👉Delay In Construction

🚧𝑬𝒙𝒄𝒖𝒔𝒂𝒃𝒍𝒆 𝒗𝒔. 𝑰𝒏𝒆𝒙𝒄𝒖𝒔𝒂𝒃𝒍𝒆 𝑫𝒆𝒍𝒂𝒚𝒔

⭐️Construction industry is like a roller coaster as it goes through different phases while completing its journey.

▶️So, it is imperative for the contractors to tighten their seat belts while holding the hand carriers carefully.

▶️The reason is that construction projects are huge investments & slight negligence can hinder successful projects completion.

💫However, there comes a time when everything becomes useless & no effort can stop the project from deferment.

▶️Yes, delays are indeed the most significant cause of disputes among the contracting parties.

🏷Generally, the delays are categorized as excusable & inexcusable based on the circumstances & impact factor.

●𝐄𝐱𝐜𝐮𝐬𝐚𝐛𝐥𝐞 𝐃𝐞𝐥𝐚𝐲𝐬

These are referred to the postponements are occur owing to unavoidable/ unforeseen conditions related to environment & legal processes or circumstances beyond human control. The reasons might be foreseeable but can't be escaped.

》Causes of Excusable Delays

•Delay in requirements approvals
•Inability to manage change orders
•Adverse weather conditions
•Delays in government permits
•Errors in project specifications
•Social chaos, protests & wars

●𝐈𝐧𝐞𝐱𝐜𝐮𝐬𝐚𝐛𝐥𝐞 𝐃𝐞𝐥𝐚𝐲𝐬

⏺Delays can be avoided in some cases, are the result of contractors’ negligence. In this way, the later type of postponements can be avoided, but if not, disputes occur.
So, Inexcusable delays are the ones that could have been easily escaped by the contractor through in-time decisions.

⏺Nevertheless, disputes aren't favorable for successful projects completion. It can cause acute damages to all parties involved in the projects.

▶️It is essential to estimate the impact of delays in terms of money to make the compensation process easier for contracting parties.

》Causes of Inexcusable Delays

•Delay in initiating the project
•Unavailability of materials
•Shortage of necessary tools
•Poor scheduling and planning
•Negligence of contractors
•Delay in project funds release

@etconp
👍12
✨ኢ.ኬ.ቲ ሴራሚክስ
💥ሴራሚክ ታይልስ

✨ለእያንዳንዱ ስራና ፍላጎት ተስማሚ ሆነው በተሰሩ ከፍተኛ ጥራት ባላቸው የ ኢ.ኬ.ቲ ሴራሚክስ ሰፊ አማራጮች ፍጹም የሆነ ውበት እና ጥንካሬን በአንድ ላይ ያግኙ። ምርቶቻችንን ዛሬውኑ ይመልከቱ እና ቤትዎን ወይም ቢሮዎን ጊዜ በማይሽረው ውበት ያሳምሩ።

✨EKT CERAMIS
💥CRAMICS TILES

✨Discover the perfect blend of elegance and durability with EKT Ceramics' wide range of high-quality ceramic tiles, designed to suit every style and need. Explore our collection today and elevate your home or office with timeless beauty.

📍Head Office
Location: Derar Mall 9th floor opposite to Sahlite Mihret Church
📱 +251 929 93 0206
📱 +251 929 53 1707
👍4❤2
👉ችግሩ የተፈጠረው የቱ ጋር ነው?

🏷ከላይ ከምትመለከቷቸው ምስሎች አንደኛውና የመጀመሪያው በአርክቴክቸሮች ተዘጋጅቶ ለሥራ ተቋራጮች የቀረበ ዲዛይን ሲሆን፣ ሁለተኛው ደግሞ በመጨረሻ አሸናፊው ሥራ ተቋራጭ ገንብቶ ለደንበኛው ያቀረበው ግንባታ ነው።

💫ጉዳዩ የሆነው ህንድ ሀይደርአባድ ውስጥ ሲሆን፣ የሕንፃው ባለቤት "National Fisheries Development Board' ነው።

🚧ችግሩ የተፈጠረው የቱ ጋር ነው?ወይንስ ሁለቱ ወሳኝ አካላት ጨርሶውኑ አይግባቡም ወይም አይናበብም ማለት ነው?

@etconp
👍4❤1😢1
የቅድሚያ ክፍያ ( Advance Payment)


💫በዚህ ፅሁፍ ቅድሚያ ክፍያ ምንድ ነው? አላማውስ? አቅራቢውና ተጠቃሚውስ ማን ነው? ያለባቸው ግዴታስ ምን ይመስላል? የሚሉትን ነጥቦች እንዳስሳለን፡፡

🚧የቅድሚያ ክፍያ ዋስትና በኮንስትራክሽን ዉሎች ከሚዘወተሩ የዋስትና አይነቶች አንዱና የተለመደዉ ነው፡፡ ነገር ግን በመጀመሪያ የቅድሚያ ክፍያ ምንድ ነው የሚለውን እንይ፡፡

⭐️በመንግስት ግዢ አዋጁ አንቀፅ 48 ላይ በመንግስት ገዥ አፈፃፀም ጊዚ አቅራቢዎች ከክፍያው ጋር እኩል የሆነ ዋስትና ሲያቅርቡ የቅድሚያ ክፍያ እንደሚስጥ ይገልፃል፡፡

🏷ይህ የቅድሚያ ክፍያ ገንዘብ ከጠቅላላው የውሉ ዋጋ ሰላሳ ፐርሰንት (30%) መብለጥ እንደለለበትና ሊከፈል የሚችለው የገንዘብ መጠንም በጨረታ መመሪያው ላይ መገለፅ እንደሚገባው የመንግስት ግዢ መመሪያ አንቀፅ 16.26.1 ያስገድዳል፡፡

▶️ተዋዋይ ተቋራጮችም ይህንን የቅድሚያ ክፍያ ገንዘብ ለማግኘት ከማመልከቻ ጋር የቅድሚያ ክፍያ ዋስትና ከታወቀ ባንክ የተረጋገጠ ቼክ ወይም በሁኔታዎች ያልተገደበ ዋስትና (Unconditional Bank Guarantee) ማቅረብ ይጠበቅባቸዋል ነገር ግን የሐገር ውስጥ ተቋራጮች ሲሆኑ በሁኔታዎች የተገደበ ዋስትና ከኢንሹራንስ ተቋማት ማቅረብ ይችላሉ፡፡

▶️የሚያቀርቡትም ዋስትና ከሚጠይቁት የቅድሚያ ክፍያ ገንዘብ ጋር እኩል መሆን አለበት ይሁን እንጂ ጥቃቅንና አነስተኛ ኢንተርፕራይዞች በዋስትናው ምትክ ከመሰረታቸውና ከሚከታተላቸው ባለሰልጣን መስሪያ ቤት የሚያቀርቡት ደብዳቤ እንደ ዋስትና ተቀባይነት ይኖረዋል ሲል የመመሪያው አንቀፅ 16.20.5(ሐ) ይደነግጋል፡፡

⏺ከዚህም በፊት ግን ተቋራጩ በግዢ ስነ-ስርዓቱ ያሸነፈውን ዉል መፈረምና የውል ማስከበሪያ ገንዘብ ወይም ዋስትና ያቀረበ መሆን አለበት (አዋጅ ቁ.649/2001፣ አንቀፅ 48/2/)፡፡

⏺በአዋጁ አንቀፅ 78(3) መሰረት የመንግስት ግዢ ኤጀንሲ አዋጁንና መመሪያውን ተግባራዊ ለማድረግ ያወጣው መደበኛ የውል ሠነድ ጠቅላላ ሁኔታ [The Public Procurement Agency Standard Bidding Document: General Condition of Contracts: PPA-2011] ክሎስ 60(1) ላይ የቅድሚያ ክፍያው ለተቋራጩ መከፈል ያለበት ተቋራጩ ስራውን ለመጀመር የሚያወጣውን ወጪ ለመሸፈን እነዲረዳው ታስቦ ሲሆን ይህም የሚከፈለው ተቋራጩ ለግንባታ ስራው የሚያገለግሉ ማሽኖችን ዕቃዎችንና መሳሪያዎችን መግዛቱን ወይም ማዘዙን የሚያሳይ መረጃ ሲያቀርብ መሆኑን ያስቀምጣል፡፡

▶️በስራው ጊዜያትም ገንዘቡን እነዚህን ዕቃዎችና ማሽኖችን ለመግዛትና ወደ ግንባታ ቦታው ለማንቀሳቀስ/ለማዘዋወር የተጠቀመበት መሆኑን የሚያሳይ ፋክቱር/Invoices ለኢንጂነሩ በማቅረብ ማሳየት ይጠበቅበታል፡፡

⏺ከዚህ ጋር ተያይዞ በተጨባጭ የሚስተዋለው ችግር  ብዙ ጊዜ ተቋራጮች የቅድሚያ ክፍያውን ለታለመለት አላማ አያውሉም የሚል ሲሆን ይህም ችግር በተለይ በግንባታው ዘርፍ በተሰማሩ ጥቃቅንና አነስተኛ ኢንተርፕራይዞች ላይ ጎልቶ ይታያል፡፡ ይህም ትልቁ ችግር መነሻው እነዚህ ተቋማት ምንም የሚያቀርቡት ዋስትና ሳይኖር ባቋቋማቸው መስሪያ ቤት ደብዳቤ ላይ ብቻ ተማምኖ ክፍያው ስለሚሰጣቸው ነው፡፡ ለዚህም ሲባል ጥቃቅንና አነስተኛ ኢንተርፕራይዞችን ወይም በሁኔታዎች ላይ የተመሰረተ የኢንሹራንስ ዋስትና ያቀረቡ ተቋራጮችን አሰሪው/ተዋዋዩ የመንግስት አካል አስፈላጊ ሲሆን፡ የቅድሚያ ክፍያው ገቢ የሚደረግበትና ከውሉ ጋር ለተያያዙ ወጪዎች ብቻ በመንግስትና በኢንተረፕራይዙ ወይም በኮንትራክተሩ ተወካዮች በጋራ ፊርማ ወጪ የሚደረግ የተለየ የባንክ አካውንት እንዲከፈት ሊያዝ ይችላል፤ ገንዘቡም ለታሰበለት አላማ ብቻ እንዲውል የተለየ ስምምነት መፈራረም አለበት፡፡

⏺ስለዚህ የቅድሚያ ክፍያ ማለት ተቋራጩ ለስራው ማስጀመሪያ የሚሆኑትን የተለያዩ የግንባታ መሳሪያዎች መግዢያነት የሚውል በአሰሪው የመንግስት መስሪያ ቤት በቅድሚያ የሚከፈለው ገንዘብ ነው፡፡

⏺ይህም ምንም ስራ ሳይሰራ የሚከፈል ገንዘብ ስለሆነ ለተቋራጩ ዕዳ ወይም ብድር ነው ስለሆነም ተቋራጩ ብድሩን እንዲምልስ ይገደዳል ማለት ነው፡፡

⏺በመሆኑም ተቋራጩ ይህንን ብድር እንዴት ይመልሳል የሚለው አንዳንድ ጊዜ በግንባታ ውሎች ላይ አለመግባባት ያስነሳል፡፡

▶️በግዢ መመሪያው አንቀፅ 16.26.9 ላይ እንደተገለፀው ለተቋራጮችና ለጥቃቅንና አነስተኛ ኢንተርፕራይዞች የተከፈለ የቅድሚያ ክፍያ በውሉ አፈፃፀም የተለያዩ ደረጃዎች ላይ በክፍያ ሰርተፍኬት ፀድቀው ከሚከፈሏቸው እያንዳንዱ ክፍያዎች ላይ እየተቀነሰ ሙሉ የቅድሚያ ክፍያው እስኪመልስ ድረስ የመንግስት መስሪያ ቤቱ ያስቅራል ይህም ማለት ተቋራጩ የወሰደውን የቅድሚያ ክፍያ ሙሉውን ከአንድ ወይም ከሁለት ክፍያዎች ላይ የመክፈል ግዴታ የለበትም፡ አሰሪ መስሪያ ቤቱም ሙሉ ክፍያውን አንዴ ቀንሶ ማስቀረት አይችልም ማለት ነው፡፡

▶️የመንግስት መስሪያ ቤቶች አንዳድ ጊዜ ሙሉ ቅድሚያ ክፍያውን በአንዴ ቀንሰው በማስቀረት ከተቋራጮች ጋ እሰጣገባ ሲገጥሙ ይስተዋላል ይህ ከህጉ አግባብ ውጭ ነው፡፡

🚧የቅድሚያ ክፍያ ገንዘቡ ሙሉውን ሳይመለስ በተለያዩ ምክንያቶች ውሉ ቢቋረጥ የአሰሪ መስሪያ ቤቱ የከፈለውን ገንዘብ ማስመለስ እንዲያስችለው ተቋራጩ የሚያቀርበው ዋስትና ክፍያው እስኪጠናቀቅ ድረስ አስገዳጅነት እንደሚኖውም መመሪያው ይገልፃል፡፡

▶️ውሉ ቢቋረጥ እንኳን ያልተከፈለውን የቅድሚያ ክፍያ ዋስትናው ወዲያውኑ ካለምንም መቃወሚያ እንዲከፍል ይገደዳል ይላል የመደበኛ የውል ሠነድ ጠቅላላ ሁኔታ ክሎስ 60.7፡፡

Via Girum Getu

@etconp
👍18❤4🙏1
👉የፌዴራል ቤቶች ኮርፖሬሽን የበርካታ አገራት ባለሀብቶች ጥምረት ከሆነው ከዓለም ዓቀፉ የንግድና የፋይንናስ ተቋም (Global Trade & Finance) ጋር የመግባቢያ ስምምነት ተፈራርሟል፡፡

ስምምነቱን የፌዴራል ቤቶች ኮርፖሬሽን ዋና ስራ አስፈጻሚ ክቡር አቶ ረሻድ ከማል የዓለም ዓቀፉ የንግድና የፋይንናስ ተቋም ዋና ሥራ አስፈጻሚ ሚስስ ኬጀ ሊ ፈርመዋል፡፡

በፕሮጀክት ፋይናንስ ፣ በቤት ግንባታና አስተዳደር ቴክኖሎጂ አቅርቦት ላይ እና በቬንቸር ካፒታል ኢንቨስትመንት  ዙሪያ ኮርፖሬሽኑ ከዓለም ዓቀፉ የንግድና የፋይናንስ ተቋም ድጋፍ የሚያገኝበትን እድል የሚፈጥር ነው፡፡

የፌዴራል ቤቶች ኮርፖሬሽን ዋና ሥራ አስፈጻሚ ክቡር አቶ ረሻድ ከማል ኮርፖሬሽኑ የመኖሪያ ቤት እጥረትን ለመቅረፍና የፋይናንስ አቅሙን ለማጠናከር በርካታ ተግባራት እያከናወነ መሆኑን አንስተው ከጠንካራ ዓለም ዓቀፍ  የፋይናንስ ምንጮች ጋር በጋራ ለመስራት ጥረት እያደረገ መሆኑን ተናግረዋል፡፡

ከዓለም ዓቀፉ የንግድና የፋይናንስ ተቋም ጋርም በተለይ በፕሮጀክት ፋይናንስ ዙሪያ በጋራ ለመስራት ኮርፖሬሽኑ ፍላጎት እንዳለው ክቡር አቶ ረሻድ ከማል ተናግረዋል፡፡ 

የዓለም ዓቀፉ የንግድና የፋይንናስ ተቋም ዋና ሥራ አስፈጻሚ ሚስስ ኬጀ ሊ  በዚሁ ወቅት እንደተናገሩት ኮርፖሬሽኑ ኢትዮጵያ ውስጥ ሊለማ የሚችል ግዙፍ ሀብት ባለቤት በመሆኑ በቂ የፋይናንስ አቅርቦት እንዲኖረው ተቋማቸው እንደሚሰራም ተናረዋል፡፡

ከዚህም በተጨማሪም ተቋማቸው ከበርካታ ስመ ጥር ዓለም ዓቀፍ ኩባንያዎች ጋር  በጥምረት የሚሰራ በመሆኑ  የኮርፖሬሽኑን ትራፋማነት በሚጨምሩ ሌሎች ተግባራትም በጋራ ለመስራት ተቋማቸው ቁርጠኛ መሆኑን  ዋና ሥራ አስፈጻሚ ሚስስ ኬጀ ሊ  ተናግረዋል፡፡

@etconp
👍9❤3
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

👉ሁሉን በአንድ ቦታ የሚያገኙበት እና ለሁሉም ቅርብ

🔰ምን ይፈልጋሉ?

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

✂️ላሜራ ማስቆራረጥ ማስበሳት ወይንም ማሳጠፍ ከፈለጉ  እንዳያስቡ ሁሉንም ማሽኖች አስገብተናል

🔗ፌሮ (ቶንዲኖ) ጥርስ ማስበጀት ወይንም ማሳጠፍ ካሰቡ ለሱም ማሽኑ በጃችን ነዉ

📐ማንኛዉንም የሞደፊክ ስራዎችን የሚሰሩ ብቁ ባለሙያዎችም አሉን

☎️ይደዉሉልን ያማክሩን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

አድራሻችን፦ ቁ.1 አዉቶብስ ተራ(መሳለሚያ)
                    ቁ.2 መርካቶ
                    ቁ.3 ተክለሀይማኖት

0904040477
0911016833
👍3
👉Did you know?

💫The reasons for honeycomb in concrete:

1. Inappropriate workability of concrete.

2. Use of stiff concrete mix or the concrete is already set before placing.

3. Improper vibration of concrete in formwork.

4. Over reinforcement.

5. Use of larger size aggregates in excessive amounts.

6. Formwork is not rigid and watertight.

7. Concrete is poured from more than allowable height.

8. Congestion of steel is preventing the concrete to flow over all corners.

@etconp
👍21❤3
👉በጎንደር ከተማ የፋሲል ቤተመንግስት እድሳት ተጀምሯል።

🚧በጣም ጥሩ ሁኔታ ላይም ይገኛል።

💫በአጭር ግዜ ውስጥ ፋሲልን ወደ ቀደመ ግርማ ሞገሱ እንመልሰዋለን።

🏷Renovation of Fasil Ghebbi has commenced in Gonder city and is progressing very well. In no time, Fasil will be elevated to its former glory.

Via  ጠ/ሚ ፌስቡክ ገፅ

@etconp
❤10👍6
Organic compounds that are responsible for the formation of tiny bubbles and holes of different sizes in concrete, which form a certain part of the aggregate
concrete, are called:
Anonymous Quiz
13%
Water retarder
14%
Pozolana
14%
Bonding admixture
60%
Air-entrainment agents
👍19
Intercon Construction Chemicals 
    
👉 Authorized agent of MC (Conmix), Weber and SIMENTEK

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Concrete Repair, Grout   
● Tile Adhesive & Tile Joint Fillers 
● Wall Putty, Prime Coat, Rush Coat
● Quartz, Contextra
● Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
● Floor hardener, Epoxy              
● Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
👍10
✨ሲካሴራም 50
💥ሴራሚክ ንጣፍን ለማስቀመጥ የሚያገለግል ዱቄታማ ማጣበቂያ
💥በውስጡ ከፍተኛ ጥንካሬን ያለው ሲሚንቶ፣ ሲሊከን/ኳርትዝ ንጥረነገር እና የተለያዩ ኬሚካሎችን የያዘ ዱቄታማ ማጣበቂያ ነው።
ጥቅም
📌ውሀን ለሚመጥ ሴራሚክ ንጣፍ ማንጠፊያ
📌በግድግዳ እና በወለል ላይ ለሚሰሩ ንጣፍ ስራዎች

✨SikaCeram -50
💥Powder adhesive to lay ceramic tiles
💥A one-pack premixed adhesive consisting of high resistance cements, selected silicon/ quartz mineral charges and specific additives.
Uses
📌 Laying absorbing ceramic Tiles
📌On walls and floors

📍Head Office
Location: Derar Mall 9th floor opposite to Sahlite Mihret Church

📱+251 929 93 0206
📱+251 929 53 1707  

www.ektceramics.com

#EKTceramics #ethiopia #theklinker #ektceramics #construction #admixture #ceramic #paint #sika #jotun #aquapa #primacera #hanbon #tesaassaabloy #spc #tiles #pprpipe #doorlock #sanitarywares #buildingmaterials
❤3
#ADVERTISEMENTS

💫ከዲዛይን እስከ ፊኒሺንግ ድረስ ብቁ በሆኑ ሰራተኞቻችን በጥራት እየሰራ ደንበኞቻችንን በማስደሰት የሚታወቀው እቴጌ ዲዛይንና ፈርኒቸር አሁንም ጥራታቸውንና ውበታቸውን የጠበቁ ፈርኒቸሮችንና የኢንተሪየር ዲዛይን ስራዎችን በተመጣጣኝ ዋጋ ሰርተን እናስረክባችኋለን፡፡

የምንሰጣቸው አገልግሎቶች
✔️ የፊኒሺንግ ስራ
✔️ የዲዛይን ስራ
✔️ የፈርኒቸር ስራ

Etege Design and Furniture, which is known for making our customers happy by working with quality from design to finishing, still maintains its quality and beauty, and we deliver furniture and interior design works at affordable prices.

The services we provide
✔️ Finishing work
✔️ Design work
✔️ Furniture work

አድራሻ፡ ኢምፔሪያል ወደ 24 በሚወስደው መንገድ ከዞላ ኢንተርናሽናል ሆቴል አጠገብ አባይ ባንክ 1ኛ ፎቅ ላይ ያገኙናል

📞 ይደውሉልን: 0912270394
0974107073

https://linktr.ee/etegedesign
👍5👌2
👉የቁፋሮ ሥራ (Excavation works) ላይ መረጋገጥ ያለባቸው የቁጥጥር ነጥቦች

🚧የቁፋሮ ሥራ ከመጀመሩ በፊት ቁፋሮዎች፣ አጎራባች ቦታዎች እና የመሬት መንሸራተት መከላከያ ዘዴዎች በባለሙያ ጥናት ሊደረግባቸው ይገባል። ይመረመራሉ።

🏷በመሆኑም በቁፋሮ ሥራ የግንባታ ቁጥጥር ባለሙያው የሚከተሉትን ነጥቦች ትኩረት አድርጎ ማረጋገጥ አለበት።

⏺1. የአጎራባች ወሰንን ከመፍረስ መታደግ፦ በግንባታ ሥራ የመጀመሪያው ተግባር ቁፋሮ ሲሆን ማንኛውም ቦታ አጎራባች የሆነ የሕንጻ ቦታ ወይም መንገድ የሚኖረው ሲሆን ቁፋሮው ወደአጎራባች ወሰን ተጠግቶ የሚከናወን ከሆነ በቁፋሮው መጠጋት አልያም በንቅናቄ (Vibration) የተነሳ የአጎራባች መሬት በመውደቅ ወይም በመንከባለል ለሁለቱም ቦታዎች አደጋ እንዳይፈጥር የሚያስችል ቅድመ ጥንቃቄ መደረጉን ማረጋገጥ አለበት። ይህ ሳይሆን ቀርቶ የጎረቤት ወሰን/አጥር/ ቢፈርስ ወይም ሕንጻ ቢወድቅ በመሐንዲሱ የክትትል ድክመት የተነሳ ካሳ እንዲከፍሉ ሊገደዱ ይችላሉ።

⏺2. በሕግ የሚፈቀደውን የውጪ መስመር አለማለፉን ማረጋገጥ፦ ሕንጻው የሚሰራበት የካርታ ቦታ በአካባቢ ልማት (Local development plan) መሰረት ከፍተኛ የኢሌክትሪክ ኃይል (High Electric tension) የሚያልፍበት አልያም የመንገድ ማስፋፊያ ስፋት (Road Widening Area) የሚገባበት ሊሆን ስለሚችል በግንባታ ወቅት የተዘጋጀ አዲስ የፕላን ስምመትን በማመሳከር እንደዲዛይኑ በተፈቀደ ክልል ውስጥ ማረፉን እና በባለቤት ግፊት የተነሳ ያልተፈቀደ ቦታ ላይ አለማረፉን ማረጋገጥ አለበት።

⏺3. በቁፋሮ ክልል ደህንነትን ማረጋገጥ፦ ከቁፋሮው በኋላ ከመሬት ውስጥ ያለው ሥራ (Sub Structure Works) ተጠናቆ የተቆፈረው ክፍል እስኪሞላ ድረስ የሰከረ፣ ወይም የአእምሮ እክል ያለበት፣ ወይም ሕጻናት፣ ወይም ሽማግሌዎች ወደጉድጓድ ገብተው አካላዊ ጉዳት እንዳይደርስባቸው ከተፈቀደላቸው የግንባታ ሰራተኞች ውጪ ወደ ክልሉ እንዳይገቡ የታጠረ (Fenced) እና የውስጥ መሸጋገሪያ (Bridge Ladders) የተሰራላቸው መሆኑን ማረጋገጥ አለበት።

⏺4. የመሬት ውስጥ ዝርጋታዎች (Underground installations)፦ በሰፋፊ ግቢዎች ውስጥ ለግቢው አግልግሎት የሚሰጡ አስቀድሞ የተዘረጉ የውኃ፣ የኢንተርኔት፣ የመረጃ እና የመብራት ዝርጋታዎች የሚኖሩ ከሆነ ከሚመለከተው አካል ጋር በመነጋገር በጥንቃቄ እንዲነሱ አልያም ግንባታው ጉዳት ሳያደርስባቸው እንዲከናወን ማድረግ ይኖርበታል።

⏺5. የቁፋሮውን ልኬት ማረጋገጥ፦ በተለይ በአርክቴክቸራል፣ ስትራክቸራል እና ሳኒታሪ ንድፎች ላይ የተመለከተው ተጓዳኝ የቁፋሮ ሥራ የሚጠይቁትን ልኬቶች ማሟላቱን (ወርዱን፣ ስፋቱን፣ ርዝመቱን፣ ዲያሜትሩን፣ ጥልቀቱን) ጠብቆ ቁፋሮ መንዲከናወን የመቆጠጠርና መከናወኑን የማረጋገጥ ኃላፊነት አለበት።

⏺6. ውኃ እንዳይቋጥር ማስደረግ፦ በዝናባማ እና የመሬት ውኃ በሚፈልቅባቸው አካባቢዎች ቁፋሮ እንደተከናወነ ዝናብ ቢዘንብ ቢያንስ የጎርፍ ውሃ እንዳይገባ የመከላከያ ሥራዎች፣ እንዲሁም የመሬት ውስጥ ምንጭ ውሃን የመከላከያ (like: Permeable hardcore layer, geotextile material, channelization...) መንገዶች ተግባራዊ የሚደረጉበት መሆኑን ማረጋገጥና መከታተል አለበት።

⏺7. የቁፋሮ ግብአቶችና ማሽኖችን ደህንነት ማረጋገጥ፦ በቁፋሮ ሥራ መወጣጫ የሚሆኑ የብረት፣ የእንጨት እና የፕላስቲክ ግብአቶችን ብልሽት የሌለባቸው መሆኑ እና ለቁፋሮ ሥራ የቀረቡ የእጅ መሳሪያዎች እና ማሽኖች የደህንነት ችግር የሌለባቸው መሆኑን ማረጋገጥ አለበት።

⏺8. በቂ አየርና ብርሃን የሚገኝበት መሆኑን፦ በጣም ልዩ ሁኔታ የሚባልና በብዙዎቹ ግንባታዎች ላይ የማይገጥም ቢሆንም በውኃ ውስጥ፣ በመሬት ውስጥ ለሚከናወኑ ቁፋሮዎች የሚሳተፉ ሰራተኞች በቂ የሆነ የኦክስጅን አየር ማግኘት ስላለባቸው መሐንዲሱ የአየር ሁኔታውን የሚቆጠጠሩ ማሽኖች፣ አልባሳት እና ብርሃን መቅረባቸውን ማረጋገጥ ማድረግ አለበት።

@etconp

ሌላኛው የቴግራም ቻናላችን: t.me/ETCONpWORK
ሊጽፉልን ካሰቡ፡  t.me/ETCONpBOT
ፌስቡክ: https://www.facebook.com/ethioconp
👍29❤7🕊2
👉ትምህርት ሚኒስቴር የድህረ ምረቃ ፕሮግራሞች የመግቢያ ፈተና (NGAT) የምዝገባ ጊዜን አሳውቋል።

💫ሚኒስቴሩ በ2017 የትምህርት ዘመን የድህረምረቃ ፕሮግራሞች ለመማር ፍላጎት ላላቸው አመልካቾች የሚሰጠው የድህረምረቃ ፕሮግራሞች የመግቢያ ፈተና  (NGAT) ምዝገባ ከሐምሌ 24 እከ ነሐሴ 05/2016 ዓ.ም የሚካሄድ እንደሆነ ገልጿል።

🏷የድህረ ምረቃ ፕሮግራም መማር ፍላጎቱ ያላቸው የመመዝገቢያው ቅጽ ላይ የተዘረዘሩትን መስፈርቶች በሟሟላት በ
https://NGAT.ethernet.edu.et በኩል መመዝገብ ይችላሉ ተብሏል።

@etconp
👍14🙏1
👉 የሾላ ገበያ የተሽከርካሪ ማቆሚያ

🏷የግንባታው ፕሮጀክት 84.2 በመቶ በላይ ደርሷል፤

⏺ከመሬት ስር የሚገነቡ ሁለት ወለሎች እና ከመሬት በላይ አምስት ወለሎች አሉት፤

⏺እያንዳንዱ ወለል በአማካኝ 132 የተለያየ መጠን ያላቸውን ተሽከርካሪዎች የማስተናገድ አቅም ይኖረዋል፤

⏺በቅርቡ ተጠናቆ ለአገልግሎት ክፍት ይሆናል፤

⏺ የተሽከርካሪ ማቆሚያው በአጠቃላይ 921 ተሽከርካሪዎችን በአንድ ጊዜ የሚስተናገድ አቅም ይኖረዋል፤

⏺መሰረተ ልማቱ በ7 ሺህ 306 ሜትር ስኩዌር ቦታ ላይ ያረፈ ነው፤

⏺ዘመናዊ የደህንነት መቆጣጠሪያ ካሜራ እና የተሽከርካሪ ማቆሚያ አገልግሎት አስተዳደር ስርዓት (Parking Management System) ያለው፤

⏺ፈጣን የኤሌክትሪክ ተሽከርካሪዎች ኃይል መሙያ ጣቢያዎች (Fast Electric Car Charging Stations) መሳሪያዎች ይኖረዋል፤

⏺በፕሮጀክቱ ግንባታ ወቅት ከ120 ላላነሱ ዜጎች ጊዜያዊ የሥራ እድል የተፈጠረ ሲሆን፤ ፕሮጀክቱ ተጠናቆ ለአገልግሎት ሲበቃ ከ50 ላላነሱ ዜጎች ቋሚ የሥራ እድል ይፈጥራል፤

⏺ፕሮጀክቱ ተጠናቆ ሙሉ ለሙሉ ለአገልግሎት ሲበቃ በአካባበቢው ላይ የሚስተዋሉትን የተሽከርካሪ ማቆሚያ ችግሮች በመቅረፍ ለትራፊክ ፍሰቱ መሻሻል ከፍተኛ አስተዋጽዖ ያበረክታል፤

⏺የፕሮጀክቱ ሙሉ ወጪ በከተማ አስተዳደሩ በኩል የሚሸፈን ሲሆን 1.5 ቢሊየን ብር የሚፈጅ ይሆናል፤

⏺ የግንባታው ሥራ ተቋራጭ አለም አቀፍ ድርጅት የሆነው ዞንግሚ ኢንጂነሪንግ ነው፤

⏺ግንባታውን እያስገነባ ያለው ተቋም የትላልቅ ፕሮጀክቶች ግንባታ ጽ/ቤት ነው።

Via AA Transport Bureau

@etconp
👍11❤4😢1