๐Key Performance indicators for construction management
๐ซKey Performance Indicators (KPIs) that support better schedule tracking, cost management, resource utilization, and quality control.
๐The following pictures illustrate 10 basic KPIs with their basic explanations.
Via Yonatan Tadesse PMPยฎ
@etconp
๐ซKey Performance Indicators (KPIs) that support better schedule tracking, cost management, resource utilization, and quality control.
๐The following pictures illustrate 10 basic KPIs with their basic explanations.
Via Yonatan Tadesse PMPยฎ
@etconp
โค14๐9๐2
๐แจแ แญแแณ แฅแจแต แ แแตแญ แแ แซแ
แ แญแแแแ?
๐งแแฎแแตแตแซแญแฝแ แแฅแแต แจแแแ แแแธแ แจแ แญแแณ แฅแจแต แ แ แญแแธแ แ แแแต แญแจแแแ:-
๐ท1. แแแฅ แฅแจแต (Mild Steel or plain rebar)
๐ท2. แฃแ แญแญแญแญ/แ แญแแณ แฅแจแต(Deformed steel rebar)
๐ซแ แฅแแซแฌ แฐแจแ แฐแแ แ แตแแต Grade 60 แฅแ Grade 40 แ แแฃแ แญแแซแ แญแ แ แแฅแจแณแ แแญแ/tensile strength/แ แแแแ แ แ แแธแ แแแข
โญ๏ธGrade 40=275.79MPa yield strength แฒแแจแ
โญ๏ธGrade 60=413.68MPa yield strength แญแแจแแ
โ๏ธแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐งแแฎแแตแตแซแญแฝแ แแฅแแต แจแแแ แแแธแ แจแ แญแแณ แฅแจแต แ แ แญแแธแ แ แแแต แญแจแแแ:-
๐ท1. แแแฅ แฅแจแต (Mild Steel or plain rebar)
๐ท2. แฃแ แญแญแญแญ/แ แญแแณ แฅแจแต(Deformed steel rebar)
๐ซแ แฅแแซแฌ แฐแจแ แฐแแ แ แตแแต Grade 60 แฅแ Grade 40 แ แแฃแ แญแแซแ แญแ แ แแฅแจแณแ แแญแ/tensile strength/แ แแแแ แ แ แแธแ แแแข
โญ๏ธGrade 40=275.79MPa yield strength แฒแแจแ
โญ๏ธGrade 60=413.68MPa yield strength แญแแจแแ
โ๏ธแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐25โค2
๐แณแแแแซ แจแแตแซแ
แ แแชแซแ แจแ
แแ แตแแตแญ แญแ แ แฐแจแแฝ
๐ทแณแแแแซ แ แชแญแถแชแซ แแญแ แแญ 3.2 แชแ แแตแญ แญแแแต แซแแ แตแแตแญ แ 300 แแแจแ แถแแญ แจแแแ แตแ แแแฃแณ แ แ แแแแฝแข
๐งแญแ แตแแตแญ แ แณแแแแซ ๐บ๐ฌแกแแแณแฃ ๐ท๐ผแฉแแแณแแฃแฅแฉแแฒแ แจแแฎ แ แแแฝ แแแซแต แแซแจแ แซแแแ แจแแแต แแแแฅ แแแณแแฅ แณแตแฆ แจแฐแแแฃ แตแแตแญ แแแข
๐ซแจแแตแซแ แ แแชแซ แจแ แ แตแแตแญแฃ 3.2 แชแ แแตแญ แจแแธแแ แฒแแ แ แแแแชแซ แจแชแแแ-แกแฒแฒ แตแแตแญ แ แแฃแ แญแณแแ แจแแ แจแ แแณแแแแซ แจแแตแ แแฌแแณแแต แแ แแแค แแดแ แแแแ แญแฅแญ แฒแ แแ แแแแ แตแแตแญ แฐแฃแแข
โญ๏ธแตแแตแฉ แ แฌแแซ แตแแ แญ แแญ แจแแแแแ แณแชแแ แจแกแแแณ แตแแ แญ แกแฎแฃ แแญ แจแแซแแแแ แจแณแแแแซ Trunk road T4 แ แซแ แฒแแ แ แ แซแฃแขแ แซแแแ แจแแ แแ แจ2 แฐแ แต แแฐ 4 แฐแแ แซแณแฅแจแแแข
๐แ แปแญแ แจแฐแแแฃแ แแ แแ แจแฐ แแแต แ แปแญแ แฒแชแ แขแแแแชแแ แฎแแตแตแซแญแฝแ แแฉแ (แฒแฒแฒแ) แฅแ แ แปแญแ แแตแญ แฃแกแญ แจแฐแตแฐแแแฐ แฒแแ แแ แ แแ แจแณแแแแซ แแแแตแต แ แซแฑ แแข แฐแธแแแแข
๐ฐแจแ แซแต แ แแณแต แ แแญ แจแฐแฐแซ แ แแ แ แ แแชแซ แจแ แ แแ แฐแแ แจแแญแแ แแแต ( low-pylon cable-stayed bridge) แซแแ แตแแตแญ แ แแ แแ แ แแ แฐแแแแทแแข
๐ฐแ แ แแชแซ แตแแ แแญแ แ แแแ แ แชแญแถแชแซ แแญแ แฐแกแฃแ แจแฃแ แญ แณแญแป แแญ แจแแแแ แตแแตแฉ 4.66 แชแ แแตแญ แญแแแต แซแแ แฒแแ แ แฐแ แต แ120 แชแ แแตแญ แแฅแแต แจแฐแแฐแ แฃแแแแต แฐแจแแ แซแแ แแแข
๐ฐแแแ แตแแตแญ, 520 แแตแญ, แฃแ แถแตแต-แแญแแ, แฃแ แแแต แแแต แ แแฎแแแ แแ แฐแ-แแญแแ แจแฌแฅแ แแแต แซแแ แแแ แญ, 123 แญแแแฝแ แซแแ แแแข
โ๏ธแแ แแก แ แแแแ แฅแ แ แแแฝ แญแแแฝ แแซแจแ แซแแแ แแแแแต แแปแปแแฃแจแแ แแแ แฅแ แจแแแแฃ แแชแแฝแ แแแแต แฅแ แจแฐแแฝ แฅแ แจแธแแฆแฝ แฅแแ แตแแดแ แแปแปแ แแแข
โญ๏ธแตแแตแฉ แจ MV 'Hapa Kazi Tu' แแญแจแฅ แฅแ แจแตแณแแณแญแต แแแชแซ แฃแกแญ (SGR) แ แฐแแญแ แจแแแแ-แขแณแซ แญแแแ แจแแฎ แฐแ แจแแ แจแฐ แแแต แฐแแณแฝแแต แ แซแ แแแข
๐แญแ แแฎแแญแต แจ1,500 แ แแญ แแแแ แแแฝ แจแตแซ แฅแตแ แจแแ แจ แฒแแ แแ แซแฃแขแ แ แ แ แแแฃแณ แฅแ แขแฎแแแซแ แฅแตแแต แ แตแฐแแฝแฆ แ แตแญแแแข
@etconp
๐ทแณแแแแซ แ แชแญแถแชแซ แแญแ แแญ 3.2 แชแ แแตแญ แญแแแต แซแแ แตแแตแญ แ 300 แแแจแ แถแแญ แจแแแ แตแ แแแฃแณ แ แ แแแแฝแข
๐งแญแ แตแแตแญ แ แณแแแแซ ๐บ๐ฌแกแแแณแฃ ๐ท๐ผแฉแแแณแแฃแฅแฉแแฒแ แจแแฎ แ แแแฝ แแแซแต แแซแจแ แซแแแ แจแแแต แแแแฅ แแแณแแฅ แณแตแฆ แจแฐแแแฃ แตแแตแญ แแแข
๐ซแจแแตแซแ แ แแชแซ แจแ แ แตแแตแญแฃ 3.2 แชแ แแตแญ แจแแธแแ แฒแแ แ แแแแชแซ แจแชแแแ-แกแฒแฒ แตแแตแญ แ แแฃแ แญแณแแ แจแแ แจแ แแณแแแแซ แจแแตแ แแฌแแณแแต แแ แแแค แแดแ แแแแ แญแฅแญ แฒแ แแ แแแแ แตแแตแญ แฐแฃแแข
โญ๏ธแตแแตแฉ แ แฌแแซ แตแแ แญ แแญ แจแแแแแ แณแชแแ แจแกแแแณ แตแแ แญ แกแฎแฃ แแญ แจแแซแแแแ แจแณแแแแซ Trunk road T4 แ แซแ แฒแแ แ แ แซแฃแขแ แซแแแ แจแแ แแ แจ2 แฐแ แต แแฐ 4 แฐแแ แซแณแฅแจแแแข
๐แ แปแญแ แจแฐแแแฃแ แแ แแ แจแฐ แแแต แ แปแญแ แฒแชแ แขแแแแชแแ แฎแแตแตแซแญแฝแ แแฉแ (แฒแฒแฒแ) แฅแ แ แปแญแ แแตแญ แฃแกแญ แจแฐแตแฐแแแฐ แฒแแ แแ แ แแ แจแณแแแแซ แแแแตแต แ แซแฑ แแข แฐแธแแแแข
๐ฐแจแ แซแต แ แแณแต แ แแญ แจแฐแฐแซ แ แแ แ แ แแชแซ แจแ แ แแ แฐแแ แจแแญแแ แแแต ( low-pylon cable-stayed bridge) แซแแ แตแแตแญ แ แแ แแ แ แแ แฐแแแแทแแข
๐ฐแ แ แแชแซ แตแแ แแญแ แ แแแ แ แชแญแถแชแซ แแญแ แฐแกแฃแ แจแฃแ แญ แณแญแป แแญ แจแแแแ แตแแตแฉ 4.66 แชแ แแตแญ แญแแแต แซแแ แฒแแ แ แฐแ แต แ120 แชแ แแตแญ แแฅแแต แจแฐแแฐแ แฃแแแแต แฐแจแแ แซแแ แแแข
๐ฐแแแ แตแแตแญ, 520 แแตแญ, แฃแ แถแตแต-แแญแแ, แฃแ แแแต แแแต แ แแฎแแแ แแ แฐแ-แแญแแ แจแฌแฅแ แแแต แซแแ แแแ แญ, 123 แญแแแฝแ แซแแ แแแข
โ๏ธแแ แแก แ แแแแ แฅแ แ แแแฝ แญแแแฝ แแซแจแ แซแแแ แแแแแต แแปแปแแฃแจแแ แแแ แฅแ แจแแแแฃ แแชแแฝแ แแแแต แฅแ แจแฐแแฝ แฅแ แจแธแแฆแฝ แฅแแ แตแแดแ แแปแปแ แแแข
โญ๏ธแตแแตแฉ แจ MV 'Hapa Kazi Tu' แแญแจแฅ แฅแ แจแตแณแแณแญแต แแแชแซ แฃแกแญ (SGR) แ แฐแแญแ แจแแแแ-แขแณแซ แญแแแ แจแแฎ แฐแ แจแแ แจแฐ แแแต แฐแแณแฝแแต แ แซแ แแแข
๐แญแ แแฎแแญแต แจ1,500 แ แแญ แแแแ แแแฝ แจแตแซ แฅแตแ แจแแ แจ แฒแแ แแ แซแฃแขแ แ แ แ แแแฃแณ แฅแ แขแฎแแแซแ แฅแตแแต แ แตแฐแแฝแฆ แ แตแญแแแข
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
๐20โค3
๐Patent Defects in Construction
๐ซPatent defects are defects that are completely visible to the naked eyeโfor example, faulty pipes, water stains on the walls, wall cracks, etc.
โญ๏ธA practical completion certificate is a contractual document that allows the client to take possession of and use a building.
๐ทAll the defects apparent before the practical completion of the project should be rectified before issuing the certificate of practical completion.
โ๏ธแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐ซPatent defects are defects that are completely visible to the naked eyeโfor example, faulty pipes, water stains on the walls, wall cracks, etc.
โญ๏ธA practical completion certificate is a contractual document that allows the client to take possession of and use a building.
๐ทAll the defects apparent before the practical completion of the project should be rectified before issuing the certificate of practical completion.
โ๏ธแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐15โค3
Ethio Construction Engineering
๐Patent Defects in Construction ๐ซPatent defects are defects that are completely visible to the naked eyeโfor example, faulty pipes, water stains on the walls, wall cracks, etc. โญ๏ธA practical completion certificate is a contractual document that allows theโฆ
๐Types of Defects In Building Construction
โญ๏ธ1. Cracks: Cracks can occur in walls, floors, and ceilings due to settling of a structure, poor workmanship, or environmental factors such as temperature changes.
โญ๏ธ2. Leaks: Leaks can occur in roofs, walls, windows, and pipes, leading to water infiltration and damage to the building structure.
โญ๏ธ3. Poor insulation: Poor insulation can lead to energy inefficiency, higher utility bills, and discomfort for occupants.
โญ๏ธ4. Uneven floors: Uneven or sloping floors can be caused by poor foundation construction, settling of the structure, or water damage.
โญ๏ธ5. Electrical problems: Electrical defects can include faulty wiring, incorrect installation of fixtures, and inadequate access to electrical panels.
โญ๏ธ6. Plumbing issues: Plumbing defects can include leaking pipes, poor water pressure, and inadequate drainage systems.
โญ๏ธ7. Mold and mildew: Mold and mildew growth can occur due to water infiltration, poor ventilation, and high humidity levels, leading to health hazards for occupants.
โญ๏ธ8. Structural issues: Structural defects can include inadequate reinforcement, foundation problems, and unstable walls or columns.
โญ๏ธ9. Poor finishing: Poor finishing can include uneven paint or flooring, poorly installed fixtures, and damaged surfaces, affecting the overall aesthetic appeal of the building.
โญ๏ธ10. Inadequate ventilation: Poor ventilation can lead to poor indoor air quality, discomfort for occupants, and potential health hazards.
@etconp
โญ๏ธ1. Cracks: Cracks can occur in walls, floors, and ceilings due to settling of a structure, poor workmanship, or environmental factors such as temperature changes.
โญ๏ธ2. Leaks: Leaks can occur in roofs, walls, windows, and pipes, leading to water infiltration and damage to the building structure.
โญ๏ธ3. Poor insulation: Poor insulation can lead to energy inefficiency, higher utility bills, and discomfort for occupants.
โญ๏ธ4. Uneven floors: Uneven or sloping floors can be caused by poor foundation construction, settling of the structure, or water damage.
โญ๏ธ5. Electrical problems: Electrical defects can include faulty wiring, incorrect installation of fixtures, and inadequate access to electrical panels.
โญ๏ธ6. Plumbing issues: Plumbing defects can include leaking pipes, poor water pressure, and inadequate drainage systems.
โญ๏ธ7. Mold and mildew: Mold and mildew growth can occur due to water infiltration, poor ventilation, and high humidity levels, leading to health hazards for occupants.
โญ๏ธ8. Structural issues: Structural defects can include inadequate reinforcement, foundation problems, and unstable walls or columns.
โญ๏ธ9. Poor finishing: Poor finishing can include uneven paint or flooring, poorly installed fixtures, and damaged surfaces, affecting the overall aesthetic appeal of the building.
โญ๏ธ10. Inadequate ventilation: Poor ventilation can lead to poor indoor air quality, discomfort for occupants, and potential health hazards.
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
๐ฉ @Philemona7
๐9
๐แฅแตแช แญแ แแแญ แณแญแต/Site แแญ แจแแ แแฝแ?
๐งแ แ แแแ แแญแต แแ แฐแฝแฅแ แญแแจแแ? แแแแต bend แญแฐแจแแ?
๐ฉแแณแฆแปแน แจแณแฝ แฃแแ แแแญ แซแแฉแ แแญ แฎแแแต แแตแซ แแญ แแ๐
https://t.me/COTMp
@etconp
๐งแ แ แแแ แแญแต แแ แฐแฝแฅแ แญแแจแแ? แแแแต bend แญแฐแจแแ?
๐ฉแแณแฆแปแน แจแณแฝ แฃแแ แแแญ แซแแฉแ แแญ แฎแแแต แแตแซ แแญ แแ๐
https://t.me/COTMp
@etconp
๐19
This media is not supported in your browser
VIEW IN TELEGRAM
๐แจแแญ แ แแญ แแฎแแตแตแซแญแฝแ แฃแแแซแแฝ
๐ซแ แแแซแฝแ แ แฎแแตแตแซแญแฝแ แแญแ แแแฐแแซแต แจแแซแตแฝแแธแแ แแแต แฅแแฒแซแแ แจแตแแ แฐแฅแณแค แจแแซแแแ แตแ แแแณ แแแแฐแ แ แแฃแ แแแชแซ แแฅแญ 29/2012 แ.แ แแฐแจแต แ แแแแแฑแ แ แแแฃแญ แฒแฐแฅ แแญแทแแกแก
๐งแจแตแแ แฐแฅแณแค แ แฐแฃแฅ แ แแแแแต แแแฃแแ แจแฐแแแแฉแ แแแแต แจแแซแจแซ แญแแ แแแต แ แดแญแแแ แฅแแฒแณแแ แแแตแจแ แจแแฐแ แฅแจแต แฒแฐแจแ แแญแทแ แกแก
๐ทแ แแ แแฐแจแต แจแ แแแแแต แ แฐแฃแกแ แจแฅแ แแต 1 แแ2017แ.แ แแแฎ แฃแแแณแฉแฝ แซแแ แต แฆแณ แแแ แ online แ แแแแแต แจแแซแแแ แต แแแณ แตแแฐแแปแธ แ แแแแแฑแ แจแแตแแแ แ www.Eservice.gov.et แแแแต แจแแตแฝแ แแแแ แฅแแแแแแ แข
แแ แแ แแจแ แ แตแแญ แแฅแญ
+25115541285 | +25115541254 แฐแแแ แแจแ แแแแต แญแปแแ
แจแจแฐแแ แแ แจแฐ แแแต แแแตแดแญ
@etconp
๐ซแ แแแซแฝแ แ แฎแแตแตแซแญแฝแ แแญแ แแแฐแแซแต แจแแซแตแฝแแธแแ แแแต แฅแแฒแซแแ แจแตแแ แฐแฅแณแค แจแแซแแแ แตแ แแแณ แแแแฐแ แ แแฃแ แแแชแซ แแฅแญ 29/2012 แ.แ แแฐแจแต แ แแแแแฑแ แ แแแฃแญ แฒแฐแฅ แแญแทแแกแก
๐งแจแตแแ แฐแฅแณแค แ แฐแฃแฅ แ แแแแแต แแแฃแแ แจแฐแแแแฉแ แแแแต แจแแซแจแซ แญแแ แแแต แ แดแญแแแ แฅแแฒแณแแ แแแตแจแ แจแแฐแ แฅแจแต แฒแฐแจแ แแญแทแ แกแก
๐ทแ แแ แแฐแจแต แจแ แแแแแต แ แฐแฃแกแ แจแฅแ แแต 1 แแ2017แ.แ แแแฎ แฃแแแณแฉแฝ แซแแ แต แฆแณ แแแ แ online แ แแแแแต แจแแซแแแ แต แแแณ แตแแฐแแปแธ แ แแแแแฑแ แจแแตแแแ แ www.Eservice.gov.et แแแแต แจแแตแฝแ แแแแ แฅแแแแแแ แข
แแ แแ แแจแ แ แตแแญ แแฅแญ
+25115541285 | +25115541254 แฐแแแ แแจแ แแแแต แญแปแแ
แจแจแฐแแ แแ แจแฐ แแแต แแแตแดแญ
@etconp
๐15โค8
Intercon Construction Chemicals
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐2๐1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แแแ แ แ แแต แฆแณ แจแแซแแแ แต แฅแ แแแแ แ แญแฅ
๐ฐแแ แญแแแแ?
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแตแแซแจแฅ แแตแ แณแต แแญแแ แแณแ แ แจแแแ แฅแแณแซแตแก แแแแ แแฝแแฝ แ แตแแฅแฐแแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ 1. แแญแซแถ
แ.1 แ แจแญ แคแ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐แแแ แ แ แแต แฆแณ แจแแซแแแ แต แฅแ แแแแ แ แญแฅ
๐ฐแแ แญแแแแ?
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแตแแซแจแฅ แแตแ แณแต แแญแแ แแณแ แ แจแแแ แฅแแณแซแตแก แแแแ แแฝแแฝ แ แตแแฅแฐแแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ 1. แแญแซแถ
แ.1 แ แจแญ แคแ
แ.3 แฐแญแแแญแแแต
0904040477
0911016833
๐3
๐Bonding of Old and New Concrete?
๐งIn construction, there always comes a time when there is a need to bond hardened concrete (substrate) with fresh concrete topping/overlay. The aim of this post is to explain how to bond old and fresh concrete successfully.
Furthermore, we will review the strength of the interfacial bond between old and new concrete based on laboratory studies.
โบProper bonding is very important for adequate performance when the fresh concrete topping is used to overlay an existing hardened concrete. This construction feature is usually found in bridge deck construction, concrete pavements, precast filigree slab, pile caps (in some cases) etc. Proper bonding between the substrate and the topping is not always guaranteed unless simple precautions are taken.
โบFor adequate bonding, it is very important to prepare the surface of the substrate adequately.
โญ๏ธThe preparation of the surface usually involves:
๐Roughening the surface, and removal of all dirt, oil, grease, and loosened or unbonded portions of the existing concrete.
โบBy implication, the surface of the substrate should be hard, firm, clean, and free from loosened particles. This can be achieved by the use of chipping hammers, wire brushing the surface, etc.
๐After this is done, the exposed concrete surface can be cleaned by using pressurized clean water, air, etc. The man hours involved depend on the area of the surface, location, and the ease of cleaning (e.g reinforcement obstruction).
๐After surface preparation, there is usually a need to apply a bonding agent on the surface of the existing concrete in order to facilitate the bonding. Epoxy-based bonding agents are very popular for such operations. It is recommended that a bonding agent is applied prior to casting the fresh concrete. In essence, the procedure should be โwet-to-wetโ as the bonding agent should not be allowed to dry before the fresh concrete topping is placed.
๐In a research carried out by Vandhiyan and Kathiravan (2017), the compressive strength of monolithic and bonded concrete was compared using 150mm x 150mm cube specimens at 28 days. With an epoxy-based bonding agent, the compressive strength of the bonded concrete was about 5% less than the monolithic strength, while without the bonding agent, the compressive strength was about 28% less than the monolithic compressive strength.
๐Research has also shown that the moisture condition of the substrate affects the shear bond strength of bonded concrete. Shin and Wan (2010) investigated the interfacial bond strength of old and new concrete considering saturated surface dry (SSD) and air dry conditions. Saturated surface dry is a condition in which the concrete contains moisture that is equal to its potential absorption, without the surface being wet or damp.
๐At a water/cement ratio of 0.45 (for the topping concrete), the shear bond strength at the interface was about 44% greater when the substrate was at SSD condition than when it was air dry. At a water/cement ratio of 0.6 for the topping layer, an increase in shear bond strength was recorded, but there was a reduction in the compressive strength of the concrete.
โบSo the recommendation in this article is that when casting a topping layer of fresh concrete on old concrete, adhere to the following guidelines;-
(1) Prepare the surface properly
(2) Make sure that the substrate is at saturated surface dry condition
(3) Use a bonding agent and follow the manufacturerโs technical recommendation properly.
@etconp
๐งIn construction, there always comes a time when there is a need to bond hardened concrete (substrate) with fresh concrete topping/overlay. The aim of this post is to explain how to bond old and fresh concrete successfully.
Furthermore, we will review the strength of the interfacial bond between old and new concrete based on laboratory studies.
โบProper bonding is very important for adequate performance when the fresh concrete topping is used to overlay an existing hardened concrete. This construction feature is usually found in bridge deck construction, concrete pavements, precast filigree slab, pile caps (in some cases) etc. Proper bonding between the substrate and the topping is not always guaranteed unless simple precautions are taken.
โบFor adequate bonding, it is very important to prepare the surface of the substrate adequately.
โญ๏ธThe preparation of the surface usually involves:
๐Roughening the surface, and removal of all dirt, oil, grease, and loosened or unbonded portions of the existing concrete.
โบBy implication, the surface of the substrate should be hard, firm, clean, and free from loosened particles. This can be achieved by the use of chipping hammers, wire brushing the surface, etc.
๐After this is done, the exposed concrete surface can be cleaned by using pressurized clean water, air, etc. The man hours involved depend on the area of the surface, location, and the ease of cleaning (e.g reinforcement obstruction).
๐After surface preparation, there is usually a need to apply a bonding agent on the surface of the existing concrete in order to facilitate the bonding. Epoxy-based bonding agents are very popular for such operations. It is recommended that a bonding agent is applied prior to casting the fresh concrete. In essence, the procedure should be โwet-to-wetโ as the bonding agent should not be allowed to dry before the fresh concrete topping is placed.
๐In a research carried out by Vandhiyan and Kathiravan (2017), the compressive strength of monolithic and bonded concrete was compared using 150mm x 150mm cube specimens at 28 days. With an epoxy-based bonding agent, the compressive strength of the bonded concrete was about 5% less than the monolithic strength, while without the bonding agent, the compressive strength was about 28% less than the monolithic compressive strength.
๐Research has also shown that the moisture condition of the substrate affects the shear bond strength of bonded concrete. Shin and Wan (2010) investigated the interfacial bond strength of old and new concrete considering saturated surface dry (SSD) and air dry conditions. Saturated surface dry is a condition in which the concrete contains moisture that is equal to its potential absorption, without the surface being wet or damp.
๐At a water/cement ratio of 0.45 (for the topping concrete), the shear bond strength at the interface was about 44% greater when the substrate was at SSD condition than when it was air dry. At a water/cement ratio of 0.6 for the topping layer, an increase in shear bond strength was recorded, but there was a reduction in the compressive strength of the concrete.
โบSo the recommendation in this article is that when casting a topping layer of fresh concrete on old concrete, adhere to the following guidelines;-
(1) Prepare the surface properly
(2) Make sure that the substrate is at saturated surface dry condition
(3) Use a bonding agent and follow the manufacturerโs technical recommendation properly.
@etconp
๐11๐1
๐แจแแแฃแณ แแชแ แแแแแฐ แจแแจแฑ แ แแซแญ แแดแแฝ
๐งแแ แแ แแแฃแณ แจแแซแตแแแ แฅแแฐ แฅแจแตแฃ แฒแแแถแฃ แฅแแฌแตแฃ แ แ แญ แซแ แฅแฌ แแแแฝ แแ แฅแจแจแแจ แจแแแฑ แแณแญ แจแแแ แจแฐแฐแแจ แ แญแฐแแแกแก
๐ซแแแ แแแตแค แ แแแแแต แจแแ แแฑแต แจแแแจแปแฃ แจแ แซแฐแ แแแ แตแฃ แจแตแซแแแญแต แแ แแจแแญ แฅแ แฐแซแซแฅแแต แซแแ แจแแ แแฝแ แต แแธแแกแก
โบแจแฎแแตแตแซแญแฝแ แขแแฐแตแตแช แแฉ แฃแ แช แฐแแ แฅแฌ แแแแฝแ แ แแแแต แฅแ แ แแฐแฃแแ แฃ แ แแซแซ แจแ แ แแตแ แจแแแจแ แฅแ แแฅ แจแแ แ แแแแฝแ แแแแฃแต แแแกแก
โถ๏ธแจแแ แ แแแณแต แจแฎแแตแตแซแญแฝแ แคแญแตแแญแถแฝ แจแฅแฌ แแ แแจแตแ แ แแแแ แแชแ แแแแแต แซแตแฝแแ แฅแแ แ แแณแแแต แซแตแแแงแธแแ แ แ แซแฎแฝ แแตแแญแถแฝ แจแแจแฐแแต แแธแแกแก
๐ฐแ แแซแซ แจแแ แต แแแ แแแญแแต
โบแฅแแฐ แแแแแ แจแแแต แแญแ แจแฎแแตแตแซแญแฝแ แขแแฐแตแตแช แจแแจแจแป แแฅ แแตแจแ แแแกแก แญแ แแ แตแญแ แแแแแต แแแแฃแณแ แจแแซแตแแแแแ แ แแต แฅแ แแญแแญ แจแแแฃแณ แแฐแถแฝ แจแฐแแแจแฐ แ แแซแญ แซแ แจแแ แต แแแ แแแจแญ แแแกแก
โถ๏ธแญแ แแ แฝแแญ แแแ แจแ แจแแซแตแฝแ แ แแซแญ แซแ แจแแ แต แแแแฝ แแตแฅ แฅแฌ แแแแฝแ แซแแ แแฃแซแ แแแณ แ แแแญแแญ แแฐแ แฅแ แแจแแธแต แ แฅแซแแณแแฑ แจแแแฃแณ แแฐแต แจแแซแตแแแ แแฅแแถแฝแ แแฐแ แฅแ แแแแแต แแธแแกแก
๐ฐแแฐแ แ แจแแ แฅแ แจแแฐแแแ แฒแแญแ
โบแ แแต แ แแ แจแแฌแต แฐแแตแถ แฅแซแฐแ แ แแฐ แแฅแญแฃ แจแแญแแธแ แจแญแแ แแ แณแแฝ แแฐแ แ แจแแ แตแแต แฅแ แแ แณ แจแฐแแ แฑ แฅแแฐแแ แแตแจแ แแแ แแแแแต แญแจแณแแกแก
โถ๏ธแ แแแ แฃแฐแ แแฅแญ แจแแตแฅ แแ แณ แฒแแญแ แจแแแแแฅ แจแแแฃ แจแฅแฌ แแต แฅแญแแต แซแตแจแตแแแกแก แแฐแแแญ แฒแแญแ แจแแแ แแ แฅแฉ แแต แแแแตแ แญแ แญแแแกแก
โถ๏ธแฅแตแจ แแแแณแ แแแแฃแณ แจแแซแแแแ แแถแฝแ แแฐแ แฅแ แแจแแธแต แฅแแณแญแปแ แซแฐแญแแแกแก แแแแฃแณ แจแแซแตแแแ แแฃแชแซแแฝ แ แจแแแ แฅแแฒแแแแก แซแฐแญแแแกแก
โนแจแฅแซ แแฅแแต แฅแ แแฐแตแ แแแแฃแ แญ แจแแซแตแฝแ แแฌแฃ แญแแฅแซแแกแก
๐ฐแ แแซแญ แแถแฝแ แแ แแ
โบแ แ แแ แแแฃแณ แ แแแ แแแฐแแต แจแแฐแ แแ แ แแแแแต แจแแแต แ แแตแแฃแต แจแณแญแญแแต แจแแ แฅแจแถแฝแ แจแแแฐแ แฅแ แจแฃแแ แจแแแแ แจแแตแฅ แแจแแแซ แแญแแณแแฝแ แแ แแแฃ แฐแแฃแแ แฅแแฌแถแฝ แฅแ แแญแแณแแฝแ แแ แแ แจแ แแแ แจแแแฃแณ แแ แฅแแฒแแแต แซแฐแญแแ::
๐ฐแจแแแฃแณ แฃแแแซแแฝ แแชแ แแแแต
โบแจแแแฃแณ แแฐแตแ แ แแ แฐแแณ แธแแฝแ แ แตแแแแแ แแต แแฐแ แฅแ แ แแแแตแฃ แแแแฃแณแ แจแแซแตแแแแแ แฃแแแซ แ แแแ แ แแ แ แญ แแแฃแณ แจแแซแตแแแ แจแแแ แต (แจแแซ) แญแแซ แแชแ แ แจแแฐแ แแ แ แแแแแต แญแจแณแ::
๐ฐแแ แฅแ แแแแฅแ แแแ แฅ
โบแแแแฃแณ แจแแซแตแแแ แฅแ แฅแซแ แจแแซแแแฅแ แฅแแฐ แแฐแญแฃ แคแญแตแซแซแฐแญแฃ แแแต (แจแฅแจแต แแแฃแ) แจแฎแแญแชแต แแแฃแ แฐแปแซแแฃ แฐแแฃแฃแ แฅแจแถแฝแแฃ แแแฃแณแ แณแญแแจแฅ แ แแแแแ แต แแ แแฒแซแ แจแแแญแกแ แตแ แแฐแ แซแ แแแ แต แแตแจแ แแแแฃแณ แจแแซแตแแแ แแ แ แแแ แฅแฃ แ แแฅแแต แแฐแแแแแ แตแญแแ แแ แแแแซแต แ แฐแแแ แแตแ แแชแ แแแแแต แญแจแณแแกแก
โถ๏ธแฅแญแแ แจแแซแตแแก แแตแณแแถแฝแ แฅแ แจแแแญ แฅแญแแแ แแฐ แคแแญแตแชแญ แจแแแแก แแญแแณแแฝแ แแซแฐแตแฃ แ แแแ แจแฐแ แแแ แ แแ แแแ แจแแญแ แแแณ (แแแแฅ) แฅแแฒแแ แฅ แซแฐแญแแ
๐ฒแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐งแแ แแ แแแฃแณ แจแแซแตแแแ แฅแแฐ แฅแจแตแฃ แฒแแแถแฃ แฅแแฌแตแฃ แ แ แญ แซแ แฅแฌ แแแแฝ แแ แฅแจแจแแจ แจแแแฑ แแณแญ แจแแแ แจแฐแฐแแจ แ แญแฐแแแกแก
๐ซแแแ แแแตแค แ แแแแแต แจแแ แแฑแต แจแแแจแปแฃ แจแ แซแฐแ แแแ แตแฃ แจแตแซแแแญแต แแ แแจแแญ แฅแ แฐแซแซแฅแแต แซแแ แจแแ แแฝแ แต แแธแแกแก
โบแจแฎแแตแตแซแญแฝแ แขแแฐแตแตแช แแฉ แฃแ แช แฐแแ แฅแฌ แแแแฝแ แ แแแแต แฅแ แ แแฐแฃแแ แฃ แ แแซแซ แจแ แ แแตแ แจแแแจแ แฅแ แแฅ แจแแ แ แแแแฝแ แแแแฃแต แแแกแก
โถ๏ธแจแแ แ แแแณแต แจแฎแแตแตแซแญแฝแ แคแญแตแแญแถแฝ แจแฅแฌ แแ แแจแตแ แ แแแแ แแชแ แแแแแต แซแตแฝแแ แฅแแ แ แแณแแแต แซแตแแแงแธแแ แ แ แซแฎแฝ แแตแแญแถแฝ แจแแจแฐแแต แแธแแกแก
๐ฐแ แแซแซ แจแแ แต แแแ แแแญแแต
โบแฅแแฐ แแแแแ แจแแแต แแญแ แจแฎแแตแตแซแญแฝแ แขแแฐแตแตแช แจแแจแจแป แแฅ แแตแจแ แแแกแก แญแ แแ แตแญแ แแแแแต แแแแฃแณแ แจแแซแตแแแแแ แ แแต แฅแ แแญแแญ แจแแแฃแณ แแฐแถแฝ แจแฐแแแจแฐ แ แแซแญ แซแ แจแแ แต แแแ แแแจแญ แแแกแก
โถ๏ธแญแ แแ แฝแแญ แแแ แจแ แจแแซแตแฝแ แ แแซแญ แซแ แจแแ แต แแแแฝ แแตแฅ แฅแฌ แแแแฝแ แซแแ แแฃแซแ แแแณ แ แแแญแแญ แแฐแ แฅแ แแจแแธแต แ แฅแซแแณแแฑ แจแแแฃแณ แแฐแต แจแแซแตแแแ แแฅแแถแฝแ แแฐแ แฅแ แแแแแต แแธแแกแก
๐ฐแแฐแ แ แจแแ แฅแ แจแแฐแแแ แฒแแญแ
โบแ แแต แ แแ แจแแฌแต แฐแแตแถ แฅแซแฐแ แ แแฐ แแฅแญแฃ แจแแญแแธแ แจแญแแ แแ แณแแฝ แแฐแ แ แจแแ แตแแต แฅแ แแ แณ แจแฐแแ แฑ แฅแแฐแแ แแตแจแ แแแ แแแแแต แญแจแณแแกแก
โถ๏ธแ แแแ แฃแฐแ แแฅแญ แจแแตแฅ แแ แณ แฒแแญแ แจแแแแแฅ แจแแแฃ แจแฅแฌ แแต แฅแญแแต แซแตแจแตแแแกแก แแฐแแแญ แฒแแญแ แจแแแ แแ แฅแฉ แแต แแแแตแ แญแ แญแแแกแก
โถ๏ธแฅแตแจ แแแแณแ แแแแฃแณ แจแแซแแแแ แแถแฝแ แแฐแ แฅแ แแจแแธแต แฅแแณแญแปแ แซแฐแญแแแกแก แแแแฃแณ แจแแซแตแแแ แแฃแชแซแแฝ แ แจแแแ แฅแแฒแแแแก แซแฐแญแแแกแก
โนแจแฅแซ แแฅแแต แฅแ แแฐแตแ แแแแฃแ แญ แจแแซแตแฝแ แแฌแฃ แญแแฅแซแแกแก
๐ฐแ แแซแญ แแถแฝแ แแ แแ
โบแ แ แแ แแแฃแณ แ แแแ แแแฐแแต แจแแฐแ แแ แ แแแแแต แจแแแต แ แแตแแฃแต แจแณแญแญแแต แจแแ แฅแจแถแฝแ แจแแแฐแ แฅแ แจแฃแแ แจแแแแ แจแแตแฅ แแจแแแซ แแญแแณแแฝแ แแ แแแฃ แฐแแฃแแ แฅแแฌแถแฝ แฅแ แแญแแณแแฝแ แแ แแ แจแ แแแ แจแแแฃแณ แแ แฅแแฒแแแต แซแฐแญแแ::
๐ฐแจแแแฃแณ แฃแแแซแแฝ แแชแ แแแแต
โบแจแแแฃแณ แแฐแตแ แ แแ แฐแแณ แธแแฝแ แ แตแแแแแ แแต แแฐแ แฅแ แ แแแแตแฃ แแแแฃแณแ แจแแซแตแแแแแ แฃแแแซ แ แแแ แ แแ แ แญ แแแฃแณ แจแแซแตแแแ แจแแแ แต (แจแแซ) แญแแซ แแชแ แ แจแแฐแ แแ แ แแแแแต แญแจแณแ::
๐ฐแแ แฅแ แแแแฅแ แแแ แฅ
โบแแแแฃแณ แจแแซแตแแแ แฅแ แฅแซแ แจแแซแแแฅแ แฅแแฐ แแฐแญแฃ แคแญแตแซแซแฐแญแฃ แแแต (แจแฅแจแต แแแฃแ) แจแฎแแญแชแต แแแฃแ แฐแปแซแแฃ แฐแแฃแฃแ แฅแจแถแฝแแฃ แแแฃแณแ แณแญแแจแฅ แ แแแแแ แต แแ แแฒแซแ แจแแแญแกแ แตแ แแฐแ แซแ แแแ แต แแตแจแ แแแแฃแณ แจแแซแตแแแ แแ แ แแแ แฅแฃ แ แแฅแแต แแฐแแแแแ แตแญแแ แแ แแแแซแต แ แฐแแแ แแตแ แแชแ แแแแแต แญแจแณแแกแก
โถ๏ธแฅแญแแ แจแแซแตแแก แแตแณแแถแฝแ แฅแ แจแแแญ แฅแญแแแ แแฐ แคแแญแตแชแญ แจแแแแก แแญแแณแแฝแ แแซแฐแตแฃ แ แแแ แจแฐแ แแแ แ แแ แแแ แจแแญแ แแแณ (แแแแฅ) แฅแแฒแแ แฅ แซแฐแญแแ
๐ฒแแแแแแ แ แตแฐแซแจแตแ แฅแ แแณแฅแ แญแปแแแ!
๐แ แตแซ แฅแ แจแจแณแแฝ แแแแ แ แต แปแแ แแแแแแ๐ @ETCONpWORK
๐ฉแแฝแแแ แซแฐแก @ETCONpBOT
๐ซแฒแญแถแญ:๐
www.tiktok.com/@etconp7
@etconp
๐15๐2โค1๐1
๐Did you know that the distribution of soil pressure varies with time and also depends on the type of soil as well as the stiffness of the base and the structure.
๐ซHowever, it is quite important to note that adequate depth of footing helps to regulate the movement of foundation as a result of seasonal changes.
@etconp
๐ซHowever, it is quite important to note that adequate depth of footing helps to regulate the movement of foundation as a result of seasonal changes.
@etconp
๐7
๐'แดแต แฃแญ' แจแฐแฃแแ แ แแแแช แจแแแฃแณ แแแญแซ แจแฎแชแฐแญ แแแต แแช แฃแ แแ แแ แแแแถแฝ แฅแ แ แแแต แแ แแแแถแฝ แแญ แญแแญ แฐแแฃแซแ แญแฐแจแแ แฐแฃแ
๐ทแจแถแตแต แณแแแต แ แแต แ แแฃแ แแแญแซ แแฐแจแต แ แแแแฝ แจแแแแต แแซแ แซแแฃแธแ แญแแต (แแญแ set back)แฃ แจแแฌแต แตแแต แฅแ แแ แฐแแ แแฐแฅ แฅแ แจแ แแ แจแแ แตแแต (แแญแ frontage) แแแฐแแ แแแ แ แแ แญแข
โถ๏ธแ แแ แฑ แ แฐแซแแ แแแฃแฝแ แ แดแต แฃแญ แ แ แแฐแจแต แจ15 แแตแญ แฅแ แ แแญ แตแแต แซแแธแ แแแแถแฝ แจแแซแแตแแธแ แญแแณแแฝ แแ แฐแแ แจแฆแณ แตแแต แดแต แฃแญ แจแฐแแแฐ แ แแ แขแซแแต 500 แแตแญ แซแฌ แแแ แฅแแณแแ แต แแฐแแแแ แแแแ แแ แญแข
โบแ แฐแจแแชแ แ แแแ แแแแถแฝ แแญ แแ แฐแแ แจแ แแ แจแแ แตแแต แจ20 แแตแญ แซแแแฐ แแแ แฅแแณแแต แ แ แฅแแฐแแ แ แต แแจแ แ แ แญแ แ แ แแ แ แแญแแซแต แ แญแซแณ แจแ แแ แฎแแตแตแซแญแฝแ แตแซแแฝ แจแฐแแ แแตแฅ แฅแแฐแแ แ แแแ แแ แญแข
แญแ แแตแจแจแ 3 แแ แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แจแแแฃแณ แแแต แฅแ แแฅแฅแญ แฃแแณแฃแ แจแแฃ แจแ แฐแแฃแ แญ แแแญแซ แแ แตแซ แ แแฑแ แญ/แจแฐแแฝ แฐแแฎ แจแแ แจ แขแแแ แ แแ แฐแแ แ แฒแต แแปแปแซ แฅแแฐแฐแฐแจแแ แต แฐแแฐแแแข
โบแ แแ แ แแฐแจแต แจแ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแแ แฅแ แแแต แขแฎ แ แฒแต แ แแแ แฐแฅแณแค แจแฎแชแฐแญ แแแฑ แ5 แ แแต แจแฐแซแ แฅแ แต แแแแ แ แแแแ แจ15 แแตแญ แฅแ แ แแญ แตแแต แซแแธแ แแแแถแฝ แจแแซแแตแแธแ แญแแณแแฝ แแ แฐแแ แจแฆแณ แตแแต แดแต แฃแญ แจแฐแแแฐ แ แแ แขแซแแต 500 แแตแญ แซแฌ แแแ แฅแแณแแ แต แจแแฐแแแแ แแแญแซ แจแฎแชแฐแญ แแแต แแช แฃแ แแ แแ แแแแถแฝ แฅแ แ แแแต แแ แแแแถแฝ แแญ แแแแ แญแแณแแฝ แญแแญ แจแแแแจแณแธแ แแแแ แแแฟแแข
โญ๏ธแ แฐแจแแชแ แจแฎแชแฐแญ แแช แจแฐแฅแณแข แแแแต แฅแ แจแแตแฅ แแแตแฅ แแแแถแฝ แแญ แจแแแฐแ แญแแณแแฝ แแแฃแณแธแแ แ แฐแแแจแฐ แจแฐแปแปแแแ แจแดแต แฃแญ แ แ แแ แ แ แฅแแณแแฃแธแ แ แ แถ 500 แซแฌ แแตแญ แ แแตแฐแ แจแญแแณ แตแแต แแณแ แฅแ 20 แแตแญ แจแแแแต แแต แแแต แแ แณ แ แตแแณแ แจแแญแแ แแแแ แ แฅแซแญแทแแข
Via meseret
@etconp
๐ทแจแถแตแต แณแแแต แ แแต แ แแฃแ แแแญแซ แแฐแจแต แ แแแแฝ แจแแแแต แแซแ แซแแฃแธแ แญแแต (แแญแ set back)แฃ แจแแฌแต แตแแต แฅแ แแ แฐแแ แแฐแฅ แฅแ แจแ แแ แจแแ แตแแต (แแญแ frontage) แแแฐแแ แแแ แ แแ แญแข
โถ๏ธแ แแ แฑ แ แฐแซแแ แแแฃแฝแ แ แดแต แฃแญ แ แ แแฐแจแต แจ15 แแตแญ แฅแ แ แแญ แตแแต แซแแธแ แแแแถแฝ แจแแซแแตแแธแ แญแแณแแฝ แแ แฐแแ แจแฆแณ แตแแต แดแต แฃแญ แจแฐแแแฐ แ แแ แขแซแแต 500 แแตแญ แซแฌ แแแ แฅแแณแแ แต แแฐแแแแ แแแแ แแ แญแข
โบแ แฐแจแแชแ แ แแแ แแแแถแฝ แแญ แแ แฐแแ แจแ แแ แจแแ แตแแต แจ20 แแตแญ แซแแแฐ แแแ แฅแแณแแต แ แ แฅแแฐแแ แ แต แแจแ แ แ แญแ แ แ แแ แ แแญแแซแต แ แญแซแณ แจแ แแ แฎแแตแตแซแญแฝแ แตแซแแฝ แจแฐแแ แแตแฅ แฅแแฐแแ แ แแแ แแ แญแข
แญแ แแตแจแจแ 3 แแ แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แจแแแฃแณ แแแต แฅแ แแฅแฅแญ แฃแแณแฃแ แจแแฃ แจแ แฐแแฃแ แญ แแแญแซ แแ แตแซ แ แแฑแ แญ/แจแฐแแฝ แฐแแฎ แจแแ แจ แขแแแ แ แแ แฐแแ แ แฒแต แแปแปแซ แฅแแฐแฐแฐแจแแ แต แฐแแฐแแแข
โบแ แแ แ แแฐแจแต แจแ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแแ แฅแ แแแต แขแฎ แ แฒแต แ แแแ แฐแฅแณแค แจแฎแชแฐแญ แแแฑ แ5 แ แแต แจแฐแซแ แฅแ แต แแแแ แ แแแแ แจ15 แแตแญ แฅแ แ แแญ แตแแต แซแแธแ แแแแถแฝ แจแแซแแตแแธแ แญแแณแแฝ แแ แฐแแ แจแฆแณ แตแแต แดแต แฃแญ แจแฐแแแฐ แ แแ แขแซแแต 500 แแตแญ แซแฌ แแแ แฅแแณแแ แต แจแแฐแแแแ แแแญแซ แจแฎแชแฐแญ แแแต แแช แฃแ แแ แแ แแแแถแฝ แฅแ แ แแแต แแ แแแแถแฝ แแญ แแแแ แญแแณแแฝ แญแแญ แจแแแแจแณแธแ แแแแ แแแฟแแข
โญ๏ธแ แฐแจแแชแ แจแฎแชแฐแญ แแช แจแฐแฅแณแข แแแแต แฅแ แจแแตแฅ แแแตแฅ แแแแถแฝ แแญ แจแแแฐแ แญแแณแแฝ แแแฃแณแธแแ แ แฐแแแจแฐ แจแฐแปแปแแแ แจแดแต แฃแญ แ แ แแ แ แ แฅแแณแแฃแธแ แ แ แถ 500 แซแฌ แแตแญ แ แแตแฐแ แจแญแแณ แตแแต แแณแ แฅแ 20 แแตแญ แจแแแแต แแต แแแต แแ แณ แ แตแแณแ แจแแญแแ แแแแ แ แฅแซแญแทแแข
Via meseret
@etconp
๐16โค1๐ฅ1