๐This place is called Novy Okkervil, located in Russia.
โ๏ธThe building is actually one of the largest apartment complexes in the world.
โ๏ธThe population of residents has reached 18,000 people. This 25-story building was constructed in 2015 and has 35 entrances within the complex.
@etconp
โ๏ธThe building is actually one of the largest apartment complexes in the world.
โ๏ธThe population of residents has reached 18,000 people. This 25-story building was constructed in 2015 and has 35 entrances within the complex.
@etconp
๐9โค6๐ฅฐ1
14. Workability of concrete mix with low water cement ratio is determined by
Anonymous Quiz
3%
[ A ] Tensile strength test
77%
[ B ] Slump cone test
17%
[ C ] Compaction factor test
3%
[ D ] Flexural strength test
๐14๐ข1๐1
15. Shrinkage in concrete can be reduced by using
Anonymous Quiz
15%
A. Low water cement ratio
9%
B. More amount of cement in the concrete
13%
C. Presaturated aggregates
30%
D. A&B
33%
E. A&C
๐17๐ข3๐2
Which of the following is appropriate as a simple field method for assessing consistency of concrete?
Anonymous Quiz
17%
Compacting factor
64%
Slump test
12%
Vee-Bee test
7%
Kelly Ball test
๐16โค4๐ข2๐2๐ฅฐ1๐1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ แ.1 แ แแถแฅแต แฐแซ(แแณแแแซ)
แ.2 แแญแซแถ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ แ.1 แ แแถแฅแต แฐแซ(แแณแแแซ)
แ.2 แแญแซแถ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐3๐ฅฐ1
๐๐๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐๐ญ๐ข๐จ๐ง ๐๐๐ฅ๐๐ฒ๐ฌ
๐งDelays are unplanned events that happen during both work planning & execution that result in a ๐๐จ๐ฌ๐ญ &/๐จ๐ซ ๐๐๐ก๐๐๐ฎ๐ฅ๐ ๐๐๐ซ๐ข๐๐ง๐๐ to the ๐๐ซ๐ข๐ ๐ข๐ง๐๐ฅ ๐๐ซ๐จ๐ฃ๐๐๐ญ ๐๐ฅ๐๐ง.
โบDelays can impact your project cost & extend your project delivery schedule.
โ๏ธ๐๐๐ฉ๐ญ๐ฎ๐ซ๐ข๐ง๐ , ๐๐ฌ๐ฌ๐๐ฌ๐ฌ๐ข๐ง๐ & ๐๐๐ฉ๐จ๐ซ๐ญ๐ข๐ง๐ on delays is a standard project management process to manage unplanned events that happen during planning & execution of any major project.
โ๏ธ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐ฎ๐๐ฅ ๐๐ฅ๐๐ฎ๐ฌ๐๐ฌ related to the ๐๐ข๐ฆ๐ ๐๐๐ซ, ๐ ๐ฅ๐จ๐๐ญ ๐๐ฐ๐ง๐๐ซ๐ฌ๐ก๐ข๐ฉ should be considered while ๐๐๐ ๐จ๐ญ๐ข๐๐ญ๐ข๐จ๐ง.
โ๐๐๐๐ฌ๐จ๐ง๐ฌ ๐จ๐ ๐๐๐ฅ๐๐ฒ๐ฌ:
ใOwner
ใContractor
ใExternal
โ๐๐๐ฅ๐๐ฒ๐ฌ ๐๐ซ๐ ๐๐๐ญ๐๐ ๐จ๐ซ๐ข๐ฌ๐๐ ๐๐ฌ:
ใExcusable-Compensable
ใExcusable-Non compensable
ใNon excusable-Non compensable
ใConcurrent
โณ๏ธThere are several delay causes that results a claim, however below listed popular ๐๐๐ฅ๐๐ฒ ๐๐๐ฎ๐ฌ๐๐ฌ;
ใFragnet
ใDisruption
ใDiscrepancies
๐๐๐๐ฅ๐๐ฒ๐ฌ may also result in ๐๐ข๐ญ๐ข๐ ๐๐ญ๐ข๐จ๐ง if there is a ๐๐ข๐ฌ๐ฉ๐ฎ๐ญ๐ over who was responsible for the project delay
@etconp
๐งDelays are unplanned events that happen during both work planning & execution that result in a ๐๐จ๐ฌ๐ญ &/๐จ๐ซ ๐๐๐ก๐๐๐ฎ๐ฅ๐ ๐๐๐ซ๐ข๐๐ง๐๐ to the ๐๐ซ๐ข๐ ๐ข๐ง๐๐ฅ ๐๐ซ๐จ๐ฃ๐๐๐ญ ๐๐ฅ๐๐ง.
โบDelays can impact your project cost & extend your project delivery schedule.
โ๏ธ๐๐๐ฉ๐ญ๐ฎ๐ซ๐ข๐ง๐ , ๐๐ฌ๐ฌ๐๐ฌ๐ฌ๐ข๐ง๐ & ๐๐๐ฉ๐จ๐ซ๐ญ๐ข๐ง๐ on delays is a standard project management process to manage unplanned events that happen during planning & execution of any major project.
โ๏ธ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐ฎ๐๐ฅ ๐๐ฅ๐๐ฎ๐ฌ๐๐ฌ related to the ๐๐ข๐ฆ๐ ๐๐๐ซ, ๐ ๐ฅ๐จ๐๐ญ ๐๐ฐ๐ง๐๐ซ๐ฌ๐ก๐ข๐ฉ should be considered while ๐๐๐ ๐จ๐ญ๐ข๐๐ญ๐ข๐จ๐ง.
โ๐๐๐๐ฌ๐จ๐ง๐ฌ ๐จ๐ ๐๐๐ฅ๐๐ฒ๐ฌ:
ใOwner
ใContractor
ใExternal
โ๐๐๐ฅ๐๐ฒ๐ฌ ๐๐ซ๐ ๐๐๐ญ๐๐ ๐จ๐ซ๐ข๐ฌ๐๐ ๐๐ฌ:
ใExcusable-Compensable
ใExcusable-Non compensable
ใNon excusable-Non compensable
ใConcurrent
โณ๏ธThere are several delay causes that results a claim, however below listed popular ๐๐๐ฅ๐๐ฒ ๐๐๐ฎ๐ฌ๐๐ฌ;
ใFragnet
ใDisruption
ใDiscrepancies
๐๐๐๐ฅ๐๐ฒ๐ฌ may also result in ๐๐ข๐ญ๐ข๐ ๐๐ญ๐ข๐จ๐ง if there is a ๐๐ข๐ฌ๐ฉ๐ฎ๐ญ๐ over who was responsible for the project delay
@etconp
๐18โค1๐1
Intercon Construction Materials
๐ Specialized in construction chemicals, Authorized agent of MC (Conmix) and Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofing Chemicals and Materials
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ External finishes (Quartz paint, Contextra),
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy, Self-level
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Specialized in construction chemicals, Authorized agent of MC (Conmix) and Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofing Chemicals and Materials
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ External finishes (Quartz paint, Contextra),
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy, Self-level
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐แจแ แซแต แชแแ แแแญ แญแแญแซแ แฐแฅแแ แจแแ แ แ แแ
แแแแฝ แแซแจแ แจแแญแชแแ แฅแ แจแณแญแฒ แฐแญแแแ แแฎแแญแต แ แแฑ แแแข
๐ฐแญแ แแฎแแญแต แจแตแ แแแแต แแฐ แ แแตแต แชแ แฒแแ แ แตแฐ แแซ แซแ แแญ แญแแแแข
โ๏ธแแฎแแญแฑ แแแแน แ แฃแตแญ แฅแ แคแแแซแต แฑแแญ แแญแฌแถแฝ แฃ แจแแฐแซแ แคแถแฝ แฎแญแแฌแฝแ แกแจแฐแแฝ แแแแ แญแ แฅ ( แกแ ) แฅแ แฉแแจแญแณแ แดแญแแแ แฎแแ แ แจแแ แฐแแตแฐแ แ แแแต 30,000 แซแฌแแตแญ แแญ แฅแจแฐแแแฃ แจแแแ แแ แข
โ๏ธแแฎแแญแฑ แฒแ แแแ แฆแตแต แแแแฝ แญแแฉแณแ แฅแแฑแ แจแณแญแฒ/ แ แแถแฅแต แฐแญแแแ แฃ แจแฐแฝแจแญแซแชแแฝ แแแแซ แฅแ แจแ แแฅ แแแแ ( แ แแต) แแธแ แข
โบแจแแ แแฃแ แ แฆแตแต แแแแต แฐแฝแจแญแซแชแแฝ แญแแฃแ - แจแแแแชแซแ แจแแฐแซแ แคแถแฝ แฎแญแแฌแฝแ แกแจแฐแแฝ แแ แ แญ (แกแ) แฃ แ แฐแฅแ แฌแตแถแซแแต (แ แณ แคแต) แฅแ แ แฅแญแแ แฅแ แ แแ แแญแฃ แ แแ แ แแจแฐแ แแแฐ แแแต แแซแแณ แคแต แ แฉแ แแธแแข
โณ๏ธแแแฃแณแแ แจแปแญแแ แแแ แฉแฃแแซ แแแ แฑ แขแแฐแญแแฝแแ แขแฎแแแญ แฅแ แดแญแแซแ แแฉแ แ แแฅแแต แฅแซแซแแฐแ แแ แข แแแฃแณแ แจแฐแแแจ แแแต แแฉ แขแแแ แ แแ แจแแตแแแจแฑแต แฐแจแ แแญ แฐแญแทแ แข
๐งแจแฎแชแฐแญ แแแฑ แจแแญแฃ แ แฅแแต แจแแแ แญแ แแฎแแญแต แฒแ แแแ แฃ แ แซแต แชแ แแญ แ แแณแ แแ แแญ แฐแฝแจแญแซแชแแฝแ แแแ แแจแต แแ แต แญแแแ แฐแฅแ แญแ แ แแแข
Via WZ news
@etconp
๐ฐแญแ แแฎแแญแต แจแตแ แแแแต แแฐ แ แแตแต แชแ แฒแแ แ แตแฐ แแซ แซแ แแญ แญแแแแข
โ๏ธแแฎแแญแฑ แแแแน แ แฃแตแญ แฅแ แคแแแซแต แฑแแญ แแญแฌแถแฝ แฃ แจแแฐแซแ แคแถแฝ แฎแญแแฌแฝแ แกแจแฐแแฝ แแแแ แญแ แฅ ( แกแ ) แฅแ แฉแแจแญแณแ แดแญแแแ แฎแแ แ แจแแ แฐแแตแฐแ แ แแแต 30,000 แซแฌแแตแญ แแญ แฅแจแฐแแแฃ แจแแแ แแ แข
โ๏ธแแฎแแญแฑ แฒแ แแแ แฆแตแต แแแแฝ แญแแฉแณแ แฅแแฑแ แจแณแญแฒ/ แ แแถแฅแต แฐแญแแแ แฃ แจแฐแฝแจแญแซแชแแฝ แแแแซ แฅแ แจแ แแฅ แแแแ ( แ แแต) แแธแ แข
โบแจแแ แแฃแ แ แฆแตแต แแแแต แฐแฝแจแญแซแชแแฝ แญแแฃแ - แจแแแแชแซแ แจแแฐแซแ แคแถแฝ แฎแญแแฌแฝแ แกแจแฐแแฝ แแ แ แญ (แกแ) แฃ แ แฐแฅแ แฌแตแถแซแแต (แ แณ แคแต) แฅแ แ แฅแญแแ แฅแ แ แแ แแญแฃ แ แแ แ แแจแฐแ แแแฐ แแแต แแซแแณ แคแต แ แฉแ แแธแแข
โณ๏ธแแแฃแณแแ แจแปแญแแ แแแ แฉแฃแแซ แแแ แฑ แขแแฐแญแแฝแแ แขแฎแแแญ แฅแ แดแญแแซแ แแฉแ แ แแฅแแต แฅแซแซแแฐแ แแ แข แแแฃแณแ แจแฐแแแจ แแแต แแฉ แขแแแ แ แแ แจแแตแแแจแฑแต แฐแจแ แแญ แฐแญแทแ แข
๐งแจแฎแชแฐแญ แแแฑ แจแแญแฃ แ แฅแแต แจแแแ แญแ แแฎแแญแต แฒแ แแแ แฃ แ แซแต แชแ แแญ แ แแณแ แแ แแญ แฐแฝแจแญแซแชแแฝแ แแแ แแจแต แแ แต แญแแแ แฐแฅแ แญแ แ แแแข
Via WZ news
@etconp
โค4๐4
๐แ แขแตแฎแตแซ แแแ แแ แจแฐแฃแแแต แจแ แญแฃ แแแญ แฉแแจแญแฒแฒ แจแแตแฐแแชแซ แฅแ แฎแแแญแแแฒแญ แตแแปแแญแแต แแตแแณแ แ แแฌแ แแแต แฐแแจแแข
๐งแตแ แแตแแณแ แฆ
- แจแแตแแณแ แแแฃแณ แจแฐแแแจแ แ แแแขแต 29 /2007 แ/แ แแแข
- แแแแฃแณ 1.4 แขแแฎแ แฅแญ แแช แแฅแถแ แณแแข
- 25 แบแ แซแฌ แแญ แแ แซแจแแแข
- แ แแ แแญ แฅแ แ แแแแ แจแฐแฃแ แจแแญแแ แแตแซแ แจแแญแแซ แดแญแแแแแฝ แ แแตแข
- 600 แฐแจแแธแแ แจแ แ แ แ แแแแฝ แ แแตแข
- แจแแแฎแแฐแญ แ แแกแแแต แ แแแแแต แจแแฐแฅแ แต แฆแณ แ แแแข
- แจแแตแฅ แฐแ แฃ แจแแถ แฅแแ แฃ แจแแปแแตแ แฅแแถแฝ แฃ แจแแ แธแ แฝแแต แฃ แจแ แแแต แ แแญแฃ แจแ แฅแแตแ แจแตแ แ แฅแแฎ ... แแแฝแ แ แญแแแแฝ แญแฐแกแ แณแแข
- แฆแญแฒแ แ แจแแแจแตแ แต แญแแ / แฆแญแฒแ แแ แ แจแญแแ แจแแซแณแญแต แแตแแญ แฃ แจแฒแ แณแ แคแญแตแฌแญ แแฝแ แฃ แฒแฒ แตแซแ แฃ แคแ แ แญ แ แญ แฃ แแแแ แ แแตแซ แณแแแต แแฝแแฝ แ แแตแข
- แ แแ แ แ แ แตแซ แฒแแแญ 100 แตแแปแแตแต แแชแแฝ แฅแ แจ2 แบแ แ แแญ แฐแซแฐแแฝ แ แแแแแต แญแฐแกแ แณแแข
- แจ7 แแแฎแ แ แแญ แแแแ แจแ แซแฃแขแแ แจแ แแซแฃแฝ แญแแแฝแฃ แแแฝ แแแชแแฝ แ แ แ แแแญแ แ แตแแปแแฒ แฐแจแ แ แแแแแต แญแฐแฃแแข
Via PMO
@etconp
๐งแตแ แแตแแณแ แฆ
- แจแแตแแณแ แแแฃแณ แจแฐแแแจแ แ แแแขแต 29 /2007 แ/แ แแแข
- แแแแฃแณ 1.4 แขแแฎแ แฅแญ แแช แแฅแถแ แณแแข
- 25 แบแ แซแฌ แแญ แแ แซแจแแแข
- แ แแ แแญ แฅแ แ แแแแ แจแฐแฃแ แจแแญแแ แแตแซแ แจแแญแแซ แดแญแแแแแฝ แ แแตแข
- 600 แฐแจแแธแแ แจแ แ แ แ แแแแฝ แ แแตแข
- แจแแแฎแแฐแญ แ แแกแแแต แ แแแแแต แจแแฐแฅแ แต แฆแณ แ แแแข
- แจแแตแฅ แฐแ แฃ แจแแถ แฅแแ แฃ แจแแปแแตแ แฅแแถแฝ แฃ แจแแ แธแ แฝแแต แฃ แจแ แแแต แ แแญแฃ แจแ แฅแแตแ แจแตแ แ แฅแแฎ ... แแแฝแ แ แญแแแแฝ แญแฐแกแ แณแแข
- แฆแญแฒแ แ แจแแแจแตแ แต แญแแ / แฆแญแฒแ แแ แ แจแญแแ แจแแซแณแญแต แแตแแญ แฃ แจแฒแ แณแ แคแญแตแฌแญ แแฝแ แฃ แฒแฒ แตแซแ แฃ แคแ แ แญ แ แญ แฃ แแแแ แ แแตแซ แณแแแต แแฝแแฝ แ แแตแข
- แ แแ แ แ แ แตแซ แฒแแแญ 100 แตแแปแแตแต แแชแแฝ แฅแ แจ2 แบแ แ แแญ แฐแซแฐแแฝ แ แแแแแต แญแฐแกแ แณแแข
- แจ7 แแแฎแ แ แแญ แแแแ แจแ แซแฃแขแแ แจแ แแซแฃแฝ แญแแแฝแฃ แแแฝ แแแชแแฝ แ แ แ แแแญแ แ แตแแปแแฒ แฐแจแ แ แแแแแต แญแฐแฃแแข
Via PMO
@etconp
๐20โค7
๐แ แแแ แจแ แจแญ แแญ แแตแ
๐แ แฒแต แ แ แฃโค๏ธ
Via แ แแ แณแแฐ
@etconp
๐แ แฒแต แ แ แฃโค๏ธ
Via แ แแ แณแแฐ
@etconp
๐7โค5
Obligatory points in highway engineering are controls points governing the
Anonymous Quiz
17%
load points on highway bridges
16%
locations to survey vehicles of the highway
23%
traffic survey of the highway
44%
alignment of the highway
๐9โค2
Which of the following levelling method is used to determine the difference of elevation of two points that are quite apart
Anonymous Quiz
22%
Check levelling
16%
Fly levelling
35%
Reciprocal levelling
28%
Simple levelling
๐9โค3๐3
A surveyor measured the distance between two points on the plan drawn to a scale 1cm = 40m and the result was 468m. later however, he discovered that he had used a scale of 1cm = 20m find the true distance the two points
Anonymous Quiz
10%
1023m
11%
๏ 451m
26%
220m
52%
936m
โค13๐6๐ฅฐ2
Intercon Construction Materials
๐ Specialized in construction chemicals, Authorized agent of MC (Conmix) and Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofing Chemicals and Materials
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ External finishes (Quartz paint, Contextra),
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy, Self-level
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Specialized in construction chemicals, Authorized agent of MC (Conmix) and Weber
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofing Chemicals and Materials
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ External finishes (Quartz paint, Contextra),
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy, Self-level
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐5
Media is too big
VIEW IN TELEGRAM
๐ซตLook this video
๐งBest concrete bricks building tutorial.
๐ฉPut your thoughts advantage and disadvantages of this bricks.
๐Contact me ๐ฃ @ETCONp_Bot
๐Join @ETCONpWORK
@etconp
๐งBest concrete bricks building tutorial.
๐ฉPut your thoughts advantage and disadvantages of this bricks.
๐Contact me ๐ฃ @ETCONp_Bot
๐Join @ETCONpWORK
@etconp
๐4โค2๐1
This media is not supported in your browser
VIEW IN TELEGRAM
๐Bridge construction is interesting,
๐Base isolation is a seismic retrofitting technique used in building construction to minimize earthquake damage. It involves placing a building on flexible bearings or isolators, typically made of rubber or sliding materials, situated between the structure and its foundation. These isolators decouple the building from ground motion during an earthquake, allowing the base to move independently of the superstructure.
@etconp
๐Base isolation is a seismic retrofitting technique used in building construction to minimize earthquake damage. It involves placing a building on flexible bearings or isolators, typically made of rubber or sliding materials, situated between the structure and its foundation. These isolators decouple the building from ground motion during an earthquake, allowing the base to move independently of the superstructure.
@etconp
โค8๐3
@etconp 2016 4th Quarter Direct Cost.pdf
19.6 MB
๐ทแ 2016 แ.แ แจ แ แซแฐแ แฉแฅ แแแต แฐแแฃแซแ แจแแฐแจแ แจแแแฃแณ แฅแซแแฝ แญแแ แแฅแฐแ แแ แฐแแ (4th Quarter Construction Works of Direct Cost)
๐แ แฐแแญ แจแแ แฐแแ (BOQ - Priced bill of Quantities) แแแณแแก แจแฒแแญแ แ แแซแชแแฝ แฅแ แจแแฎแแญแต แแแแฒแถแฝ แญแ แแฝแแแข
๐ซแ แแแฝ แจแแแชแฑ แญแแแฝ แจแแตแแ แจแฎแแตแตแซแญแฝแ แฃแแแซแแฝแ แฅแแฐแแแป แแณแฅ แญแ แ แแฝแแแข
@etconp
๐แ แฐแแญ แจแแ แฐแแ (BOQ - Priced bill of Quantities) แแแณแแก แจแฒแแญแ แ แแซแชแแฝ แฅแ แจแแฎแแญแต แแแแฒแถแฝ แญแ แแฝแแแข
๐ซแ แแแฝ แจแแแชแฑ แญแแแฝ แจแแตแแ แจแฎแแตแตแซแญแฝแ แฃแแแซแแฝแ แฅแแฐแแแป แแณแฅ แญแ แ แแฝแแแข
@etconp
๐18๐8โค4
#ADVERTISEMENTS
๐ข๐ข #Big_Discount
Class start ๐#แแแ_13
Price
Ms_project 3000 2200 birr๐ฑ
Primavera2800 2300๐ฑ
Auto_CAD4200 2000๐ฑ
ETABS2800 2100
โก๏ธToday's decision is the basis for tomorrow!
โก๏ธDecide Today!
โก๏ธGet more skill by the day! Increase your employability!
โก๏ธconsideration is on First come First serve basis.
๐๐โโHurry up, we have LIMITED space!
Get your:-
โ- #Professional skill
โ- #Certification and
โ- #cost_effective training with us.
#yehatraining #skilldevelopment #certificate #quantityserving
#addisabebaethiopia #training_center
#project_management_training
#training #constructionsoftware
For further info
Contact us :+251993749494 | @yehaengineering
๐ http://yehaengineeringplc.com
#Address:- Mexico around st. lideta, แแแญ แจแแ แซ แแแจแ 7th floor, #701
"Let's walk what we talk!"
๐ข๐ข #Big_Discount
Class start ๐#แแแ_13
Price
Ms_project
Primavera
Auto_CAD
ETABS
โก๏ธToday's decision is the basis for tomorrow!
โก๏ธDecide Today!
โก๏ธGet more skill by the day! Increase your employability!
โก๏ธconsideration is on First come First serve basis.
๐๐โโHurry up, we have LIMITED space!
Get your:-
โ- #Professional skill
โ- #Certification and
โ- #cost_effective training with us.
#yehatraining #skilldevelopment #certificate #quantityserving
#addisabebaethiopia #training_center
#project_management_training
#training #constructionsoftware
For further info
Contact us :+251993749494 | @yehaengineering
๐ http://yehaengineeringplc.com
#Address:- Mexico around st. lideta, แแแญ แจแแ แซ แแแจแ 7th floor, #701
"Let's walk what we talk!"
๐6โค2๐1
๐Types of failure
โถ๏ธStructural failure can occur from many types of problems, most of which are unique to different industries and structural types. However, most can be traced to one of five main causes.
โถ๏ธThe first is that the structure is not strong and tough enough to support the load, due to either its size, shape, or choice of material. If the structure or component is not strong enough, catastrophic failure can occur when the structure is stressed beyond its critical stress level.
.
โถ๏ธThe second type of failure is from fatigue or corrosion, caused by instability in the structureโs geometry, design or material properties.
๐ฑThese failures usually begin when cracks form at stress points, such as squared corners or bolt holes too close to the material's edge.
๐ฑThese cracks grow as the material is repeatedly stressed and unloaded (cyclic loading), eventually reaching a critical length and causing the structure to suddenly fail under normal loading conditions.
.
โถ๏ธThe third type of failure is caused by manufacturing errors, including improper selection of materials, incorrect sizing, improper heat treating , failing to adhere to the design, or shoddy workmanship.
๐ฑThis type of failure can occur at any time and is usually
unpredictable.
:
โถ๏ธThe fourth type of failure is from the use of defective materials.
๐ฑThis type of failure is also unpredictable, since the material may have been improperly manufactured or damaged from prior use.
:
โถ๏ธThe fifth cause of failure is from lack of consideration of unexpected problems.
๐ฑThis type of failure can be caused by events such as vandalism, sabotage, or natural disasters. It can also occur if those who use and maintain the construction are not properly trained and overstress the structure.
๐Reasons Structures Fail
โถ๏ธDefective construction that causes failure may be due to
numerous reasons that may not be easy to predict before or
during the construction. The major causes of structural
failure are defective designs that have not determined the
actual loading conditions on the structural elements.
โบInferior construction materials may also be the cause since the loads are calculated for materials of specific characteristics.
Structure may fail even if the design is satisfactory, but the
materials are not able to withstand the loads. Employment of unskilled labor on construction work is another reason for structural failures. Therefore, it is important that the owners,designers, and builders are fully conscious of the reasons of failure, and undertake all preventive measures.
@etconp
โถ๏ธStructural failure can occur from many types of problems, most of which are unique to different industries and structural types. However, most can be traced to one of five main causes.
โถ๏ธThe first is that the structure is not strong and tough enough to support the load, due to either its size, shape, or choice of material. If the structure or component is not strong enough, catastrophic failure can occur when the structure is stressed beyond its critical stress level.
.
โถ๏ธThe second type of failure is from fatigue or corrosion, caused by instability in the structureโs geometry, design or material properties.
๐ฑThese failures usually begin when cracks form at stress points, such as squared corners or bolt holes too close to the material's edge.
๐ฑThese cracks grow as the material is repeatedly stressed and unloaded (cyclic loading), eventually reaching a critical length and causing the structure to suddenly fail under normal loading conditions.
.
โถ๏ธThe third type of failure is caused by manufacturing errors, including improper selection of materials, incorrect sizing, improper heat treating , failing to adhere to the design, or shoddy workmanship.
๐ฑThis type of failure can occur at any time and is usually
unpredictable.
:
โถ๏ธThe fourth type of failure is from the use of defective materials.
๐ฑThis type of failure is also unpredictable, since the material may have been improperly manufactured or damaged from prior use.
:
โถ๏ธThe fifth cause of failure is from lack of consideration of unexpected problems.
๐ฑThis type of failure can be caused by events such as vandalism, sabotage, or natural disasters. It can also occur if those who use and maintain the construction are not properly trained and overstress the structure.
๐Reasons Structures Fail
โถ๏ธDefective construction that causes failure may be due to
numerous reasons that may not be easy to predict before or
during the construction. The major causes of structural
failure are defective designs that have not determined the
actual loading conditions on the structural elements.
โบInferior construction materials may also be the cause since the loads are calculated for materials of specific characteristics.
Structure may fail even if the design is satisfactory, but the
materials are not able to withstand the loads. Employment of unskilled labor on construction work is another reason for structural failures. Therefore, it is important that the owners,designers, and builders are fully conscious of the reasons of failure, and undertake all preventive measures.
@etconp
๐16โค1