Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.31K links
๐Ÿ”จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

๐Ÿ“จ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
แ‹จแŠ แ‹แˆฎแ“ แˆจแ‹ฅแˆžแ‰น แˆฐแˆ›แ‹ญแŒ แ‰€แˆต แˆ…แŠ•แŒปแ‹Žแ‰ฝแข

แŠจแ‹˜แŒ แŠ™ แˆจแ‹ฃแ‹ฅแˆ แˆ…แŠ•แŒปแ‹Žแ‰ฝ แ‹แˆตแŒฅ แˆฐแ‰ฃแ‰ฑ แˆฉแˆตแ‹ซ แ‹แˆตแŒฅ แ‹ญแŒˆแŠ›แˆ‰แข

แ‰  Sara Wiatrak แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แˆแˆตแˆ

@etconp
๐Ÿ‘18โค1๐Ÿฅฐ1
Intercon Construction Chemicals 
    
๐Ÿ‘‰ Authorized agent of MC, SIMENTEK, Sika, Weber

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Concrete Repair, Grouting   
โ— Tile Adhesive & Tile Joint Fillers 
โ— Wall Putty, Prime Coat, Rush Coat
โ— Quartz, Contextra
โ— Floor hardener, Epoxy              
โ— Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0944774267
Address: Signal, around signal mall
๐Ÿ‘1
๐Ÿ‘‰What is Bridge

๐ŸšงA bridge is a structure that spans a physical obstacle, such as a body of water, valley, or road, to provide a passage for vehicles, pedestrians, trains, or utilities.

Bridges are vital for transportation and infrastructure, facilitating the movement of people and goods. There are various types of bridges, each designed to meet specific architectural, structural, and functional requirements.

๐Ÿ’ซHere are some common types of bridges:

1. Beam Bridge: This is one of the simplest types of bridges, consisting of horizontal beams supported by piers. The weight of the bridge and the load is transferred directly to the supports. Beam bridges are typically used for short spans.

2. Arch Bridge: Arch bridges have a curved structure that transmits the load to supports at either end. The arch shape allows for the distribution of weight evenly, making it suitable for longer spans than beam bridges.

3. Truss Bridge: Made of a framework of triangular trusses, this bridge design allows for efficient weight distribution. Truss bridges can be built with various materials, including wood and steel, and are suitable for longer spans.

4. Suspension Bridge: Characterized by cables suspended between towers, with additional cables supporting the bridge deck, suspension bridges are ideal for long spans and are particularly effective in areas prone to strong winds.

5. Cable-Stayed Bridge: Similar to suspension bridges, cable-stayed bridges have cables that are attached directly to one or more towers. The design allows for a rigid structure that is efficient for medium to long spans.

6. Cantilever Bridge: This type of bridge is built using cantilevers, which are structures that project horizontally into space, supported only on one end. Cantilever bridges are typically used for medium spans and can be constructed with various materials.

7. Arch-Rib Bridge: This variation of an arch bridge features ribs that support the deck, combining the aesthetics of an arch with the structural benefits of a truss.

8. Floating Bridge: Also known as a pontoon bridge, this type of bridge is supported by floating structures. Floating bridges are often used in bodies of water where traditional piers cannot be constructed.

@etconp
๐Ÿ‘11โค1
๐Ÿ‘‰แ‰…แˆญแˆต แŠฅแ‹ตแˆณแ‰ต

๐Ÿ“แŠ แˆแАแŒƒแˆบ แˆ˜แˆตแŒ‚แ‹ตแฃ แ‰ตแŒแˆซแ‹ญแฃแŠขแ‰ตแ‹ฎแŒตแ‹ซ

๐ŸทแŠ แˆแАแŒƒแˆบ แˆ˜แˆตแŒ‚แ‹ต แŠฅแ‹ตแˆณแ‰ฑ แ‰  แŒฅแˆซแ‰ต แŠฅแŠ“ แ‰  แแŒฅแАแ‰ต แŠฅแ‹จแ‰ฐแŠจแŠ“แ‹ˆแА แˆฒแˆ†แŠ• แŠฅแ‹ตแˆณแ‰ฑ  แŠจแ‰ฐแŒ€แˆ˜แˆจ 5 แ‹ˆแˆญ แŠ แˆแŽแ‰ณแˆแข

Via แŠ แŒฝแ‰ฅแˆ€ แŒˆแ‰ฅแˆจแŠฅแŒแ‹šแŠ แ‰ฅแˆ”แˆญ

@etconp
๐Ÿ‘9
๐Ÿ‘‰Increasing the bearing capacity of soil

๐ŸทIncreasing the bearing capacity of soil Use To support building construction footings is a crucial aspect of geotechnical engineering.

โญ๏ธThere are several methods and techniques that can be employed, depending on the site's specific conditions, soil characteristics, and the type of structure being built.

๐Ÿ“œHere are some common approaches:

โ‡๏ธ1. Soil Improvement Techniques

- Compaction: Increasing the density of soil through mechanical means can enhance its bearing capacity. This can be done using various compaction equipment like rollers, vibratory plates, or compactors.

- Densification: Techniques such as dynamic compaction or vibro-replacement (adding gravel columns) can help densify loose or soft soils.

- Grouting: Injecting grout or other materials into the soil can increase its strength and reduce settlement. This includes methods like pressure grouting, chemical grouting, or polyurethane grouting.

- Soil Stabilization: This involves mixing soil with stabilizing agents (such as lime, cement, or fly ash) to improve its physical and chemical properties, resulting in increased strength and reduced plasticity.

โ‡๏ธ2. Foundation Design Alternatives

- Wider Footings: Increasing the size of the footings (making them wider) distributes the load over a larger area, reducing the pressure on the ground and increasing the effective bearing capacity.

- Deep Foundations: If the soil near the surface has low bearing capacity, deep foundations such as piles or drilled shafts can be extended into more competent soil layers that can support the loads.

- Raft or Mat Foundations: These large, thick slabs spread the load over a wider area and can be effective in reducing the pressure on weaker soils.

โ‡๏ธ3. Drainage and Groundwater Control

- Drainage Systems: Poor drainage can lead to soil saturation, which decreases bearing capacity. Implementing proper drainage systems (like French drains or ditches) can help manage groundwater levels, ensuring the soil remains stable.

- Excavation and Backfill: In some cases, it may be necessary to excavate unsuitable soils and replace them with better material or engineered fill compacted to achieve the desired bearing capacity.

@etconp
๐Ÿ‘17โค3
๐Ÿ‘‰A hydrometer test is a laboratory procedure used primarily in geotechnical engineering and soil science to determine the particle size distribution of fine-grained soil (particles smaller than 0.074 mm or #200 sieve).

๐ŸทThe test involves measuring the specific gravity of soil suspensions at different heights over time, which allows for the calculation of the concentration of soil particles in suspension.

โญ๏ธPurpose and Uses:

๐Ÿ’ซ1. Soil Classification: The hydrometer test helps classify soils according to their grain size, which is essential in many engineering and construction applications.

๐Ÿ’ซ2. Geotechnical Engineering: Engineers use the results to evaluate the physical and engineering properties of soils, such as their permeability, compaction characteristics, and stability.

๐Ÿ’ซ3. Environmental Studies: It helps assess soil contamination and erosion processes by analyzing the distribution of fine particles.

๐Ÿ’ซ4. Agriculture: Understanding soil texture helps farmers make informed decisions about irrigation, crop selection, and soil amendment practices.

๐ŸšงTest Procedure:

โบ1. Soil Sample Preparation: A soil sample is taken and mixed with water and a dispersing agent to separate the particles.

โบ2. Sedimentation: The mixture is placed in a graduated cylinder, and the hydrometer is inserted into the liquid. The hydrometer measures the specific gravity of the suspension at predetermined time intervals.

โบ3. Data Collection: The density of the suspension decreases over time as the larger particles settle more quickly than the finer ones. The readings from the hydrometer, combined with the time of measurement, are used to calculate the particle size distribution.

โบ4. Analysis: The results are plotted on a graph, typically a particle size distribution curve, which provides valuable information on the soil texture.

๐Ÿ“œOverall, the hydrometer test is a crucial tool for a wide range of fields, enabling the analysis and understanding of soil behavior under different environmental and engineering conditions.

@etconp
๐Ÿ‘16
๐Ÿ‘‰แ‹แ‹ต แ‰คแ‰ฐแˆฐแ‰ฆแ‰ปแ‰ฝแŠ• แˆแˆญแŒฅ แ‹จ SAP แˆถแแ‰ตแ‹Œแˆญ แ‰ฒแ‰ถแˆญแ‹ซแˆ แ‰  YOUTUBE แ‰ปแŠ“แˆ‹แ‰ฝแŠ• แŠฅแŠ•แ‹ฐแŒ€แˆ˜แˆญแŠ• แ‹ญแ‰ณแ‹ˆแ‰ƒแˆ

๐ŸŒŸแŠฅแŠ•แˆ† SAP 2000 แ‰  แŠฃแˆ›แˆญแŠ› แŠญแแˆ 3 แŠ แˆแŠ• แˆˆแ‰€แАแ‹‹แˆ

โœณ๏ธแ‰  แŠญแแˆ 3 แ‹จแ‹ณแˆตแАแ‹ Roof แ‰  SAP แŠฅแŠ•แ‹ดแ‰ต แ‹ฒแ‹›แ‹ญแŠ• แŠฅแŠ•แ‹ฐแˆšแ‹ฐแˆจแŒ แАแ‹

๐Ÿ™แˆˆ YOUTUBE แ‰ปแŠ“แˆ‹แ‰ฝแŠ• แŠ แ‹ฒแˆต แŠจแˆ†แŠ‘ SUBSCRIBE แ‰ แˆ›แˆจแŒ แ‰คแ‰ฐแˆฐแ‰ฅ แ‹ญแˆแŠ‘ แŠฅแŠ•แ‹ฒแˆแˆ แˆˆแ‹ˆแ‹ณแŒ…แ‹Ž แ‹ซแŒ‹แˆฉ

๐Ÿ–ฑAmharic SAP 2000 Tuetorial Part 3 ๐Ÿ‘‡

https://youtu.be/5pJVBdxjW8Y
๐Ÿ™6๐Ÿ‘3โค1
#ADVERTISEMENT

๐Ÿ”ง๐Ÿ“๐Ÿ“แ€แŒแˆฝ แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต ๐Ÿ“๐Ÿ“  
                 แˆ˜แˆ›แˆแˆจแ‰ป แ‹ตแˆญแŒ…แ‰ตโš™๐Ÿ”ง๐Ÿ› 


๐Ÿ› ๐Ÿ› ๐Ÿ› แ‹จแˆแŠ•แˆฐแŒฃแ‰ธแ‹ แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝ๐Ÿ› ๐Ÿ› ๐Ÿ› 

1 แˆ˜แŒˆแˆˆแŒซแ‰ฝแŠ• แ‹จแˆ†แАแ‹ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝ

2 แŠฅแ‹ฒแˆแˆ แ•แˆŒแ‰ต แŠจ 1แˆšแˆŠแˆ แŠฅแˆตแŠจ 30 แˆšแˆŠแˆ แŠฅแŠ•แ‰†แˆญแŒฃแˆˆแŠ• แŠฅแ‰ แˆณแˆˆแŠ•

3 แ‰ แˆ˜แ‰€แŒ แˆ แŒ„แ‰ฆแˆแ‰ต 12แˆš แŠฅแˆตแŠจ 32แ‹ตแˆจแˆต แŒฅแˆญแˆต แŠ แ‹แŒฅแ‰ฐแŠ• แŠ แŒฅแˆแŠ• แŠฅแŠ“แ‰€แˆญแ‰ฃแˆˆแŠ•

4 แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แ‰ฆแˆแ‰ถแ‰ฝ แ‰ แˆแˆˆแŒ‰แ‰ต แˆ˜แŒฅแŠ•

                แˆ˜แŒˆแŠ›แ‰ฝแŠ•


แ‰1แ‰ แŠฅแŒ†แ‰ต แ‰ฃแˆˆ แˆตแˆแŠญ แˆˆแŠ“แ‰ฐ แ‰…แˆญแ‰ฅ

แ‰2 แ‰ แ‰ณแ‰ณแˆชแ‹Žแ‰ฝ แˆ˜แŒˆแŠ› แŠฎแˆญแ‰ป แ‰ฐแˆซ

แ‰3 แŠ แ‹จแˆญ แŒคแŠ“ แŠชแ‹ณแŠ• แˆแˆ…แˆจแ‰ต แŒŠแ‰ข แˆ›แŠ•แŠ›แ‹แˆ แˆแˆœแˆซ   
      แŠฅแ‹›แ‹ แ‰ แ‹˜แˆ˜แŠ“แ‹Š แˆ›แˆฝแŠ• แŠฅแ‰†แˆญแŒฃแˆˆแŠ•
แ‰  4 แˆดแˆšแ‰ต แแ‹จแˆ แ‰คแ‰ต แ‰ แ‰…แˆญแ‰ฃ แ‰ฃแˆซแ‰ฑแˆ แŠ แ‰…แŒฃแŒซ

แˆ›แˆณแˆฐแ‰ฅแ‹ซ

แŠจแŒŠแ‹œแ‹ แŠ แŠ•แƒแˆญ แ‹จแ‹‹แŒ‹ แŠ•แˆจแ‰ต แŠซแˆณแˆฐแ‰ฆแ‰ต แŠฅแŠ›แŒ‹ แŠฅแˆšแŒˆแˆญแˆ แˆ˜แแ‰ตแˆ„ แŠ แˆˆ แ‰ แˆ›แ‹ซแˆตแ‰กแ‰ต แˆ˜แˆแŠญ แˆตแˆซแ‹ŽแŠ• แ‹ญแˆฐแˆซแˆ‰ แ‹ญแ‹ฐแ‹แˆ‰

แˆตแˆแŠญ แ‰แŒฅแˆญ
0912492727
0913061530
0923764834

แˆ˜แˆแŠซแˆ แˆตแˆซ แˆˆแˆซแˆต แАแ‹ แ‰ธแˆญ แ‹ญแŒแŒ แˆ›แ‰น แ€แŒแˆฝ   
แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต!
๐Ÿ‘7
๐Ÿ›‘แˆแ‹ฉ แ‹จ Interior Design แŠฅแŠ“ Software แˆตแˆแŒ แŠ“ แŠจแˆฐแˆญแ‰ฐแŠแŠฌแ‰ต แŒ‹แˆญ

๐Ÿ“ž 0984121839

๐Ÿ“แ‹จแˆ›แ‰ณ

แˆฐแŠž - แŠฅแˆแ‹ต (แŠจ11:30-1:30)

๐Ÿ“แ‹จแ‰…แ‹ณแˆœ แŠฅแŠ“ แŠฅแˆแ‹ต

แ‰…แ‹ณแˆœ แŒ แ‹‹แ‰ต 3:00 - 6:00 แฃ แŠจแˆฐแ‹“แ‰ต 7:30-10:30
แŠฅแˆแ‹ต แŒ แ‹‹แ‰ต 3:00 - 6:00 แฃ แŠจแˆฐแ‹“แ‰ต 7:30-10:30


โœ…แˆแˆแ‹ต แ‰ฃแˆ‹แ‰ธแ‹ แ‹จแ‹ฉแŠ’แ‰จแˆญแˆฒแ‰ฒ แˆ˜แˆแˆ…แˆซแŠ• แŠ“ แŠ แˆญแŠญแ‰ดแŠญแ‰ถแ‰ฝ แ‹จแˆšแˆฐแŒฅ แˆแ‹ฉ แˆตแˆแŒ แŠ“แข


โœ…แ‹ญแˆ… Course แˆตแˆˆ Interior Design, แˆ›แ‹ˆแ‰… แ‹ซแˆˆแ‰ฆแ‰ตแŠ• แˆแˆ‰แŠ•แˆ แˆ˜แˆฐแˆจแ‰ณแ‹Š แАแŒˆแˆฎแ‰ฝ แ‹จแˆšแ‹ซแŠซแ‰ตแ‰ต แАแ‹

โœณ๏ธ แ‹จแŠฎแˆญแˆฑ แ‹แˆญแ‹แˆฎแ‰ฝ

โœ… Fundamental of Interior Design

โœ… Archicad 3D For Interior Design

โœ… Rendering in Lumion



โœณ๏ธ แ‰ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ 15, 000 ETB แˆˆ3 แ‹ˆแˆญ!


๐Ÿ“ž 0984121839
๐Ÿ“ฅ
Telegram:- https://t.me/archidemyy
๐Ÿ‘2
๐Ÿ‘‰๐‘ช๐’๐’๐’•๐’“๐’‚๐’„๐’• ๐‘ท๐’†๐’“๐’‡๐’๐’“๐’Ž๐’‚๐’๐’„๐’† ๐‘น๐’†๐’‘๐’๐’“๐’•๐’Š๐’๐’ˆ

๐Ÿ’ซ๐–๐ก๐š๐ญ ๐ข๐ฌ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ ๐๐ž๐ซ๐Ÿ๐จ๐ซ๐ฆ๐š๐ง๐œ๐ž?

โบCritical part of corporate governance process, tracking how well an organization/Operation adheres to obligations outlined in each of its business contracts.

โบAs companies grow & expand their suppliers, contractors & vendors list, effectively managing those contracts complexities also grows, set up a process meet unique needs is crucial to

โ€ขAccurately measure performance aspect against expectation.
โ€ขProvides long-term strengths & weaknesses analysis, enabling smarter growth & success.

๐Ÿšง๐“๐ซ๐š๐œ๐ค๐ข๐ง๐  ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ ๐๐ž๐ซ๐Ÿ๐จ๐ซ๐ฆ๐š๐ง๐œ๐ž ๐๐ž๐ง๐ž๐Ÿ๐ข๐ญ๐ฌ

๐‘๐ข๐ฌ๐ค ๐Œ๐ข๐ญ๐ข๐ ๐š๐ญ๐ข๐จ๐ง
-Track activities for every contract from negotiation, implementation & execution
-Provide valuable protection during legal disputes
-Offer early warning system to avoid noncompliance or breach

๐’๐ญ๐š๐ฒ๐ข๐ง๐  ๐‚๐จ๐ฆ๐ฉ๐ฅ๐ข๐š๐ง๐ญ
-Help organization meet specific legal & regulatory requirements, rules & standards
-Keep close eye on compliance data

๐Ž๐ฉ๐ญ๐ข๐ฆ๐ข๐ณ๐ข๐ง๐  ๐๐ž๐ซ๐Ÿ๐จ๐ซ๐ฆ๐š๐ง๐œ๐ž
-Help business clearly understand real performance measuring up to internal projections & external expectations
-Major issues early detection

๐ˆ๐๐ž๐ง๐ญ๐ข๐Ÿ๐ฒ๐ข๐ง๐  ๐€๐ซ๐ž๐š๐ฌ ๐Ž๐Ÿ ๐ˆ๐ฆ๐ฉ๐ซ๐จ๐ฏ๐ž๐ฆ๐ž๐ง๐ญ
-Help leaders discover wasteful spending.
-Find trouble areas provides opportunity to make immediate corrections

๐๐ซ๐ž๐ฌ๐ž๐ซ๐ฏ๐ž ๐Œ๐š๐ซ๐ค๐ž๐ญ ๐’๐ญ๐š๐ญ๐ฎ๐ฌ
-Proactive monitoring protect against reputational harm

๐“๐š๐ค๐ž ๐‚๐จ๐ง๐ญ๐ซ๐จ๐ฅ ๐Ž๐Ÿ ๐…๐ฎ๐ญ๐ฎ๐ซ๐ž ๐’๐ญ๐ซ๐š๐ญ๐ž๐ ๐ฒ
-Provide rich variety of information to navigate industry complexities & seek out better business opportunities.

๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ ๐๐ž๐ซ๐Ÿ๐จ๐ซ๐ฆ๐š๐ง๐œ๐ž ๐Œ๐ž๐š๐ฌ๐ฎ๐ซ๐ž๐ฆ๐ž๐ง๐ญ

Contract performance measurement can be answered by following 5 basic steps.

๐’๐ญ๐ž๐ฉ ๐Ÿ: Clearly define deliverable & timeframes. The clearer the language, the better your ability to track what matters.

๐’๐ญ๐ž๐ฉ ๐Ÿ: Implement tracking plan
,what to monitor & mechanism for doing so, gathering & documenting specific metrics within project.

๐’๐ญ๐ž๐ฉ ๐Ÿ‘: Set up alerts, connect major due dates with ongoing operational updates to detect potential divergences.

๐’๐ญ๐ž๐ฉ ๐Ÿ’: Issue updates & reports, involve key stakeholders, keep them in loop with regular updates.

๐’๐ญ๐ž๐ฉ ๐Ÿ“: Review & improve each completed contract offers a chance to assess performance under a specific scenario.

๐Š๐ž๐ฒ ๐‚๐จ๐ง๐ญ๐ซ๐š๐œ๐ญ ๐๐ž๐ซ๐Ÿ๐จ๐ซ๐ฆ๐š๐ง๐œ๐ž ๐Œ๐ž๐ญ๐ซ๐ข๐œ๐ฌ

Defining KPIs that drive specific plans for revenue, growth & other operational priorities, generally fall under

ใ€‹3 Broad Categories

-Complete performance, where parties fulfill all contractual obligations
-Substantial performance, where main obligations met but some โ€œnon-materialโ€ obligations aren't
-Breach of contract, where basic obligations aren't met.

ใ€‹4 Categories

-Quality
-Cost
-Time
-Reliability

@etconp
๐Ÿ‘11โค2๐Ÿ‘1
๐Ÿ‘‰Construction Claims

๐ŸšงIn the context of construction and contract administration, a claim refers to a formal request by one party (typically the contractor or subcontractor) seeking additional compensation, time or other entitlements under the terms of a contract.

โบClaims usually arise from unexpected circumstances or disputes during the execution of a project.

๐Ÿ’ซBelow are the key types of claims:

๐ŸทTypes of Claims

1. Payment Claims

- Arising when contractors are not paid for completed work or for variations.

2. Variation Claims

- Requests for payment or time adjustment due to changes in scope or specifications.

3. Extension of Time (EOT) Claims

- Related to delays beyond the contractor's control, such as:

- Client-induced delays

- Variations or additional work

- Delays in design approvals or site access

- Unforeseen circumstances (e.g., extreme weather)

4. Prolongation Cost Claims

- Associated with additional costs incurred due to project delays (e.g., extended overheads, staff costs, or equipment hire).

5. Disruption Claims

- For additional costs or inefficiencies caused by interruptions in the contractor's planned work schedule.

6. Acceleration Claims

- When a contractor is required to speed up work to meet a deadline, leading to additional costs.

7. Force Majeure Claims

- Claims arising from events beyond the control of both parties (e.g., natural disasters, pandemics).

8. Termination Claims

- Associated with costs due to premature termination of the contract by either party.

๐Ÿ“œKey Steps in Claim Preparation

1. Identifying the Claim

- Analyze the situation and identify the contractual basis for the claim.

2. Documentation

- Maintain detailed records, including:

- Contract documents

- Correspondence and meeting minutes

- Program updates, progress reports, and delay records

- Cost breakdowns and receipts

3. Preparation of Claim Submission

- A clear, concise, and substantiated claim document typically includes:

- Background and details of the event

- Contractual provisions relied upon

- Supporting evidence (e.g., delay analysis, cost details)

- Requested relief (time, money, or both)

4. Negotiation and Resolution

- Engage in discussions to reach an amicable resolution before resorting to dispute resolution mechanisms.

โญ๏ธRole of Contract Administration

A qualified contract administrator ensures claims are well-managed, using tools like Time Impact Analysis (TIA) for EOT claims and providing accurate cost substantiation for financial claims. Effective claim management minimizes disputes and enhances project outcomes.

@etconp
๐Ÿ‘17โค1
๐Ÿ‘‰Construction planning and management

โบis a critical discipline within the construction industry, involving the organization, coordination, and control of a construction project from inception to completion.

โบEffective construction management ensures that projects are completed on time, within budget, and to the required quality standards. Below is an overview of key aspects involved in construction planning and management:

๐ŸทKey Components of Construction Planning and Management

๐Ÿšง1. Project Initiation:
- Define Project Scope: Outline the goals, deliverables, tasks, and deadlines of the project.
- Feasibility Study: Assess the project's viability, including financial and technical aspects.

๐Ÿšง2. Planning:
- Work Breakdown Structure (WBS): Break the project into smaller, manageable components.
- Scheduling: Use tools like Gantt charts and Critical Path Method (CPM) to develop a timeline for project activities.
- Resource Allocation: Identify and allocate necessary resources (labor, materials, equipment) needed for each phase of the project.
- Risk Management: Identify potential risks and develop mitigation strategies.

๐Ÿšง3. Budgeting:
- Cost Estimation: Prepare detailed estimates for labor, materials, and overhead costs.
- Financial Management: Monitor expenditures and manage cash flow throughout the project lifecycle.

๐Ÿšง4. Execution:
- Site Management: Oversee the construction site, ensuring safety, compliance with regulations, and quality control.
- Communication: Maintain clear communication between stakeholders (clients, contractors, suppliers).
- Progress Monitoring: Regularly assess progress against the project schedule and budget.

๐Ÿšง5. Quality Control:
- Implement quality assurance and quality control (QA/QC) processes to ensure that standards are met.
- Conduct inspections and audits at various project stages.

๐Ÿšง6. Safety Management:
- Develop and enforce safety protocols to minimize risks and ensure worker safety.
- Conduct regular safety training sessions and inspections.

๐Ÿšง7. Closure:
- Project Completion: Ensure all work is finished as per specifications.
- Documentation and Handover: Prepare and submit final reports, including as-built drawings and warranty information.

@etconp
๐Ÿ‘23โค2
This media is not supported in your browser
VIEW IN TELEGRAM
๐Ÿ‘‰แŠ แ‹ฒแˆฑ แ‹จแ‰คแ‰ถแ‰ฝ แ‹แ‹ญแŠ“แŠ•แˆต แˆตแˆญแŠ แ‰ต EBS แ‹จแˆฐแˆซแ‹ แ‹˜แŒˆแ‰ฃ แ‹ญแˆ˜แˆแŠจแ‰ฑ

https://t.me/ETCONpWORK

@etconp
โค4๐Ÿ‘1
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•


๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•
0904040477
0911016833
๐Ÿ‘5๐Ÿ‘1
Intercon Construction Chemicals 
    
๐Ÿ‘‰ Authorized agent of MC, SIMENTEK, Sika, Weber

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Concrete Repair, Grouting   
โ— Tile Adhesive & Tile Joint Fillers 
โ— Wall Putty, Prime Coat, Rush Coat
โ— Quartz, Contextra
โ— Floor hardener, Epoxy              
โ— Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0944774267
Address: Signal, around signal mall
๐Ÿ‘4โค1
๐Ÿ‘‰แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆญ แˆˆแˆ˜แˆ†แŠ• แˆแŠ• แ‹ซแˆตแˆแˆแŒ‹แˆ?
What do we need to have to be a contractor?

๐Ÿšง1.แ‹จแŠ•แŒแ‹ต แˆตแ‹ซแˆœ แ‰  แ‹Œแ‰ฅแˆณแ‹ญแ‰ฑ แ‰ แˆ˜แŒแ‰ฃแ‰ต แˆ˜แˆ˜แ‹แŒˆแ‰ฅ แŠฅแŠ“ แ‹จ แ‹ตแˆญแŒ…แ‰ฑแŠ• แˆ˜แ‹‹แ‰…แˆญ แˆ˜แ‹ˆแˆฐแŠ•๐Ÿ‘‡

https://www.business.gov.et

แˆ€. Sole proprietorship/ แŠ แŠ•แ‹ต แŒแˆˆแˆฐแ‰ฅ แ‰ฅแ‰ป แ‰ฃแˆˆแ‰คแ‰ต แ‹จแˆ†แАแ‰ แ‰ต

แˆˆ. PLC ( private limited company)/ แŠƒแˆ‹แŠแАแ‰ฑ แ‹จแ‰ฐแ‹ˆแˆฐแА แ‹จแŒแˆ แˆ›แˆ…แ‰ แˆญ

แˆ. SC(share company)/ แŠ แŠญแˆฒแ‹ฎแŠ• แˆ›แˆ…แ‰ แˆญ

๐Ÿšง2. แ‹แˆ แŠฅแŠ“ แˆ›แˆตแˆจแŒƒ ( document authentication) แ‰ แˆ˜แˆ„แ‹ต แˆ˜แˆ˜แˆตแˆจแ‰ป แŠฅแŠ“ แˆ˜แ‰ฐแ‹ณแ‹ฐแˆชแ‹ซ แˆ›แ€แ‹ฐแ‰…

๐Ÿšง3.แŠญแแˆˆแŠจแ‰ฐแˆ› แŠ•แŒแ‹ต แ‰ขแˆฎ แ‰ แˆ˜แˆ„แ‹ต แ‰ แ‰ฃแŠ•แŠญ แ‹แŒ แŠ แŠซแ‹แŠ•แ‰ต แ‰ แˆ›แˆณแ‹จแ‰ต แŠซแ’แ‰ณแˆ แˆ›แ€แ‹ฐแ‰…

๐Ÿšง4. แˆฐแАแ‹ถแ‰ฝ แˆ›แˆจแŒ‹แŒˆแŒซ แ‰ แˆ˜แˆ„แ‹ต แ‰  แ‰คแ‰ต แŠชแˆซแ‹ญ แ‹แˆ แˆ›แ‹˜แŒ‹แŒ€แ‰ต

๐Ÿšง5. แ‰ แŠ แ‰…แˆซแ‰ขแ‹ซ แ‰ฃแˆˆแ‹ แŒˆแ‰ขแ‹Žแ‰ฝ TIN number แˆ›แ‹แŒฃแ‰ต

๐Ÿšง6.แ‹จแŠ•แŒแ‹ต แˆแ‹แŒˆแ‰ฃ แŠฅแŠ“ แŠ•แŒแ‹ต แˆแ‰ƒแ‹ต https://www.business.gov.et แ‰ แ‹š แ‹Œแ‰ฅ แˆณแ‹ญแ‰ต แ‰ แˆ˜แŒแ‰ฃแ‰ต แˆ›แ‹แŒฃแ‰ต

๐Ÿšง7. แ‹ฐแˆจแˆฐแŠ แˆ›แˆณแ‰ฐแˆ

๐Ÿšง8. แŠฎแŠ•แˆตแˆซแŠญแˆฝแŠ• แ‰ขแˆฎ แ‰ แˆ˜แˆ„แ‹ต แ‹ฐแˆจแŒƒ แˆ›แ‹แŒฃแ‰ต

๐Ÿ’ซแ‰ฃแˆ‹แ‰ฝแˆ แ‰ฅแ‰ƒแ‰ต (แˆแˆแ‹ต แฃแ‹จแˆฐแ‹ แˆ€แ‹ญแˆแฃแˆ›แˆฝแŠ•) แ‹จแ‹ฐแˆจแŒƒ แŠฅแˆญแŠจแŠ• แ‹ญแ‹ˆแŒฃแˆ‹แ‰ฝแŠ‹แˆ!

@etconp
๐Ÿ‘32โค3
๐Ÿ‘‰แ‹จแ‹แˆƒ แˆ›แแˆฐแˆป (Drainage) แŠ•แ‹ตแ แ‹จแˆฒแ‰ชแˆ แˆแˆ…แŠ•แ‹ตแˆตแŠ“แฃ แ‹จแŠจแ‰ฐแˆ› แ•แˆ‹แŠ• แŠฅแŠ“ แ‹จแˆ˜แˆฌแ‰ต แŒˆแŒฝแ‰ณ แŠ แˆญแŠญแ‰ดแŠญแ‰ธแˆญ แ‹ˆแˆณแŠ แŒˆแŒฝแ‰ณ แАแ‹แข

๐Ÿšงแ‹จแ‹แŠƒ แแˆฐแ‰ตแŠ• แ‰ แ‰ฐแˆˆแ‹ญแˆ แ‹จแ‹แŠ“แ‰ฅ แ‹แˆƒแŠ•แฃแ‹จแŒŽแˆญแ แˆ˜แŒฅแˆˆแ‰…แˆˆแ‰…แŠ•แฃแ‹จแŠ แˆแˆญ แˆ˜แˆธแˆญแˆธแˆญแŠ• แŠฅแŠ“ แ‹จแ‹แˆƒ แˆ˜แ‰†แˆซแˆจแŒฅแŠ• แˆˆแˆ˜แŠจแˆ‹แŠจแˆ แˆตแˆญแ‹“แ‰ถแ‰ฝแŠ• แˆ›แ‰€แ‹ต แŠฅแŠ“ แˆ˜แ‰ฐแŒแ‰ แˆญแŠ• แ‹ซแŠซแ‰ตแ‰ณแˆแข

๐Ÿทแ‹จแแˆณแˆฝ แˆ›แˆตแ‹ˆแŒˆแŒƒ แŠ•แ‹ตแ แŠ แŒ แ‰ƒแˆ‹แ‹ญ แˆ‚แ‹ฐแ‰ถแ‰ฝ แŠจแ‹šแˆ… แ‰ แ‰ณแ‰ฝ แ‰€แˆญแ‰ แ‹‹แˆ

โญ๏ธ1. แ‹จแ•แˆฎแŒ€แŠญแ‰ต แˆแ‹˜แŠ“ แŠฅแŠ“ แˆ˜แˆจแŒƒ แˆ›แˆฐแ‰ฃแˆฐแ‰ฅ

- แ‹จแˆณแ‹ญแ‰ต แ‹ณแˆฐแˆณแก แ‹จแˆ˜แˆฌแ‰ต แŠ แ‰€แˆ›แˆ˜แŒฅแŠ•แฃ แ‰ฐแ‹ณแ‹แ‰ตแŠ• แŠฅแŠ“ แ‹จแ‰ฐแˆแŒฅแˆฎ แแˆณแˆฝแŠ• แˆแŠ”แ‰ณ แˆˆแˆ˜แˆจแ‹ณแ‰ต แ‹จแˆ˜แˆฌแ‰ต แŠ แ‰€แˆ›แˆ˜แŒฅ แ‹ณแˆฐแˆณ แ‹ซแŠซแˆ‚แ‹ฑแข
- แ‹จแˆƒแ‹ญแ‹ตแˆฎแˆŽแŒ‚แŠซแˆ แˆ˜แˆจแŒƒแก แ‹จแ‹แŠ“แ‰ฅ แˆ˜แˆจแŒƒแŠ• แ‹ญแˆฐแ‰ฅแˆตแ‰กแฃ แ‹จแ‹แŠ“แ‰ฅ แˆ˜แŒ แŠ•แฃ แ‹จแ‰†แ‹ญแ‰ณ แŒŠแ‹œ แŠฅแŠ“ แ‹จแŠ แ‹แˆŽ แАแ‹แˆถแ‰ฝ แ‰ฅแ‹›แ‰ต (แˆˆแˆแˆณแˆŒ แ‰ณแˆชแŠซแ‹Š แ‹จแŠ แ‹จแˆญ แˆแŠ”แ‰ณ แˆ˜แˆจแŒƒแŠ• แ‰ แˆ˜แŒ แ‰€แˆ)แข
- แ‹จแŠ แˆแˆญ แ‰ฃแˆ…แˆชแ‹ซแ‰ตแก แ‹จแŠ แˆแˆญ แŠ แ‹ญแАแ‰ตแฃ แ‹จแˆ˜แ‰ฐแˆ‹แˆˆแŠแ‹ซ แŠ แ‰…แˆ แŠฅแŠ“ แ‹จแˆฐแˆญแŒŽ แˆ˜แŒแ‰ฃแ‰ต แˆ˜แŒ แŠ•แŠ• แ‹ญแ‰ฐแŠ•แ‰ตแŠ‘แข
- แ‹จแˆ˜แˆฌแ‰ต แŠ แŒ แ‰ƒแ‰€แˆแก แ‹จแ‹แˆƒ แแˆณแˆฝแŠ• แˆˆแˆ˜แŒˆแˆ˜แ‰ต แАแ‰ฃแˆฉแŠ• แŠฅแŠ“ แ‹จแ‰ณแ‰€แ‹ฐแ‹แŠ• แ‹จแˆ˜แˆฌแ‰ต แŠ แŒ แ‰ƒแ‰€แˆ (แˆˆแˆแˆณแˆŒ แ‹จแˆ˜แŠ–แˆชแ‹ซแฃ แ‹จแŠ•แŒแ‹ตแฃ แ‹จแŒแ‰ฅแˆญแŠ“) แ‹ญแˆˆแ‹ฉแข
- แ‹จแ‰แŒฅแŒฅแˆญ แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ *: แ‹จแŠ แŠซแ‰ฃแ‰ข แ‹ฐแŠ•แ‰ฆแ‰ฝแŠ•, แŠฎแ‹ถแ‰ฝแŠ• แŠฅแŠ“ แ‹จแŠ แŠซแ‰ฃแ‰ข แˆ˜แˆ˜แˆชแ‹ซแ‹Žแ‰ฝแŠ• แ‹ญแŠจแˆแˆฑแข

โญ๏ธ2. แ‹จแŠ•แ‹ตแ แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝแŠ• แ‹ญแ‹ˆแˆตแŠ‘

- Design Stormแก แ‰ แ•แˆฎแŒ€แŠญแ‰ฑ แŠ แˆตแˆแˆ‹แŒŠแАแ‰ต แŠฅแŠ“ แŠ แ‹ฐแŒ‹ แˆ‹แ‹ญ แ‰ แˆ˜แˆ˜แˆตแˆจแ‰ต แ‰ฐแŒˆแ‰ขแ‹แŠ• แ‹จแŠ แ‹แˆŽ แАแ‹แˆต แˆ˜แˆ˜แˆˆแˆป แŒŠแ‹œ (แˆˆแˆแˆณแˆŒแก 10-แŠ แˆ˜แ‰ตแฃ 25-แŠ แˆ˜แ‰ตแฃ แ‹ˆแ‹ญแˆ 100-แŠ แˆ˜แ‰ต แŠ แ‹แˆŽ แАแ‹แˆต) แ‹ญแˆแˆจแŒกแข
- Runoff Coefficient *: แ‰ แˆ˜แˆฌแ‰ต แŠ แŒ แ‰ƒแ‰€แˆแฃ แ‰ แŠ แˆแˆญ แŠ แ‹ญแАแ‰ต แŠฅแŠ“ แ‰ แŒˆแ€ แˆแ‹ตแˆญ แ‰ฃแˆ…แˆชแ‹ซแ‰ต แˆ‹แ‹ญ แ‰ แˆ˜แˆ˜แˆตแˆจแ‰ต แ‹จแแˆณแˆนแŠ• แˆ˜แŒ แŠ• (C) แŠ แˆตแˆ‹แข
- แŠจแแ‰ฐแŠ› แแˆฐแ‰ต แˆ˜แŒ แŠ• *: แŠจแแ‰ฐแŠ› แแˆฐแ‰ต แˆ˜แŒ แŠ–แ‰ฝแŠ• แˆˆแˆ˜แŒˆแˆ˜แ‰ต แŠฅแŠ•แ‹ฐ แˆแŠญแŠ•แ‹ซแ‰ณแ‹Š แ‹˜แ‹ด แ‹ˆแ‹ญแˆ แˆƒแ‹ญแ‹ตแˆฎแˆŽแŒ‚แŠซแˆ แˆžแ‹ดแˆŽแ‰ฝแŠ• แ‹ญแŒ แ‰€แˆ™แข
- แ‹จแแŒฅแАแ‰ต แŒˆแ‹ฐแ‰ฆแ‰ฝแก แ‹จแŠ แˆแˆญ แˆ˜แˆธแˆญแˆธแˆญแŠ• แ‹ˆแ‹ญแˆ แ‹ฐแˆˆแˆแŠ• แˆˆแˆ˜แŠจแˆ‹แŠจแˆ แ‹จแแˆฐแ‰ต แแŒฅแАแ‰ถแ‰ฝ แ‰ฐแ‰€แ‰ฃแ‹ญแАแ‰ต แ‰ฃแˆˆแ‹ แŒˆแ‹ฐแ‰ฅ แ‹แˆตแŒฅ แˆ˜แˆ†แŠ“แ‰ธแ‹แŠ• แ‹ซแˆจแŒ‹แŒแŒกแข

โญ๏ธ3. แˆ€แ‹ญแ‹ตแˆฎแˆŽแŒ‚แŠซแˆ แ‰ตแŠ•แ‰ฐแŠ“

- Run off Estimationแก แŠฅแŠ•แ‹ฐ แˆแŠญแŠ•แ‹ซแ‰ณแ‹Š แ‹˜แ‹ดแฃ แ‹จแŠคแˆต.แˆฒ.แŠคแˆต แŠจแˆญแ‰ญ แ‰แŒฅแˆญ แ‹˜แ‹ด แ‹ˆแ‹ญแˆ แ‹จแˆƒแ‹ญแ‹ตแˆฎแˆŽแŒ‚ แˆžแ‹ดแˆŠแŠ•แŒ แˆถแแ‰ตแ‹Œแˆญ (แˆˆแˆแˆณแˆŒ HEC-HMSแฃ SWMM) แ‹ซแˆ‰ แ‹˜แ‹ดแ‹Žแ‰ฝแŠ• แ‰ฐแŒ แ‰€แˆแข
- Time of Concentration*: แ‹แˆƒ แŠจแ‰ฐแ‹แˆฐแˆฑ แŠจแˆฉแ‰… แ‰ฆแ‰ณ แ‹ˆแ‹ฐ แˆ˜แ‹แŒซแ‹ แˆˆแˆ˜แŒ“แ‹ แ‹จแˆšแˆแŒ€แ‹แŠ• แŒŠแ‹œ แ‹ซแˆฐแˆ‰ แข
- แ‹จแแˆฐแ‰ต แˆ˜แŠ•แŒˆแ‹ถแ‰ฝแก แŒ…แˆจแ‰ถแ‰ฝแŠ•แฃ แˆตแ‹‹แˆŽแ‰ฝแŠ• แŠฅแŠ“ แ‹ซแˆ‰แ‰ตแŠ• แ‹จแแˆณแˆฝ แˆ›แˆตแ‹ˆแŒˆแŒƒ แ‹˜แ‹ดแ‹Žแ‰ฝแŠ• แŒจแˆแˆฎ แ‹จแ‰ฐแˆแŒฅแˆฎ แŠฅแŠ“ แŠ แˆญแ‰ฒแŠแˆปแˆ แแˆฐแ‰ต แˆ˜แŠ•แŒˆแ‹ถแ‰ฝแŠ• แ‹ญแˆˆแ‹ฉแข

โญ๏ธ4. แ‹จแˆƒแ‹ญแ‹ตแˆฎแˆŠแŠญ แ‹ฒแ‹›แ‹ญแŠ•

- แ‹จแ‰งแŠ•แ‰ง แˆ˜แŒ แŠ• *: แ‰งแŠ•แ‰งแ‹Žแ‰ฝแŠ• แฃ แ‰งแŠ•แ‰งแ‹Žแ‰ฝแŠ• แŠฅแŠ“ แˆฐแˆญแŒฆแ‰ฝแŠ• แˆˆแˆ˜แˆˆแŠซแ‰ต แ‹จแˆ›แŠ’แŠ•แŒ แŠฅแŠฉแˆแ‰ณ แ‹ˆแ‹ญแˆ แˆŒแˆ‹ แ‹จแˆƒแ‹ญแ‹ตแˆฎแˆŠแŠญ แ‰€แˆ˜แˆฎแ‰ฝแŠ• แ‹ญแŒ แ‰€แˆ™แข
- แŒแˆซแ‹ฒแ‹จแŠ•แ‰ต แŠฅแŠ“ แ‰ฐแ‹ณแ‹แ‰ต: แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แแŒฅแАแ‰ถแ‰ฝแŠ• แ‰ แˆ›แˆตแ‹ˆแŒˆแ‹ต แ‰ตแŠญแŠญแˆˆแŠ› แ‰ฐแ‹ณแ‹แ‰ตแŠ• แˆˆแˆตแ‰ แ‰ต แŠƒแ‹ญแˆ แแˆฐแ‰ต แ‹ซแˆจแŒ‹แŒแŒกแข
- แˆ˜แŒแ‰ขแ‹ซแ‹Žแ‰ฝ แŠฅแŠ“ แˆ˜แ‹แŒซแ‹Žแ‰ฝ *: แ‹แˆƒแŠ• แ‰ แ‰ฅแ‰ƒแ‰ต แˆˆแˆ˜แˆฐแ‰ฅแˆฐแ‰ฅ แŠฅแŠ“ แˆˆแˆ›แ‹แŒฃแ‰ต แ‹จแˆ˜แŒแ‰ขแ‹ซ แŠฅแŠ“ แˆ˜แ‹แŒซ แˆ˜แ‹‹แ‰…แˆฎแ‰ฝแŠ• แ‹ญแŠ•แ‹ฐแ‰แข
- แ‹จแˆ›แŒ แˆซแ‰€แˆšแ‹ซ แ‰ฐแ‰‹แˆ›แ‰ต *แก แŠจแแ‰ฐแŠ› แแˆฐแ‰ถแ‰ฝแŠ• แˆˆแˆ˜แ‰†แŒฃแŒ แˆญ แŠฅแŠ“ แ‹จแ‰ณแ‰ฝแŠ›แ‹ แ‰ฐแ‹แˆฐแˆต แ‰ฐแ…แŠฅแŠ–แ‹Žแ‰ฝแŠ• แˆˆแˆ˜แ‰€แАแˆต แŠ แˆตแˆแˆ‹แŒŠ แŠจแˆ†แА แˆ›แ‰†แ‹ซ แ‹ˆแ‹ญแˆ แˆ›แ‰†แ‹ซ แŒˆแŠ•แ‹ณแ‹Žแ‰ฝแŠ• แ‹ฒแ‹›แ‹ญแŠ• แ‹ซแ‹ตแˆญแŒ‰แข

โญ๏ธ5. แ‹จแˆตแˆญแ‹“แ‰ต แŠ แ‰€แˆ›แˆ˜แŒฅ

- แ‹จแŠ แ‹แ‰ณแˆจ แˆ˜แˆจแ‰ฅ แŠ•แ‹ตแ *: แ‹จแ‰งแŠ•แ‰งแ‹Žแ‰ฝแŠ•, แ‹จแˆฐแˆญแŒฆแ‰ฝแŠ• แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‹จแแˆณแˆฝ แŠญแแˆŽแ‰ฝแŠ• แŠ แ‰€แˆ›แˆ˜แŒฅ แ‹ซแ‰…แ‹ฑ.
- แŠจแАแ‰ฃแˆญ แˆตแˆญแ‹“แ‰ถแ‰ฝ แŒ‹แˆญ แ‹แˆ…แ‹ฐแ‰ต *: แŠ แˆแŠ• แŠซแˆˆแ‹ แ‹จแแˆณแˆฝ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แŒ‹แˆญ แ‰ฐแŠณแˆƒแŠแАแ‰ตแŠ• แ‹ซแˆจแŒ‹แŒแŒกแข
- แŠ แŠซแ‰ฃแ‰ขแ‹ซแ‹Š แŒ‰แ‹ณแ‹ฎแ‰ฝแก แ‹˜แˆ‹แ‰‚แАแ‰ตแŠ• แˆˆแˆ›แŒŽแˆแ‰ แ‰ต แŠ แˆจแŠ•แŒ“แ‹ด แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ตแŠ• (แˆˆแˆแˆณแˆŒ แ‹จแ‹แŠ“แ‰ฅ แŒ“แˆฎแ‹Žแ‰ฝแฃ แ‰ฐแˆ‹แˆ‹แŠ แˆ˜แŠ•แŒˆแ‹ถแ‰ฝแŠ•) แˆ›แŠซแ‰ฐแ‰ตแข

โญ๏ธ6. แˆ˜แ‹‹แ‰…แˆซแ‹Š แŠ•แ‹ตแ

- แ‹จแ‰แˆณแ‰แˆถแ‰ฝ แˆแˆญแŒซ *: แˆˆแ‰งแŠ•แ‰งแ‹Žแ‰ฝ, แˆˆแ‰†แˆปแˆป แˆ›แŒ แˆซแ‰€แˆšแ‹ซแ‹Žแ‰ฝ แŠฅแŠ“ แˆˆแˆŒแˆŽแ‰ฝ แˆ˜แ‹‹แ‰…แˆฎแ‰ฝ (แˆˆแˆแˆณแˆŒ, แŠฎแŠ•แŠญแˆชแ‰ต, HDPE, แ‰†แˆญแ‰†แˆฎ แ‰ฅแˆจแ‰ต) แ‰ฐแˆตแˆ›แˆš แ‰แˆณแ‰แˆถแ‰ฝแŠ• แ‹ญแˆแˆจแŒก.
- แ‹จแŒญแАแ‰ต แ‰ตแŠ•แ‰ฐแŠ“ : แ‹จแŠ แˆแˆญแŠ• แŒแŠแ‰ต แŠฅแŠ“ แ‹จแ‰ตแˆซแŠแŠญ แŒญแАแ‰ถแ‰ฝแŠ• แŒจแˆแˆฎ แˆ˜แ‹‹แ‰…แˆฎแ‰ฝ แ‹จแˆšแŒ แ‰ แ‰ แˆธแŠญแˆžแ‰ฝแŠ• แˆ˜แ‰‹แ‰‹แˆ แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ‰ แ‹ซแˆจแŒ‹แŒแŒก.
- แ‹จแŠ แˆแˆญ แˆ˜แˆธแˆญแˆธแˆญแŠ• แˆ˜แ‰†แŒฃแŒ แˆญ *: แŠฅแŠ•แ‹ฐ แˆ˜แˆธแˆญแˆธแˆญ, แŒ‹แ‰ขแŠ• แ‹ˆแ‹ญแˆ แŠฅแ…แ‹‹แ‰ตแŠ• แ‹จแˆ˜แˆณแˆฐแˆ‰ แ‹จแŠ แˆแˆญ แˆ˜แˆธแˆญแˆธแˆญแŠ• แˆˆแˆ˜แŠจแˆ‹แŠจแˆ แ‹จแŠ•แ‹ตแ แŠฅแˆญแˆแŒƒแ‹Žแ‰ฝ.

โญ๏ธ 7. แˆžแ‹ดแˆŠแŠ•แŒ แŠฅแŠ“ แˆ›แˆตแˆ˜แˆฐแˆ

- แ‹จแˆถแแ‰ตแ‹Œแˆญ แˆ˜แˆณแˆชแ‹ซแ‹Žแ‰ฝ *: แ‰ แ‰ฐแˆˆแ‹ซแ‹ฉ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แ‹แˆตแŒฅ แ‹จแˆตแˆญแ‹“แ‰ต แŠ แˆแƒแ€แˆแŠ• แˆˆแˆ›แˆตแˆ˜แˆฐแˆ แ‹จแ‹แˆƒ แˆ›แแˆฐแˆป แˆžแ‹ดแˆŠแŠ•แŒ แˆถแแ‰ตแ‹ŒแˆญแŠ• แ‹ญแŒ แ‰€แˆ™ (แˆˆแˆแˆณแˆŒ แฃ SWMM แฃ Civil 3D แฃ AutoCAD)แข
- แ‹จแ‰ตแ‹•แ‹ญแŠ•แ‰ต แ‰ตแŠ•แ‰ฐแŠ“ * แˆตแˆญแ‹“แ‰ฑแŠ• แ‰ แ‰ฐแˆˆแ‹ซแ‹ฉ แŠ แ‹แˆŽ แАแ‹แˆถแ‰ฝ แŠฅแŠ“ แ‹แ‹ตแ‰€แ‰ต แˆแŠ”แ‰ณแ‹Žแ‰ฝ แ‹แˆตแŒฅ แ‹ญแˆžแŠญแˆฉแ‰ตแข

โญ๏ธ8. แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆฐแАแ‹ต

- แ‹ตแˆฎแ‹ŠแŠ•แŒ *: แŠฅแ‰…แ‹ถแ‰ฝแŠ•, แˆ˜แŒˆแˆˆแŒซแ‹Žแ‰ฝแŠ• แŠฅแŠ“ แˆ˜แˆตแ‰€แˆŽแ‰ฝแŠ• แŒจแˆแˆฎ แ‹แˆญแ‹แˆญ แ‹จแŒแŠ•แ‰ฃแ‰ณ แŠ•แ‹ตแŽแ‰ฝแŠ• แ‹ซแ‹˜แŒ‹แŒ.
- แˆ˜แŒแˆˆแŒซแ‹Žแ‰ฝ *: แ‹จแ‰แˆณแ‰แˆต แŠฅแŠ“ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‹แˆญแ‹แˆฎแ‰ฝแŠ• แ‹ซแ‰…แˆญแ‰ก.
- แ‹จแ‹ˆแŒช แŒแˆแ‰ต *: แ‹จแ‹แˆƒ แˆ˜แ‹แˆจแŒƒ แˆตแˆญแ‹“แ‰ต แ‹ˆแŒช แŒแˆแ‰ต แ‹ซแ‹˜แŒ‹แŒ.

โญ๏ธ9. แŠ แ‰ฐแŒˆแ‰ฃแ‰ แˆญ แŠฅแŠ“ แŒฅแŒˆแŠ“

- แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‰แŒฅแŒฅแˆญ *: แ‹จแแˆณแˆฝ แˆ›แˆตแ‹ˆแŒˆแŒƒ แŠญแแˆŽแ‰ฝแŠ• แ‰ แ‰ตแŠญแŠญแˆ แˆ˜แŒซแŠ‘แŠ• แ‹ซแˆจแŒ‹แŒแŒก.
- แแ‰ฐแˆป แŠฅแŠ“ แˆ™แŠจแˆซ *: แ‹จแˆตแˆญแ‹“แ‰ต แŠ แˆแƒแ€แˆแŠ• แˆˆแˆ›แˆจแŒ‹แŒˆแŒฅ แˆแˆญแˆ˜แˆซแ‹Žแ‰ฝแŠ• แŠฅแŠ“ แˆ™แŠจแˆซแ‹Žแ‰ฝแŠ• แ‹ซแŠซแˆ‚แ‹ฑแข
- แ‹จแŒฅแŒˆแŠ“ แŠฅแ‰…แ‹ต *: แ‹จแˆจแŒ…แˆ แŒŠแ‹œ แ‰ฐแŒแ‰ฃแˆซแ‰ตแŠ• แˆˆแˆ›แˆจแŒ‹แŒˆแŒฅ แ‹จแŒฅแŒˆแŠ“ แŠฅแ‰…แ‹ต แˆ›แ‹˜แŒ‹แŒ€แ‰ต, แˆ›แŒฝแ‹ณแ‰ตแŠ•, แŒฅแŒˆแŠ“แ‹Žแ‰ฝแŠ• แŠฅแŠ“ แˆ›แˆปแˆปแ‹ซแ‹Žแ‰ฝแŠ• แ‹ซแŠซแ‰ตแ‰ณแˆ.

โญ๏ธ10. แŠญแ‰ตแ‰ตแˆแŠ“ แŒแˆแŒˆแˆ›

- แ‹จแŠ แˆแŒปแŒธแˆ แŠญแ‰ตแ‰ตแˆ *: แˆตแˆญแ‹“แ‰ฑแŠ• แ‰ แˆ›แ‹•แ‰ แˆ แŒŠแ‹œ แŠฅแŠ“ แ‰ แŠ‹แˆ‹ แ‹ญแ‰†แŒฃแŒ แˆฉ แ‹แŒคแ‰ณแˆ›แАแ‰ฑแŠ• แˆˆแˆ˜แŒˆแˆแŒˆแˆ.
- แ‰ฐแˆตแˆ›แˆš แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ *: แ‰ แ‰ณแ‹ฉ แŠ แˆแŒปแŒธแˆ แŠฅแŠ“ แ‰ แ‰ฐแˆˆแ‹‹แ‹‹แŒญ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‰ แˆ˜แˆ˜แˆตแˆจแ‰ต แˆ›แˆตแ‰ฐแŠซแŠจแ‹ซแ‹Žแ‰ฝแŠ• แ‹ซแ‹ตแˆญแŒ‰แข

๐Ÿ“œแ‰แˆแ แŒ‰แ‹ณแ‹ฎแ‰ฝ

- แ‹˜แˆ‹แ‰‚แАแ‰ต *: แ‹˜แˆ‹แ‰‚ แ‹จแแˆณแˆฝ แˆ›แˆตแ‹ˆแŒˆแŒƒ แ‹˜แ‹ดแ‹Žแ‰ฝแŠ• (SuDS) แ‹ˆแ‹ญแˆ แ‹แ‰…แ‰ฐแŠ›-แ‰ฐแ…แŠฅแŠ– แˆแˆ›แ‰ต (LID) แˆแˆแ‹ถแ‰ฝแŠ• แˆ›แŠซแ‰ฐแ‰ตแข
- แ‹จแŠ แ‹จแˆญ แŠ•แ‰ฅแˆจแ‰ต แˆˆแ‹แŒฅ *: แ‰ แŠ แ‹จแˆญ แŠ•แ‰ฅแˆจแ‰ต แˆˆแ‹แŒฅ แˆแŠญแŠ•แ‹ซแ‰ต แ‰ แ‹แŠ“แ‰ฅ แˆ˜แŒ แŠ• แˆ‹แ‹ญ แˆŠแ‹ฐแˆจแŒ‰ แ‹จแˆšแ‰ฝแˆ‰ แˆˆแ‹แŒฆแ‰ฝแŠ• แŒแˆแ‰ต แ‹แˆตแŒฅ แ‹ซแˆตแŒˆแ‰กแข
- แ‹จแˆ…แ‹แ‰ฅ แ‹ฐแˆ…แŠ•แАแ‰ตแก แˆตแˆญแ‹“แ‰ฑ แŠฅแŠ•แ‹ฐ แŒŽแˆญแ แ‹ˆแ‹ญแˆ แˆ˜แ‹‹แ‰…แˆซแ‹Š แ‹แ‹ตแ‰€แ‰ต แ‰ฃแˆ‰ แ‹จแˆ…แ‹แ‰ฅ แ‹ฐแˆ…แŠ•แАแ‰ต แˆ‹แ‹ญ แŠ แ‹ฐแŒ‹แ‹Žแ‰ฝแŠ• แŠฅแŠ•แ‹ฐแˆ›แ‹ญแˆแŒฅแˆญ แ‹ซแˆจแŒ‹แŒแŒกแข

โบแŠฅแАแ‹šแˆ…แŠ• แ‰…แ‹ฐแˆ แ‰ฐแŠจแ‰ฐแˆŽแ‰ฝ แ‰ แˆ˜แŠจแ‰ฐแˆ, แˆ˜แˆแŠ•แ‹ฒแˆถแ‰ฝ แŠฅแŠ“ แ‹ฒแ‹›แ‹ญแАแˆฎแ‰ฝ แˆแˆˆแ‰ฑแŠ•แˆ แ‰ฐแŒแ‰ฃแˆซแ‹Š แŠฅแŠ“ แŠ แŠซแ‰ฃแ‰ขแ‹ซแ‹Š แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝแŠ• แ‹จแˆšแ‹ซแˆŸแˆ‰ แ‹แŒคแ‰ณแˆ› แŠฅแŠ“ แ‰ฐแŠจแˆ‹แŠซแ‹ญ แ‹จแแˆณแˆฝ แˆ›แˆตแ‹ˆแŒˆแŒƒ แˆตแˆญแ‹“แ‰ถแ‰ฝแŠ• แˆ˜แแŒ แˆญ แ‹ญแ‰ฝแˆ‹แˆ‰แข

@etconp
๐Ÿ‘18โค2๐Ÿ”ฅ1