๐Ÿ‘‰๐‘น๐’Š๐’”๐’Œ๐’” & ๐‘น๐’†๐’˜๐’‚๐’“๐’…๐’” ๐’๐’‡ 8 ๐‘ป๐’š๐’‘๐’†๐’” ๐’๐’‡ ๐‘ช๐’๐’๐’”๐’•๐’“๐’–๐’„๐’•๐’Š๐’๐’ ๐‘ช๐’๐’๐’•๐’“๐’‚๐’„๐’•๐’”

๐ŸทAs construction projects vary in terms of scope, delivery, schedule, budget & parties involved, there isnโ€™t one-size-fits-all approach to contracts between owners & contractors

๐Ÿ’ซ๐–๐ก๐ข๐œ๐ก ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ ๐“๐ฒ๐ฉ๐ž ๐ˆ๐ฌ ๐๐ž๐ฌ๐ญ?

It depends, type of contract you & owner agree to use will vary based on job requirements & owner needs Using right contract for right kind of project is critical to make sure you stay profitable & protect your company's best interest

โ€ขWell-defined scope=lump sum
โ€ขTransparent/open book=cost+
โ€ขUnclear scope=T&M
โ€ขRepeated work with undefined volume of scope=unit price
โ€ขFixed budget presented by owners=GMP
โ€ขOther 3 are less common & used in specific situations

๐Ÿšง๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ๐ฌ ๐“๐ฒ๐ฉ๐ž๐ฌ

โญ๏ธ๐‹๐ฎ๐ฆ๐ฉ ๐’๐ฎ๐ฆ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ

Fixed price contract is straightforward, establish fixed fee paid for all materials & labor to complete project, place more risk on contractor as it depends on accurate estimate & clear SOW on what is & isnโ€™t included

โญ๏ธ๐†๐ฎ๐š๐ซ๐š๐ง๐ญ๐ž๐ž๐ ๐Œ๐š๐ฑ๐ข๐ฆ๐ฎ๐ฆ ๐๐ซ๐ข๐œ๐ž ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ (๐†๐Œ๐)

Similar to lump sum, but owner can benefit from cost saving if final cost is under budget & any cost come up exceeding max amount is contractor responsibility
You act as construction manager at risk (CMAR) who must diligently oversee project to ensure actual cost not exceeding budget

โญ๏ธ๐‚๐จ๐ฌ๐ญ-๐๐ฅ๐ฎ๐ฌ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ

Reimburse for all costs+markup during construction. Isn't blank check, typically require estimate at project start so owner knows what to expect

โญ๏ธ๐“๐ข๐ฆ๐ž & ๐Œ๐š๐ญ๐ž๐ซ๐ข๐š๐ฅ๐ฌ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ(๐“&๐Œ)

Owner reimburse for agreed-upon price for time & materials+profit margin, allowing for flexibility in cost of materials & labor rates

โญ๏ธ๐”๐ง๐ข๐ญ ๐๐ซ๐ข๐œ๐ž ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ

Owner pay based on agreed-upon rate/unit for labor, materials, supplies, overhead cost & profit where volume of units needed is unknown & it provides transparency of costs for additional labor & material

โญ๏ธ๐ƒ๐ž๐ฌ๐ข๐ ๐ง-๐๐ฎ๐ข๐ฅ๐ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ

Instead of addressing design & construction as two separate processes, design-build contract addresses both sides simultaneously speeding up process but can lead to higher cost eliminating competitive bidding phase.

โญ๏ธ๐ˆ๐ง๐œ๐ž๐ง๐ญ๐ข๐ฏ๐ž ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ

Provide incentive if project delivered by certain date & under agreed-upon cost, help create collaborative process but require more negotiations to determine incentives & milestones.

โญ๏ธ๐ˆ๐ง๐ญ๐ž๐ ๐ซ๐š๐ญ๐ž๐ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐ƒ๐ž๐ฅ๐ข๐ฏ๐ž๐ซ๐ฒ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ(๐ˆ๐๐ƒ)

Relatively new to construction industry, multi-party agreement between owner, designer & builder, all stakeholders agree to lump sum profit if project meets its designated financial outcomes spread out risk & rewards, popular for those who want to embrace collaboration

@etconp
๐Ÿ‘10โค6
๐Ÿ‘‰Causes Of Segregation on Concrete

1.) Insufficient compaction to
concrete.
2.) Less cover to reinforcement
bars.
3.) Improper Workability in
concrete
4.) Concrete already set before
placing .
5.) High concrete free fall while
pouring
6.) Form work not watertight/
rigid.
7.) More coarse aggrgegates
than designed mix
proportions and over sized
aggregates.
8.) Improper placement of bars
at column and beam
junction.
9.) Addition of more water than
designed at site for
achieving workability.

10.) Steel congestion not
allowing concrete flow to
all corner.

๐Ÿท แˆˆแˆŒแˆŽแ‰ฝแˆ แ‰ฐแ‹ซแ‹ซแ‹ฅ แˆตแˆซ แˆ‹แˆ‹แ‰ธแ‹ แ‰ฃแˆแ‹ฐแˆจแ‰ฆแ‰ปแ‰ฝแˆ แŠ แŒ‹แˆฉ!

โญ๏ธแ‰ฐแŒจแˆ›แˆช แ‹ญแŒ แ‰…แˆ›แˆ แ‹จแˆแ‰ตแˆ‰แ‰ต๐Ÿ‘‡
แˆ˜แˆแ‹•แŠญแ‰ถแŠ• แˆˆแŠฅแŠ› แˆˆแˆ›แŒ‹แˆซแ‰ต


แ‰ดแˆŒแŒแˆซแˆ แˆ‹แ‹ญ แŠจแˆตแˆญ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ:
แ‰  t.me/ETCONpBOT
แˆ€แˆณแ‰ฃแ‰ฝแˆแŠ• แ‰ฅแ‰ตแˆแŠฉแˆแŠ•แฃ แ‹ญแ‹ฐแˆญแˆฐแŠ“แˆ!
แŠฅแŠ›แˆ แŒˆแˆแŒแˆ˜แŠ• แˆ˜แˆแˆฐแŠ• แŠฅแŠ“แ‹ฐแˆญแˆณแˆˆแŠ•

@etconp
๐Ÿ‘33โค3
๐Ÿ‘‰Slab Leak ๐Ÿ‘‡

@etconp
๐Ÿ‘5๐Ÿ‘2
Ethio Construction Engineering
๐Ÿ‘‰Slab Leak ๐Ÿ‘‡ @etconp
๐Ÿ‘‰A slab leak refers to a water leak that occurs beneath a concrete slab foundation. These leaks can lead to significant damage if not addressed promptly.

๐ŸทHere are some common reasons for slab leaks, along with descriptions:

๐Ÿ’ซ1. Corrosion of Pipes

- Description: Over time, the pipes (often made of copper) beneath the slab can corrode due to various factors, including water quality (high levels of acidity or alkalinity), chemical reactions, and age. Corrosion weakens the pipes, leading to leaks.

- Causes: This is often exacerbated by the electrolytic action that occurs when different metals are in contact with water.

๐Ÿ’ซ2. Earth Movement

- Description: Shifts in the ground beneath a building can create pressure on the pipes under the slab.
This movement can be due to factors such as settling, soil erosion, or seismic activity.

- Causes: Variations in moisture content in the soil can lead to expansion and contraction, causing the ground to settle unevenly.

๐Ÿ’ซ3. Improper Installation

- Description: If the plumbing pipes were not installed correctly, they may be prone to damage or leaks.
This includes improper joints, inadequate supports, or insufficient protective measures.

- Causes: Poor workmanship or lack of adherence to plumbing codes during construction can lead to long-term issues.

๐Ÿ’ซ4. High Water Pressure

- Description: Excessively high water pressure in the plumbing system can stress the pipes and lead to leaks. It can also cause joints to loosen over time, increasing the risk of leaks.

- Causes: High water pressure may result from municipal supply issues or problems with pressure-reducing valves.

๐Ÿ’ซ5. Temperature Changes

- Description: Fluctuations in temperature can cause pipes to expand and contract. This constant movement can weaken the joints and fittings over time, leading to leaks.

- Causes: Seasonal changes or hot water running through cold pipes can cause significant temperature variations.

๐Ÿ’ซ6. Poor Drainage

- Description: If drainage systems are inadequate or functioning poorly, water can pool around the foundation, increasing pressure on the pipes beneath the slab and leading to leaks.

- Causes: Clogged drains, improperly graded landscapes, or damaged gutters can all contribute to drainage issues.

๐Ÿ’ซ7. Tree Roots

- Description: The infiltration of tree roots into plumbing systems can cause pipes to crack or break. Roots may seek out moisture and can grow into and around pipes, leading to leaks.

- Causes: Trees that are too close to the buildingโ€™s foundation or plumbing systems can inflict structural damage.

๐Ÿ’ซ8. Wear and Tear

- Description: Over time, pipes can simply wear out. The natural aging process can lead to cracks and weakness in the plumbing.

- Causes: Long-term use, along with exposure to various environmental stresses, can lead to pipe deterioration.

๐Ÿ’ซ9. Chemical Reactions

- Description: Certain chemicals found in soils, or chemical reactions between different types of pipe materials, can lead to corrosion or deterioration of pipes.

- Causes: Soil composition, exposure to corrosive chemicals, and improper installation materials can all contribute.

๐Ÿ“œConclusion

โบDetecting a slab leak early is crucial to prevent extensive damage to the foundation and the structure of a building. Signs of a slab leak may include unexplained increases in water bills, the sound of running water in the walls, damp or moldy spots on floors or walls, and hot spots on the floor in cases of hot water line leaks. If a slab leak is suspected, it's important to consult a professional plumber for evaluation and repair.

@etconp
๐Ÿ‘5โค4๐Ÿ‘4
โœ‹ETCONp Today Quiz

๐Ÿ’กWhich one of the following schedules shows the specific activities necessary to complete an activity or work package? @etconp
Anonymous Quiz
20%
๐Ÿ”˜ A. Master schedule
28%
๐Ÿ”˜ B. Project schedule
47%
๐Ÿ”˜ C. Task schedule
4%
๐Ÿ”˜ D. Internal schedule
โค11๐Ÿ‘7
๐Ÿ‘‰Self-healing concrete

๐Ÿ’ซSelf-healing concrete is a novel type of cement-based material characterized by the ability of the concrete to self-seal cracks occurring due to external loading and/or exposure in aggressive environments, with chemical products within the concrete.

๐ŸšงThe most compelling benefit of self-healing concrete lies in its potential to transform the way we approach infrastructure and construction.

โบBy harnessing the power of self-repair, engineers and architects can design structures that are not only stronger and more durable but also more sustainable and resilient to the challenges of the future.

Via Yonatan Tadesse PMPยฎ

@etconp
๐Ÿ‘15โค1
๐Ÿ‘‰The difference between footing and foundation

๐ŸทFootings and foundations are both essential components of a building's structural system, but they serve different purposes and have distinct characteristics.

โบHereโ€™s a breakdown of their differences:

๐ŸŒŸ1. Definition:

โ–ถ๏ธFooting: A footing is a specific part of the foundation that directly supports the weight of the structure.
It is typically a concrete slab or a series of concrete blocks that distribute the load over a larger area to prevent settling.

โ–ถ๏ธFoundation: The foundation is the entire system that supports a building, including footings, walls, and any other structural elements below ground level. It transfers the load of the building to the soil.

๐ŸŒŸ. Function:

โบFooting: Its primary function is to provide stability by spreading the weight of the structure over a larger area, reducing pressure on the soil beneath.

โบFoundation: It serves to anchor the building to the ground, resist lateral forces (like wind and earthquakes), and prevent moisture from entering the structure.

๐ŸŒŸ3. Location:

โบFooting: Footings are located at the base of walls or columns, usually below the frost line in colder climates.

โบFoundation: The foundation encompasses all elements below ground level, including footings, foundation walls, and any other structural components.

๐ŸŒŸ4. Types:

โบโ€ข Footing: Common types include spread footings, strip footings, and pad footings.

โบFoundation: Types of foundations include shallow foundations (like spread footings) and deep foundations (like piles or drilled shafts).

๐ŸŒŸ5. Construction Material:

โบBoth footings and foundations are typically made of concrete, but the specific design and reinforcement may vary based on their functions and loads.

๐Ÿ“œSummary

In essence, the footing is a component of the foundation system, specifically designed to support and distribute loads from the structure above. The foundation as a whole includes all components that provide stability and support for a building.

Via Eagleng

@etconp
๐Ÿ‘19โค3
๐Ÿ‘‰Tallest RCC dam in the world!

๐ŸทThe project is the natural extension of the biggest complex along the Gilgel Gibe River with the two other hydroelectric dams, Gibe I (completed and operational since 2004) and Gibe II (operational since 2010).

๐Ÿ’ซThe works involved a RCC dam 250 m high, with a crest length of 630 m and a total volume of 6,214,000 mยณ of concrete.

โญ๏ธLocated 450 km south west of the capital of #Ethiopia, the #hydroelectric plant boosts the national energy production by 85%, meeting the growing demand for energy within the country and enabling the development of integrated export networks to neighboring countries.

@etconp
๐Ÿ‘12๐Ÿ‘8โค2
๐Ÿ‘‰CONCRETE MATURITY TESTING METHOD

๐ŸทMaturity is a non-destructive approach to testing concrete that allows you to estimate the early-age and compressive strength of in-place concrete in real-time.

โบThe maturity method is defined on ASTMC1074: Standard Practice for Estimating Concrete Strength by the Maturity Method, as โ€œa technique for estimating concrete strength that is based on the assumption that samples of a given concrete mixture attain equal strengths if they attain equal values of the maturity index.โ€

It is based on the idea that the strength of concrete increases with time, and that this increase in strength follows a predictable pattern.

This pattern is known as the "maturity curve," which is a plot of the strength of the concrete as a function of time.

The maturity curve is determined by conducting experiments in which concrete specimens are cured under controlled temperature and humidity conditions, and the strength of the specimens is measured at various intervals.

Via Yonatan PMPยฎ

@etconp
๐Ÿ‘10โค2
๐Ÿ‘‰แŠ แ‹ฐแ‹ญ แŠ แ‰ แ‰ฃ แ‰ฅแˆ”แˆซแ‹Š แˆตแ‰ณแ‹ฒแ‹จแˆ

๐ŸทแŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠจแŠ แˆแˆตแ‰ต แŠ แˆ˜แ‰ต แ‰ แŠƒแˆ‹ แ‹จแˆšแŠซแˆ„แ‹ฐแ‹ 37แŠ›แ‹แŠ• แ‹จแŠ แแˆชแŠซ แ‹‹แŠ•แŒซ แˆˆแˆ›แ‹˜แŒ‹แŒ€แ‰ต แ‹จแ‹ซแ‹˜แ‰ฝแ‹ แŠฅแ‰…แ‹ต แˆˆแˆ›แˆณแŠซแ‰ต แŒฅแˆจแ‰ถแ‰ฝ แŠฅแ‹จแ‰ฐแŠซแˆ„แ‹ฑ แˆ˜แˆ†แŠ‘ แ‰ฐแŒˆแˆˆแ€แข

โบแŒ แ‰…แˆ‹แ‹ญ แˆšแŠ•แˆตแ‰ตแˆญ แ‹ถ/แˆญ แ‹แ‰ขแ‹ญ แŠ แˆ…แˆ˜แ‹ต แ‹›แˆฌ แŠจแŠ แแˆชแŠซ แŠฅแŒแˆญ แŠณแˆต แŠฎแŠ•แŒแ‹ดแˆฌแˆฝแŠ• (แŠซแ) แ•แˆฌแ‹แ‹ณแŠ•แ‰ต แ“แ‰ตแˆชแˆต แˆžแ‰ตแˆดแ”แŠ• แŠฅแŠ“ แŠจแŠซแ แˆฅแˆซ แŠ แˆตแˆแƒแˆš แŠฎแˆšแ‰ด แŠจแแ‰ฐแŠ› แŠ แˆ˜แˆซแˆฎแ‰ฝ แŒ‹แˆญ แ‰ แˆ˜แˆ†แŠ• แ‰ แˆ˜แŒ แŠ“แ‰€แ‰… แˆ‹แ‹ญ แ‹ซแˆˆแ‹แŠ• แ‹จแŠ แ‹ฐแ‹ญ แŠ แ‰ แ‰ฃ แˆตแ‰ณแ‹ฒแ‹จแˆแŠ• แ‰ แŒ‹แˆซ แŒŽแ‰ฅแŠแ‰ฐแ‹‹แˆแข

๐Ÿšงแ‰ แ‰ณแˆ…แˆณแˆต 2008 แ‹“.แˆ แŒแŠ•แ‰ฃแ‰ณแ‹ แ‹จแ‰ฐแŒ€แˆ˜แˆจ แ‹จแŠ แ‹ฐแ‹ญ แŠ แ‰ แ‰ฃ แ‰ฅแˆ”แˆซแ‹Š แˆตแ‰ณแ‹ฒแ‹จแˆ 62 แˆบแˆ… แˆฐแ‹Žแ‰ฝแŠ• แ‰ แ‹ˆแŠ•แ‰ แˆญ แ‹จแˆ˜แ‹ซแ‹ แŠ แ‰…แˆ แ‹ซแˆˆแ‹ แˆฒแˆ†แŠ•แฃ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซ แˆแ‹•แˆซแ แŒแŠ•แ‰ฃแ‰ณ แŠจแ‰ฐแŒ แŠ“แ‰€แ‰€ แ‰ แŠƒแˆ‹ แ‰ แ‰…แˆญแ‰ก แˆแˆˆแ‰ฐแŠ›แ‹ แˆแ‹•แˆซแ แ‰ฐแŒ€แˆแˆฎ แ‰ แˆ˜แŠซแˆ„แ‹ต แˆ‹แ‹ญ แ‹ญแŒˆแŠ›แˆแข

โบแŒ แ‰…แˆ‹แ‹ญ แˆšแŠ’แˆตแ‰ตแˆญ แ‹แ‰ขแ‹ญ แŠ แˆ•แˆ˜แ‹ต (แ‹ถ/แˆญ) แ‰ แŒแˆ‹แ‰ธแ‹ แ‰ฃแ‹ฐแˆจแŒ‰แ‰ต แŒฅแˆจแ‰ต แ‹จแ‹แŒญ แˆแŠ•แ‹›แˆฌ แ‹จแˆšแ‹ซแˆตแˆแˆแŒ‹แ‰ธแ‹ แ‹จแˆแˆˆแ‰ฐแŠ› แˆแ‹•แˆซแ แˆฅแแˆซแ‹Žแ‰ฝแŠ• แ‹ˆแŒช แ‹จแ‰ฐแ‰ฃแ‰ แˆฉแ‰ต แŠ แˆจแ‰ฅ แŠคแˆแˆฌแ‰ถแ‰ฝ แˆ˜แŠ•แŒแˆฅแ‰ต แˆˆแˆ˜แˆธแˆแŠ• แˆ˜แˆตแˆ›แˆ›แ‰ฑ แ‹จแˆšแ‰ณแ‹ˆแˆต แАแ‹แข

๐Ÿ’ซแ‹จแˆตแ‰ณแ‹ฒแ‹จแˆ™ แŒแŠ•แ‰ฃแ‰ณ แ‹“แˆˆแˆ แŠ แ‰€แ‰ แ‹จแŠฅแŒแˆญ แŠณแˆต แˆ›แˆ…แ‰ แˆญ (แŠแ‹) แŠฅแŠ“ แ‹จแŠฆแˆŠแˆแ’แŠญ แŒจแ‹‹แ‰ณแ‹Žแ‰ฝ แˆ›แˆตแ‰ฐแŠ“แŒˆแ‹ต แ‰ แˆšแ‰ฝแˆ แ‹ฐแˆจแŒƒ แˆแˆˆแ‰ฐแŠ›แ‹ แˆแ‹•แˆซแ แŠฅแ‹จแ‰ฐแŒˆแАแ‰ฃ แŠฅแŠ•แ‹ฐแˆšแŒˆแŠ แ‰ณแ‹แ‰‹แˆแข

๐ŸŒŸแˆˆแ‰ฅแˆ”แˆซแ‹Š แˆตแ‰ณแ‹ฒแ‹จแˆ™ แŒแŠ•แ‰ฃแ‰ณ แˆˆแˆ˜แŒ€แˆ˜แˆชแ‹ซแ‹ แˆแ‹•แˆซแ แŠจ4 แ‰ขแˆŠแ‹ฎแŠ• แ‰ฅแˆญ แ‰ แˆ‹แ‹ญ แ‹ˆแŒช แ‹จแ‰ฐแ‹ฐแˆจแŒˆ แˆฒแˆ†แŠ•แฃ แ‹จแˆแˆˆแ‰ฐแŠ›แ‹ แˆแ‹•แˆซแ แŒแŠ•แ‰ฃแ‰ณ แŒฃแˆชแ‹ซ แˆ›แˆแ‰ แˆตแฃ แ‹ˆแŠ•แ‰ แˆญ แˆ˜แŒแŒ แˆแฃ แ‹จแˆฐแ‹ แˆฐแˆซแˆฝ แˆ€แ‹ญแ‰… แŒแŠ•แ‰ฃแ‰ณแฃ แ‹˜แˆ˜แŠ“แ‹Š แ‹จแ‹ฐแˆ…แŠ•แАแ‰ต แŠซแˆœแˆซ แˆ˜แŒแŒ แˆแฃ แˆณแ‹แŠ•แ‹ต แˆฒแˆตแ‰ฐแˆ แˆ˜แ‹˜แˆญแŒ‹แ‰ตแฃ แ‹จแ“แˆญแŠชแŠ•แŒ แ‰ฆแ‰ณแ‹Žแ‰ฝแฃ แ‹จแ‰ฐแŒซแ‹‹แ‰พแ‰ฝ แ‹จแˆ˜แˆˆแˆ›แˆ˜แŒƒ แˆœแ‹ณ แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แˆฅแˆซแ‹Žแ‰ฝแŠ• แ‰ แ‹แˆตแŒก แ‹ซแŠซแ‰ตแ‰ณแˆแข

@etconp
๐Ÿ‘13๐Ÿ˜3
Ethio Construction Engineering
@etconp
๐Ÿ‘‰แŠฅแ‹ตแˆณแ‰ต แˆ‹แ‹ญ แ‹จแАแ‰ แˆจแ‹ แ‹จแŠ แแˆชแŠซ แŠ แŠ•แ‹ตแАแ‰ต แ‹ตแˆญแŒ…แ‰ต แ‹จแ‰ฐแˆ˜แˆฐแˆจแ‰ฐแ‰ แ‰ต แŠ แ‹ณแˆซแˆฝ แŠฅแ‹ตแˆณแ‰ฑ แ‰ฐแŒ แŠ“แ‰…แ‰† แ‹›แˆฌ แ‰ฐแˆ˜แˆจแ‰€แกแก

๐Ÿšงแ‹จแ‰ฐแ‰ฃแ‰ แˆฉแ‰ต แˆ˜แŠ•แŒแˆตแ‰ณแ‰ต แ‹ตแˆญแŒ…แ‰ต แ‹‹แŠ“ แ€แˆƒแŠ แŠ แŠ•แ‰ถแŠ’แ‹ฎ แŒ‰แ‰ดแˆฌแ‹แฃ แŒ แ‰…แˆ‹แ‹ญ แˆšแŠ’แˆตแ‰ตแˆญ แ‹แ‰ขแ‹ญ แŠ แˆ…แˆ˜แ‹ตแฃ แ‹จแŠ แแˆชแŠซ แˆ…แ‰ฅแˆจแ‰ต แŠฎแˆšแˆฝแŠ• แŠฎแˆšแˆฝแАแˆญ แˆ™แˆณ แ‹แ‰‚ แˆ›แˆ…แˆ›แ‰ต แŠฅแŠ•แ‹ฒแˆแˆ แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แˆ€แŒˆแˆซแ‰ต แŠ แˆแ‰ฃแˆณแ‹ฐแˆฎแ‰ฝ แ‰ แ‰ฐแŒˆแŠ™แ‰ แ‰ต แ‹จแˆแˆจแ‰ƒ แˆตแА - แˆตแˆญแ‹“แ‰ฑ แŠฅแ‹จแ‰ฐแŠซแˆ„แ‹ฐ แ‹ญแŒˆแŠ›แˆแข

โบแŠจแ‹›แˆฌ 61 แ‹“แˆ˜แ‰ณแ‰ต แ‰ แŠแ‰ต แ‰ แ‰€แ‹ตแˆž แŠ แŒ แˆซแˆฉ แ‹จแŠ แแˆชแŠซ แŠ แŠ•แ‹ตแАแ‰ต แ‹ตแˆญแŒ…แ‰ต แ‹จแŠ แˆแŠ‘ แ‹จแŠ แแˆชแŠซ แˆ…แ‰ฅแˆจแ‰ต แ‹จแ‰ฐแˆ˜แˆฐแˆจแ‰ฐแ‰ แ‰ต แ‰ แŠ แแˆชแŠซ แŠขแŠฎแŠ–แˆšแŠญ แŠฎแˆšแˆฝแŠ• แ‰…แŒฅแˆญ แŒแ‰ข แ‹จแˆšแŒˆแŠ˜แ‹ โ€™โ€™แ‹จแŠ แแˆชแŠซ แŠ แ‹ณแˆซแˆฝโ€™โ€™ แŠฅแ‹ตแˆณแ‰ต แˆ‹แ‹ญ แŠฅแŠ•แ‹ฐแАแ‰ แˆญ แАแŒแˆจแŠ“แ‰ฝแˆ แАแ‰ แˆญแกแก

โบแ‹จแˆ…แŠ•แƒแ‹ แ‰ฃแˆˆแ‰คแ‰ต แ‹จแˆ†แАแ‹ แ‰ แ‰ฐแ‰ฃแ‰ฃแˆฉแ‰ต แˆ˜แŠ•แŒแˆตแ‰ณแ‰ต แ‹ตแˆญแŒ…แ‰ต แ‹จแŠ แแˆชแŠซ แŠขแŠฎแŠ–แˆšแŠญ แŠฎแˆšแˆฝแŠ•(ECA) แˆˆแŠฅแ‹ตแˆณแ‰ต แˆตแˆซแ‹ 57 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‹ˆแŒช แŠ แ‹ตแˆญแŒ“แˆแกแก

โบแˆ…แŠ•แƒแ‹ 61 แ‹“แˆ˜แ‰ณแ‰ตแŠ• แ‹ซแˆตแ‰†แŒ แˆจ แ‰ แˆ˜แˆ†แŠ‘ แ‰ แˆซแˆฑ แ‰…แˆญแˆต แŠฅแŠ•แ‹ฐแˆ†แАแŠ“ แ‰ แ‹แˆตแŒก แ‹จแ‹ซแ‹›แ‰ธแ‹ แ‰…แˆญแˆถแ‰ฝแˆ แ‰ แŒŠแ‹œ แ‰ฅแ‹›แ‰ต แŠฅแˆญแŒ…แŠ“ แ‹จแ‰ฐแŒซแŒซแŠ“แ‰ธแ‹ แ‰ แˆ˜แˆ†แŠ‘ แŠฅแ‹ตแˆณแ‰ฑ แŠฅแŠ•แ‹ณแˆตแˆแˆˆแŒˆแŠ“ แŠจแ‹›แˆฌ แ‰ แŠ‹แˆ‹ แˆˆแŒŽแ‰ฅแŠšแ‹Žแ‰ฝ แŠญแแ‰ต แŠฅแŠ•แ‹ฐแˆšแˆ†แŠ• แ‹จแŒแŠ•แ‰ฃแ‰ณแ‹ แ‹จแˆฒแ‰ชแˆแŠ“ แ‹จแŠ แˆญแŠชแ‰ดแŠญแ‰ธแˆซแˆ แˆตแˆซแ‹Žแ‰ฝ แ‰ฐแ‰†แŒฃแŒฃแˆช แ‹จแˆ†แŠ‘แ‰ต แŠ แ‰ถ แŒŒแ‰ณแ‰ธแ‹ แŠ แˆญแŠ แ‹ซ แАแŒแˆจแ‹แŠ“แˆแกแก

โบแ‰ณแˆชแŠซแ‹Šแ‹ แˆ…แŠ•แƒ แŠจแ‹šแˆ… แ‰ แˆแŠ‹แˆ‹ แ‹จแˆšแŒŽแ‰ แŠ แˆ™แ‹šแ‹จแˆ แАแ‹ แ‹จแˆšแˆ‰แ‰ต แŠ แ‰ถ แŒŒแ‰ณแ‰ธแ‹ แ‰ แ‹แˆตแŒกแˆ แŠ แแˆชแŠซ แŠจแ‰ฃแˆญแАแ‰ตแŠ“ แŠจแ‰…แŠ แŒแ‹›แ‰ต แ‰ แŠแ‰ต แŠฅแŠ•แ‹ฒแˆแˆ แ‰ แˆแ‹‹แˆ‹ แ‹ซแˆ‹แ‰ตแŠ• แˆ˜แˆแŠญ แ‹จแˆšแ‹ซแˆณแ‹ญ แ‰ แˆœแ‰ฐแˆญ แŠ แˆญแ‰ฒแˆตแ‰ต แŠ แแ‹ˆแˆญแ‰… แ‰ฐแŠญแˆŒ แ‹จแ‰ฐแˆณแˆˆ แ‹จแˆ˜แˆตแ‰ณแ‹ˆแ‰ต แˆ‹แ‹ญ แˆตแ‹•แˆ แŠฅแŠ•แ‹ฒแˆแˆ  แ‰ แŠ แˆˆ แˆแˆˆแŒˆแˆฐแˆ‹แˆ แ‹จแˆตแА แˆตแ‹•แˆ แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แ‹จแ‰ณแ‹ฐแˆฐแ‹ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซแ‹แŠ• แ‹จแŠ แแˆชแŠซ แŠ แŠ•แ‹ตแАแ‰ต แ‹ตแˆญแŒ…แ‰ต แ‹จแˆแˆตแˆจแ‰ณ แ‰ปแˆญแ‰ฐแˆญ แ‹จแˆแˆจแˆ™ แ‹จ32 แ‹จแŠ แแˆชแŠซ แˆƒแŒˆแˆซแ‰ต แˆ˜แˆชแ‹Žแ‰ฝแŠ• แ‹จแˆšแ‹ซแˆณแ‹ญ แ‹จแŒแˆญแŒแ‹ณ แˆ‹แ‹ญ แˆตแ‹•แˆแŠ• แŒจแˆแˆฎ 7 แ‹จแˆšแ‹ฐแˆญแˆฑ แ‹จแˆตแА แŒฅแ‰ แ‰ฅ แˆตแˆซแ‹Žแ‰ฝ แŠฅแŠ•แ‹ณแˆ‰แˆ แŒ แ‰แˆ˜แ‹‹แˆแกแก

โบแ‰ แ‰ฐแŒจแˆ›แˆชแˆ 50 แ‰ แˆ˜แ‰ถ แ‹จแ‰…แˆญแˆต แŒฅแŒˆแŠ“ แ‹จแ‰ฐแ‹ฐแˆจแŒˆแˆ‹แ‰ธแ‹ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซแ‹Žแ‰น แ‹จแˆ…แ‰ฅแˆจแ‰ฑ แˆ˜แˆฐแ‰ฅแˆฐแ‰ขแ‹ซ แŠ แ‹ณแˆซแˆฝ แ‹แˆตแŒฅ แ‹ซแˆ‰ แ‹ˆแŠ•แ‰ แˆฎแ‰ฝแฃแŠจแ‰ฐแˆˆแ‹ซแ‹ฉ แˆƒแŒˆแˆซแ‰ต แ‰ แˆตแŒฆแ‰ณ แ‹จแˆ˜แ‰ฐแ‰ แˆจแŠจแ‰ฑ แ‰…แˆญแˆถแ‰ฝ แˆˆแŠฅแ‹ญแ‰ณ แ‹จแˆšแ‰€แˆญแ‰กแ‰ แ‰ต แ‰‹แˆš แŠคแŒแ‹šแ‰ฅแˆฝแŠ• แˆ›แ‹•แŠจแˆแˆ แ‹ญแˆ†แŠ“แˆ แ‰ฅแˆˆแ‹‹แˆแกแก

โบแ‰ แˆ…แŠ•แƒแ‹ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซ แŠญแแˆ แŠฅแАแ‹šแˆ…แŠ• แ‹จแŒ แ‰€แˆตแŠ“แ‰ธแ‹แŠ• แŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆˆแˆ…แ‰ฅแˆจแ‰ฑ แˆแˆตแˆจแ‰ณ แ‹จแАแ‰ แˆซแ‰ต แŠ แˆตแ‰ฐแ‹‹แŠฆ แ‹จแˆšแ‹ซแˆณแ‹ฉ แ‹จแˆตแ‹•แˆ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹ญแ‹Ÿแˆแกแก

โบแˆแˆˆแ‰ฐแŠ“แ‹ แŠญแแˆ แ‹จแ“แŠ• แŠ แแˆชแŠซแŠ’แ‹แˆแŠ• แŠฅแŠ•แ‰…แˆตแ‰ƒแˆดแŠ“ แ‹จแ‹ฉแŠ”แˆตแŠฎแŠ• แŠ แˆตแ‰ฐแ‹‹แ…แŠฆ แ‹จแˆšแ‰ณแ‹ญแ‰ แ‰ตแคแ‰ 3แŠ›แ‹ แŠญแแˆ  แ‹ฐแŒแˆž แ‹จแŠ แแˆชแŠซ แŠขแŠฎแŠ–แˆšแŠญ แŠฎแˆšแˆฝแŠ•แŠ“ แ‹จแ‰ฐแ‰ฃแ‰ แˆฉแ‰ต แˆ˜แŠ•แŒแˆตแ‰ณแ‰ต แ‹ตแˆญแŒ…แ‰ตแŠ• แ‰ณแˆชแŠญ แ‹จแˆšแ‹ซแˆณแ‹ฉ แ‹จแŠฅแ‹ฐ แŒฅแ‰ แ‰ฅ แˆตแˆซแ‹Žแ‰ฝ แˆ˜แ‹ซแ‹™แŠ•แˆ แŠ แ‰ถ แŒŒแ‰ณแ‰ธแ‹ แ‹ซแ‰ฅแˆซแˆซแˆ‰แกแก

โบแ‹จแŠ แแˆชแŠซ แŠ แ‹ณแˆซแˆฝ แ‰ แŒแˆญแˆ›แ‹Š แ‰€แ‹ณแˆ›แ‹Š แˆƒแ‹ญแˆˆ แˆตแˆ‹แˆด แ‰ฐแŒˆแŠ•แ‰ฅแ‰ถแŠ“ แŒฅแˆญ 29 แ‰€แŠ•  1953แ‹“.แˆ แ‰ฐแˆ˜แˆญแ‰† แ‹จแŠ แแˆชแŠซ แŠ แŠ•แ‹ตแАแ‰ต แ‹ตแˆญแŒ…แ‰ต แˆ˜แˆฐแ‰ฅแˆฐแ‰ขแ‹ซ แŠ แ‹ณแˆซแˆฝ แ‹ญแˆ†แŠ• แ‹˜แŠ•แ‹ต แ‰ แŠ•แŒ‰แˆฑ แ‹จแ‰ฐแ‰ แˆจแŠจแ‰ฐ แŠฅแŠ•แ‹ฐแАแ‰ แˆญแŠ“ แ‹จแŠ แˆแŠ‘ แ‹จแŠ แแˆชแŠซ แˆ…แ‰ฅแˆจแ‰ต แˆ…แŠ•แƒ แŠฅแˆตแŠจแˆšแŒˆแАแ‰ฃ แ‹ตแˆจแˆต แ‹จแˆ…แ‰ฅแˆจแ‰ฑ แˆ˜แˆฐแ‰ฅแˆฐแ‰ขแ‹ซ แŠฅแŠ•แ‹ฐแАแ‰ แˆญแˆ แ‰ณแˆชแŠญ แ‹ญแАแŒแˆจแŠ“แˆแกแก

Via Sheger FM

@etconp
๐Ÿ‘10โค2
Intercon Construction Chemicals 
    
๐Ÿ‘‰ Authorized agent of MC (Conmix), Weber and SIMENTEK

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Concrete Repair, Grout   
โ— Tile Adhesive & Tile Joint Fillers 
โ— Wall Putty, Prime Coat, Rush Coat
โ— Quartz, Contextra
โ— Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ— Floor hardener, Epoxy              
โ— Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐Ÿ‘1
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ‘‰แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‹จแˆšแ‹ซแŒˆแŠ™แ‰ แ‰ต แŠฅแŠ“ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

๐Ÿ”ฐแˆแŠ• แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โœ‚๏ธแˆ‹แˆœแˆซ แˆ›แˆตแ‰†แˆซแˆจแŒฅ แˆ›แˆตแ‰ แˆณแ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠจแˆแˆˆแŒ‰  แŠฅแŠ•แ‹ณแ‹ซแˆตแ‰ก แˆแˆ‰แŠ•แˆ แˆ›แˆฝแŠ–แ‰ฝ แŠ แˆตแŒˆแ‰ฅแ‰ฐแŠ“แˆ

๐Ÿ”—แŒแˆฎ (แ‰ถแŠ•แ‹ฒแŠ–) แŒฅแˆญแˆต แˆ›แˆตแ‰ แŒ€แ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠซแˆฐแ‰ก แˆˆแˆฑแˆ แˆ›แˆฝแŠ‘ แ‰ แŒƒแ‰ฝแŠ• แАแ‹‰

๐Ÿ“แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแˆฐแˆฉ แ‰ฅแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแˆ แŠ แˆ‰แŠ•

โ˜Ž๏ธแ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

แŠ แ‹ตแˆซแˆปแ‰ฝแŠ•แฆ 1. แˆ˜แˆญแŠซแ‰ถ
                   แ‰.1 แŠ แ‹จแˆญ แŒคแŠ“
                    แ‰.3 แ‰ฐแŠญแˆˆแˆ€แ‹ญแˆ›แŠ–แ‰ต

0904040477
0911016833
๐Ÿ‘5
๐Ÿ‘‰FIBER REINFORCED CONCRETE

๐ŸทAs the name implies, we are talking about concrete that incorporates various types of fiber in an attempt to improve its flexural strength and most of all its ductility, its ability to deform without braking.

โบIt is well known that one of the biggest weaknesses of concrete is its brittleness. Although it can handle massive loads when compressed, it will break easily when submitted to bending forces, as its flexural strength is typically 6-10 times lower than its compressive strength.

โบIt is in other words a very strong but rigid material that cannot bend without breaking.

โ–ถ๏ธThat is why reinforced concrete was introduced in the first place, to help concrete overcome its fundamental weakness by working together with steel, to combine the strengths of both materials and make concrete more flexible, resulting in much slimmer construction elements that enabled erection of high-rise buildings.

๐Ÿ’ซWhen designing fiber reinforced ready-mix concrete, the following things should be taken into consideration:-

1. The type of fiber used: there is a variety of available fibers (steel, glass, carbon, cellulose, polypropylene, structural synthetic) in different sizes and shapes, suitable for different applications.

Generally, steel and structural synthetic fibers are used for industrial floors in sizes that range from 2-6 cm length and 0.5-2 mm thickness.

An important parameter is the aspect ratio of the fiber, ranging from 30 to 120 for steel fibers, as it dictates the maximum quantity of fibers that can be incorporated in concrete.

The most important property of fibers is of course their flexural strength, which ranges from 650 MPa for structural synthetic to 1,100 MPa for steel fibers.

In case of a corrosive environment, the use of synthetic fibers instead of steel fibers is recommended, as steel is easily corroded.

2. The quantity of fibers used: it ranges from 20 to 60 kg/m3 of concrete for steel fibers, 1-3 kg/m3 for synthetic structural and 600-900 g/m3 for polypropylene fibers, although a study is always necessary to determine the quantity that gives the best results of strength with minimum impact on workability of concrete.

3. The maximum grain of concrete: for industrial floor applications, maximum grain will vary from 10 โ€“ 30 mm, depending on the thickness of the floor.

Usually, 10 mm is the maximum gravel size for floors up to 10 cm thickness, while 20-30 mm gravel is used for floors of higher thickness.

4. Compressive strength: typically, for industrial floors, a minimum C25/30 concrete is required to achieve the minimum surface wear and prolong service life.

5.Workability: fiber reinforced concrete has generally lower workability compared to normal concrete as a result of the entanglement of fibers and their bridging effect, therefore it is essential to aim for higher workability.

6.Pumpability: although fiber reinforced concrete is usually applied without pump, there are cases where the use of a normal or stationery pump is required.

Fiber reinforced concrete can be pumped, but the curve of the aggregates, the cement content, type and dosage of superplasticizer, workability and maximum dosage of fibers must be carefully adjusted.

Yonatan Tadesse PMPยฎ

@etconp
๐Ÿ‘6โค1
๐Ÿ‘‰Key Performance indicators for construction management

๐Ÿ’ซKey Performance Indicators (KPIs) that support better schedule tracking, cost management, resource utilization, and quality control.

๐ŸŒŸThe following pictures illustrate 10 basic KPIs with their basic explanations.

Via Yonatan Tadesse PMPยฎ

@etconp
โค14๐Ÿ‘9๐Ÿ‘2