👉SOIL STABILIZATION: 💫Soil stabilization is a technique of increasing or maintaining stability of soil mass. 🚧Methods of soil stabilization: 1. Mechanical stabilization: It is by suitable grading or by compaction. Mechanical stabilized construction needs…
👉STABILISATION OF SOIL WITH ADDITIVES:
💫Stabilisation of soil with some kind of additive is very common.
⏺The mode and degree of alternation necessary depend on the nature of the soil and its deficiencies.
⏺If additional strength is required in the case of cohesionless soil, a cementing or a binding agent may be added and if the soil is cohesive, the strength can be increased by making it moisture-resistant, altering the absorbed water films, increasing cohesion with a cement agent and adding internal friction.
🚧Compressibility of a clay soil can be reduced by cementing the grains with a rigid material or by altering the forces of the adsorbed water films on the clay minerals.
⏺Swelling and shrinkage may also be reduced by cementing, altering the water adsorbing capacity of the clay mineral and by making it moisture-resistant. Permeability of a cohesionless soil may be reduced by filling the voids with an impervious material or by preventing flocculation by altering the structure of the adsorbed water on the clay mineral; it may be increased by removing the fines or modifying the structure to an aggregated one.
⏺A satisfactory additive for soil stabilisation must provide the desired qualities and, in addition, must meet the following requirements: Compactibility with the soil material, permanency, easy handling and processing, and low cost.
⏺Many additives have been employed but with varying degrees of success. No material has been found to meet all the requirements, and most of the materials are expensive.
@etconp
💫Stabilisation of soil with some kind of additive is very common.
⏺The mode and degree of alternation necessary depend on the nature of the soil and its deficiencies.
⏺If additional strength is required in the case of cohesionless soil, a cementing or a binding agent may be added and if the soil is cohesive, the strength can be increased by making it moisture-resistant, altering the absorbed water films, increasing cohesion with a cement agent and adding internal friction.
🚧Compressibility of a clay soil can be reduced by cementing the grains with a rigid material or by altering the forces of the adsorbed water films on the clay minerals.
⏺Swelling and shrinkage may also be reduced by cementing, altering the water adsorbing capacity of the clay mineral and by making it moisture-resistant. Permeability of a cohesionless soil may be reduced by filling the voids with an impervious material or by preventing flocculation by altering the structure of the adsorbed water on the clay mineral; it may be increased by removing the fines or modifying the structure to an aggregated one.
⏺A satisfactory additive for soil stabilisation must provide the desired qualities and, in addition, must meet the following requirements: Compactibility with the soil material, permanency, easy handling and processing, and low cost.
⏺Many additives have been employed but with varying degrees of success. No material has been found to meet all the requirements, and most of the materials are expensive.
@etconp
❤4
👉በ1.2 ቢሊዮን ብር የሚገነባው የቴፒ-ሚዛን የመንገድ ግንባታ በሚቀጥለው ዓመት ይጠናቀቃል
🚧በደቡብ ምዕራብ ኢትዮጵያ ግንባታው በመካሄድ ላይ የሚገኘው የቤንች ሸኮን እና የሸካ ዞኖችን የሚያገናኝ የቴፒ-ሚዛን 47.87 ኪሎ ሜትር አስፋልት ኮንክሪት የመንገድ ግንባታ ፕሮጀክትን በቀጣዩ በጀት ዓመት ለማጠናቀቅ በትኩረት እየተሠራ ነው፡፡
💫በእስካሁኑ የፕሮጀክቱ አፈጻጸም የአፈር ቆረጣ እና ሙሌት፣የማፋሰሻ፣ የስትራክቸር፣የሰብ ቤዝ እና የቤዝ ኮርስ ንጣፍ እንዲሁም 25 ኪሎ ሜትር የአስፋልት ንጣፍ ስራዎች ተከናውነዋል፡፡
⏺የመንገድ ግንባታ ፕሮጀክቱን እያከናወነ የሚገኘው ቻይና ግዞባ ግሩፕ ኃ/የተ/የግ/ማህበር (CGGC) የተባለ የቻይና የስራ ተቋራጭ ሲሆን የማማከርና የቁጥጥር ስራው ደግሞ ፕሮሚነንት ኢንጂነሪንግ ሶሉሽንስ አማካሪ ድርጅት አማካኝነት በመካሄድ ላይ ነው።
⏺ለግንባታው ማስፈጸሚያ የሚውለውን 1.2 ቢሊዮን ብር በላይ በጀት በኢትዮጵያ መንግሠት የተሸፈነ ነው።
⏺አሁን ላይ የሥራ ተቋራጩ ከአጠቃላይ ሥራው 31.6 ኪሎ ሜትር ወይም 66 በመቶውን ያጠናቀቀ ሲሆን የፕሮጀክቱን ቀሪ ሥራዎችም በሚቀጥለው በጀት አመት ለማጠናቀቅ እየሠራ እንደሚገኝ የኢትዮጵያ መንገዶች አስተዳደር አስታውቋል፡፡
@etconp
🚧በደቡብ ምዕራብ ኢትዮጵያ ግንባታው በመካሄድ ላይ የሚገኘው የቤንች ሸኮን እና የሸካ ዞኖችን የሚያገናኝ የቴፒ-ሚዛን 47.87 ኪሎ ሜትር አስፋልት ኮንክሪት የመንገድ ግንባታ ፕሮጀክትን በቀጣዩ በጀት ዓመት ለማጠናቀቅ በትኩረት እየተሠራ ነው፡፡
💫በእስካሁኑ የፕሮጀክቱ አፈጻጸም የአፈር ቆረጣ እና ሙሌት፣የማፋሰሻ፣ የስትራክቸር፣የሰብ ቤዝ እና የቤዝ ኮርስ ንጣፍ እንዲሁም 25 ኪሎ ሜትር የአስፋልት ንጣፍ ስራዎች ተከናውነዋል፡፡
⏺የመንገድ ግንባታ ፕሮጀክቱን እያከናወነ የሚገኘው ቻይና ግዞባ ግሩፕ ኃ/የተ/የግ/ማህበር (CGGC) የተባለ የቻይና የስራ ተቋራጭ ሲሆን የማማከርና የቁጥጥር ስራው ደግሞ ፕሮሚነንት ኢንጂነሪንግ ሶሉሽንስ አማካሪ ድርጅት አማካኝነት በመካሄድ ላይ ነው።
⏺ለግንባታው ማስፈጸሚያ የሚውለውን 1.2 ቢሊዮን ብር በላይ በጀት በኢትዮጵያ መንግሠት የተሸፈነ ነው።
⏺አሁን ላይ የሥራ ተቋራጩ ከአጠቃላይ ሥራው 31.6 ኪሎ ሜትር ወይም 66 በመቶውን ያጠናቀቀ ሲሆን የፕሮጀክቱን ቀሪ ሥራዎችም በሚቀጥለው በጀት አመት ለማጠናቀቅ እየሠራ እንደሚገኝ የኢትዮጵያ መንገዶች አስተዳደር አስታውቋል፡፡
@etconp
👍7❤3
👉የተሰበረ ወይም የተጋነነ የጨረታ ዋጋ (Unusually Low or Excessively High Bid Prices) በአዲሱ የግዥ መመሪያ
🚧የተሰበረ ወይም የተጋነነ የጨረታ ዋጋን (Unusually Low or Excessively High Bid Prices) በተመለከተ በአዲሱ የግዥ መመሪያ አንቀጽ 123 የሚከተሉትን ዝርዝር ነጥቦች ይዟል።
1. የዕቃ ግዥን በተመለከተ በተጫራቹ የቀረበው የጨረታ ዋጋ እንደቅደም ተከተላቸው ከኢትዮጵያ ስታትስቲክስ አገልግሎት በሚገኝ የዋጋ መረጃ፣ የኢትዮጵያ ስታትስቲክስ አገልግሎት የዋጋ መረጃ እንደሌለ ማረጋገጫ በሚሰጥበት ጊዜ እንደሁኔታው ከታወቀ አምራች፣ ይህም ካልሆነ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት በሚገኘው የገበያ ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ10% (አስር በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም የቀረበው ዋጋ ከ30% (ሰላሳበመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
2. የምክር እና ከምክር ውጭ የሆነ የአገልግሎት ግዥን በተመለከተ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት በሚገኘ የገበያ ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ10% (አስር በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም የቀረበው ዋጋ ከ20% (ሃያ በመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
3. የግንባታ ግዥን በተመለከተ በተጫራቹ የቀረበው የጨረታ ዋጋከምህንድስና ግምት ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ15% (አስራ አምስት በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም በተጫራቹ የቀረበው የጨረታ ዋጋ ከምህንድስና ግምት ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ20% (ሃያ በመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
4. በዚህ አንቀጽ ንዑስ አንቀጽ 3 መሠረት ለማወዳደሪያነት የሚውለው የምህንድስና ግምታዊ ዋጋ በግዥ ፈፃሚ የመንግስት መ/ቤቱ የተዘጋጀ እና ለግንባታው ግብዓት የሚሆኑ ሁሉም ዕቃዎች እና አገልግሎቶች በኢትዮጵያ ስታትስቲክስ አገልግሎት በሚገኘው የዋጋ መረጃ፣ የስታትስቲክስ አገልግሎት የዋጋ መረጃ እንደሌለ ማረጋገጫ በሚሰጥበት ጊዜ እንደሁኔታው ከታወቀ አምራች፣ ይህም ካልሆነ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት የተዘጋጀ እና ቢያንስ በሦስት ወራት ውስጥ ወቅታዊ የተደረገ መሆን አለበት፡፡
5. በዚህ አንቀጽ ንዑስ አንቀጽ 1፣ 2 እና 3 መሰረት ከተጫራቹ የቀረበው ዋጋ የተጋነነ ሆኖ ሲገኝ የመንግሥት መ/ቤቱ በአዋጁ አንቀጽ 26 (1(መ)) መሰረት ውል ከመፈረሙ በፊት ጨረታውን ወይም የመጫረቻ ሰነድን በማናቸውም ጊዜ ሙሉ በሙሉ ወይም በከፊል ውድቅ ማድረግ አለበት፡፡
6. የመንግስት መ/ቤቱ በዚህ መመሪያ እና በመደበኛ የጨረታ ሰነዱ ላይ በተቀመጠው መሠረት ተጨማሪ ምርመራ ሳያከናውን የቀረበው የጨረታ ዋጋ የተሰበረ በመሆኑ ምክንያት ብቻ ተጫራቹን ከውድድሩ ውጭ ማድረግ የለበትም፡፡
7. የመንግስት መ/ቤቱ በቀረበው የጨረታ ዋጋ ላይ ተጨማሪ ምርመራ ለማድረግ እንዲያስችለው የተሰበረ የጨረታ ዋጋ ያቀረበው ተጫራች ዝርዝር ማብራሪያ እና ተያያዥ ሰነዶች እንዲያቀርብ መጠየቅ አለበት፡፡
8. በዚህ አንቀጽ ንዑስ አንቀጽ 3 መሰረት መ/ቤቱ የሚጠይቀው ማብራሪያ ሌሎች በመደበኛ የጨረታ ሰነዱ ከሚገለጹት ነጥቦች በተጨማሪ የሚከተሉትን ሁኔታዎች ሊያካትት ይችላል፡፡
ሀ/ተጫራቹ ባቀረበው ዋጋ ጥራቱንና የመ/ቤቱን ፍላጎት በሚያሟላ መልኩ ለማመጠናቀቅ የሚያስችለው
ለ/ሥራውን ማከናወን ወይም አቅርቦቱን መፈጸም የሚያስችለው የተለየ ዘዴ ያለው ስለመሆኑ፣
ሐ/ሥራውን ወይም አቅርቦቱን በዚህ ዋጋ ለመስራት ወይም ለመፈጸም የሚያስችለው የተለየ ምቹ ሁኔታ ወይም ሙያዊ መፍትሔዎች ያለው ስለመሆኑ፣እንዲሁም
መ/ ተጫራቹ ከዚህ ቀደም ባለፉት ሁለት ዓመታት ውስጥ የገባቸውን ውሎች እና አፈጻጸም የሚያሳይ መግለጫ እና ሰነዶች፣
9) በአዋጁ፣ በዚህ መመሪያ እና በመደበኛ የጨረታ ሰነዱ ድንጋጌዎች መሰረት መ/ቤቱ በዚህ ረገድ የሚወስዳቸው
ውሳኔዎች እንደተጠበቁ ሆኖ መንግስት መ/ቤቱ ከተጫራቹ ማብራሪያ ከደረሰው ቀን ጀምሮ በ10 የሥራ
ቀናት ጊዜ ውስጥ ከተጫራቹ የቀረበውን ሀሳብ ተቀባይነት ስለማግኘቱ ወይም ስላለማግኘቱ ውሳኔውን
ለተጫራቹ ማሳወቅ አለበት፡፡
10) በዚህ አንቀጽ ንዑስ አንቀጽ 9 መሰረት ከተጫራቹ የቀረበውን ኃሳብ የማይቀበለው ከሆነ የመንግሥት መ/ቤቱ በአዋጁ አንቀጽ 26 (1(መ)) መሰረት ውል ከመፈረሙ በፊት ጨረታውን ወይም የመጫረቻ ሰነድን በማናቸውም ጊዜ ሙሉ በሙሉ ወይም በከፊል ውድቅ ማድረግ አለበት፡፡
@etconp
🚧የተሰበረ ወይም የተጋነነ የጨረታ ዋጋን (Unusually Low or Excessively High Bid Prices) በተመለከተ በአዲሱ የግዥ መመሪያ አንቀጽ 123 የሚከተሉትን ዝርዝር ነጥቦች ይዟል።
1. የዕቃ ግዥን በተመለከተ በተጫራቹ የቀረበው የጨረታ ዋጋ እንደቅደም ተከተላቸው ከኢትዮጵያ ስታትስቲክስ አገልግሎት በሚገኝ የዋጋ መረጃ፣ የኢትዮጵያ ስታትስቲክስ አገልግሎት የዋጋ መረጃ እንደሌለ ማረጋገጫ በሚሰጥበት ጊዜ እንደሁኔታው ከታወቀ አምራች፣ ይህም ካልሆነ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት በሚገኘው የገበያ ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ10% (አስር በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም የቀረበው ዋጋ ከ30% (ሰላሳበመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
2. የምክር እና ከምክር ውጭ የሆነ የአገልግሎት ግዥን በተመለከተ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት በሚገኘ የገበያ ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ10% (አስር በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም የቀረበው ዋጋ ከ20% (ሃያ በመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
3. የግንባታ ግዥን በተመለከተ በተጫራቹ የቀረበው የጨረታ ዋጋከምህንድስና ግምት ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ15% (አስራ አምስት በመቶ) የበለጠ ሲሆን እንደተጋነነ የጨረታ ዋጋ እንዲሁም በተጫራቹ የቀረበው የጨረታ ዋጋ ከምህንድስና ግምት ዋጋ ጋር በአንጻራዊነት ሲታይ የቀረበው ዋጋ ከ20% (ሃያ በመቶ) ያነሰ ሲሆን እንደተሰበረ የጨረታ ዋጋ ይቆጠራል፡፡
4. በዚህ አንቀጽ ንዑስ አንቀጽ 3 መሠረት ለማወዳደሪያነት የሚውለው የምህንድስና ግምታዊ ዋጋ በግዥ ፈፃሚ የመንግስት መ/ቤቱ የተዘጋጀ እና ለግንባታው ግብዓት የሚሆኑ ሁሉም ዕቃዎች እና አገልግሎቶች በኢትዮጵያ ስታትስቲክስ አገልግሎት በሚገኘው የዋጋ መረጃ፣ የስታትስቲክስ አገልግሎት የዋጋ መረጃ እንደሌለ ማረጋገጫ በሚሰጥበት ጊዜ እንደሁኔታው ከታወቀ አምራች፣ ይህም ካልሆነ ከመሥሪያ ቤቶች በሚቀርብለት ጥያቄ መነሻ ባለስልጣኑ በሚሰጠው ትዕዛዝ መሰረት በማዕከል በሚከናወን የገበያ ዋጋ ጥናት መሰረት የተዘጋጀ እና ቢያንስ በሦስት ወራት ውስጥ ወቅታዊ የተደረገ መሆን አለበት፡፡
5. በዚህ አንቀጽ ንዑስ አንቀጽ 1፣ 2 እና 3 መሰረት ከተጫራቹ የቀረበው ዋጋ የተጋነነ ሆኖ ሲገኝ የመንግሥት መ/ቤቱ በአዋጁ አንቀጽ 26 (1(መ)) መሰረት ውል ከመፈረሙ በፊት ጨረታውን ወይም የመጫረቻ ሰነድን በማናቸውም ጊዜ ሙሉ በሙሉ ወይም በከፊል ውድቅ ማድረግ አለበት፡፡
6. የመንግስት መ/ቤቱ በዚህ መመሪያ እና በመደበኛ የጨረታ ሰነዱ ላይ በተቀመጠው መሠረት ተጨማሪ ምርመራ ሳያከናውን የቀረበው የጨረታ ዋጋ የተሰበረ በመሆኑ ምክንያት ብቻ ተጫራቹን ከውድድሩ ውጭ ማድረግ የለበትም፡፡
7. የመንግስት መ/ቤቱ በቀረበው የጨረታ ዋጋ ላይ ተጨማሪ ምርመራ ለማድረግ እንዲያስችለው የተሰበረ የጨረታ ዋጋ ያቀረበው ተጫራች ዝርዝር ማብራሪያ እና ተያያዥ ሰነዶች እንዲያቀርብ መጠየቅ አለበት፡፡
8. በዚህ አንቀጽ ንዑስ አንቀጽ 3 መሰረት መ/ቤቱ የሚጠይቀው ማብራሪያ ሌሎች በመደበኛ የጨረታ ሰነዱ ከሚገለጹት ነጥቦች በተጨማሪ የሚከተሉትን ሁኔታዎች ሊያካትት ይችላል፡፡
ሀ/ተጫራቹ ባቀረበው ዋጋ ጥራቱንና የመ/ቤቱን ፍላጎት በሚያሟላ መልኩ ለማመጠናቀቅ የሚያስችለው
ለ/ሥራውን ማከናወን ወይም አቅርቦቱን መፈጸም የሚያስችለው የተለየ ዘዴ ያለው ስለመሆኑ፣
ሐ/ሥራውን ወይም አቅርቦቱን በዚህ ዋጋ ለመስራት ወይም ለመፈጸም የሚያስችለው የተለየ ምቹ ሁኔታ ወይም ሙያዊ መፍትሔዎች ያለው ስለመሆኑ፣እንዲሁም
መ/ ተጫራቹ ከዚህ ቀደም ባለፉት ሁለት ዓመታት ውስጥ የገባቸውን ውሎች እና አፈጻጸም የሚያሳይ መግለጫ እና ሰነዶች፣
9) በአዋጁ፣ በዚህ መመሪያ እና በመደበኛ የጨረታ ሰነዱ ድንጋጌዎች መሰረት መ/ቤቱ በዚህ ረገድ የሚወስዳቸው
ውሳኔዎች እንደተጠበቁ ሆኖ መንግስት መ/ቤቱ ከተጫራቹ ማብራሪያ ከደረሰው ቀን ጀምሮ በ10 የሥራ
ቀናት ጊዜ ውስጥ ከተጫራቹ የቀረበውን ሀሳብ ተቀባይነት ስለማግኘቱ ወይም ስላለማግኘቱ ውሳኔውን
ለተጫራቹ ማሳወቅ አለበት፡፡
10) በዚህ አንቀጽ ንዑስ አንቀጽ 9 መሰረት ከተጫራቹ የቀረበውን ኃሳብ የማይቀበለው ከሆነ የመንግሥት መ/ቤቱ በአዋጁ አንቀጽ 26 (1(መ)) መሰረት ውል ከመፈረሙ በፊት ጨረታውን ወይም የመጫረቻ ሰነድን በማናቸውም ጊዜ ሙሉ በሙሉ ወይም በከፊል ውድቅ ማድረግ አለበት፡፡
@etconp
❤19👍7
👉የግንባታ ባለአሻራው አረፉ
💫ከ 1950 ዎቹ ጀምሮ በኢትዮጵያ የኮንስትራክሽን ዘርፍ ፈር ቀዳጅ በነበሩት አልቤርቶ ቫርኔሮ ማረፋቸው ተሰማ።
ጠቅላይ ሚንስትር ዐቢይ አህመድ (ዶ/ር) ህልፈታቸውን አስመልክቶ፦ "ሥራቸው የሀገራችንን የግንባታ ከባቢ እና ታሪካዊነት ያላቸው ምልክቶችን ላቅ ባለ ደረጃ የቀረፀ ነው፤ የተሰማኝን ሀዘን ለመግለጽ እፈልጋለሁ" ብለዋል።
ጨምረውም፦ የሥራ ውርሳቸው በነዚህ ብሔራዊ ምልክቶች እና በሚወክሉት የእድገት ትእምርት ሲታወስ ይኖራል። ለነፍሳቸው ረፍትን፣ በረፍታቸው ላዘኑ ሁሉ መጽናናትን እንመኛለን ሲሉ ገልጸዋል።
@etconp
💫ከ 1950 ዎቹ ጀምሮ በኢትዮጵያ የኮንስትራክሽን ዘርፍ ፈር ቀዳጅ በነበሩት አልቤርቶ ቫርኔሮ ማረፋቸው ተሰማ።
ከታሪካዊ ሥራዎቻቸው መካከል የአፍሪካ አዳራሽ (የተባበሩት መንግሥታት የአፍሪካ የኢኮኖሚ ኮሚሽን)፣ የአዲስ አበባ ማዘጋጃ ቤት፣ የኢትዮጵያ ንግድ ባንክ ዋና መሥሪያ ቤት፣ ሂልተን ሆቴል፣ ሚሊኒየም አዳራሽ፣ የጅማ አባጅፋር አውሮፕላን ማረፊያ ማሻሻያ፣ የአብርሆት ቤተመጻሕፍት፣ የአንድነት ፓርክ እና የብሔራዊ ቤተመንግሥት እድሳት ሥራ ይገኙበታል።
ጠቅላይ ሚንስትር ዐቢይ አህመድ (ዶ/ር) ህልፈታቸውን አስመልክቶ፦ "ሥራቸው የሀገራችንን የግንባታ ከባቢ እና ታሪካዊነት ያላቸው ምልክቶችን ላቅ ባለ ደረጃ የቀረፀ ነው፤ የተሰማኝን ሀዘን ለመግለጽ እፈልጋለሁ" ብለዋል።
ጨምረውም፦ የሥራ ውርሳቸው በነዚህ ብሔራዊ ምልክቶች እና በሚወክሉት የእድገት ትእምርት ሲታወስ ይኖራል። ለነፍሳቸው ረፍትን፣ በረፍታቸው ላዘኑ ሁሉ መጽናናትን እንመኛለን ሲሉ ገልጸዋል።
@etconp
😭10❤7👍2
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
❤2👍2🔥1
#ADVERTISEMENT
🏭🏠TSEGAYE and YOHANNES J-ቦልት & PLATE 🏚🏗 🌁🌆
🧿 OUR SERVICES ⤵️
🔲Plate
⚙️ J-Bolt
⚓Anchor Bolt
➽Tie Rod
🏭🛖🌉scrap🚧🪝🔗
Phone : 🤳0938494506
🤳 0951087077
🤳 0929044037
እናመሰግናለን::
👉አድራሻ፦ መርካቶ ምንአለሽ ተራ ከጭድ ተራ ከፍ ብሎ
https://t.me/tsegaye2016Jbolt
🏭🏠TSEGAYE and YOHANNES J-ቦልት & PLATE 🏚🏗 🌁🌆
🧿 OUR SERVICES ⤵️
🔲Plate
⚙️ J-Bolt
⚓Anchor Bolt
➽Tie Rod
🏭🛖🌉scrap🚧🪝🔗
Phone : 🤳0938494506
🤳 0951087077
🤳 0929044037
እናመሰግናለን::
👉አድራሻ፦ መርካቶ ምንአለሽ ተራ ከጭድ ተራ ከፍ ብሎ
https://t.me/tsegaye2016Jbolt
❤3🔥1
👉Sustainable construction
💫Sustainable construction prioritizes building practices that minimize environmental impact and maximize social and economic benefits throughout a building's lifecycle.
🚧This involves using environmentally responsible materials, improving energy efficiency, reducing waste, and promoting human health and well-being within the building.
📜Key aspects of sustainable construction include👇
🌵 Material Selection:
⏺Choosing sustainable materials like recycled, renewable, or low-carbon materials. This can include recycled steel, timber from sustainably managed forests, or locally sourced materials to reduce transportation emissions.
🌵 Energy Efficiency:
⏺Designing buildings that are energy-efficient through techniques like passive solar design, high-performance insulation, and efficient HVAC systems.
🌵 Waste Reduction:
Minimizing waste during construction through practices like waste sorting, material reuse, and deconstruction for future use.
🌵 Water Conservation:
⏺Implementing water-efficient fixtures, rainwater harvesting systems, and greywater recycling.
🌵 Indoor Environmental Quality:
⏺Ensuring good indoor air quality through the use of low-VOC paints and adhesives, proper ventilation, and natural light.
🌵 Circular Economy Principles:
⏺Adopting strategies that promote the reuse, repurposing, and recycling of materials and components.
🌵 Social and Economic Considerations:
⏺Ensuring fair labor practices, supporting local businesses, and creating affordable and accessible housing.
🌟Benefits of Sustainable Construction:
🌵 Reduced Environmental Impact: Minimizing the use of resources, reducing carbon emissions, and preserving ecosystems.
🌵 Lower Operating Costs: Energy-efficient buildings and water-saving fixtures can lead to lower energy and water bills.
🌵 Improved Indoor Environment: Healthier and more comfortable spaces for occupants.
🌵 Increased Building Durability: Sustainable materials and construction methods can lead to longer-lasting buildings.
🌵 Enhanced Social and Economic Benefits: Supporting local communities and creating jobs.
📍 In conclusion, sustainable construction is a holistic approach that considers the entire life cycle of a building, from design and construction to operation and eventual deconstruction, with the goal of minimizing environmental impact and maximizing social and economic benefits.
@etconp
💫Sustainable construction prioritizes building practices that minimize environmental impact and maximize social and economic benefits throughout a building's lifecycle.
🚧This involves using environmentally responsible materials, improving energy efficiency, reducing waste, and promoting human health and well-being within the building.
📜Key aspects of sustainable construction include👇
🌵 Material Selection:
⏺Choosing sustainable materials like recycled, renewable, or low-carbon materials. This can include recycled steel, timber from sustainably managed forests, or locally sourced materials to reduce transportation emissions.
🌵 Energy Efficiency:
⏺Designing buildings that are energy-efficient through techniques like passive solar design, high-performance insulation, and efficient HVAC systems.
🌵 Waste Reduction:
Minimizing waste during construction through practices like waste sorting, material reuse, and deconstruction for future use.
🌵 Water Conservation:
⏺Implementing water-efficient fixtures, rainwater harvesting systems, and greywater recycling.
🌵 Indoor Environmental Quality:
⏺Ensuring good indoor air quality through the use of low-VOC paints and adhesives, proper ventilation, and natural light.
🌵 Circular Economy Principles:
⏺Adopting strategies that promote the reuse, repurposing, and recycling of materials and components.
🌵 Social and Economic Considerations:
⏺Ensuring fair labor practices, supporting local businesses, and creating affordable and accessible housing.
🌟Benefits of Sustainable Construction:
🌵 Reduced Environmental Impact: Minimizing the use of resources, reducing carbon emissions, and preserving ecosystems.
🌵 Lower Operating Costs: Energy-efficient buildings and water-saving fixtures can lead to lower energy and water bills.
🌵 Improved Indoor Environment: Healthier and more comfortable spaces for occupants.
🌵 Increased Building Durability: Sustainable materials and construction methods can lead to longer-lasting buildings.
🌵 Enhanced Social and Economic Benefits: Supporting local communities and creating jobs.
📍 In conclusion, sustainable construction is a holistic approach that considers the entire life cycle of a building, from design and construction to operation and eventual deconstruction, with the goal of minimizing environmental impact and maximizing social and economic benefits.
@etconp
❤10🔥1
👉RANKINE’S THEORY
⏺Rankine (1857) developed his theory of lateral earth pressure when the backfill consists of dry, cohesionless soil.
⏺The theory was later extended by Resal (1910) and Bell (1915) to be applicable to cohesive soils.
📜The following are the important assumptions in Rankine’s theory:
💫(i) The soil mass is semi infinite, homogeneous, dry and cohesionless.
💫(ii) The ground surface is a plane which may be horizontal or inclined.
💫(iii) The face of the wall in contact with the backfill is vertical and smooth. In other words, the friction between the wall and the backfill is neglected (This amounts to ignoring the presence of the wall).
💫(iv) The wall yields about the base sufficiently for the active pressure conditions to develop; if it is the passive case that is under consideration, the wall is taken to be pushed sufficiently towards the fill for the passive resistance to be fully mobilised. (Alternatively, it is taken that the soil mass is stretched or gets compressed adequately for attaining these states, respectively.
⏺Friction between the wall and fill is supposed to reduce the active earth pressure on the wall and increase the passive resistance of the soil. Similar is the effect of cohesion of the fill soil).
⏺Thus it is seen that, by neglecting wall friction as also cohesion of the backfill, the geotechnical engineer errs on the safe side in the computation of both the active pressure and passive resistance.
⏺Also, the fill is usually of cohesionless soil, wherever possible, from the point of view of providing proper drainage.
@etconp
⏺Rankine (1857) developed his theory of lateral earth pressure when the backfill consists of dry, cohesionless soil.
⏺The theory was later extended by Resal (1910) and Bell (1915) to be applicable to cohesive soils.
📜The following are the important assumptions in Rankine’s theory:
💫(i) The soil mass is semi infinite, homogeneous, dry and cohesionless.
💫(ii) The ground surface is a plane which may be horizontal or inclined.
💫(iii) The face of the wall in contact with the backfill is vertical and smooth. In other words, the friction between the wall and the backfill is neglected (This amounts to ignoring the presence of the wall).
💫(iv) The wall yields about the base sufficiently for the active pressure conditions to develop; if it is the passive case that is under consideration, the wall is taken to be pushed sufficiently towards the fill for the passive resistance to be fully mobilised. (Alternatively, it is taken that the soil mass is stretched or gets compressed adequately for attaining these states, respectively.
⏺Friction between the wall and fill is supposed to reduce the active earth pressure on the wall and increase the passive resistance of the soil. Similar is the effect of cohesion of the fill soil).
⏺Thus it is seen that, by neglecting wall friction as also cohesion of the backfill, the geotechnical engineer errs on the safe side in the computation of both the active pressure and passive resistance.
⏺Also, the fill is usually of cohesionless soil, wherever possible, from the point of view of providing proper drainage.
@etconp
❤15👏1
👉The initial setting of cement is primarily caused by the rapid hydration of tricalcium aluminate (C3A) when it comes into contact with water.
💫This reaction leads to the formation of a gel-like substance that begins to solidify the cement paste.
📜Here's a more detailed explanation:
⏺Tricalcium Aluminate (C3A):
This compound is the most reactive component in cement with water, and its rapid hydration is responsible for the initial setting.
⏺Hydration:When cement is mixed with water, the water molecules react with the cement compounds, a process called hydration. This reaction releases heat (heat of hydration).
⏺Gel Formation: As C3A hydrates, it forms a gel-like structure, primarily calcium aluminate hydrate. This gel starts to bind the cement particles together, leading to the initial stiffening of the cement paste.
⏺Other Compounds: While C3A is the main driver of initial setting, other compounds like tricalcium silicate (C3S) and dicalcium silicate (C2S) also contribute to the setting process, but their reactions are slower and contribute more to the later strength development.
@etconp
💫This reaction leads to the formation of a gel-like substance that begins to solidify the cement paste.
📜Here's a more detailed explanation:
⏺Tricalcium Aluminate (C3A):
This compound is the most reactive component in cement with water, and its rapid hydration is responsible for the initial setting.
⏺Hydration:When cement is mixed with water, the water molecules react with the cement compounds, a process called hydration. This reaction releases heat (heat of hydration).
⏺Gel Formation: As C3A hydrates, it forms a gel-like structure, primarily calcium aluminate hydrate. This gel starts to bind the cement particles together, leading to the initial stiffening of the cement paste.
⏺Other Compounds: While C3A is the main driver of initial setting, other compounds like tricalcium silicate (C3S) and dicalcium silicate (C2S) also contribute to the setting process, but their reactions are slower and contribute more to the later strength development.
@etconp
👏10❤3👍2
👉6 ሠራተኞች ከአራተኛ ፎቅ ወድቀው ሕይወታቸው አለፈ😭
💫በዛሬው ዕለት ከረፋዱ 4 ሰዓት አካባቢ ሲ.ኤም.ሲ ሚካኤል አካባቢ እየተገነባ በሚገኘው አያት ሪል እስቴት ላይ በግንባታ ሥራ ላይ የነበሩ ሁለት ሠራተኞች፤ ከአራተኛ ፎቅ ወድቀው ሕይወት ማለፋን አሐዱ ከቦታው ተገኝቶ ማረጋገጥ ችሏል።
አደጋው የደረሰው በልስን ሥራ ላይ ተሠማርተው በነበሩ ሠራተኞች ላይ ሲሆን፤ ሁለት ሠራተኞች ከሕንጻው 4ተኛ ፎቅ ላይ ሆነው የልስን ሥራ በማከናወን ላይ ሳሉ የቆሙበት ሊፍት (ዊንች) ካቦው በመበጠሱ አደጋው ደርሷል።
በወቅቱም ከሕንጻው ስር በመጎዝ ላይ የነበረ አንድ ሠራተኛ ዊንቹ ወድቆበት ወዲያውኑ ሕይወቱ ያለፈ ሲሆን፤ ከወደቁት ሁለት ሠራተኞች ውስጥ አንዱ ሠራተኛም በተመሳሳይ ወዲያው ሕይወቱ አልፏል።
የልስን ሥራ ሲሰራ የነበረው አንዱ ሠራተኛ ደግሞ፤ ከባድ ጉዳት ደርሶበት ለሕክምና እርዳታ ወደ ሆስፒታል ተወስዷል።
በትናትናው ዕለትም 4 የቀን ሥራ ሠራተኞች በተመሳሳይ ሁኔታ ከሪል እስቴቱ ሕንጻ ላይ ወድቀው ሁለት ሠራተኞች ሕይወታቸው ያለፈ ሲሆን፤ በሁለቱ ሠራተኞች ላይ ደግሞ ከባድ ጉዳት መድረሱን የሪል እስቴቱ የግንባታ ሠራተኞች ገልጸዋል።
እንዲሁም ከትናንት በስተያ ሐሙስ ሰኔ 12 ቀን 2017 ዓ.ም አምስት የግንባታ ሠራተኞች ከሕንጻው ላይ መውደቃቸው የተገለጸ ሲሆን፤ የሁለቱ ሠራተኞች ሕይወት ሲያልፍ በሦስቱ ሠራተኞች ላይ ከባድ ጉዳት ደርሷል ተብሏል።
በሕንጻው ግንባታ ላይ የተሰማሩ ሠራተኞች በተደጋጋሚ ተመሳሳይ አደጋ እየደረሰባቸው እንደሚገኝ የገለጹ ሲሆን፤ በሳምንት አንድ ወይ ሁለት ሠራተኞች አደጋ እንደሚደርስባቸው ተናግረዋል።
ሠራተኞቹ አክለውም፤ ሪል እስቴቱ በሠራተኞች ደህንነት ላይ ትኩረት ሰጥቶ ሊሰራ እንደሚገባ አሳስበዋል።
#FirstSafety
@etconp
💫በዛሬው ዕለት ከረፋዱ 4 ሰዓት አካባቢ ሲ.ኤም.ሲ ሚካኤል አካባቢ እየተገነባ በሚገኘው አያት ሪል እስቴት ላይ በግንባታ ሥራ ላይ የነበሩ ሁለት ሠራተኞች፤ ከአራተኛ ፎቅ ወድቀው ሕይወት ማለፋን አሐዱ ከቦታው ተገኝቶ ማረጋገጥ ችሏል።
አደጋው የደረሰው በልስን ሥራ ላይ ተሠማርተው በነበሩ ሠራተኞች ላይ ሲሆን፤ ሁለት ሠራተኞች ከሕንጻው 4ተኛ ፎቅ ላይ ሆነው የልስን ሥራ በማከናወን ላይ ሳሉ የቆሙበት ሊፍት (ዊንች) ካቦው በመበጠሱ አደጋው ደርሷል።
በወቅቱም ከሕንጻው ስር በመጎዝ ላይ የነበረ አንድ ሠራተኛ ዊንቹ ወድቆበት ወዲያውኑ ሕይወቱ ያለፈ ሲሆን፤ ከወደቁት ሁለት ሠራተኞች ውስጥ አንዱ ሠራተኛም በተመሳሳይ ወዲያው ሕይወቱ አልፏል።
የልስን ሥራ ሲሰራ የነበረው አንዱ ሠራተኛ ደግሞ፤ ከባድ ጉዳት ደርሶበት ለሕክምና እርዳታ ወደ ሆስፒታል ተወስዷል።
በትናትናው ዕለትም 4 የቀን ሥራ ሠራተኞች በተመሳሳይ ሁኔታ ከሪል እስቴቱ ሕንጻ ላይ ወድቀው ሁለት ሠራተኞች ሕይወታቸው ያለፈ ሲሆን፤ በሁለቱ ሠራተኞች ላይ ደግሞ ከባድ ጉዳት መድረሱን የሪል እስቴቱ የግንባታ ሠራተኞች ገልጸዋል።
እንዲሁም ከትናንት በስተያ ሐሙስ ሰኔ 12 ቀን 2017 ዓ.ም አምስት የግንባታ ሠራተኞች ከሕንጻው ላይ መውደቃቸው የተገለጸ ሲሆን፤ የሁለቱ ሠራተኞች ሕይወት ሲያልፍ በሦስቱ ሠራተኞች ላይ ከባድ ጉዳት ደርሷል ተብሏል።
በሕንጻው ግንባታ ላይ የተሰማሩ ሠራተኞች በተደጋጋሚ ተመሳሳይ አደጋ እየደረሰባቸው እንደሚገኝ የገለጹ ሲሆን፤ በሳምንት አንድ ወይ ሁለት ሠራተኞች አደጋ እንደሚደርስባቸው ተናግረዋል።
ሠራተኞቹ አክለውም፤ ሪል እስቴቱ በሠራተኞች ደህንነት ላይ ትኩረት ሰጥቶ ሊሰራ እንደሚገባ አሳስበዋል።