Ethio Construction Engineering
32.4K subscribers
6.25K photos
359 videos
1.99K files
3.25K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
❤4👍1
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

♧ ሁሉን በአንድ ቦታ ለሁሉም ቅርብ

♧ ምስክራችን ስራችን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

♧ ይደውሉልን ያማክሩን

0904040477
0994941708
👏2
👉Types of Claims in Contract Law

💫In contract law, claims arise when one party fails to fulfill their obligations, causing losses or damages to the other party. There are three primary types of claims:
*Contractual Claims*
*General Claims/Legal Claims* and *Ex-Gratia Claims*.

🚧1. Contractual Claim*

A contractual claim occurs when a party breaches a contractual obligation, and the other party seeks compensation for losses and damages. To pursue a contractual claim, parties must follow the contractual procedures outlined in the agreement, such as:

- *Issuing notices*: Providing written notice to the breaching party within a specified timeframe, as stated in the contract.
- *Impact mitigation measures*: Taking steps to minimize the impact of the breach, such as finding alternative suppliers or contractors.
- *Maintaining contemporary records*: Keeping accurate and up-to-date records of the breach, including correspondence, meetings, and agreements.

For example, if a contractor fails to complete a project on time, the employer may claim damages for the delay, as specified in the contract.

🚧2. General Claim/Legal Claim*

A general claim, also known as a legal claim, is pursued under the country's general law when contractual remedies are insufficient or unavailable. This type of claim is decided based on the country's legal framework, rather than the contractual provisions.

For instance:

- *Seeking compensation for delay damages outside of contractual provisions*: If a contract does not include a delay damage clause, the employer may still claim compensation for damages under the country's general law.

🚧3. Ex-Gratia Claim*

An ex-gratia claim is a relief granted by the employer on a quantum meruit basis (i.e., as much as deserved). This type of claim is considered when:

- *No contractual or legal entitlement*: The contractor has no contractual or legal basis for claiming relief.
- *Employer's discretion*: The employer chooses to provide relief to the contractor as a gesture of goodwill or to maintain a positive working relationship.

For example:

- A contractor makes a mistake or error that results in additional costs or expenses.
- Despite being responsible for the mistake, the contractor requests relief from the employer.
- The employer, at their discretion, chooses to provide an ex-gratia payment to the contractor, despite having no contractual obligation to do so.

@etconp
❤15🔥2
👉ለኢትዮጵያውያን አገልግሎት ሰጪዎች ማለትም ለአማካሪዎች እና ለሥራ ተቋራጮች በሀገር ውስጥ ለሚከናወኑ ግንባታዎች እና የማማከር አገልግሎት በአለም አቀፍ ግልጽ ጨረታ ላይ ሲሳተፉ የሚሰጥ ልዩ ጥቅማ ጥቅሞች ምን ምን ናቸው?

ለኢትዮጵያውያን አገልግሎት ሰጪዎች ነው የተፈቀደው ሲባል የኢትዮጵያ ዜግነት ያላቸው ወይም ትውልደ ኢትዮጵያዊ የውጭ አገር ዜጋ ከሆኑ ብቻ ነው::

ይህም ማለት ድርጅቱ በኢትዮጵያ ሕግ መሠረት የተቋቋመ እና ዋ/መ/ቤቱ በኢትዮጵያ ውስጥ የሚገኝ ከሆነ፣ ከድርጅቱ አክሲዮን ወይም የካፒታል ድርሻ ከ50% በላይ በኢትዮጵያውያን የተያዘ ከሆነ፣ ከድርጅቱ የዳይሬክተሮች ቦርድ አባላት መካከል ከ50% በላይ ኢትዮጵያውያን ከሆኑ እና ከድርጅቱ ቁልፍ ሠራተኞች መካከል ቢያንስ 30% ኢትዮጵያውያን ከሆኑ ብቻ ነው፡፡

ከዚህ በማስቀጠል በፌዴራል መንግስት የግዥ አፈፃፀም መመሪያ ምዕራፍ 3 ክፍል 3 አንቀጽ 28 የመንግሥት መ/ቤቶች ለኢትዮጵያውያን የምክር አገልግሎት ሰጪዎች እና ሥራ ተቋራጮች በአዋጅ ቁጥር 1333/2024 አንቀጽ 21(1)(ለ) በተቀመጠው መሰረት ልዩ አስተያየት መስጠት አለባቸው ይላል፡፡

ይህም ሲባል የሚደረገው ልዩ አስተያየት በዋጋ ላይ በሚደረግ ውድድር ወቅት በሚከተለው መሠረት ተፈፃሚ መደረግ አለበት፡፡ ለግንባታ ሥራ እና ለምክር አገልግሎት ግዥዎች በሚወዳደሩበት ወቅት 7.5% ከአጠቃላይ የጨረታ ውጤቱ ተደማሪ ይኖራቸዋል ማለት ነው፡፡

ከላይ ከተገለጹት በተጨማሪ የአገር ውስጥ የሥራ ተቋራጭች የሚወዳደሩባቸው ሥራዎች ካሸነፉ ከሥራው ጠቅላላ ዋጋ ከ20% የማያንስ ዋጋ ያለውን ሥራ በንዑስ ተቋራጭነት ለጥቃቅንና አነስተኛ ማኅበራት በመስጠት ለማሰራት ግዴታ የገቡ ከሆነ በጨረታው ለዋጋ ከተያዘው ነጥብ ተጨማሪ 2% ልዩ አስተያየት ይደረግላቸዋል፡፡

Via Getabun Abate

@etconp
❤2🔥2
👉DIFFERENCES BETWEEN ‎TRUE,  SHEAR,  AND COLLAPSE SLUMP CONE WITH THEIR APPLICATION⤵️
‎
💫‎TRUE SLUMP

    ‎🚧1. CHARACTERISTICS: Uniform decrease in height, maintaining the shape of the cone.
‎
    ‎🚧2. APPLICATION: Suitable for concrete with good workability and cohesion, often used in general construction projects.
‎
💫‎SHEAR SLUMP

    ‎🚧1. CHARACTERISTICS: Portion of the concrete shears off and slides down, indicating a lack of cohesion.
‎
    ‎🚧2. APPLICATION: May indicate issues with mix design or excessive water content; often seen in concrete with poor workability.
‎
💫‎COLLAPSE SLUMP

    ‎🚧1. CHARACTERISTICS: Concrete collapses completely, losing its shape.
‎
    🚧2. APPLICATION: Indicates high workability opr excessive water content; often used in applications requiring high flowability, such as self-compacting concrete.
‎
📜‎APPLICATIONS

     ‎📍1. CONSTRUCTION PROJECTS: Slump tests help ensure concrete meets workability requirements.
‎
      ‎📍2. MIX DESIGN: Slump tests aid in adjusting mix proportions to achieve desired workability.
‎
      ‎📍3. QUALITY CONTROL: Regular slump tests help monitor concrete quality and detect potential issues.
‎
⏺‎By understanding the differences between True slump, Shear slump, and Collapse slump tests, construction professionals can better assess concrete workability and make informed decisions.‎

@etconp
❤12🥰1
የገንዘብ_ሚኒስቴር_መመሪያ_ቁጥር_1063_2017.pdf
5.8 MB
👉የገንዘብ ሚኒስቴር፥ የታክስ ኦዲት የሚከናወንበትን ሥርዓት እና የታክስ ስሌት ማስታወቂያ የሚወጣበትን አኳኋን ለመወሰን መመሪያ አውጥቷል።

መመሪያው ከትላንትና በስቲያ ጀምሮ ስራ ላይ ውሏል።

መመሪያው ስለ አጠቃላይ ኦዲት ምን ይላል ?

የታክስ ባለስልጣን አጠቃላይ ኦዲት የሚያከናውነው ፦

- በስጋት ግምገማ ወቅት ታክስ ከፋዩ በህግ በተደነገገው መሰረት የሂሳብ መዝገብ የመያዝ ገቢውን የማስታወቅ እና ታክስ የመክፈል ግዴታውን ያልተወጣ መሆኑ ሲታወቅ እና ይህም ሁኔታ የተለያዩ ታክሶችን የሚመለከት ሲሆን፤

- ሌላ አይነት ኦዲት በመደረግ ላይ ባለበት ጊዜ የተገኙ ታክስ ከፋዩ የፈጸማቸው ተገቢ ያልሆኑ አድራጎቶች ኦዲቱ በማይሸፍናቸው በሌሎች ታክሶች ላይ ጭምር ውጤት ያላቸው መሆኑ ሲታወቅ፤

- ታክስ ከፋዩ ኦዲት እንዲደርግ ሲጠየቅ እና በታክስ ባለስልጣኑ አጠቃላይ ኦዲት አስፈላጊ መሆኑ ሲታመንበት፤

- አግባብነት ባላቸው በሌሎች የታክስ ህጎች በተገለጹ ሌሎች ምክንያቶች፤

- ታክስ ከፋዩ በጭብጥ ኦዲት ተደርጎ አከራካሪ ከሆነ እና በቅሬታ ጽ/ቤት በኩል አጠቃላይ ኦዲት እንዲደረግ ትዕዛዝ ሲሰጥ፤ ... ነው ይላል።

የታክስ ባለስልጣን አጠቃላይ አዲት በሚያከናውንበት ጊዜ ፦
° ተገቢ ያልሆነ የሂሳብ ስሌት፣ ግድፈት፤
° ገቢን ማሳነስ፤
° ተገቢ ያልሆነ የታክስ አሰያየም
° በታክስ ማስታወቂያ ወይም ስሌት ረገድ የተፈጸመ ሌላ ማናቸውም ጥፋት ያለመኖሩን ለማረጋገጥ፤ ሁሉንም ወይም የተወሰኑትን የታክስ አይነቶች በሚመለከት ዝርዝር እና ጥልቀት ያለው ምርመራ ማድረግ እንዳለበት መመሪያው ላይ ሰፍሯል።

ይህ የማጣራት ተግባር አግባብነት እስካለው ድረስ የህግ ድንጋጌዎችን ተከትሎ መፈጸም እንዳለበትም ይገልጻል።

(ሙሉ መመሪያው ከላይ ተያይዟል)

@etconp
❤11🥰2😭2👍1🔥1
👉የቆዩ የከተማ ምስሎች

💫አዲስ አበባ ፒያሳ - 1958 ዓ.ም

⏺Returned Peace Corps Ethiopia III Volunteers/Darrel & Betty Hagburg Photograph:

በ Historic Ethiopia Through The Camera Lens 1860s-1990s

@etconp
👍7❤2🔥1
The length of a transition curve depends on the rate of change of
Anonymous Quiz
45%
Centrifugal acceleration
27%
Tangential acceleration
19%
Speed
8%
Distance
❤13👏1
The treatment that should be given to the water from a deep tube well is :
Anonymous Quiz
17%
pre-settling only
46%
coagulation and flocculation only
19%
filtration only
18%
disinfection only
🔥8❤3👏3
❤9👏4👍1
Which one of the following process is/are used for the permanent adjustment of a transit theodolite?
Anonymous Quiz
19%
Adjustment of the vertical axis
20%
Adjustment of plate level
57%
Both of the above
4%
None of the above
👍7❤5👏1
A continuous beam ABCDE is 12 m long, and contains 4 spans of 3 m each. The beam is loaded with uniformly distributed load of 4,000 kgf/m, throughout its length. The bending moment at A and Ewill be equal to
Anonymous Quiz
51%
zero
13%
6,000 kg f-m
26%
12,000 kg f-m
10%
3,000 kg f-m
❤7👏5
❤12
An R.C.C. beam not provided with shear reinforcement may develop cracks in its bottom inclined roughly to the horizontal at
Anonymous Quiz
15%
25°
9%
60°
64%
45°
12%
90°
🎉14❤5
distributed load, the ratio of the maximum negative to maximum positive radial moment, is
Anonymous Quiz
46%
1
34%
2
14%
3
6%
4
❤6👏4
🥇When a load is transferred through one surface to another surface in contact, the stress is known as:
Anonymous Quiz
18%
Tensile stress
36%
Compressive stress
38%
Shearing stress
8%
None of these
❤11🥰5
The upstream slope of an earth dam under steady seepage condition is
Anonymous Quiz
23%
equipotential line
20%
phreaticline
20%
flow-line
37%
seepage line
👏8❤2
Consider the following statements :
Sand in mortar is needed for
1. decreasing the quantity of cement. 2. reducing shrinkage. 3. decreasing the surface area of the binding material. 4. increasing the strength. Of these statements :
Anonymous Quiz
33%
2, 3 and 4 are correct
23%
1, 2 and 3 are correct
16%
1, 3 and 4 are correct
28%
1, 2 and 4 are correct
❤18
Moisture content in aggregate can be recorded continuously by
Anonymous Quiz
13%
Calcium carbide method
36%
Wet measurement
9%
Electrical meter method
42%
Drying method
🎉5👏4❤2