Ethio Construction Engineering
32.3K subscribers
6.26K photos
359 videos
1.99K files
3.29K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Which type of foundation is typically used in areas with weak soil to distribute loads over a wide area?
Anonymous Quiz
15%
a) Pile Foundations
82%
b) Mat Foundations
3%
c) Ground Improvement Techniques
1%
d) Rigid Frame Foundations
❤5👍2
The flight of the stairs should be restricted to a maximum
Anonymous Quiz
22%
10
9%
14
40%
12
29%
15
👍13
Which of the following is a significant challenge faced in the construction of tall buildings?
Anonymous Quiz
11%
a) Abundance of available land.
37%
b) Minimal wind forces.
34%
c) Efficient load distribution.
17%
d) Simple transportation logistics
❤8👍2🕊1
Which structural system, introduced by Fazlur Khan, distributes vertical loads evenly throughout the structure using a tubular design?
Anonymous Quiz
17%
a) Rigid Frame Systems
29%
b) Shear Wall Systems
28%
c) Braced Frame Systems
26%
d) Tube System
👏9👍5
The width of the landing should not be less than the width of the stair.
Anonymous Quiz
72%
TRUE
23%
FALSE
5%
See Result
👏9👍6
technique to increase the bearing capacity of soil.
Anonymous Quiz
67%
Compaction
2%
Curing
2%
Filtering
29%
All of them
🙏6😭3👍2👏1
foundations can be broadly divided into two groups: shallow foundations and deep foundations based on
Anonymous Quiz
4%
Base
2%
Shape
72%
Depth
21%
All
👍14🎉2
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
👍2❤1👏1
👉The water-cement ratio (W/C ratio) is a key factor in determining the strength and durability of concrete.

💫It is defined as the ratio of the mass of water to the mass of cement used in a concrete mix.

⭐️Importance of Water-Cement Ratio:

1. Strength: A lower W/C ratio typically results in higher strength concrete, as there is less water to create voids in the hardened concrete. Conversely, a higher W/C ratio can lead to weaker concrete.

2. Durability: The W/C ratio affects the permeability of concrete. A lower ratio generally leads to less permeable concrete, which is more resistant to environmental factors like freeze-thaw cycles and chemical attacks.

3. Workability: While a lower W/C ratio improves strength and durability, it can make the mix less workable. Therefore, achieving a balance between workability and strength is essential.

📍Common Ratios:

- Typical Ratios: Common W/C ratios range from 0.4 to 0.6 for structural concrete. For high-strength concrete, ratios can be as low as 0.3
 
- Special Applications: For specific applications, such as self-consolidating concrete or very fluid mixes, higher W/C ratios might be used.

📜Calculation:

⏺To calculate the water-cement ratio, you can use the formula:

    Water-Cement Ratio = Weight of Water/Weight of Cement

For example, if you use 200 kg of cement and 100 kg of water, the W/C ratio would be:

    W/C Ratio = 100/200 = 0.5

Understanding and controlling the water-cement ratio is crucial for achieving the desired properties of concrete in construction projects.

@etconp
👍17
👉Wrongful Termination

⏺Understanding Your Rights

Wrongful termination occurs when a contractor's contract is terminated without just cause or proper procedure, leading to significant financial losses and reputational damage.

⏺Common Causes of Wrongful Termination

Some common causes of wrongful termination include:

* *Failure to follow procedure*: The employer fails to follow the termination process outlined in the contract.
* *Unstated reasons*: Termination for reasons not stated in the contract.
* *Insufficient notice*: Termination without giving the contractor sufficient time to remedy any breaches.

*Contractor's Rights and Remedies*
In the event of wrongful termination, contractors have several rights and remedies available to them, including:

* *Compensation*: Contractors may be entitled to compensation for financial losses incurred as a result of the termination.
* *Damages*: Contractors may also be entitled to damages for reputational damage or other losses.
* *Reinstatement*: In some cases, contractors may be entitled to reinstatement of their contract.

*Claims for Compensation and Damages*
To make a claim for compensation or damages, contractors will typically need to provide evidence of:

* *Direct costs*: Direct costs incurred as a result of the termination, such as demobilisation expenses.
* *Indirect losses*: Indirect losses, such as loss of reputation or future business opportunities.
* *Documentation*: Documentation and records to support the claim.

*Payment for Completed Work*
Contractors are generally entitled to payment for work completed prior to termination, including:

* *Payment for accepted work*: Payment for work that has been accepted by the employer.
* *Outstanding retention money*: Outstanding retention money that is due to the contractor.

*Recovering Loss of Profit*
Contractors may also be entitled to recover loss of profit resulting from the termination. To do so, they will typically need to:

* *Provide financial projections*: Provide financial projections to demonstrate expected earnings.
* *Submit a well-supported claim*: Submit a well-supported claim to increase the chances of recovery.

*Suspending or Stopping Work*
In the event of wrongful termination, contractors may be entitled to suspend or stop work. To do so, they should:

* *Provide formal notice*: Provide formal notice to the employer, citing the relevant contract clauses.
* *Ensure legal justification*: Ensure that the suspension or stoppage is legally justified to avoid breaching the contract.

*Termination Clauses and Dispute Resolution*
Contractors should familiarise themselves with the termination clauses in their contract and use these clauses to defend against wrongful termination. They should also:

* *Use dispute resolution mechanisms*: Use dispute resolution mechanisms, such as mediation or arbitration, to resolve disputes.
* *Seek legal advice*: Seek legal advice to protect their interests.

*Importance of Evidence*
Contractors should maintain accurate records and documentation to support their claims, including:

* *Project records*: Records of project performance and communication.
* *Documentation*: Emails, reports, and other documentation.

*Next Steps*
In the event of wrongful termination, contractors should:

* *Review the contract*: Review the contract to ensure that the termination was unjustified.
* *Collect evidence*: Collect evidence and seek legal counsel.
* *File a claim*: File a claim for compensation and pursue dispute resolution.

@etconp
👍14🥰1
በአዲስ አበባ ለጨረታ የቀረቡት 1,735 የንግድ ቤቶች የት ነው የሚገኙት ?

የአዲስ አበባ ቤቶች ልማት ኮርፖሬሽን በተለያዩ ክ/ከተሞች ተገንብተው በተጠናቀዉ የ40/60 የጋራ ህንጻዎች ላይ የሚገኙ 1,735 የንግድ ቤቶችን በግልጽ ጨረታ አወዳድሮ በሽያጭ ለማስተላለፍ እንደሚፈልግ ማሳወቁ ይታወሳል።

ኮርፖሬሽኑ የንግድ ቤቶቹ የሚገኙባቸውን ክ/ከተሞች ፣ ቤቶቹ የሚገኙባቸውን ሳይቶች እና የቤቶቹን ብዛት ዛሬ ይፋ አድርጓል።

በተለይም ከፍተኛውን ቁጥር የሚይዙት በለሚ ኩራ ክ/ከተማ የሚገኙ ቤቶች ሲሆኑ በሻሌ ሳይት ላይ 622 ቤቶች፣ አያት ሁለት 309 ቤቶች ፣ አያት ሁለት ሳይት አራት 176 ቤቶች እንዲሁም አያት አንድ ሳይት ሶስት 140 ቤቶች ለጨረታ ወጥተዋል።

(ሙሉ ዝርዝሩን ከላይ ይመልከቱ)

@etconp
👍6❤1
የግብዓት ዋጋ እስከ 400 በመቶ በመጨመሩ የመንገድ ፕሮጀክቶች እንዲጓተቱ ምክንያት ሆኗል ተባለ

የከተማና መሠረተ ልማት ሚኒስቴር እንደገለፀው የግንባታ ግብዓቶች ዋጋ እስከ 400 በመቶ መጨመሩ የመንገድ ግንባታው የሚፈለገውን ደረጃ ላይ እንዳይደርስ ምክንያት ሆኗል።

ሚኒስትሯ ጫልቱ ሳኒ እንደተናገሩት ይህንን ችግር ለመቅረፍ አዳዲስ ፕሮጀክቶችን በማቆም ነባሮችን ለማጠናቀቅ እየተሰራ መሆኑን ገልጸዋል። ሆኖም ቃል የተገቡ ሁሉም የመንገድ ፕሮጀክቶች ላይጠናቀቁ እንደሚችሉ አስጠንቅቀዋል።

የምክር ቤት አባላትም ከ1980 ጀምሮ በጥናት የተለዩ መንገዶች እንዳልተገነቡ፣ የተጀመሩት በጊዜያቸው አለመጠናቀቃቸውንና የተሰሩትም ሳይገለገሉ መበላሸታቸውን አንስተዋል። በተጨማሪም ለመንገድ ልማት የተነሱ ዜጎች ለዓመታት ካሳ ሳይከፈላቸው መቆየታቸውንም ካፒታል ሰምቷል።

የኢትዮጵያ መንገዶች አስተዳደር ዋና ዳይሬክተር ኢንጂነር መሐመድ አብዱራህማን በበኩላቸው የመንገድ ግንባታ መጓተት የካሳ ክፍያና የግንባታ ግብዓት አቅርቦት ችግር መሆኑን አምነዋል። ችግሩን ለመፍታትም ከሚመለከታቸው አካላት ጋር በቅንጅት እየተሰራ መሆኑን አስረድተዋል።

Via capital ethiopia

@etconp
👍17❤1
👉በቅርቡ እውን ይሆናል

💫በኢትዮጵያ የኤሌክትሪክ ሽፋንን 75 በመቶ ያሳድጋል ተብሎ የሚጠበቀው እና ሊጠናቀቅ 1.34 ፐርሰንት ብቻ የቀረው ታላቁ የኢትዮጵያ ህዳሴ ግድብ እየመጣ ነው🙏

@etconp
❤13👍2🥰1
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን


0904040477
0911016833
❤5👍1
👉What is a Cost-Plus Contract in Construction?

🏷A cost-plus contract provides reimbursement for all of the costs associated with a construction project, plus a fee to account for the contractor’s overhead and profit.

⏺Construction project owners may employ this type of contract when they want to get a project moving quickly or when the scope of work is unclear, making it difficult to estimate the total cost.

💫That said, the total price for a cost-plus contract may ultimately be higher than it would be with other contract types.

⏺Next, we’ll provide an in-depth look at how cost-plus contracts work, a cost-plus contract example, and the pros and cons of this contract type.

@etconp
👍20❤2
120 ዓመታት ያስቆጠረው ጣይቱ የባህል እና የትምህርት ማዕከል ለአገልግሎት ክፍት ሆነ

ጣይቱ የባህል እና የትምህርት ማዕከል ለአገልግሎት ክፍት መደረጉን የአዲስ አበባ ከንቲባ አዳነች አቤቤ አስታወቁ

120 ዓመታትን ያስቆጠረው እና ወደ ማዕከልነት የተቀየረው የቅርስ ቤት የመጀመሪያው ጠቅላይ ሚኒስትር እና የአዲስ አበባ ሁለተኛ ከንቲባ የነበሩት ቢትወደድ ኃይለጊዮርጊስ ወልደሚካኤል መኖሪያ ቤት ነበር።

ይህ ጥንታዊ ቤት የመጀመሪያው የከተማዋ ማዘጋጃ ቤት እና የፍትህ ማዕከል ሆኖ ያገለገለ ታሪካዊ ቤት ነው በማለት ከንቲባው በማህበራዊ ትስስር ገፃቸው አስነብበዋል።

ከንቲባዋ በከተማዋ አስተዳደር የ39 ሚሊዩን ብር ድጋፍ ማዕከሉ እውን እንዲሆን ትልቁን ድርሻ ወስዳለች ሲሉ አርቲስት አለምፀሀይ ወዳጆን በምረቃው ወቅት አመስግነዋል።

@etconp
👍6❤1