current time
Ctrl +; - insert the current date
Ctrl + "- copy the value of the cell above
Ctrl + ' ' copy the formula from the cell above
Update - adjusting the lag for additional functions in the excel menu
Shift + F1 - what is it?
Shift + F2 - edit cell comment
Shift + F3 - Paste the function in the formula
Shift + F4 - search next
Shift + F5 - Find
Update + f6 - previous panel
Shift + f8 - add to the selection
Shift + F9 - calculate active working sheet
Shift + f10 - contextual menu display
Shift + f11 - new calculation sheet
Shift + f12 - save
Ctrl + f3 - define the name
Ctrl + f4 - close
Ctrl + F5 - XL, the size of the restoration window
Ctrl + F6 - window of the following binder
Update + CTRL + f6 - previous window of the binder
Ctrl + f7 - moving the window
Ctrl + f8 - resizing window
Ctrl + f9 - minimize the binder
Ctrl + f10 - window maximize or restore
Ctrl + F11 - Inset 4.0 Macro Leaf
Ctrl + f1 - open file
Alt + F1 - insert a graphic
Alt + F2 - save under
Alt + F4 - out
Alt + f8 - macro dialogue box
Alt + F11 - Visual Basic Editor
Ctrl + shift + F3 - create a name using the names of the line and column labels
Ctrl + update + f6 - previous window
Ctrl + update + F12 - Print
Alt + update + f1 - new calculation sheet
Alt + update + F2 - save
Alt + = - autosum
Ctrl + ' Tipping Value / formula display
Ctrl + shift + a - insert arguments names in the formula
Alt + Arrow to the bottom - automatic display list
Alt + ' dialogue box style of format
Ctrl + shift + ~ - general format
Ctrl + Shift +! - Format Comma
Ctrl + shift + @ - format of the hour
Ctrl + shift + # - format of the date
Ctrl + shift + $ - currency format
Ctrl + shift +% - percentage format
Ctrl + shift + ^ - exponential format
Ctrl + shift + & - place the edge of the contour around the selected cells
Ctrl + update + _ - delete the edge of the contour
Ctrl + shift + * - Select the current region
Ctrl ++ - insert
Ctrl + - - delete
Ctrl + 1-format of the cell dialogue box
Ctrl + 2 - Bold
Ctrl + 3-Italic
Ctrl + 4-underlined
Ctrl + 5 - Strikethrough
Ctrl + 6-show / hide objects
Ctrl + 7-show / hide the standard tool bar
Ctrl + 8 - Toggle Outline symbols
Ctrl + 9-hide the lines
Ctrl + 0-hide the columns
Ctrl + shift + (-show the lines
Ctrl + update +) - show the columns
Alt or f10 - turn on the menu
Ctrl + tab - in the tool bar: following toolbar
Shift + CTRL + tab - in the tool bar: previous tool bar
Ctrl + tab - in a binder: turn on the next binder
Shift + CTRL + tab - in a binder: activate the previous filing cabinet
Tab - next tool
Shift + tab - previous tool
Come in - make the order
Shift + CTRL + F - Fonts Drop-down
Shift + CTRL + F + F - Cell Tab Police Tab dialog box
Update + CTRL + p - point size drop-down.
@etconp
Ctrl + a - select everything
Ctrl + B - Bold
Ctrl + c - copy
Ctrl + d - fill
Ctrl + f - find
Ctrl + G - fat
Ctrl + h - replace
Ctrl + I - italic
Ctrl + k - insert a hypertext link
Ctrl + n - new binder
Ctrl + o - open
Ctrl + P - Print
Ctrl + r - nothing on the right
Ctrl + s - save
Ctrl + u - underlined
Ctrl + v - paste
Ctrl w - close
Ctrl + x - cut
Ctrl + y - repeat
Ctrl + z - cancel
F1 - help
F2 - Edition
F3 - Paste the name
F4 - repeat the last action
F4 - when entering a formula, switch between the absolute / relative references
F5 - goto
F6 - Next Pane
F7 - spell check
F8 - Extension of the fashion
F9 - Recalculate all binders
F10 - Activate Menubar
F11 - new graphic
F12 - save under
Ctrl +: - insert current time
Ctrl +; - insert the current date
Ctrl + "- copy the value of the cell above
Ctrl + ' ' copy the formula from the cell above
Update - adjusting the lag for additional functions in the excel menu
Shift + F1 - what is it?
Shift + F2 - edit cell comment
Shift + F3 - Paste the function in the formula
Shift + F4 - search next
Shift + F5 - Find
Update + f6 - previous panel
Shift + f8 - add to the selection
Shift + F9 - calculate active working sheet
Shift + f10 - contextual menu display
Shift + f11 - new calculation sheet
Shift + f12 - save
Ctrl + f3 - define the name
Ctrl + f4 - close
Ctrl + F5 - XL, the size of the restoration window
Ctrl + F6 - window of the following binder
Update + CTRL + f6 - previous window of the binder
Ctrl + f7 - moving the window
Ctrl + f8 - resizing window
Ctrl + f9 - minimize the binder
Ctrl + f10 - window maximize or restore
Ctrl + F11 - Inset 4.0 Macro Leaf
Ctrl + f1 - open file
Alt + F1 - insert a graphic
Alt + F2 - save under
Alt + F4 - out
Alt + f8 - macro dialogue box
Alt + F11 - Visual Basic Editor
Ctrl + shift + F3 - create a name using the names of the line and column labels
Ctrl + update + f6 - previous window
Ctrl + update + F12 - Print
Alt + update + f1 - new calculation sheet
Alt + update + F2 - save
Alt + = - autosum
Ctrl + ' Tipping Value / formula display
Ctrl + shift + a - insert arguments names in the formula
Alt + Arrow to the bottom - automatic display list
Alt + ' dialogue box style of format
Ctrl + shift + ~ - general format
Ctrl + Shift +! - Format Comma
Ctrl + shift + @ - format of the hour
Ctrl + shift + # - format of the date
Ctrl + shift + $ - currency format
Ctrl + shift +% - percentage format
Ctrl + shift + ^ - exponential format
Ctrl + shift + & - place the edge of the contour around the selected cells
Ctrl + update + _ - delete the edge of the contour
Ctrl + shift + * - Select the current region
Ctrl ++ - insert
Ctrl + - - delete
Ctrl + 1-format of the cell dialogue box
Ctrl + 2 - Bold
Ctrl + 3-Italic
Ctrl + 4-underlined
Ctrl + 5 - Strikethrough
Ctrl + 6-show / hide objects
Ctrl + 7-show / hide the standard tool bar
Ctrl + 8 - Toggle Outline symbols
Ctrl + 9-hide the lines
Ctrl + 0-hide the columns
Ctrl + shift + (-show the lines
Ctrl + update +) - show the columns
Alt or f10 - turn on the menu
Ctrl + tab - in the tool bar: following toolbar
Shift + CTRL + tab - in the tool bar: previous tool bar
Ctrl + tab - in a binder: turn on the next binder
Shift + CTRL + tab - in a binder: activate the previous filing cabinet
Tab - next tool
Shift + tab - previous tool
Come in - make the order
Shift + CTRL + F - Fonts Drop-down
Shift + CTRL + F + F - Cell Tab Police Tab dialog box
Update + CTRL + p - point size drop-down.
@etconp
👍22💯2🏆2❤1
Cutoff Wall
Cutoff wall ማለት ግድግዳ ነው። የውሃ አካላት አቅራቢያ ለሚገነቡ እስትራክቸሮች የሚገነቡ ግድግዳዎች። ከፍተኛ ground water ያለበት አካባቢም ልንጠቀማቸው እንችላለን።
አገልግሎታቸውም ውሃ በእስትራክቸሮቹ መሠረት (foundation) ስር ገብቶ መሬቱን እንዳይቦረቡረውና ለአደጋ እንዳያጋልጣቸው ነው። በተለይም earthen dam እና culvert ላይ ነው ብዙ ጊዜ አገልግሎት ላይ የሚውሉት።
Cutoff wall ባንገነባ ውሃው በስር ገብቶ አፈሩን እንደትቦ ይሸረሽረዋል። ወይም piping ይፈጥራል። ይሄም ትቦ በውስጡ ውሃ በማሳለፍ እስትራክቸሩን ይጎዳዋል። ቡርቦራውና ውሃው ከከፋም እስትራክቸሩን እንደመርከብ እያንሳፈፈ ሊወስደው ይችላል። ወይም ደሞ ወደታች እንዲሰምጥ (settlement ) እንዲያጋጥመው ሊያደርገው ይችላል። ውሃው የአፈሩን የመሸከም አቅም (bearing capacity) በማዳከም ለተለያዩ ቀውሶችም ያጋልጠዋል።
ግድግዳዎቹ ውሃ በ foundation ስር እንዳይገባ የተወሰነ ጥልቀት ነው የሚከልሉት። ያን ያህል ጥልቀት ገብቶ በ Cutoff wallኡ ስር ቢያልፍም ያን ያህል ከባድ አደጋ ላያደርስ ይችላል። ከባዶው ጋር ሲነፃፀር።
የቡርቦራው መጠን በሚከተሉት ነገሮች ላይ ይወሰናል። Plasticity of soil ፣ gradation ፣ degree of compaction and water pressure
ግንባታቸውም በ masonry ፣ concrete፣ sheet pile ወዘተ ሊደረግ ይችላል። አንዱ ፎቶ ላይ በቀይ የተሰመረውን ያህል ስፋት ያለው ግድግዳ ወደታች ተቀብሯል። የተሻለ ፎቶ ወደፊት የምንለቅ ይሆናል።
@etconp
Cutoff wall ማለት ግድግዳ ነው። የውሃ አካላት አቅራቢያ ለሚገነቡ እስትራክቸሮች የሚገነቡ ግድግዳዎች። ከፍተኛ ground water ያለበት አካባቢም ልንጠቀማቸው እንችላለን።
አገልግሎታቸውም ውሃ በእስትራክቸሮቹ መሠረት (foundation) ስር ገብቶ መሬቱን እንዳይቦረቡረውና ለአደጋ እንዳያጋልጣቸው ነው። በተለይም earthen dam እና culvert ላይ ነው ብዙ ጊዜ አገልግሎት ላይ የሚውሉት።
Cutoff wall ባንገነባ ውሃው በስር ገብቶ አፈሩን እንደትቦ ይሸረሽረዋል። ወይም piping ይፈጥራል። ይሄም ትቦ በውስጡ ውሃ በማሳለፍ እስትራክቸሩን ይጎዳዋል። ቡርቦራውና ውሃው ከከፋም እስትራክቸሩን እንደመርከብ እያንሳፈፈ ሊወስደው ይችላል። ወይም ደሞ ወደታች እንዲሰምጥ (settlement ) እንዲያጋጥመው ሊያደርገው ይችላል። ውሃው የአፈሩን የመሸከም አቅም (bearing capacity) በማዳከም ለተለያዩ ቀውሶችም ያጋልጠዋል።
ግድግዳዎቹ ውሃ በ foundation ስር እንዳይገባ የተወሰነ ጥልቀት ነው የሚከልሉት። ያን ያህል ጥልቀት ገብቶ በ Cutoff wallኡ ስር ቢያልፍም ያን ያህል ከባድ አደጋ ላያደርስ ይችላል። ከባዶው ጋር ሲነፃፀር።
የቡርቦራው መጠን በሚከተሉት ነገሮች ላይ ይወሰናል። Plasticity of soil ፣ gradation ፣ degree of compaction and water pressure
ግንባታቸውም በ masonry ፣ concrete፣ sheet pile ወዘተ ሊደረግ ይችላል። አንዱ ፎቶ ላይ በቀይ የተሰመረውን ያህል ስፋት ያለው ግድግዳ ወደታች ተቀብሯል። የተሻለ ፎቶ ወደፊት የምንለቅ ይሆናል።
@etconp