Ethio Construction Engineering
32.4K subscribers
6.25K photos
359 videos
1.99K files
3.26K links
๐Ÿ”จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

๐Ÿ“จ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
๐Ÿ‘‰DIFFERENTIAL LEVELING

๐Ÿšง1)Bench mark (BM)

โบrelatively permanent point of known elevation

๐Ÿšง2). Backsight (BS) - a sight taken to the level rod held at a point of known elevation (either a BM or TP

๐Ÿšง3)Height of instrument (HI) - the elevation of the line of sight of the telescope

๐Ÿšง4)Foresight (FS) - a sight taken on any point to determine its elevation

@etconp
๐Ÿ‘15โค4
๐Ÿ‘‰แ‹จ EiABC Architecture แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แˆตแˆซ

๐Ÿ’ซRussia-Islamic World Kazan Forum 2025 แŠ แˆˆแˆแŠ แ‰€แ แŠ แ‹แ‹ฐแˆญแ‹•แ‹ญแข

แ‹จแ‰ฐแˆ›แˆชแ‹Žแ‰ปแ‰ฝแŠ• แˆตแˆซ แŠฅแŠ•แ‹ฐแ‹šแˆ… แŠจแˆŒแˆŽแ‰ฝ แŠ แŒˆแˆซแ‰ต แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แŒ‹แˆญ แ‰ฐแˆˆแŒฅแŽ แˆ›แ‹จแ‰ตแŠ• แ‹จแˆ˜แˆฐแˆˆ แАแŒˆแˆญ แ‹จแˆˆแˆแข

แŠ แ‹˜แŒ‹แŒ†แ‰น แ‰ แŠ› แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แˆตแˆซ แ‹จแ‰ดแŠญแŠ’แŠซแˆ แ‰ฅแ‰ƒแ‰ต แ‰ฅแ‰ป แˆณแ‹ญแˆ†แŠ• แ‹จแŠฅแˆณแ‰ค แŒฅแˆแ‰€แ‰ตแŠ•แˆ แŠ แ‹ตแŠ•แ‰€แ‹ แАแŒแˆจแ‹แŠ›แˆแข

แ‰ฅแ‰ป แŠฅแŠ› แŠ แŒˆแˆญ แˆแŠ•แˆ แŠ แˆ‹แАแˆฐแŠ•แˆแข แ‰ฃแˆˆแŠ• แŠ แ‰…แˆ แ‹ˆแ‹ฐแŠแ‰ต แˆ˜แˆตแˆแŠ•แŒ แˆญแ‹ซ แˆšแˆตแŒฅแˆฉแŠ• แˆแŒฃแˆช แ‹ซแˆ˜แˆ‹แŠญแ‰ฐแŠ•แข

Via แ‹ณแ‹Šแ‰ต แ‰ แŠ•แ‰ฒ

@etconp
โค9๐Ÿ‘5๐Ÿ‘1
๐Ÿ‘‰Breakdown of Lump Sum Prices under FIDIC Contracts

In FIDIC contracts, lump sum prices are commonly used for specific items or packages of work. However, these lump sum prices can create challenges when it comes to interim payments, variation valuation, and potential disputes. To address these challenges, FIDIC contracts require the Contractor to provide a breakdown of lump sum prices.

The breakdown of lump sum items is a requirement under FIDIC contracts, specifically Sub-Clause 14.1(d) of Fidic 1999, equivalent sub-clause within 1987 edition is Sub-Clause 57.2. The purpose of this breakdown is multifaceted:

1. Facilitates Interim Payments: By providing a detailed breakdown of lump sum prices, the Contractor enables the Engineer to calculate the values to be included in Interim Payment Applications, ensuring a smoother payment process.

2. Reduces Scope for Argument: By providing a clear breakdown of lump sum prices, the Contractor and Engineer can reduce the scope for argument and potential disputes regarding the proportion of items included in the Schedules as lump sums.

3. Supports Variation Valuation: The breakdown helps to determine the proportion of lump sum prices that should be included in each Variation, ensuring that payments reasonably reflect the distribution of the lump sums over the period of the Contract.

In summary, the Contractor will typically wish to be paid in full for the item at the earliest possible moment. The Engineer, while not bound by the breakdown, is expected to discuss any queries or changes with the Contractor. The breakdown of lump sum items is essential for facilitating interim payments, enabling process of smooth IPCs, reducing the scope for argument, and supporting variation valuation.

@etconp
๐Ÿ‘12โค10
๐Ÿ‘‰Waffle Slab is a type of flat reinforced concrete slab that uses a grid system of ribs in two directions, resembling the pattern of a *waffle*, hence the name.

๐Ÿ“Œ Key Features

- It consists of a concrete slab supported by a network of intersecting ribs.
- The ribs are formed using reusable plastic or steel molds.
- It is typically used in wide-span areas requiring high load resistance without the need for drop beams.

โœ… Advantages

1. *Concrete savings* compared to traditional slabs.
2. *Lighter weight*, reducing loads on columns and foundations.
3. *High crack resistance* due to effective load distribution across the ribbed network.
4. *Aesthetic architectural look*, and can be left exposed in modern designs.

โŒ *Disadvantages

- *More complex execution* requiring high precision in mold placement.
- *Higher formwork cost* compared to conventional slab systems.
- *Not suitable for small areas* or those with dense internal partitioning.

@etconp
๐Ÿ‘10๐Ÿ™2
๐Ÿ‘‰In building construction, load-bearing structures and frame structures represent two distinct approaches to supporting loads.

๐Ÿ’ซHereโ€™s an overview of their differences:

๐ŸšงLoad-Bearing Structures

1. Definition: In load-bearing structures, the walls themselves support the weight of the building and its contents. The walls are thick and made of materials like brick, stone, or concrete.
2. Load Distribution: The loads (dead and live) are transferred directly through the walls to the foundation.
3. Design Flexibility: There is limited flexibility in design and layout since the walls must be strategically placed to support loads. Removing or altering walls can compromise structural integrity.
4. Construction Materials: Commonly uses masonry or concrete for walls, making it generally more labor-intensive.
5. Height Limitation: Typically not suitable for very tall buildings due to the heavy load on walls.

๐ŸšงFrame Structures

1. Definition: Frame structures use a system of beams and columns to support loads. The walls (often non-load-bearing) are not essential for structural support.
2. Load Distribution: Loads are transferred through the columns to the foundation, allowing walls to be lighter and more varied in design.
3. Design Flexibility: Offers greater architectural flexibility, allowing for open floor plans and the easy alteration of interior spaces.
4. Construction Materials: Often constructed with steel or reinforced concrete, which allows for taller buildings with fewer materials.
5. Height Suitability: Suitable for high-rise buildings due to the strength of the frame system.

๐Ÿ“œSummary

โบIn essence, load-bearing structures rely on walls for support, while frame structures utilize a skeletal framework. This fundamental difference impacts design, materials, height capabilities, and overall flexibility in construction.

@etconp
โค8๐Ÿ‘7
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โ™ง แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

โ™ง แˆแˆตแŠญแˆซแ‰ฝแŠ• แˆตแˆซแ‰ฝแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

โ™ง แ‹ญแ‹ฐแ‹แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

0904040477
0994941708
๐Ÿ‘3โค1
๐Ÿ‘‰In road construction, the terms "subgrade" and "embankment" refer to different layers and functions within the pavement structure.

1. Subgrade:
- The subgrade is the native soil or material that forms the foundation for the road. It is the layer directly beneath the pavement structure.
- Its primary role is to provide support and stability to the road above. The quality of the subgrade greatly affects the overall performance and durability of the roadway.
- The subgrade is usually compacted to increase its load-bearing capacity and reduce settlement.

2. Embankment:
- An embankment is a raised structure built using soil or other materials to elevate the roadway above the surrounding terrain. It is often used in areas where the natural ground level is too low or where drainage is a concern.
- Embankments can be made from various materials, including earth, gravel, or other fill materials. The construction of an embankment usually involves careful compaction to ensure stability.
- Embankments can also help in managing water drainage and preventing erosion.

In summary, the subgrade is the prepared layer of soil that supports the road, while an embankment is a constructed elevation to raise the road above the surrounding land. Both are critical for the overall stability and longevity of a road.

@etconp
โค15๐Ÿ‘5