Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.31K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
👍8❤1👏1
Ethio Construction Engineering
Photo
👉Types of Concrete Defects - Causes, Prevention

🚧1. Cracking

Various reasons for cracking are improper mix design, insufficient curing, omission of expansion and contraction joints, use of high slump concrete mix, unsuitable sub-grade etc.

Prevention, use low water - cement ratio maximize the coarse aggregate in concrete mix, admixtures containing calcium chloride must be avoided.

🚧2. Crazing

Crazing also called as pattern cracking or map cracking is the formation of closely spaced shallow cracks in an uneven manner.

Crazing occurs due to rapid hardening of top surface of concrete due to high temperatures or if the mix contains excess water content or due to insufficient curing
Pattern cracking can be avoided by proper curing, by dampening the sub-grade to resist absorption of water from concrete, by providing protection to the surface from rapid temperature changes.

🚧3. Blistering & Delamintaion

Blistering is the formation of hollow bumps of different sizes on concrete surface due to entrapped air under the finished concrete surface.

It may cause due to excessive vibration of concrete mix or presence of excess entrapped air in mix or due to improper finishing Delamination is also similar to blistering.

In this case also, top surface of concrete gets separated from underlying concrete.

Hardening of top layer of concrete before the hardening of underlying concrete will lead to delamination.

It can be prevented by using good proportion of ingredients in concrete mix, by covering the top surfacewhich reduces evaporation and using appropriate techniques for placing and finishing

🚧4. Dusting

Dusting, also called as chalking is the formation of fine and loose powdered concrete on the hardened concrete by disintegration.

This happens due to the presence of excess amount of water in concrete To avoid dusting, use low slump concrete mix to obtain hard concrete surface with good wear resistance

🚧5. Curling

When a concrete slab is distorted into curved shape by upward or downward movement of edges or corners, it is called curling.

It occurs mainly due to the differences in moisture content or temperature between slab surface (top) and slab base (bottom).

To prevent curling, use low shrink concrete mix, provide control joints, provide heavy reinforcement at edges or provide edges with great thickness,

🚧6. Efflorescence

Efflorescence is the formation of deposits of salts on the concrete surface.

Formed salts generally white in color.

It can be prevented by using clean and pure water for mixing, using chemically ineffective aggregates etc.

And make sure that cement should not contain alkalis more than 1% of its weight

🚧7. Scaling and Spalling

Scaling and spalling, in both the cases concrete surface gets deteriorated and flaking of concrete occurs.

The main cause for this type of cases is penetration of water through concrete surface.

This makes steel gets corroded and spalling or scaling may occurs.

Via Yonatan Tadesse PMP

@etconp
👍12👏9❤2🥰1
👉የጊዜ ማራዘሚያ በኮንስትራክሽን ኘሮጀክት ( Extension of time)

⏺በግንባታ ፕሮጀክቶች ውስጥ ያለው የጊዜ ማራዘሚያ የሚጠየቅባቸው ሁኔታዎች ብዙና ሰፊ ትንታኔ የሚፈልጉ በመሆኑ በአጭሩ ለመቃኘት ያክል ፤ ብዙ ጊዜ የሚከሰተው በተለያዩ ምክንያቶች ነው እነዚህ ምክንያቶች የሚፈጠሩት ከሦስቱ ባለ ድርሻ አካላት በአንዱ ወይም በሁለቱ አልያም ከሦስቱም ቁጥጥር ውጭ በሆነ ሁነታ በሚከሰቱ ምክንያቶች ሊሆን ይችላል።

⭐️አንዳንድ ዋና ዋና የተባሉ ምክንያቶችን በጥቂቱ ለማየት እንሞክራለን
**
🚧ያልተጠበቁ የቦታ ሁኔታዎች (unforeseen site condition)፡- ያልተጠበቁ የመሬት ሁኔታዎች እንደ የአፈር አለመረጋጋት፣ መበከል ወይም የመሬት ውስጥ መገልገያዎችን መገኘት በግንባታው ላይ ከፍተኛ መጓተት ሊያስከትሉ ይችላሉ።
****
🚧የዲዛይን ለውጦች እና ልዩነቶች ፦ ሥራ ከተጀመረ በኋላ በአሰሪው የሚጠየቁ ለውጦች ወይም ማሻሻያዎች ለትግበራ፣ እንደገና ለመንደፍ ወይም ለማጽደቅ ተጨማሪ ጊዜ ያስፈልጋቸዋል።
**
🚧የማጽደቅ እና የፈቃድ መዘግየት (Delay in approval band permit) ፦ግንባታው ብዙውን ጊዜ በአካባቢው ባለስልጣናት ወቅታዊ ፍቃዶች እና ማፅደቆች ላይ የተመሰረተ ነው።እነዚህን ለማግኘት ማንኛውም መዘግየቶች በተወሰኑ የፕሮጀክቱ ክፍሎች ላይ ያለውን እንቅስቃሴዎችን ሊያቆሙ ይችላሉ።

🚧የአየር ሁኔታ (weather condition)፦ከባድ ወይም ወቅቱን ያልጠበቀ የአየር ሁኔታ እንደ ከባድ ዝናብ፣ በረዶ ወይም ከፍተኛ ሙቀት የስራ ሁኔታዎች ፕሮጀክቱን ወደማይቀርበት መዘግየቶች ያመራል።

🚧ከአሰሪ ጋር የተገናኙ መዘግየቶች ፦ የዘገዩ ውሳኔዎች፣ ዘግይተው ማጽደቆች ወይም በደንበኛው መስፈርቶች ላይ የተደረጉ ለውጦች ግስጋሴን ሊያዘገዩ እና የጊዜ ማራዘሚያዎችን ያስገድዳሉ።

🚧ከአቅም በላይ የሆኑ ክስተቶች (Force majeur events)፦ የተፈጥሮ አደጋዎች፣ ወረርሽኞች፣ ወይም ሌሎች ያልተጠበቁ፣ ከቁጥጥር ውጪ የሆኑ ክስተቶች (እንደ ጎርፍ ወይም የመሬት መንቀጥቀጥ) ከአቅም በላይ በሆኑ ኮንትራቶች ውስጥ ጊዜ ማራዘም ሊያስፈልግ ይችላል።

🚧በዲዛይን ውስጥ ያሉ ስህተቶች ወይም ግድፈቶች (omission) ፦በግንባታው ወቅት የተገኙት በዋናው ዲዛይን ላይ ያሉ ስህተቶች ወይም ክፍተቶች እንደገና መስራት፣ ማሻሻያ ማድረግ ወይም ተጨማሪ ማጽደቅ ሊያስፈልጋቸው ይችላል፣ ይህም ወደ መዘግየቶች ያመራል።

🚧የህግ ለውጦች ፦ በፕሮጀክቱ ሂደት ውስጥ አዳዲስ ህጎች ወይም የግንባታ ደንቦች ለውጦች የጊዜ ገደቦችን የሚገፉ ማስተካከያዎችን ሊጠይቁ ይችላሉ።

🚧ክፍያ መዘግየት (late payment)
የጊዜ ማራዘሚያዎች በተለምዶ በግንባታ ኮንትራቶች ውስጥ በመደበኛ ሂደት የሚተዳደሩ ናቸው፤ ኮንትራክተሩ የመዘግየቱን መንስኤ ማረጋገጥ እና ተጨማሪ ጊዜን ማረጋገጥ ያስፈልጋል።

@etconp
👍23👏2❤1
👉Why Crushed Stones Are Used in Rail Tracks

🏷Crushed stones play several pivotal roles when it comes to railway track laying, which adds to the rail network's safety, stability, and durability.

⏺When the trains zoom on the tracks, little do you regard the base underneath; however, the ballast composed mainly of crushed stone keeps those tracks in their place.

🚧1. Stability and Support

⏺Crushed stone can be used in railway tracks because it provides the beds with stability.

⏺Due to their angular shape, the crushed stones interlock tightly, thus making a solid bed for supporting the weights of the tracks and trains.

▶️Because of this interlocking effect, the tracks cannot shift under pressure.
▶️They will remain aligned and level over time.
▶️This stability is particularly crucial when it comes to heavy trains traveling at very high speeds.

🚧2. Load Distribution

▶️Railway tracks have to bear enormous loads from the weight of trains that travel on them.
▶️Crushed stone distributes the load equally on the ground, and thus, the track is not set or warped.
▶️This even distribution helps avoid expensive repairs and maintenance and provides for a smoother ride for trains, which is important for safety.

🚧3. Drainage and Moisture Control

▶️Crushed stone also works well in terms of its drainage capabilities.
▶️Proper drainage averts the problem of water accumulating around the track and undermining its integrity.
▶️Stagnation of water around the tracks undermines the strength of the foundation, and deformation or even accidents concerning the track may occur.
▶️The gaps between the angular stones give enough room for the rainwater and moisture to pass freely through and around the tracks, thus leaving the foundation dry and intact.

🚧4. Cost-Effectiveness and Durability

▶️Besides serving its functional purpose, crushed stone is an economical choice in constructing tracks.
▶️It is readily available, moderately priced material compared to other construction options available to contractors.
⏺Moreover, it is strong enough and can survive for several years without requiring frequent replacement, so it's cheap in the long term, too.

🚧5. Easy Maintenance

▶️Another advantage of using crushed stone in railway tracks is that they are very easy to maintain.
▶️If an adjustment or repair of the track needs to be done, the crushed stone can easily be shifted or refilled.
⏺Over time, as the tracks have settled or shifted, the crushed stone ballast can be re-leveled, providing for the tracks to maintain alignment and functionality.

⭐️Conclusion

🌟It's more than just a subordinate material to railway tracks, actually; it's the unsung hero of the rail system.

🔰But the crushed stone performs many other functions:

⏚it stabilizes, distributes the loads, improves drainage, and makes maintenance easier.
▶️The tracks will not be in the best condition if the load-carrying crushed stones are not in good condition.

⏺Whether it is a high-speed express train or a local freight service, crushed stone helps in keeping the railway at work with efficiency, thus becoming an indispensable part of modern rail infrastructure.

@etconp
👍14⚡1
👉የፋይናንስ ማእከል ግንባታ፣ አዲስ አበባ

💫የ ኢትዮጵያ ኢንቨስትመንት ሆልዲንግስ ከ ሮክስቶን ሪልስቴት አፍሪካ ጋር በአዲስ አበባ የሚገነባ የፋይናንስ ማዕከል ግንባታን በተመለከተ የመግባቢያ ሰነድ ተፈራርመዋል።

⭐️በሁለቱ ትብብር የሚሰራው ማዕከል ቢሮዎች፣ ንግድ ስፍራዎች እንዲሁም የመኖርያ ቦታዎች ይኖሩታል።

📜ሰነዱን የተፈራረሙት የኢትዮጵያ ኢንቨስትመንት ሆልዲንግ ዋና ስራ አስፈጻሚ ዶክተር ብሩክ ታዬ እና ሚስተር ዲየትሪች ሮግ የሮክስቶን ስራ አስፈጻሚ ናቸው።

Via Ethiopian Investment Holdings

@etconp
👍6
👉የኮሪደር ልማት ስራውን በፍጥነት በማጠናቀቅ ምቹ የመኖሪያና የመስሪያ ከተማን ለመፍጠር ርብርብ ይደረጋል - አቶ ኦርዲን በድሪ

🚧የኮሪደር ልማቱን በምሽት ጭምር በማከናወን ፕሮጀክቶችን በተያዘላቸው ጊዜና ጥራት ለማጠናቀቅ እየተሰራ እንደሚገኝ የሀረሪ ክልል ርዕሰ መስተዳድር አቶ ኦርዲን በድሪ ገለፁ።

▶️ርዕሰ መስተዳድሩ በክልሉ በምሽት እየተከናወኑ የሚገኙ የኮሪደር ልማት ስራዎችን ተዘዋውረው ተመልክተዋል።

▶️አቶ ኦርዲን በምልከታው ወቅት እንደገለፁት የኮሪደር ልማት ፕሮጀክቶችን በተያዘላቸው ጊዜና ጥራት ለማጠናቀቅ ስራውን በምሽት ጭምር በማከናወን መነቃቃት ተፈጥሯል።

🏷የኮሪደር ልማቱ ፕሮጀክቶችን በምሽት ጭምር የማከናወን ልምድ እንዲዳብር በማድረግ ቀድሞ የነበረውን የስራ ባህል የቀየረ መሆኑንም ርዕሰ መስተዳድሩ ገልፀዋል።

💫በተጨማሪም ስራው በተለይ ፕሮጀክቶችን በጥራት እና በፍጥነት በማጠናቀቅ ረገድ ለቀጣይ የልማት ስራዎች ልምድ የተወሰደበት ነው ብለዋል።

❇️ማህበረሰቡ ለኮሪደር ልማቱ እያደረገው ያለው ድጋፍ ለስራው ምቹ ሁኔታን መፍጠሩን በመጠቆም፤ አጋጣሚውን በመጠቀም ፕሮጀክቶችን በተያዘላቸው ጊዜና ጥራት ለማከናወን እየተሰራ መሆኑን ገልፀዋል።

⏺የኮሪደር ልማት ስራውን በአጭር ጊዜ በማጠናቀቅ ምቹ የመኖሪያ እና የመስሪያ ከተማን ለመፍጠር ርብርብ እንደሚደረግም አቶ ኦርዲን ተናግረዋል።

Via EBC

@etconp
👍14❤2🥰1
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

👉ሁሉን በአንድ ቦታ የሚያገኙበት እና ለሁሉም ቅርብ

🔰ምን ይፈልጋሉ?

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

✂️ላሜራ ማስቆራረጥ ማስበሳት ወይንም ማሳጠፍ ከፈለጉ  እንዳያስቡ ሁሉንም ማሽኖች አስገብተናል

🔗ፌሮ (ቶንዲኖ) ጥርስ ማስበጀት ወይንም ማሳጠፍ ካሰቡ ለሱም ማሽኑ በጃችን ነዉ

📐ማንኛዉንም የሞደፊክ ስራዎችን የሚሰሩ ብቁ ባለሙያዎችም አሉን

☎️ይደዉሉልን ያማክሩን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

አድራሻችን፦ ቁ.1 አዉቶብስ ተራ(መሳለሚያ)
                    ቁ.2 መርካቶ
                    ቁ.3 ተክለሀይማኖት

0904040477
0911016833
👍8
👉Example: Calculate the weight of 100 m 16 mm ø bar.

🏷Given-Here

D = 16 mm
L = 100 m
W = 16² x 100/162 = 158 kg

💫If we put 1 meter length for each diameter of steel bar in the formula then we will get the unit weight.

⏺6 mm ø bar = 6² x 1/162 = 0.222 kg/m

⏺8 mm ø bar = 8² x 1/162 = 0.395 kg/m

⏺10mm ø bar = 10² x 1/162 = 0.617 kg/m

⏺12mm ø bar = 12² x 1/162 = 0.888 kg/m

⏺16mm ø bar = 16² x 1/162 = 1.580 kg/m

⏺20mm ø bar = 20² x 1/162 = 2.469 kg/m

⭐️If we multiply the length of bars by this unit weight, we will get the total weight of steel bars. For example, the total weight of 1000 meter long 20mm ø steel bar is 1000 x 2.469 = 2469 kg.

@etconp
👍30❤8
#ADVERTISEMENTS

👉ለግንባታዎ ውበት እኛን ስለ ምናስፈልግዎ ከግንባታ በኋላ ወደ እኛ ይደውሉ።

💫AR Building Finishing & Water Proofing Works ለህንፃዎች ውበት ፈጣሪዎች ነን

🚧በልዩ ጥራት የፊኒሽንግ ስራውን አጠናቀን ቤትዎ ውበት አጎናፅፈን እናስረክብዎታለን።

🌟ከመኖሪያ ቤት እስከ ትልልቅ ህንፃዎች አሻራችንን አሳርፈናል።
▶️Contextra
▶️Fine quartez
▶️Stone paint
▶️ Water Proofing Chemicals
▶️ Membranes በጥራት እንሰራለን።

📍አድራሻ:—ኡራኤል ሀይላለም ህንፃ
            ስልክ  0977 67 67 90
                      0912 23 04 71

💫AR Building Finishing & Water Proofing Works

ቴሌግራም:
@antearb
@antearb
👍4👏2